ML15327A213: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2015  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2015 Vice President, Operations Entergy Nuclear Operations, Inc.
 
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center  
 
450 Broadway, GSB P.O. Box 249  
 
Buchanan, NY 10511-0249  


==SUBJECT:==
==SUBJECT:==
PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATIO N (CAC NOS. MD5407 AND MD5408)  
PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)


==Dear Sir or Madam:==
==Dear Sir or Madam:==


By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2  
By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009 and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.
 
In accordance with the enclosed audit plan, the NRC staff plans to conduct an onsite audit of the service water integrity and fire water system aging management programs during the week of February 22, 2016. If you have any questions, please contact me by telephone at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov.
and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009 and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water  
Sincerely,
 
                                              /RA/
system components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation."
Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
In accordance with the enclosed audit plan, the NRC staff plans to conduct an onsite audit of the service water integrity and fire water system aging management pr ograms during the week of February 22, 2016. If you have any questions, please contact me by telephone at 301-415-
 
6459, or by e-mail at michael.wentzel@nrc.gov. Sincerely,
      /RA/ Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286  


==Enclosure:==
==Enclosure:==


As stated cc w/encl: Listserv  
As stated cc w/encl: Listserv


ML15327A213   *concurrence via email OFFICE LA:DLR* PM:RPB2:DLR BC:RARB:DLR BC:RPB1:DLR PM:RPB2:DLR NAME IBetts MWentzel DMorey YDiaz MWentzel DATE 11/24/15 11/24/15 12/16/15 12/18/15 12/21/15 Letter to Vice President, Operations, Entergy from M. Wentzel dated December 21, 2015.  
ML15327A213                               *concurrence via email OFFICE     LA:DLR*       PM:RPB2:DLR     BC:RARB:DLR       BC:RPB1:DLR     PM:RPB2:DLR NAME       IBetts       MWentzel         DMorey           YDiaz           MWentzel DATE       11/24/15     11/24/15         12/16/15         12/18/15         12/21/15 Letter to Vice President, Operations, Entergy from M. Wentzel dated December 21, 2015.


==SUBJECT:==
==SUBJECT:==
PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)  
PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)
 
DISTRIBUTION:
DISTRIBUTION
HARD COPY:
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource  
DLR RF E-MAIL:
 
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource IBetts YDiaz MWentzel WHolston JGavula DPickett STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OCA MGray, RI GDentel, RI DonaldJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcNamara, RI BHaagensen, RI GNewman, RI SRich, RI
RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource  
 
RidsNrrDlrRerb Resource  
 
RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource  
 
RidsNrrDeEeeb Resource  
 
RidsNrrDssSrxb Resource  


RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource
Audit Plan Service Water Integrity and Fire Water System Aging Management Program Review for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application February 23-25, 2016 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ENCLOSURE
------------- IBetts YDiaz MWentzel WHolston JGavula DPickett STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OCA MGray, RI GDentel, RI DonaldJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA


DTifft, RI NMcNamara, RI BHaagensen, RI GNewman, RI SRich, RI ENCLOSURE Audit Plan Service Water Integrity and Fire Water System Aging Management Program Review for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application February 23-25, 2016
Service Water Integrity and Fire Water System Aging Management Program Audit Plan Indian Point Nuclear Generating Unit Nos. 2 and 3
: 1.      Background By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009, and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2).
Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system (FWS) components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.
The NRC staff from the Division of License Renewal will lead a supplemental regulatory audit to gain a better understanding of Entergys responses to requests for additional information (RAIs) related to LR-ISG-2012-02, submitted by letters dated December 16, 2014, and August 18, 2015 (ADAMS Accession Nos. ML14365A069 and ML15236A017, respectively). The audit will cover the aging management programs (AMPs) for managing recurring internal corrosion in the service water integrity (SWI) and FWS, as well as aging effects managed by the Fire Water System Program described in license renewal application (LRA) B.1.14.
: 2.      Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Guidance is provided in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants (SRP-LR), dated December 2010, NUREG-1801, Rev. 2, Generic Aging Lessons Learned (GALL) Report, dated December 2010, and LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation, dated November 2013.
: 3.      Regulatory Audit Scope The scope of this audit is to examine Entergys RAI response, associated materials, and supporting documentation for the SWI and FWS AMPs. Audit team members will focus on reviewing the documents and requested information listed in the Audit Needs section of this plan and discussing the information with Entergys subject matter experts.
: 4.      Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List.
: 5.      Team Assignments Area of Review                        Assigned Auditor Project Manager                        Michael Wentzel


Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission    Service Water Integrity and Fire Water System Aging Management Program Audit Plan Indian Point Nuclear Generating Unit Nos. 2 and 3
Area of Review                        Assigned Auditor Technical Reviewer                          James Gavula Technical Reviewer                          William Holston Technical Reviewer                            Brian Allik
: 1. Background By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009, and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2).
: 6.     Logistics The audit will be conducted on location at the IP2 and IP3 site from February 23 to February 25, 2016. Entrance and exit briefings will be held at the beginning and end of the audit, respectively.
Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system (FWS) components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-I SG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation." The NRC staff from the Division of License Renewa l will lead a supplemental regulatory audit to gain a better understanding of Entergy's responses to requests for additional information (RAIs) related to LR-ISG-2012-02, submitted by letters dated December 16, 2014, and August 18, 2015 (ADAMS Accession Nos. ML14365A069 and ML15236A017, respectively). The audit will
: 7.     Special Requests The NRC staff request a suitable facility for the audit team to caucus during the audit. In addition, the NRC staff request Entergy have one or more break-out rooms available for meetings between staff and Entergy personnel.
: 8.     Deliverables The NRC staff will issue an audit report to Entergy, which normally occurs within 90 days from the end of the audit.
: 9.     References
: a. Periodic Summary Report of NRC Regulatory Commitment Changes at Indian Point 1 and 2, Letter NL-01-088, dated July 3, 2001.
: b. Reply to Request for Additional Information Regarding License Renewal Application -
Operating Experience, Letter NL-08-091, dated June 5, 2008.
: c. NUREG 1930, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, dated November 2009.
: d. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-14-147, dated December 16, 2014.
: e. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-15-092, dated August 18, 2015.


