ML17256A631: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/28/1983
| issue date = 02/28/1983
| title = Requests Info Re Override Capability & Problems Encountered When Manual Isolation Bypassed,Per Press Release 83-17
| title = Requests Info Re Override Capability & Problems Encountered When Manual Isolation Bypassed,Per Press Release 83-17
| author name = STOLLER A A
| author name = Stoller A
| author affiliation = AFFILIATION NOT ASSIGNED
| author affiliation = AFFILIATION NOT ASSIGNED
| addressee name = WANG A B
| addressee name = Wang A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORYItRMATIONDISTRIBUTIONSYST(RIDS)ACCESSIONNBR:8304140103DQCRDATE:83/02/28NOTARIZED:NODOCKETFACIL:50244RobertEmmetGinnaNuclearPlantiUnit1ERochesterG05000244AUTHBYNAMEAUTHORAFFILIATIONSTOLLER,A,A~Affi1iationUnknownRECIP~NAMERECIPIENIAFFILIATIONWANGzA~BRDivisionofLicensi,ngN
{{#Wiki_filter:REGULATORY      It  RMATION DISTRIBUTION SYST        (RIDS)
ACCESSION NBR:8304140103            DQCRDATE: 83/02/28      NOTARIZED:   NO        DOCKET FACIL:50 BYNAME244 Robert Emmet Ginna Nuclear Planti          Unit  1E  Rochester  G 05000244 AUTH                AUTHOR      AFFILIATION STOLLER,A,A ~       Af f i 1 iation Unknown RECIP ~ NAME        RECIPIENI AFFILIATION WANGzA ~ BR          Division of Licensi,ng N


==SUBJECT:==
==SUBJECT:==
RequestsinforeoverridecapabilityLproblemsencount,"eredwhenmanualisolationbypassediperPressRelease8317"DISTRIBUTIONCODE:H001SCOPIESRECEIVED:LTRENCL)SIZE:TITLE:FileLocationDistribution.'ocket50NOTES:NRR/DL/SEP1cy,05000244RECIPIENTIDCODE/NAMENTERNA,REGFLEXTERNAL:LPDRNTISOTES:010304COPIESLTTRENCL11111111RECIPIENTIDCODE/NAMENRCPDR02COPIESLTTRENCLTOTALNUMBEROFCOPIESREQUIRED:LTTR5ENCL5 l'r.IkI)i'tt'iil.T(II.Kg'tT~)II~4,>if]i>>)+,t)(If<;IIttifI')I'tt$It4''lt'If4',it')'lljlIII'"IilifIAIi,)IIIlj)IrIIIitti,r,jf.<Ift~*llr~~'(sI)(l-Ilt.0tl>II<f)')II>'>I~ti9l(/)f'j(14MIq(0fgIvlt'IIfi,%i,g)'),gfC'i>'f''.'''I"14'.<4IqtI'>t".g~ts'IlyII)3(l)Cg'4iif'(1'fif:1t;4I',II'lit'Tf))I',)It)it()jC4'il)"T~IIC4.4)fit()3$4IyI'(iljII;iILj)sV~)~P<f'/l,?l,l'),il'Tlltf'4'>I",lII(t,'4lI,,)li41~II)IIIIgt('$,llII4ItI,5j(,))'ii)J~"(jI.I.,IsII)](
Requests info re override capability          L  problems encount,"ered when manual    isolation bypassediper      Press Release 83 17" DISTRIBUTION CODE: H001S          COPIES RECEIVED:LTR        ENCL  )   SIZ E:
A.A.STOLLERP.O.Box544NevadaCity.CA95959g~Pebruary28,1983Mr.A.B.WangDiv.ofLicensingU.S.MRCWashington,D.C.
TITLE:   File Location Distribution.'ocket          50 NOTES:NRR/DL/SEP 1cy,                                                               05000244 RECIPIENT            COPIES          RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL      ID CODE/NAME          LTTR ENCL NTERNA ,   REG  F LE        01        1    1 XTERNAL: LPDR                03        1    1    NRC  PDR        02 NTIS              04        1    1 OTES:                                 1    1 TOTAL NUMBER OF COPIES REQUIRED: LTTR              5  ENCL      5


