ML16279A004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801 October 17, 2016
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 17, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801


==SUBJECT:==
==SUBJECT:==
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 -CORRECTION TO LICENSE AMENDMENT TO REVISE TECHNICAL SPECIFICATION FOR ESSENTIAL RAW COOLING WATER SYSTEM ALLOWED COMPLETION TIME (CAC NOS. MF7450 AND MF7451)  
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION TO LICENSE AMENDMENT TO REVISE TECHNICAL SPECIFICATION FOR ESSENTIAL RAW COOLING WATER SYSTEM ALLOWED COMPLETION TIME (CAC NOS. MF7450 AND MF7451)


==Dear Mr. Shea:==
==Dear Mr. Shea:==
On September 30, 2016, the U.S. Nuclear Regulatory Commission issued Amendment No. 336 to Renewed Facility Operating License (RFOL) No. DPR-77, and Amendment No 329 to RFOL No. DPR-79, for the Sequoyah Nuclear Plant, Units 1 and 2, respectively.
 
The amendments consisted of changes to the RFOLs and Technical Specifications (TSs) in response to your application dated March 11, 2016, as supplemented by letters dated May 31, and July 22, 2016. These amendments revised the TSs for Essential Raw Cooling Water System Allowed Completion Time. After issuance, it came to our attention that TS page number 3. 7.8-2 for Unit 2, was incorrectly numbered.
On September 30, 2016, the U.S. Nuclear Regulatory Commission issued Amendment No. 336 to Renewed Facility Operating License (RFOL) No. DPR-77, and Amendment No 329 to RFOL No. DPR-79, for the Sequoyah Nuclear Plant, Units 1 and 2, respectively. The amendments consisted of changes to the RFOLs and Technical Specifications (TSs) in response to your application dated March 11, 2016, as supplemented by letters dated May 31, and July 22, 2016.
Please replace the incorrect page with the enclosed corrected page.
These amendments revised the TSs for Essential Raw Cooling Water System Allowed Completion Time.
J. Shea Thank you for bringing this matter to our attention.
After issuance, it came to our attention that TS page number 3. 7.8-2 for Unit 2, was incorrectly numbered. Please replace the incorrect page with the enclosed corrected page.
We regret any inconvenience this may have caused. If you have any questions, please call me at (301) 415-8480.
 
Docket Nos. 50-327 and 50-328  
J. Shea                                         Thank you for bringing this matter to our attention. We regret any inconvenience this may have caused. If you have any questions, please call me at (301) 415-8480.
Sincerely, Afi-- Ji-_
Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328


==Enclosure:==
==Enclosure:==


Corrected TS Page for Unit 2 cc w/enclosures:
Corrected TS Page for Unit 2 cc w/enclosures: Distribution via Listserv
Distribution via Listserv Sincerely, Afi--Ji-_ Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE Corrected page 3.7.8-2 for Amendment No. 329 to DPR-79 B. One ERCW System 8.1 train inoperable for reasons other than Condition A C. Required Action and C.1 associated Completion Time of Condition A or AND B not met. C.2 SEQUOYAH -UNIT 2 --------------N 0 TES------------
 
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources -Operating," for emergency diesel generator made inoperable by ERCW System. 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops -MODE 4," for residual heat removal loops made inoperable by ERCW System. ------------------------------------
ENCLOSURE Corrected page 3.7.8-2 for Amendment No. 329 to DPR-79
Restore ERCW System train to OPERABLE status. Be in MODE 3. Be in MODE 5. 3.7.8-2 72 hours 6 hours 36 hours ERCW System 3.7.8 Amendment J.2.7.-329 J. Shea Thank you for bringing this matter to our attention.
We regret any inconvenience this may have caused. If you have any questions, please call me at (301) 415-8480.
Docket Nos. 50-327 and 50-328