cover the aging management programs (AMPs) for managing recurring internal corrosion in the service water integrity (SWI) and FWS, as well as aging effects managed by the Fire Water System Program described in license renewal application (LRA) B.1.14. 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), "Requirements for Renewal of Operating Licenses for Nuclear Power Plants."  Guidance is provided in NUREG-1800, Rev. 2, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants" (SRP-LR), dated December 2010, NUREG-1801, Rev. 2, "Generic Aging Lessons Learned (GALL) Report," dated December 2010, and LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation," dated November 2013. 3. Regulatory Audit Scope The scope of this audit is to examine Entergy's RAI response, associated materials, and supporting documentation for the SWI and FWS AMPs. Audit team members will focus on reviewing the documents and requested information listed in the Audit Needs section of this plan and discussing the information with Entergy's subject matter experts. 4. Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List. 5. Team Assignments Area of Review Assigned Auditor Project Manager Michael Wentzel Area of Review Assigned Auditor Technical Reviewer James Gavula Technical Reviewer William Holston Technical Reviewer Brian Allik
Service Water Integrity and Fire Water System Aging Management Programs Audit Needs List DATE
: 6. Logistics The audit will be conducted on location at the IP2 and IP3 site from February 23 to February 25, 2016. Entrance and exit briefings will be held at the beginning and end of the audit, respectively. 7. Special Requests The NRC staff request a suitable facility for the audit team to caucus during the audit. In addition, the NRC staff request Entergy have one or more break-out rooms available for meetings between staff and Entergy personnel. 8. Deliverables The NRC staff will issue an audit report to Entergy, which normally occurs within 90 days from the end of the audit. 9. References a. Periodic Summary Report of NRC Regulatory Commitment Changes at Indian Point 1 and 2, Letter NL-01-088, dated July 3, 2001. b. Reply to Request for Additional Information Regarding License Renewal Application - Operating Experience, Letter NL-08-091, dated June 5, 2008. c. NUREG 1930, "Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, dated November 2009. d. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-14-147, dated December 16, 2014. e. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-15-092, dated August 18, 2015. Service Water Integrity and Fire Water System Aging Management Programs Audit Needs List DATE 1. Documents or Information for Review: a. Plant-specific leak-related operating experience for the FWS and city water system (CWS), and all associated corrective action entries for the past 10 years. This should include all leaks with the exception of packing leaks. b. Inspection reports for the 14 non-destructive evaluation (NDE) inspections for FWS (9 IP1 and 5 IP2). c. T min computations and stress reports to determine longitudinal pipe stress in the vicinity of the 14 NDE inspections. d. Copy of preventive maintenance for charcoal replacement and sampling for the IP2, IP3, and Technical Support Center (TSC) charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. e. Drawings of charcoal filter units in relation to location of deluge piping.
: 1. Documents or Information for Review:
: f. Drawings showing the number and location of all wet pipe sprinkler systems subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. g. Procedures used for implementation of the Service Water Integrity Program, as described in LRA B.1.34. h. For the leaks discussed in response to RAI 3.0.3-4, request 4b (NL-15-092): i. Provide associated corrective action doc uments for all service water system leaks within the past 10 years. In addition to these documents, also include a summary of all corrective action documents associated with the service water system within the past 10 years. ii. Distinguish between those leaks associated with internal lining/coating issues (i.e., gaps in concrete lining, or failed coating) and those leaks not associated with internal coating issues. iii. For any of the in-service inspection (ISI) Class 3 leaks where American Society of Mechanical Engineers (ASME) Code Case 513-3 was used, provide the locations of the augmented sample(s) examined and the engineering evaluations that identified these locations as being the most susceptible. 2. Interview and Discussion Meeting: a. Discuss the adequacy of the number of inspections conducted to date to manage loss of material due to recurring internal corrosion in the fire water and city water systems.
: a. Plant-specific leak-related operating experience for the FWS and city water system (CWS), and all associated corrective action entries for the past 10 years. This should include all leaks with the exception of packing leaks.
It is not clear to the staff that sufficient inspections have been conducted to justify a one-time based exclusion of future inspections (i.e., 9 inspections at Unit 1, 5 at Unit 2, none at Unit 3). b. Discuss: 1) the effect of leakage on nearby safety-related components; 2) acceptance criteria in relation to the pressure boundary function and structural integrity (attached) function of the piping; 3) the lack of specificity related to extent of condition inspections that would occur if opportunistic inspections or leakage events reveal wall loss sufficient to cause leakage, loss of pressure boundary function; or loss of structural integrity (attached) function; and 4) based on the probable lack of volumetric wall thickness data from original construction, specifically how inspection results were projected to 60 years. c. Describe the configuration of the water distribution piping inside each of the charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. For example, is the water distributed by nozzles, or flow holes?  Is the piping above or within the charcoal beds?  Will the piping be inspected during charcoal replacement or sampling?  What is the periodicity of replacement and sampling?  Reference enhancements appearing in Attachment 2, page 10 of 13 of letter NL-15-092. d. Describe the periodicity and method for deluge valve testing for all charcoal filter beds subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. Exception No. 3, Attachment 2, page 57 of 66 of letter NL-14-147 states that, "[t]he deluge valve for the IP2 primary
: b. Inspection reports for the 14 non-destructive evaluation (NDE) inspections for FWS (9 IP1 and 5 IP2).
: c. Tmin computations and stress reports to determine longitudinal pipe stress in the vicinity of the 14 NDE inspections.
: d. Copy of preventive maintenance for charcoal replacement and sampling for the IP2, IP3, and Technical Support Center (TSC) charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14.
: e. Drawings of charcoal filter units in relation to location of deluge piping.
: f. Drawings showing the number and location of all wet pipe sprinkler systems subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14.
: g. Procedures used for implementation of the Service Water Integrity Program, as described in LRA B.1.34.
: h. For the leaks discussed in response to RAI 3.0.3-4, request 4b (NL-15-092):
: i. Provide associated corrective action documents for all service water system leaks within the past 10 years. In addition to these documents, also include a summary of all corrective action documents associated with the service water system within the past 10 years.
ii. Distinguish between those leaks associated with internal lining/coating issues (i.e.,
gaps in concrete lining, or failed coating) and those leaks not associated with internal coating issues.
iii. For any of the in-service inspection (ISI) Class 3 leaks where American Society of Mechanical Engineers (ASME) Code Case 513-3 was used, provide the locations of the augmented sample(s) examined and the engineering evaluations that identified these locations as being the most susceptible.
: 2. Interview and Discussion Meeting:
: a. Discuss the adequacy of the number of inspections conducted to date to manage loss of material due to recurring internal corrosion in the fire water and city water systems.
It is not clear to the staff that sufficient inspections have been conducted to justify a one-time based exclusion of future inspections (i.e., 9 inspections at Unit 1, 5 at Unit 2, none at Unit 3).
: b. Discuss: 1) the effect of leakage on nearby safety-related components; 2) acceptance criteria in relation to the pressure boundary function and structural integrity (attached) function of the piping; 3) the lack of specificity related to extent of condition