==DearMr.Wang:==
l'r. Ik I)                  i  't  t    'iil            .T        (II.K      g              'tT                                            ~    )I I  ~4,>if]i>                                                                                                                                                                            Ii t                t
20555I'minterestedinyourrecentreportontheGinnaplant,especiallyregardingoverridecapability(g5inthelistofsafetyimprovementsinpressreleasef83-17).Couldyousendmeinformationonthis,andtheproblemsencounteredwhenmanualisolationisbypassed.Thankyouforyourassistance.Sincerely,.SSoe140103830228&#x17d;PDRADOCK05000204,-,',"-H'"'DRI'J~
                                              > ) +,t    )(If<;II tt  i                              f I') I                  'tt        $  It  4          ''lt'I f          4',it ti,
IF~J'a~'%i~t''C4Q/  
                                                                                                                                                  ')'ll  jl  III "Ii        r,jf .<      If
)POUTINGANDTRANSMITI'ALSLIPTO1(Name,oNcesymbol,roomnumber,building,Agency!Post)DocumentControlBranch:Date4/12/83InitialsDateS.ctionrovalsReuestedircuiateommentCoordinationREMARKSFileForClearanceForCorrectionForYourInformationinvestigatefustlNoteandReturnPerConversationPrepareReplSeeMeSignaturer-PleasedockettheDocketNo.50-244chance,youseeapl'easedocketthebackground.Thankyou.attachedletteron(R.E.Ginna).IfbylettertoR.Stoller,attachedletterasDONOT:use,thisformasaRECORDofapprovals,concurrences,disposals,ciearances,andsimilaractionsFROM:(Name,org.symbol,Agency/Post)DebbieKragh~1-102*GFO:19810$41-529(101)RoomNo.-8ldg.OPTIONALFORM41(Rev,7-76)PrescribedbvGSAFPMR(41CFR)101-11.206'pc DOCKETNO(S).50-244February21983,DISTRIBUTION,DocketORBReadingHSmithSEE.THOSEONTHEATTACHEDLIST.R.E.GinnaNuclearPlant,locatedinHayneCounty,NewYork.Thefollowingdocumentsconcerningourreviewofthesubjectfacilityaretransmittedforyourinformation.-'oticeofReceiptofApplication.Draft/FinalEnvironmentalStatement,datedNoticeofAvailabilityofDraft/FinalEnvironmentalStatement,datedSafetyEvaluationReport,orSupplementNo.,datedNoticeofHearingonApplicationforConstructionPermit.NoticeofConsiderationofIssuanceofFacilityOperatingLicense.ApplicationandSafetyAnalysisReport,VolumeAmendmentNo.toApplication/SARdatedConstructionPermitNo.CPPR-,AmendmentNo.,datedFacilityOperatingLicenseNo.,AmendmentNo.,datedOrderExtendingConstructionCompletionDate,datedXOthpp($ppp/fy)ForwardsMonthlyOperatinReportforNovember1982~
                                                                                                                                                                                                                                              ~
* li f    IA    Ii,)            II                                                          ll r Il j) Ir      II                                                                        ~    ~
                                                                                                                                                                                                                                                        '(  s I )
(l -
Il t. 0 t l>II<f)')II>'>        I~ ti9 l (/)f'j(1 4    MI    q(0    ffC        'i >
                                                                                                                              'f'                '.''        'I "1        4'.<4          '4 ii    f'(1'      f                                  : 1 g Ivlt'I I fi, %i,g )'),        g qt I'>t".g~ts'Ily                          I)3(l)    Cg                      if
                                                                                                                  'T I                                    I 4)fit(
t    ;4  I',                                                                                                        It                                        "T ~ I f))I',)
IC4 .
II'lit
                                                                                                                                                                                                            )it () j C  4'    il )
I              i
) 3 $ 4 y I' (il j I I; ILj)                                                                                                                                                                              sV~)      ~
P  < f'/l,?                                          tf'4'> I",l                                                                                                          41~II )III        I l,l      '),il'T        ll                        I I(  t,'4lI,,)  li g    t    (  '
                                                                                                                                                                                                                                                          $ ,      ll II                                                4 I t                      I,    5 j(,
                                                                                                ) )                                        'ii)      J      ~"              (jI        . I          ., Is            II            )    ]  (
 
