|
---|
Category:Letter
MONTHYEARML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09
[Table view] Category:Report
MONTHYEARML22013A7062022-01-13013 January 2022 Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G ML21056A0782021-04-0707 April 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Indian Point ISFSI (Docket: 72-51) NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML20259A2172020-09-14014 September 2020 Commitment Change Summary Report ML20260H0722020-06-18018 June 2020 IP-RPT-14-00013, Revision 3, Indian Point Nuclear Generating Units 2 and 3, Consequences of a Postulated Fire and Explosion Following the Release of Natural Gas from the New Aim 42 Pipeline Near Ipec ML20122A1052020-05-27027 May 2020 Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power Pl ML20100F6352020-04-0808 April 2020 Expert Team Final Report NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML19252A3182019-09-0909 September 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of Sept 2, 2019 NL-19-061, Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2019-06-13013 June 2019 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements ML19114A0742019-04-22022 April 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of April 15, 2019 NL-19-012, Request for Approval of a Certified Fuel Handler Training and Retraining Program2019-04-15015 April 2019 Request for Approval of a Certified Fuel Handler Training and Retraining Program ML18098A0882018-04-0606 April 2018 Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-18-021, Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability2018-04-0606 April 2018 Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-20-066, Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center2017-12-19019 December 2017 Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center ML17349A1562017-12-0808 December 2017 Risk Impact of One-Time Extending the ILRT Interval Associated with the Proposed Technical Specification Changes ML17279A2472017-10-0606 October 2017 2017 Annual Assessment Meeting Written Comments Compilation ML17222A2392017-10-0404 October 2017 NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard Reevaluations ML17289A6552017-10-0202 October 2017 Attachment 6 to NL-17-115, Revised HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Energy Center, Revision 9 NL-17-122, Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,20172017-09-28028 September 2017 Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,2017 ML17096A2122017-03-23023 March 2017 Entergy Engineering Report No. IP-RPT-16-00078, Indian Point RAI CLI-16-07 SAMA Cost-Benefit Sensitivities Rev. 1 (March 23, 2017) NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan ML17096A2112017-01-0404 January 2017 Entergy Engineering Report No. IP-RPT-16-00077, Indian Point RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan 4, 2017) ML16280A2282016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual NL-16-109, Indian Point 2 Technical Requirements Manual2016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual NL-16-109, HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center.2016-09-19019 September 2016 HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center. ML16250A2762016-09-13013 September 2016 Evaluation of Impacts to Proposed Critical Habitat for the Atlantic Sturgeon for Indian Point Nuclear Generating Units 2 and 3 Proposed License Renewal NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 32016-08-0101 August 2016 Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3 ML18115A0592016-06-28028 June 2016 After Action Report/Improvement Plan, Drill Date June 28, 2016 ML17052A2662015-10-0202 October 2015 Sturgeon Mobile Tracking for the New Ny Bridge at Tappan Zee NL-15-128, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update2015-09-28028 September 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 NL-15-099, Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2015-07-30030 July 2015 Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-15-072, 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2015-06-18018 June 2015 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements NL-15-030, Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project2015-04-0808 April 2015 Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project NL-15-029, Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 20152015-04-0606 April 2015 Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 2015 ML15062A2002015-02-19019 February 2015 NET-300067-01, Revision 1, Criticality Safety Analysis of the Indian Point, Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels. (Non-Proprietary) NL-15-013, Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval2015-01-28028 January 2015 Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval ML15061A2772014-12-31031 December 2014 WCAP-17954-NP, Revision 0, Indian Point Unit 3 Heatup and Cooldown Limit Curves for