auxiliary building exhaust, containment building purge exhaust and containment building pressure relief charcoal units are tested each refueling outage, which is every  
inspections that would occur if opportunistic inspections or leakage events reveal wall loss sufficient to cause leakage, loss of pressure boundary function; or loss of structural integrity (attached) function; and 4) based on the probable lack of volumetric wall thickness data from original construction, specifically how inspection results were projected to 60 years.
: c. Describe the configuration of the water distribution piping inside each of the charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. For example, is the water distributed by nozzles, or flow holes? Is the piping above or within the charcoal beds? Will the piping be inspected during charcoal replacement or sampling? What is the periodicity of replacement and sampling? Reference enhancements appearing in Attachment 2, page 10 of 13 of letter NL-15-092.
: d. Describe the periodicity and method for deluge valve testing for all charcoal filter beds subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. Exception No. 3, Attachment 2, page 57 of 66 of letter NL-14-147 states that, [t]he deluge valve for the IP2 primary auxiliary building exhaust, containment building purge exhaust and containment building pressure relief charcoal units are tested each refueling outage, which is every two years.
: e. Describe the number of wet pipe sprinkler systems in each building that are subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. In addition, provide the basis for inspecting one-third of the systems, as described in response to RAI 3.0.3-11 (NL    092) instead of one-half as cited by NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, Section 14.2.
: f. Reconcile the response to RAI 3.0.3-4, request 4b (NL-15-092), which reported three ISI Class 3 leaks identified in 2013, with the statement in Licensee Event Report (LER) 247/2013-004 that eight pin hole leaks were discovered during an engineering walkdown of the service water system where seven leaks were on socket welds and one was on an elbow with all located in the ASME Section XI Code boundary.
: g. In context of the following statement (NL-01-088, Attachment 1), provide details relating to the radiographic inspections of the service water piping welds that are performed as part of the Generic Letter (GL) 89-13 program:
The exam is also more sophisticated than a random 10% of welds. For example, the exam for 10 inch piping inside containment is as follows:
20% of welds that have shown moderate scalloping, 5% of the welds that have shown scalloping, 1% of welds that have minor scalloping and 1% of previously accepted or repaired welds.
: h. Provide details relating to the internal visual inspections performed by the Service Water Integrity program, as described in LRA B.1.34 (i.e., how much piping is inspected and frequency of inspections). Describe the process for using the results from the visual inspections to directing volumetric inspections.
: i. Identify the approximate number of safety-related weld locations and nonsafety-related weld locations that are subject to aging management review for which aging effects are managed by the Service Water Integrity Program, as described in LRA B.1.34. Response 4c to RAI 3.0.3-4 (NL-15-092) states that 20 to 30 weld locations