A.A. STOLLER P.O. Box 544 Nevada City. CA 95959 g ~
Pebruary 28, 1983 Mr. A.B. Wang Div. of Licensing U.S. MRC Washington, D.C. 20555
 
==Dear Mr. Wang:==
 
I'm interested in your recent report on the Ginna plant, especially regarding override capability (g5 in the list of safety improvements in press release f83-17). Could you send me information on this, and the problems encountered when manual isolation is bypassed.
Thank you for your assistance.
Sincerely,
. SSoe140103 830228
                  'DR I'J~
PDR ADOCK 05000204,-,',
  "-H   '"
 
J' a I
F~
            ~ '%
i ~
t'
                  'C 4
Q /
 
Date
      )POUTING AND TRANSMITI'AL SLIP                                  4/12/83 TO1 (Name, oNce symbol, room number,                                     Initials    Date building, Agency!Post)
Document Control Branch:
S.
ction                          File                          Note and Return roval                      For Clearance                  Per Conversation s Re uested                    For Correction                Prepare Repl ircuiate                      For Your Information          See Me omment                        investigate                    Signature Coordination                    fustl REMARKS r-Please docket the attached letter on Docket No. 50-244 (R. E. Ginna).                           If  by chance, you see a letter to R. Stoller, pl'ease docket the attached letter as background.
Thank you.
DO NOT: use,   this form as a RECORD of approvals, concurrences,                 disposals, ciearances, and similar actions FROM: (Name, org. symbol, Agency/Post)                             Room    No.8ldg.
Debbie Kragh                                                                            'pc
~1-102                                             OPTIONAL FORM 41 (Rev, 7-76)
Prescribed bv GSA
*GFO:           $ 41-529 (101)                   FPM R (41 CFR) 101-11.206 1981 0
 
February 2    1983,    ,
DISTRIBUTION Docket ORB  Reading DOCKET NO(S).               50-244                                                            HSmith SEE .THOSE ON THE ATTACHED          LIST.
R. E. Ginna Nuclear            Plant, located in      Hayne County, New York.
The following documents concerning our review of the subject facility are transmitted for your                information.-'otice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                         , dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendment No.                         to Application/SAR dated Construction Permit No. CPPR-                         , Amendment No.         , dated Facility Operating License No.                             , Amendment No.             , dated Order Extending Construction Completion Date, dated X  Othpp($ ppp/fy)             Forwards Monthly Operatin        Report  for November      1982 ~
                                                                            /Q        ~ii P~
Office f Nuclear Reactor Reg latio Division of Licensing