Normal Operation. NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...2014-12-22022 December 2014 Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... ML14329A1952014-11-0404 November 2014 NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels NL-14-115, 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 20142014-09-18018 September 2014 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 2014 ML14304A7012014-09-16016 September 2014 Reliability Needs Assessment ML15166A0702014-08-31031 August 2014 Algonquin Incremental Market (Aim) Project, Phase 2 Acoustic Survey for Indiana Bats (Myotis Sodalis) and Northern Long-Eared Bats (Myotis Septentrionalis), August 2014 NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 ML14168A0592014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 1 of 5 ML14168A0602014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 ML14168A0612014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 2022-01-13
[Table view] Category:Miscellaneous
MONTHYEARML22013A7062022-01-13013 January 2022 Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G ML20260H0722020-06-18018 June 2020 IP-RPT-14-00013, Revision 3, Indian Point Nuclear Generating Units 2 and 3, Consequences of a Postulated Fire and Explosion Following the Release of Natural Gas from the New Aim 42 Pipeline Near Ipec ML20122A1052020-05-27027 May 2020 Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power Pl NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML19252A3182019-09-0909 September 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of Sept 2, 2019 NL-19-061, Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2019-06-13013 June 2019 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements ML19114A0742019-04-22022 April 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of April 15, 2019 NL-19-012, Request for Approval of a Certified Fuel Handler Training and Retraining Program2019-04-15015 April 2019 Request for Approval of a Certified Fuel Handler Training and Retraining Program ML17279A2472017-10-0606 October 2017 2017 Annual Assessment Meeting Written Comments Compilation ML17222A2392017-10-0404 October 2017 NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard Reevaluations NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 32016-08-0101 August 2016 Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3 NL-15-128, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update2015-09-28028 September 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 NL-15-099, Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2015-07-30030 July 2015 Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-15-072, 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2015-06-18018 June 2015 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements NL-15-030, Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project2015-04-0808 April 2015 Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project NL-15-013, Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval2015-01-28028 January 2015 Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...2014-12-22022 December 2014 Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... ML14329A1952014-11-0404 November 2014 NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels NL-14-115, 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 20142014-09-18018 September 2014 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 2014 ML15166A0702014-08-31031 August 2014 Algonquin Incremental Market (Aim) Project, Phase 2 Acoustic Survey for Indiana Bats (Myotis Sodalis) and Northern Long-Eared Bats (Myotis Septentrionalis), August 2014 NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14141A5402014-05-0909 May 2014 Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14071A1832014-04-0101 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-042, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi. NL-14-043, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. ML14071A1982014-03-20020 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14015A4172014-01-30030 January 2014 Staff Summary of the Steam Generator Tube Inservice Inspections for the Spring 2013 Refueling Outage ML14304A7512013-12-13013 December 2013 Unit 3 Coastal Zone Management Act Consistency Certification, Vol. II of III, Supplemental Information Regarding NYSDEC Record, Part 8 of 9 NL-13-133, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2013-10-0202 October 2013 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time ML13221A4172013-07-26026 July 2013 LTR-13-0662 - Susan Lerner, Common Cause New York Ltr Provides a Copy of Generating Influence, Entergy'S Political Spending and the Battle Over the Indian Point Nuclear Power Plant. ML14304A7522012-12-31031 December 2012 Unit 3 Coastal Zone Management Act Consistency Certification, Vol. II of III, Supplemental Information Regarding NYSDEC Record, Part 9 of 9 ML12346A3432012-11-20020 November 2012 Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through End ML12346A3422012-11-20020 November 2012 Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 434 NL-12-167, Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 4342012-11-20020 November 2012 Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Cover Through Page C-288 of 434 NL-12-167, Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through End2012-11-20020 November 2012 Indian Point, Unit 2, Enclosure to NL-12-167 Seismic Walkdown Report - Page D-69 of 203 Through End NL-12-136, 10 CFR 72.48(d)(2) Report, Listing and Summary of Changes, Tests and Experiments2012-10-0101 October 2012 10 CFR 72.48(d)(2) Report, Listing and Summary of Changes, Tests and Experiments NL-14-002, Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies2012-09-20020 September 2012 Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies NL-12-009, Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 52012-01-11011 January 2012 Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 5 ML12040A3102012-01-11011 January 2012 Enclosure 1 to NL-12-009, Holtec International Licensing Report HI-2094289, Revision 5 ML11280A1212011-09-28028 September 2011 License Renewal Application - Completion of Commitment #30 Re Reactor Vessel Internals Inspection Plan NL-11-094, Request for Relief Request 14 - Code Case N-770-1 Weld Inspection Frequency Extension2011-08-0303 August 2011 Request for Relief Request 14 - Code Case N-770-1 Weld Inspection Frequency Extension NL-10-109, CFR 50.59(d) Report Listing and Summary Report of the Changes, Tests and Experiments Implemented Between 04/20/2008 and 04/12/20102010-10-12012 October 2010 CFR 50.59(d) Report Listing and Summary Report of the Changes, Tests and Experiments Implemented Between 04/20/2008 and 04/12/2010 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML11299A1752010-02-0808 February 2010 Lr Hearing - Indian Point Task I Report - Deliverable (Redacted Version) ML0936410942009-12-30030 December 2009 Preliminary Power Authority of the State of New York, Indian Point No. 3, Nuclear Power Plant, Systems Interaction Study. Volume II ML0926401772009-08-28028 August 2009 Environmental Science and Engineering NL-09-095, Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes2009-07-21021 July 2009 Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes ML0905407042009-01-0909 January 2009 American Radiation Services, Inc. Laboratory Analysis Report No. ARS1-08-02367, Revised 01/09/2009 2022-01-13
[Table view] |
Text
2609 North River Road, Port Allen, Louisiana 70767 (800) 401-4277 -- FAX (225) 381-2996 INTERNATIONAL American Radiation Services, Inc.
Laboratory Analysis Report ARSI-08-02367 Preparedfor:
Nuclear Regulatory Commission (NRC)
James Noggle USNRC Region 1 475 Allendale Road King of Prussia, PA 19406 James.Noggle@nrc.gov Phone: 610.337.5063 Revised 1/9/09 MaazcOJ (TiA,Pf,,J Review SProt!"4-' nager Review Notes: American Radialion Services, Inc. assumes no liability for the use or interpretation of any analyfical results provided other than the cost of the analysis itself.
Reproduction of this report in less than full requires the written consent of the client.
Contact Person: Questions regarding this analytical report should be addressed to:
Project Manager Project Managers@amrad.com Phone: 225.381.2991 Fax: 225.381.2996
.LELAP Celt# 30658 NELAP Cert* E87558
M U U U " 2609 North River Road . Port Allen, .Louisiana 70767
.... NTA 1 (800) 401-4277
- Fax (225) 381-2996 INTERNATIONAL January 9, 2009 Nuclear Regulatory Commission James Noggle 475 Allendale Road.
King of Prussia, PA 19406 Client Sample: LAF-002-(010)
ARS SGD: ARSI-08-02367
Dear Mr. Noggle,
On November 19, 2008, American Radiation Services (ARS) received 1 Ground Water Sample to be analyzed for Gamma Spectroscopy, Tritium, Strontium-90, and Nickel-63. This sample was reanalyzed for Ni-63 to verify the positive value per client's request.
The sample was processed and counted using the appropriate counting equipment and QA/QC for this type of analysis. Results of the analysis and QA/QC are attached in the data package.
The sample and QAIQC's were counted with a count time sufficient to meet a statistical sound detection limits.
Counting equipment Quality Assurance was with in acceptance criteria when the above referenced samples were processed.
If you have any questions please do not hesitate to call at 225-381-2991.:
Sincerely, Quality Assurance Officer
4RSR 3INTERNATIONAL 2609 North River Road & PortAllen, Louisiana 70767 1 (800)401-4277
- Fax (225)381-2996 COVER PAGE Statement 'of Work for Analytical Laboratories PROJECT SAMPLE IDENTIFICATION CROSS-REFERENCE TO ARS SAMPLE LABORATORY IDs CLIENT SAMPLE American Radiation Services SAMPLE ID NUMBER(S)
LAF-002-(010) ARSI-08-02367-001 SAMPLE RECEIPT The samples were received in good condition. The samples were screened for radioactive contamination as per procedure ARS-062 "Sample Receiving".