two years." e. Describe the number of wet pipe sprinkler systems in each building that are subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. In addition, provide the basis for inspecting one-third of the systems, as described in response to RAI 3.0.3-11 (NL 092) instead of one-half as cited by NFPA 25, "Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems,' Section 14.2. f. Reconcile the response to RAI 3.0.3-4, request 4b (NL-15-092), which reported three ISI Class 3 leaks identified in 2013, with the statement in Licensee Event Report (LER) 247/2013-004 that eight pin hole leaks were discovered during an engineering walkdown of the service water system where "seven leaks were on socket welds and one was on an elbow with all located in the ASME Section XI Code boundary." g. In context of the following statement (NL-01-088, Attachment 1), provide details relating to the radiographic inspections of the service water piping welds that are performed as part of the Generic Letter (GL) 89-13 program: The exam is also more sophisticated than a random 10% of welds. For example, the exam for 10 inch piping inside containment is as follows: 20% of welds that have shown moderate scalloping, 5% of the welds that have shown scalloping, 1% of welds that have minor scalloping and 1% of previously accepted or repaired welds. h. Provide details relating to the internal visual inspections performed by the Service Water Integrity program, as described in LRA B.1.34 (i.e., how much piping is inspected and frequency of inspections). Describe the process for using the results from the visual inspections to directing volumetric inspections. i. Identify the approximate number of safety-related weld locations and nonsafety-related weld locations that are subject to aging management review for which aging effects are managed by the Service Water Integrity Program, as described in LRA B.1.34. Response 4c to RAI 3.0.3-4 (NL-15-092) states that 20 to 30 weld locations are inspected each outage; what percentage of the total locations does this number represent? j. The response to RAI AUX-2 (NL-08-091, Attachment I) states that "the Service Water Integrity Program is credited for managing the effects of aging on components as listed in LRA Section 3 Tables regardless of safety classification.LER 286/2011-003 states that the GL 89-13 program will be revised to include nonsafety-related service water lines 1221 and 1222. Provide discussion relating to how these piping segments will be treated differently in the GL 89-13 program as compared to how they were treated in the Service Water Integrity Program. Are these now the only nonsafety-related piping segments included in the GL 89-13 program? k. LER 286/2014-002 states that procedure 3-PT-185B was specifically developed to address problems with leaks developing in stagnant vent and drain connection piping and it is the main line of defense for preventing future leaks. The response to RAI 3.0.3-4 (NL-15-092) states that the flushing and inspections performed under 3-PT-185B have been effective at managing the effects of aging; however, leaks continue to occur in the associated piping. Of the leaks that occurred in the past 10 years, provide information about the leaks that occurred in the piping segments where 3-PT-185B was or should have been used. l. Inspections of the service water intake structure are included as part of GL 89-13. If these inspections are not part of the Service Water Integrity Program, as described in LRA B.1.34, which aging management program do these inspections fall under?
are inspected each outage; what percentage of the total locations does this number represent?
: j. The response to RAI AUX-2 (NL-08-091, Attachment I) states that the Service Water Integrity Program is credited for managing the effects of aging on components as listed in LRA Section 3 Tables regardless of safety classification. LER 286/2011-003 states that the GL 89-13 program will be revised to include nonsafety-related service water lines 1221 and 1222. Provide discussion relating to how these piping segments will be treated differently in the GL 89-13 program as compared to how they were treated in the Service Water Integrity Program. Are these now the only nonsafety-related piping segments included in the GL 89-13 program?
: k. LER 286/2014-002 states that procedure 3-PT-185B was specifically developed to address problems with leaks developing in stagnant vent and drain connection piping and it is the main line of defense for preventing future leaks. The response to RAI 3.0.3-4 (NL-15-092) states that the flushing and inspections performed under 3-PT-185B have been effective at managing the effects of aging; however, leaks continue to occur in the associated piping. Of the leaks that occurred in the past 10 years, provide information about the leaks that occurred in the piping segments where 3-PT-185B was or should have been used.
: l. Inspections of the service water intake structure are included as part of GL 89-13. If these inspections are not part of the Service Water Integrity Program, as described in LRA B.1.34, which aging management program do these inspections fall under?
Discuss the differences/similarities between the silting issue that is documented in LER 247/2011-003 and the silting levels seen in 2007. Discuss corrective actions from 2007, and whether these should have prevented the 2011 event.}}
Discuss the differences/similarities between the silting issue that is documented in LER 247/2011-003 and the silting levels seen in 2007. Discuss corrective actions from 2007, and whether these should have prevented the 2011 event.}}

Latest revision as of 08:24, 5 February 2020

Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA
ML15327A213
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/21/2015
From: Michael Wentzel
License Renewal Projects Branch 2
To:
Entergy Nuclear Operations
Michael Wentzel, 415-6459
References
CAC MD5407, CAC MD5408
Download: ML15327A213 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2015 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)

Dear Sir or Madam:

By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009 and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.

In accordance with the enclosed audit plan, the NRC staff plans to conduct an onsite audit of the service water integrity and fire water system aging management programs during the week of February 22, 2016. If you have any questions, please contact me by telephone at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov.

Sincerely,

/RA/

Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/encl: Listserv

ML15327A213 *concurrence via email OFFICE LA:DLR* PM:RPB2:DLR BC:RARB:DLR BC:RPB1:DLR PM:RPB2:DLR NAME IBetts MWentzel DMorey YDiaz MWentzel DATE 11/24/15 11/24/15 12/16/15 12/18/15 12/21/15 Letter to Vice President, Operations, Entergy from M. Wentzel dated December 21, 2015.