==Enclosures:==
==Enclosures:==
Asstated/Q~iiP~OfficefNuclearReactorReglatioDivisionofLicensingOperatingReactorsBranchE/5CC:OFFICE/SURNAME)DATE)Bo~~~~~~'.QS.O/83NRCFORM318(10/80)NREM0240OFFICIALRECORDCOPY Lg~ ChiefDivisionofEcologicalServicesBureauofSportFisheriesandWildlife='.'S.DepartmentoftheInteriorWashington,D.C.20240Joyceth.Wood,DirectorOfficeofEcologyandConservationNationalOceani.candAtmosphericAdministrationU.S.DepartmentofCommerce,RH5813(PP/EC)14thandConstitutionAve.,N.W..Washington,D.C.20230Dr.WilliamB.Stroube,Jr.FDAResearchChemistNationalBureauofStandardsReactorBuilding235,Rm.B108Washington,D.C.20234U,S.EnvironmentalProtectionAgencyRegionIIOfficeATTN:RegionalRadiationRepresentative26FederalPlazaNewYork,NewYork10007 DOCKETNO(S).5O-2"4january3,1983DISTRIBUTIONDocketHSmithORBReadingSEETHOSEONTHEATTACHEDLISTSUBJFCT'.:Ginna,'NuclearPowerPlant1ocatedinWayneCounty,NewYork,datedThe.followingdocumentsconcerningourreviewofthesubjectfacilityaretransmittedforyourinformation.'oticeofReceiptofApplication.Draft/FinalEnvironmentalStatement,datedNoticeofAvailabilityofDraft/FinalEnvironmental.Statement,datedSafetyEvaluationReport,orSupplementNo.,datedNoticeofHearingonApplicationforConstructionPermit.NoticeofConsiderationofIssuanceofFacilityOperatingLicense.ApplicationandSafetyAnalysisReport,VolumeAmendmentNo.toApplication/SARdatedConstructionPermitNo.CPPR-,AmendmentNo.,datedFacilityOperatingLicenseNo.,AmendmentNo.OrderExtendingConstructionCompletionDate,datedKother(Specify)MonthlyOPeratingRePortforOctober1982.
Operating Reactors Branch          E/5 As stated CC:
OFFICE/
B      o ~ ~ ~ ~ ~ ~
SURNAME)                '. QS.
DATE)      O       /83 NRC FORM 318 (10/80) NREM 0240                  OFFICIAL RECORD COPY
 
L g ~
Chief Di vi si on of Ecological Services Bureau of Sport Fisheries and Wildlife Department of the    Interior      ='.'S.
Washington, D. C. 20240 Joyce th. Wood, Director Office of Ecology and Conservation National Oceani.c    and Atmospheric Administration U. S. Department of Commerce, RH 5813 (PP/EC) 14th and Constitution Ave., N. W..
Washington, D. C. 20230 Dr. William B. Stroube, Jr.
FDA  Research  Chemist National Bureau of Standards Reactor Building 235, Rm. B108 Washington, D. C. 20234 U, S. Environmental Protection Agency Region    II Office ATTN: Regional      Radiation Representative 26 Federal Plaza New  York,  New  York  10007
 
DISTRIBUTION Docket january 3,               1983                    HSmith ORB Reading DOCKET NO(S).             5O-2"4 SUBJFCT        '.:
SEE THOSE ON THE ATTACHED            LIST Ginna,'Nuclear Power Plant 1ocated in Wayne County, The. following documents concerning our review of the subject New facility are transmitted for your information.
York of Receipt of Application.                                                                                       'otice Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental. Statement, dated Safety Evaluation Report, or Supplement No.                           , dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendment No.                   to Application/SAR dated Construction Permit No. CPPR-                   , Amendment No.                                 , dated Facility Operating License No.                         , Amendment No.                               , dated Order Extending Construction Completion Date, dated K other(Specify)             Monthly OPerating RePort          for      October 1982.
Office o                uclear Reactor Re ulation Division of Licensing