ANALYTICAL METHODS The Gamma Spectroscopy determinations were performed using American Radiation Services procedure ARS-006/EPA 901.1, "Gamma Emitting Radionuclides in Water." The tritium analyses were performed using American Radiation Services procedure ARS-054, "Tritium In Water". ". The Strontium-90 analyses were performed using American Radiation Services procedure ARS-032, "Total Strontium by Eichrom Resin Seperation." The Nickel-63 analyses were performed using American Radiation Services procedure ARS-022.
ANALYTICAL RESULTS The result data that are flagged with "U" indicates that the activity is below the MDC, With regards to Nickel-63 analysis, the highlevel LCS standard (S-0 178) was accidentally used for the LCS/LCSD.
Due to the LCS/LCSD sample counts being higher than the yield spike counts, the activity for the LCS/LCSD could not be calculated. Due to each sample having its own yield spike, data is being released as valid per technical review.
After reanalyzing the sample, the activity was below the MDA; therefore, the original results werea false positive.
2609 North River Road
( N U
- LU W 1 (800)401-4277 9 Fax (225)381-2996
- . _ .... INTERNATIONAL American Radiation Services Project Manager/Laboratory Manager'sComments:
"I certify that this sample data package is in compliance with SOW requirements, both technically and for completeness, other than the conditions detailed above. Release of the data contained in this s*ample data package and the computer-readable EDD, as applicable, submitted on diskette or by modem, has been authorized by the Laboratory Manager or the Manager's designee,. as verified by the following signature."
VI certify that this electronic image, and all hardcopiesproduced from this image, accurately represents the data and is in compliance with the client specific requirements, both technically andfor completeness, other than the conditions detailed above or in the sample datapackage narrative.Release, by submission through email, the data*
containedin this electronic image and the computer-readableEDD (as applicable), has been authorizedby the laboratoryManager/TechnicalDirector or the Manager'sdesignee."'
Quality Assurance Officer, American Radiation Services SigntrO' Title Date
siRS - INTERNATIONAL
- % ,, 2609.orthRive Road, 1 (800) 401-4277 Por427 FAll(,225)
FAX (225) 381-2996 sn 70729 67 ARS Sample Delivery Group: ARS1-08-02367 Request or PO Number: N/A Client Sample ID: LAF-002-(010) ARS Sample ID: ARS1108-02367-001 Sample Collection Date: 10/17/08 10:32 Date Received: 11/19/2008 Sample Matrix: Aqueous Report Date: .12/15/08 16:24 Descrlptioui A-*--;
-- Analysis ..........-
.......... t .. ..
A.t.,.T i
dnor / d Amill
. .... N .....
DLC QuaAnalysis l.nls isC
=.----
lest Method
. Analysis DateTiFe
-L .....
0 I.
Analysisr
_____c Techn-1ian 1Coery 1 e *
-MN-54 0.092 0.88B .7 .3 pCi/L ARS 006/EPA 901.1 111/24/08 16:46 1 LA N/A FE-59 2.127 2,455 .-
8260 . 4.130 U pCi/L ARS-006/EPA 901.1 11/24/08 16:46 ILA t N/A CO-58 . - 0.858 1 1.120 3.770 1.885 u pCi/L ARS-006/EPA 901.1 11/24/08 16:46 ILA N/A
.CO-. 1.256 1 339 4.520 2.260 U pCi/L I ARS-006/EPA 901.1 111/24/08 16:46 LA ZN-65 1.087 2.286 9.640 4.820 j U pCi/L ARS-006/EPA 901.1 11/24/08 16:46 1 )LA N/A NB-95 0.600 1 1.269 4.290 2.145 i pCi/L ARS-006/EPA 901.2 11/24/08 16:46 )LA N/A 2.145 U pCi/L ARS-IDAEP. 9/A ZR-95 1.124 i 1.852 6350 . 3.175 U PO/L ARS-006/EPA 901.1 11/24/08 1646 I
-131 0.192 3840
.1137 , 1.920 *U . pCi/L ARS-DO6/EPA 902.1 1/24/0816:48 JL l/A CS-134 3.142 2 1.199 4.510 2,255 U pCi/L ARS-006/EPA901.1 11/24/08 16:46 .. A
/LA
_ _ __ _ _ IA ., __ N/A CS-137 i 1.142 1.258 1 4.220 2.110 U pCl/L I ARS-OQ6/EPA 901.1 11/24/08 16:46 JLA BA-140 LA-140_--72
-1.254
-L.8- 18.742 1.,0 17.200 11 i.- 8.0___5_U 8.600 3.055 I- ___pCi/L pCL .