SUBJECT:

PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource IBetts YDiaz MWentzel WHolston JGavula DPickett STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OCA MGray, RI GDentel, RI DonaldJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcNamara, RI BHaagensen, RI GNewman, RI SRich, RI

Audit Plan Service Water Integrity and Fire Water System Aging Management Program Review for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application February 23-25, 2016 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ENCLOSURE

Service Water Integrity and Fire Water System Aging Management Program Audit Plan Indian Point Nuclear Generating Unit Nos. 2 and 3

1. Background By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009, and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2).

Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system (FWS) components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.

The NRC staff from the Division of License Renewal will lead a supplemental regulatory audit to gain a better understanding of Entergys responses to requests for additional information (RAIs) related to LR-ISG-2012-02, submitted by letters dated December 16, 2014, and August 18, 2015 (ADAMS Accession Nos. ML14365A069 and ML15236A017, respectively). The audit will cover the aging management programs (AMPs) for managing recurring internal corrosion in the service water integrity (SWI) and FWS, as well as aging effects managed by the Fire Water System Program described in license renewal application (LRA) B.1.14.

2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Guidance is provided in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants (SRP-LR), dated December 2010, NUREG-1801, Rev. 2, Generic Aging Lessons Learned (GALL) Report, dated December 2010, and LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation, dated November 2013.
3. Regulatory Audit Scope The scope of this audit is to examine Entergys RAI response, associated materials, and supporting documentation for the SWI and FWS AMPs. Audit team members will focus on reviewing the documents and requested information listed in the Audit Needs section of this plan and discussing the information with Entergys subject matter experts.
4. Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List.
5. Team Assignments Area of Review Assigned Auditor Project Manager Michael Wentzel

Area of Review Assigned Auditor Technical Reviewer James Gavula Technical Reviewer William Holston Technical Reviewer Brian Allik

6. Logistics The audit will be conducted on location at the IP2 and IP3 site from February 23 to February 25, 2016. Entrance and exit briefings will be held at the beginning and end of the audit, respectively.
7. Special Requests The NRC staff request a suitable facility for the audit team to caucus during the audit. In addition, the NRC staff request Entergy have one or more break-out rooms available for meetings between staff and Entergy personnel.
8. Deliverables The NRC staff will issue an audit report to Entergy, which normally occurs within 90 days from the end of the audit.
9. References
a. Periodic Summary Report of NRC Regulatory Commitment Changes at Indian Point 1 and 2, Letter NL-01-088, dated July 3, 2001.
b. Reply to Request for Additional Information Regarding License Renewal Application -

Operating Experience, Letter NL-08-091, dated June 5, 2008.

c. NUREG 1930, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, dated November 2009.
d. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-14-147, dated December 16, 2014.
e. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-15-092, dated August 18, 2015.

Service Water Integrity and Fire Water System Aging Management Programs Audit Needs List DATE

1. Documents or Information for Review:
a. Plant-specific leak-related operating experience for the FWS and city water system (CWS), and all associated corrective action entries for the past 10 years. This should include all leaks with the exception of packing leaks.
b. Inspection reports for the 14 non-destructive evaluation (NDE) inspections for FWS (9 IP1 and 5 IP2).
c. Tmin computations and stress reports to determine longitudinal pipe stress in the vicinity of the 14 NDE inspections.
d. Copy of preventive maintenance for charcoal replacement and sampling for the IP2, IP3, and Technical Support Center (TSC) charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14.
e. Drawings of charcoal filter units in relation to location of deluge piping.
f. Drawings showing the number and location of all wet pipe sprinkler systems subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14.
g. Procedures used for implementation of the Service Water Integrity Program, as described in LRA B.1.34.
h. For the leaks discussed in response to RAI 3.0.3-4, request 4b (NL-15-092):
i. Provide associated corrective action documents for all service water system leaks within the past 10 years. In addition to these documents, also include a summary of all corrective action documents associated with the service water system within the past 10 years.

ii. Distinguish between those leaks associated with internal lining/coating issues (i.e.,

gaps in concrete lining, or failed coating) and those leaks not associated with internal coating issues.

iii. For any of the in-service inspection (ISI) Class 3 leaks where American Society of Mechanical Engineers (ASME) Code Case 513-3 was used, provide the locations of the augmented sample(s) examined and the engineering evaluations that identified these locations as being the most susceptible.

2. Interview and Discussion Meeting:
a. Discuss the adequacy of the number of inspections conducted to date to manage loss of material due to recurring internal corrosion in the fire water and city water systems.