==Enclosure:==
ERCW System 3.7.8 B. One ERCW System        8.1 --------------N 0 TES------------
train inoperable for      1. Enter applicable reasons other than              Conditions and Condition A                    Required Actions of LCO 3.8.1, "AC Sources - Operating,"
for emergency diesel generator made inoperable by ERCW System.
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops - MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System                  72 hours train to OPERABLE status.
C. Required Action and    C.1 Be in MODE 3.                        6 hours associated Completion Time of Condition A or AND B not met.
C.2 Be in MODE 5.                        36 hours SEQUOYAH - UNIT 2                  3.7.8-2                            Amendment J.2.7.-329


Corrected TS Page for Unit 2 Sincerely, IRA/ Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/enclosures:
ML16279A004 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA               NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME     AH on                 BClayton                 JD ion                 AH on DATE     10/7/2016             10/7/2016               10/17/2016             10/17/2016}}
Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDssSbpb Resource RidsNrrPMSequoyah Resource RidsRgn2MailCenter Resource LWheeler, NRR LPL2-2 R/F RidsNrrDorllpl2-2 Resource RidsNrrLABClayton Resource MHamm, NRR RecordsAmend RidsACRS_MailCTR Resource RidsNrrDssStsbResource NHobbs, NRR JDion, NRR ADAMS Accession No.: ML16279A004 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME AH on BClayton JD ion AH on DATE 10/7/2016 10/7/2016 10/17/2016 10/17/2016 OFFICIAL RECORD COPY}}

Latest revision as of 00:09, 5 February 2020

Correction to Page Number of License Amendment to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion Time (CAC Nos. MF7450 and MF7451)
ML16279A004
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/17/2016
From: Andrew Hon
Plant Licensing Branch II
To: James Shea
Tennessee Valley Authority
Hon A DORL/LPL2-2 301-415-8480
References
CAC MF7450, CAC MF7451
Download: ML16279A004 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 17, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION TO LICENSE AMENDMENT TO REVISE TECHNICAL SPECIFICATION FOR ESSENTIAL RAW COOLING WATER SYSTEM ALLOWED COMPLETION TIME (CAC NOS. MF7450 AND MF7451)

Dear Mr. Shea:

On September 30, 2016, the U.S. Nuclear Regulatory Commission issued Amendment No. 336 to Renewed Facility Operating License (RFOL) No. DPR-77, and Amendment No 329 to RFOL No. DPR-79, for the Sequoyah Nuclear Plant, Units 1 and 2, respectively. The amendments consisted of changes to the RFOLs and Technical Specifications (TSs) in response to your application dated March 11, 2016, as supplemented by letters dated May 31, and July 22, 2016.

These amendments revised the TSs for Essential Raw Cooling Water System Allowed Completion Time.

After issuance, it came to our attention that TS page number 3. 7.8-2 for Unit 2, was incorrectly numbered. Please replace the incorrect page with the enclosed corrected page.

J. Shea Thank you for bringing this matter to our attention. We regret any inconvenience this may have caused. If you have any questions, please call me at (301) 415-8480.

Sincerely, Afi-- Ji-_

Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosure:

Corrected TS Page for Unit 2 cc w/enclosures: Distribution via Listserv

ENCLOSURE Corrected page 3.7.8-2 for Amendment No. 329 to DPR-79

ERCW System 3.7.8 B. One ERCW System 8.1 --------------N 0 TES------------

train inoperable for 1. Enter applicable reasons other than Conditions and Condition A Required Actions of LCO 3.8.1, "AC Sources - Operating,"

for emergency diesel generator made inoperable by ERCW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops - MODE 4," for residual heat removal loops made inoperable by ERCW System.

Restore ERCW System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> train to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or AND B not met.

C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SEQUOYAH - UNIT 2 3.7.8-2 Amendment J.2.7.-329

ML16279A004 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME AH on BClayton JD ion AH on DATE 10/7/2016 10/7/2016 10/17/2016 10/17/2016