ARS-006/EPA 901.1 ARS-006/EPA 901.1 I 11/24/08 16:46 11/24/08 16:46 JLA
)LA I N/A N/A SR-90 0.413 0.311 - 0.316 0.147 U 1 pCi/L i ARS-032/Eichrom SRW-01 -12/10/08 13:30 B)S 107.67%
H-3 124.532 89 882 j 147.733 1 72.695 U pCi/L ARS-084/EPA 906.0 12/7/08 18:00 B.S N/A NI-62 ' i -3.6214 4 5757 i 7.7984 3.8363 U pCi/L i
___________ -1 NOThS: Ni-63 reanalyzed Projtt Manager R( o-)
Notes: American Radiation Services, Inc. assumes no liabilIty for the use or Interpretation of any analytical results provided other than the cost of the analysis Itself. Reproduction of this report In less than full requires th* written consent of the client.
LELAP Certificate# 30658 NELAP Certificate # E87558 K
A- 2609 North River Road
- Fax (225) 381-2996 70767 IN TERNATI1A Notes:
Comments:
1.0) Soil and Sludge analysis are reported on a wet basis or an as received basis unless otherwise indicated.
2.0) Data in this report are within the limits of uncertainty specified in the reference method unless otherwise specified.
3.0) Modified analysis procedures are procedures that are modified to meet the certain specifications. An example may be the use of a water method to analyze a solid matrix due to the lack of an officially recognized procedure for the analysis of the solid matrix.
Modified analyses are indicated by the subsequent addition of "m" to the procedure number (i.e. 900.OM),
4.0) Derived Air Concentrationsand Effluent Release Concentrations are obtained from 10 CFR 20 Appendix B.
5.0) Total activity is actually total gamma activity and is determined utilizing the prominent gamma emitters from the naturally occurring radioactive decay chains and.other prominent radioactive nuclides. Total activity may be lower than the actual total activity due to the extent of secular equilibrium achieved In the various decay chains at the time of analysis. The total activity is not representative of nuclides that emit solely alpha or beta particles.
6.0) Ra-228 is determined via secular equilibrium with its daughter. Actinium 228. (Gamma Spectroscopy only).
7.0) U-238 is determined via secular equilibrium with its daughter, Thorium 234. (Gamma Spectroscopy only).
8.0) All gamma spectroscopy was performed utilizing high purity germanium detectors (HPGe).
9.0) ARS makes every attempt to match sample density to calibrated density; however, in some cases, it is not practical or possible to do so and data results may be affected.
Method
References:
1.0) EPA 60014-80-032; Prescribed Procedures for the Measurements of Radioactivity in Drinking Water, August 1980.
2.0) Standard Methods' for Examination of Water and Waste Water, 1 8 1h, 1992.
3.0) EPA SWr846; Test Methods for Evaluating Solid Waste, Third Edition, (9186). (Updated through 1995).
4.0)' EPA 600/4f79-020: Methods for Chemical Analysis of Water and Waste, March 1983.