It is not clear to the staff that sufficient inspections have been conducted to justify a one-time based exclusion of future inspections (i.e., 9 inspections at Unit 1, 5 at Unit 2, none at Unit 3).

b. Discuss: 1) the effect of leakage on nearby safety-related components; 2) acceptance criteria in relation to the pressure boundary function and structural integrity (attached) function of the piping; 3) the lack of specificity related to extent of condition

inspections that would occur if opportunistic inspections or leakage events reveal wall loss sufficient to cause leakage, loss of pressure boundary function; or loss of structural integrity (attached) function; and 4) based on the probable lack of volumetric wall thickness data from original construction, specifically how inspection results were projected to 60 years.

c. Describe the configuration of the water distribution piping inside each of the charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. For example, is the water distributed by nozzles, or flow holes? Is the piping above or within the charcoal beds? Will the piping be inspected during charcoal replacement or sampling? What is the periodicity of replacement and sampling? Reference enhancements appearing in Attachment 2, page 10 of 13 of letter NL-15-092.
d. Describe the periodicity and method for deluge valve testing for all charcoal filter beds subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. Exception No. 3, Attachment 2, page 57 of 66 of letter NL-14-147 states that, [t]he deluge valve for the IP2 primary auxiliary building exhaust, containment building purge exhaust and containment building pressure relief charcoal units are tested each refueling outage, which is every two years.
e. Describe the number of wet pipe sprinkler systems in each building that are subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. In addition, provide the basis for inspecting one-third of the systems, as described in response to RAI 3.0.3-11 (NL 092) instead of one-half as cited by NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, Section 14.2.
f. Reconcile the response to RAI 3.0.3-4, request 4b (NL-15-092), which reported three ISI Class 3 leaks identified in 2013, with the statement in Licensee Event Report (LER) 247/2013-004 that eight pin hole leaks were discovered during an engineering walkdown of the service water system where seven leaks were on socket welds and one was on an elbow with all located in the ASME Section XI Code boundary.
g. In context of the following statement (NL-01-088, Attachment 1), provide details relating to the radiographic inspections of the service water piping welds that are performed as part of the Generic Letter (GL) 89-13 program:

The exam is also more sophisticated than a random 10% of welds. For example, the exam for 10 inch piping inside containment is as follows:

20% of welds that have shown moderate scalloping, 5% of the welds that have shown scalloping, 1% of welds that have minor scalloping and 1% of previously accepted or repaired welds.

h. Provide details relating to the internal visual inspections performed by the Service Water Integrity program, as described in LRA B.1.34 (i.e., how much piping is inspected and frequency of inspections). Describe the process for using the results from the visual inspections to directing volumetric inspections.
i. Identify the approximate number of safety-related weld locations and nonsafety-related weld locations that are subject to aging management review for which aging effects are managed by the Service Water Integrity Program, as described in LRA B.1.34. Response 4c to RAI 3.0.3-4 (NL-15-092) states that 20 to 30 weld locations

are inspected each outage; what percentage of the total locations does this number represent?

j. The response to RAI AUX-2 (NL-08-091, Attachment I) states that the Service Water Integrity Program is credited for managing the effects of aging on components as listed in LRA Section 3 Tables regardless of safety classification. LER 286/2011-003 states that the GL 89-13 program will be revised to include nonsafety-related service water lines 1221 and 1222. Provide discussion relating to how these piping segments will be treated differently in the GL 89-13 program as compared to how they were treated in the Service Water Integrity Program. Are these now the only nonsafety-related piping segments included in the GL 89-13 program?
k. LER 286/2014-002 states that procedure 3-PT-185B was specifically developed to address problems with leaks developing in stagnant vent and drain connection piping and it is the main line of defense for preventing future leaks. The response to RAI 3.0.3-4 (NL-15-092) states that the flushing and inspections performed under 3-PT-185B have been effective at managing the effects of aging; however, leaks continue to occur in the associated piping. Of the leaks that occurred in the past 10 years, provide information about the leaks that occurred in the piping segments where 3-PT-185B was or should have been used.
l. Inspections of the service water intake structure are included as part of GL 89-13. If these inspections are not part of the Service Water Integrity Program, as described in LRA B.1.34, which aging management program do these inspections fall under?

Discuss the differences/similarities between the silting issue that is documented in LER 247/2011-003 and the silting levels seen in 2007. Discuss corrective actions from 2007, and whether these should have prevented the 2011 event.