==Enclosures:==
==Enclosures:==
AsstatedOfficeouclearReactorReulationDivisionofLicensingOperatingReactorsBranch85CC:oFFIcEIFSURNAME)DATE/DL:ORP5pig.8P..1I.3lNRCFORM318n0/80)NRCM0240~~~I~~~~~\~~~~~~~~~~~~~~~~~~~~OFFICIALRECORDCOPY ChiefDivisionofEcologicalServicesBureauofSportFisheriesandWildlifeU.S.DepartmentoftheInteriorWashington,D.C.20240JoyceN.Wood,DirectorOfficeofEcologyandConservationNationalOceanicandAtmosphericAdministrationU.S.DepartmentofCommerce,Rt<5813(PP/EC)14thandConstitutionAve.,N.W..Washington,D.C.20230Dr.WilliamB.Stroube,Jr.FDAResearchChemistNationalBureauofStandardsReactorBuilding235,Rm.'108Washington,D.C.20234U;S.EnvironmentalProtectionAgencyRegionIIOfficeATTN:RegionalRadiationRepresentative26FederalPlaza.NewYork,NewYork10007 0DEC291982DI',STRIBUTION;DocketHSjjth,ORB&#xb9;5ReqdjngSEI'8ReadingOCQAWangDOCKETNO(S).60-244TheHonorableTobyNoffett,ChairmanSubcomrbitteeonEnvironment,EnergyandNaturalResourcesComtitteeonGovernmentOperationsUn1tedStatesHouseofRepresentattvesMash1nton,O.C.20515ROCHESTERGAS5ELECTRICCORPORATION,R.E.GINNANUCLEARPOHERPLANTThefollowingdocumentsconcerningourreviewofthesubjectfacilityaretransmittedforyourinformation.NoticeofReceiptofApplication.Draft/FinalEnvironmentalStatement,datedNoticeofAvailabilityofDraftiFinalEnvironmentalStatement,datedISafetyEvaluationReport,orSupplementNo.,datedrNoticeofHearingonApplicationforConstructionPermit.NoticeofConsiderationofIssuanceofFacilityOperatingLicense.ApplicationandSafetyAnalysisReport,VolumeAmendmentNo.toApplicatloniSARdatedsConstructionPermitNo.CPPR-,AmendmentNo.,dated.FacilityOperatingLicenseNo.,AmendmentNo.,dated'OrderExtendingConstructionCompletionDate,dated8Other(Specify'heletteroftransmittelto.the'licenseeandNoticeofAvailabilitoftheFinalIntematedPlantSafetAssessmentReortNUREG-0821.EnclosuresAsstatedcc:Rep.JoelDeckard0icfNuclarReactregulationt1Div>sionofLicensingOperatingReactorsBranchNo.5OFFICEISURNAME)OATEP.o.L.:.8PH/bl11(/82~~~~~0I~~~~i~~~~~~~~~~~~'t~~~~'slitI~~~~~~i~~~~~\~~I~~~~~~~~~~~~~NRCFORM318(10/80)NRCM0240OFFlCIALRECORDCOPY 1fc1If1II1~,<I1~I~~~f1\I~~$'I"~g%gf1If~~fII*~1fgfIfl~~
Operating Reactors Branch 85 As stated CC:
DEC291982DISTRIBUTION'ocketHSSith-,ORB&#xb9;5ReadingSEPBReadingOCAAWang'OCKETNO(S).50>>244TheHonorableRichardL.Ottinger,ChairmanSubcomitteeonEnergyConservationandPowerConmitteeonEnergyandCommerceUnitedStatesHouseofRepresentativesllashington,D.C.20515
oFFIcEIF  DL:     OR    P5 SURNAME) pig. 8P..
DATE/    1I.3l                      ~ ~ ~ I~ ~   ~ ~ ~ \~~ ~~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 318 n0/80) NRCM 0240            OFFICIAL RECORD COPY
 
Chief Division of Ecological Services Bureau of Sport Fisheries and Wildlife U. S. Department of the Interior Washington, D. C. 20240 Joyce N. Wood, Director Office of Ecology and Conservation National Oceanic and Atmospheric Administration U. S. Department of Commerce, Rt< 5813 (PP/EC) 14th and Constitution Ave., N. W..
Washington, D. C. 20230 Dr. William B. Stroube,   Jr.
FDA  Research Chemist National Bureau of Standards Reactor Building 235, Rm.'108 Washington, D. C. 20234 U; S. Environmental  Protection Agency Region  II Office ATTN: Regional    Radiation Representative 26 Federal Plaza
. New  York, New York  10007
 