6.0) HASL 300 6.0) ARS-040; An LCSD is not reported with this process. The criteria for the.LCS/LCSD analysis for reproducibility have not been established for Low Level Tritium analysis. A prepared standard for Low Level Tritium has not been developed. As a result, the standard we use is based on the dilution of a verified conventional tritium standard. The volume required for. Low Level Tritium analysis, in addition to the lack of an available Low Level Tritium standard, introduce variability into the LCS/LCSD analysis that does not represent the actual sample analysis. The preferred measure for reproducibility is to run a duplicate analysis of a sample.
Definitions:
1.0) ND Not detected above the detection limit (non-detect).
2.0) MDC (Minimum Detectable Concentration) minimum concentration of the analyte that ARS can detect utilizing the specific analysis 3.0) MBL Method Blank 4.0) DO Duplicate Original 5.0) DUP Method Duplicate 6.0) MSIMSD Matrix Spike/Matrix Spike Duplicate 7.0) S Spike 8.0) RS Reference Spike 9.0) *SC 'Subcontracted out to another qualified laboratory 10.0) NR Not Referenced 11.0) N/A Not Applicable 12.0) Reported as a calculated value 13.0) False Positive due to interference from Bi-214 14.0) U Activity is below the MDC 15.0) LCS/LCSD Laboratory Control Standard/Laboratory Control Standard Duplicate Notes: ARS International assumes no liability for the use or interpretation of any analytical results provided other than the cost of the analysis itself. Reproduction of this report in less than full requires the written consent of ARS International.
LELAP Cert# 30658 (NELAPCert#E87558 I
a PAGE 1 of 2
- C FORM 303 U.S. NUCLEAR REGULATORY COMMISSION LABORATORY USE ONLY 004) CONTROL NUMBER REQUEST FOR ANALYSIS AND CHAIN OF CUSTODY LABORATORY:
4PLE LOCATION (LICENSEE) LICENSEE NUMBER DOCKET NO.
INDIAN POINT ENERGY CENTER SAMPLE SUBMITTED
- TOTAL TYPE VOLUME WEIGHT DATE SAMPLES SUBMITTED PRIORITY 1 GROUND WATER 2000 ML . 2 Kg - UR ROUTINE .
SAMPLE COLLECTION INTERVAL MONTH DAY YEAR TIME START
- ECTOR RESPONSIBIE TELEPHONE NUMBER "STOP (610) 337-5063 -TOP Jim Noggle (USNRC) _
LIST DESIRED LIST DESIRED ANALYSIS TO BE PERFORMED LLD (Optional) OTHER TYPE OF ANALYSIS (Specify) LLD (Optional)
[-] GROSS ALPHA (GA) STRONTIUM-90 (Sr90)
D GROSS BETA (GB) NICKEL-63 (Ni63)
GAMMA SPEC (GS) D F1 TRITIUM (3)
DCARBON-14 (C14)D D--] IODINE-125 (1125) D-- ,_
RELENQUISHED BY RECEIVED BY DATE TIME REASON FOR CHANGE OF CUSTODY
<L FEE RECOVERABLE D NO [YES TAC NUMBER LARKS:
IOTE: SAMPLES WILL BE DISCARDED AFTER ANALYSIS UNLESS REASON ARE NOTED'IN REMARKS ABOVE.
FORM3O3 (4-2004) PRINTED ON RECYCLED PAPER
./ .
I PAGE 2 of.2 NRC FORM 303 U.S. NUCLEAR REGULATORY-COMMISSION. LABORATORY USE ONLY (4-2004) CONTROL NUMBER SAMPLE RECORD - Continued LABORATORY:
SAMPLE SAMPLE NAME COLLECTION REMARKS, PRESERVATIVE NUMBER AND DESCRIPTION DATEITIME ANALYSIS REQUESTED, ETC.
LAF-002-(01 0) Ground Water Split Sample of LAF-002-(01 0) t /' /0i ' Sample is unfiltered & unpreserved. Analyze foi S/ U 2'*J Gamma Spec, H3, Sr9O, Ni63
-J PRINTED ON RECYCLED PAPES NRC FORMS03 (4-2004)
U