0                DEC2          9 1982                                              DI',STRI BUT ION
                                                                                                                              ; Docket HSjjth, ORB&#xb9;5 Reqdjng SEI'8 Reading OCQ DOCKET NO(S). 60-244                                                                                                            AWang The Honorable Toby Noffett, Chairman Subcomrbittee on Environment, Energy and Natural Resources Comtittee on Government Operations Un1ted States House of Representattves Mash1n ton, O. C. 20515 ROCHESTER GAS 5 ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POHER PLANT The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availability of DraftiFinal Environmental Statement, dated                                      I Safety Evaluation Report, or Supplement No.                                       , dated                                                    r Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendment No.                   to ApplicatloniSAR dated s
Construction Permit No. CPPR-                         Amendment No.                                         ,dated No.,
      .Facility Operating License No.                               ,   Amendment                                        dated Order Extending Construction Completion Date, dated 8 Other(Specify'he              letter of transmittel to.the                             'licensee and Notice                        of Availabilit of the Final Inte            mated Plant Safet        Assessment                  Re    ort        NUREG-0821           .
0 ic f Nucl ar React r egulationt                          1 Div>sion of Licensing Enclosures                                                                            Operating Reactors Branch No. 5 As stated cc:     Rep. Joel Deckard OFFICEI .o.L.:.
8 P SURNAME) H        /       bl                                        '
slit    I~~ ~       i            \~
                                                            ~ ~   ~   t~~~~                       ~ ~ ~   ~ ~ ~ ~ ~           ~ ~ ~ ~ ~ ~ ~ ~
OATE P 11(      /82                ~ ~ ~ ~ ~ 0 I ~ ~ ~ ~ i~     ~ ~ ~~ ~ ~ ~ ~       ~ I~ ~ ~ ~ ~
NRC FORM 318 (10/80) NRCM 0240 OFFlCIAL RECORD COPY
 
1 fc 1
I f 1I          I    1
                      ~,   <     I  1    ~
I   ~
                                              \
                      ~         ~             I f
                                                          ~   ~
1                                        'I "
              ~
g%       g f
1 I
~     ~
f          I      I
                  * ~   1fg      f  I    fl            ~ ~
 
DEC 2 9 1982 DISTRIBUTION
                                                                                                                          'ocket HSSith                  -,
NO(S). 50>>244                                                                                            ORB&#xb9;5 Reading The Honorable Richard L. Ottinger, Chairman                                                                          SEPB                  Reading Subcomittee on Energy Conservation and Power                                                                        OCA AWang'OCKET Conmittee on Energy and Commerce United States House of Representatives llashington, D.C. 20515


==SUBJECT:==
==SUBJECT:==
ROCHESTERGAS5ELECTRICCORPORATION,R.E.GINNANUCLEARPOWERPLANTNoticeofReceiptofApplication.Draft/FinalEnvironmentalStatement,datedNoticeofAvailabilityofDraft/FinalEnvironmentalStatement,datedtSafetyEvaluationReport,orSupplementNo.,datedNoticeofHearingonApplicationforConstructionPermit.NoticeofConsiderationofIssuanceofFacilityOperatingLicense.ApplicationandSafetyAnalysisReport,Volumet,Amendment.No.toApplication/SARdated,dated,AmendmentNoConstructionPermitNo.CPPRFacilityOperatingLicenseNo.,AmendmentNo.,datedOrderExtendingConstructionCompletionDate,dated4Other($pec//y)Theletteroftransmittaltothe1icenseeandNoticeofAvailabilit-Qxofthe.FinalInteratedPlantSafetAssessmentReortNUREG-821.OficofNuclearReactorRegulation'ivisionofLicensingOperatingReactorsBranchNo.51
ROCHESTER GAS      5 ELECTRIC CORPORATION, R. E. GINNA NUCLEAR                                    POWER PLANT The following documents concerning our review of the subject facility are transmitted for your information."
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated t
Safety Evaluation Report, or Supplement              No.,                     dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume t,
Amendment.No.                       to Application/SAR dated Construction Permit No. CPPR                          ,  Amendment No                      , dated Facility Operating License No.                               , Amendment No.                     , dated Order Extending Construction Completion Date, dated 4
Qx Other ($pec//y)           The  letter of transmittal to the                    1 icensee and Notice                          of Availabil it of the. Final Inte rated Plant Safet                      Assessment          Re    ort    NUREG- 821         .
Of ic of Nuclear Reactor Regulation 1                                                                                                of Licensing                                                  'ivision


==Enclosures:==
==Enclosures:==
.~Asstatedcc:Rep.CarlosHoorhead/~~~OFFICE)VSURNAME)DATEPj.-.'DL:ORB+':.bl...l...(.82...~~~~~~~~~~~~0~OA~0~~~~~~~~~~~~~~~~~~I~~~~~~~~~~Og~~~~~~~~~~OFFICIALRECORDCOPY~~~J~~~~~~~jNRCFORMSI8(IO/NRCM0240Thefollowingdocumentsconcerningourreviewofthesubjectfacilityaretransmittedforyourinformation."
.                                                                   Operating Reactors Branch No. 5
0~~,~4 PE,C-2'91982;DISTRIBUTIONIDocket.ORB05ReadingSEPBReadingOCAAWangDOCKETNO(S).50-244TheHonorableAlanSimpson,ChairmanSubcommitteeonEnergyandTheEnvironmentCommitteeonInteriorandInsularAffairsUnitedStatesHouseofRepresentativesWashington,D.C.20515
      ~   As stated cc:   Rep. Carlos Hoorhead
                                                                                                                              /
V OFFICE)   'DL:ORB+ '                                                                                             ~~ ~                    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~     ~~   0 ~ OA SURNAME)
:.bl ..                                                                          ~ ~~ ~~~                           ~ 0 ~   ~ ~ ~~~ ~~ ~         ~   ~ ~
DATE P
: j. .                      .l...(.82...  ~ j          ~ ~ ~ ~ Og ~ ~ ~ ~ ~ I~ ~ ~ ~ ~ ~ ~ ~   ~   ~ ~                 ~ ~ ~     J     ~ ~ ~ ~ ~ ~
NRC FORM SI8 (IO/   NRCM 0240 OFFICIAL RECORD COPY
 
0
~ ~
      , ~
4
 
PE,C-2'9 1982; DISTRIBUTION I  Docket  .
DOCKET NO(S). 50-244                                                                                                          ORB05 Reading The Honorable Alan Simpson, Chairman                                                                                        SEPB Reading Subcommittee on Energy and The Environment                                                                                  OCA Committee on Interior and Insular Affairs                                                                                    AWang United States House of Representatives Washington, D. C. 20515


==SUBJECT:==
==SUBJECT:==
ROCHESTERGAS8ELECTRICCORPORATION,R.E.GINNANUCLEARPOllERPLANT,AmendmentNoThefollowingdocumentsconcerningourreviewofthesubjectfacilityaretransmittedforyourinformation.NoticeofReceiptofApplication.Draft/FinalEnvironmentalStatement,datedNoticeofAvailabilityofDraft/FinalEnvironmentalStatement,datedSafetyEvaluationReport,orSupplementNo.,datedNoticeofHearingonApplicationforConstructionPermit.,NoticeofConsiderationofIssuanceofFacilityOperatingLicense.ApplicationandSafetyAnalysisReport,VolumeAmendmentNo.toApplication/SARdatedConstructionPermitNo.CPPR-,datedFacilityOperatingLicenseNo.,AmendmentNo.,datedOrderExtendingConstructionCompletionDate,datedQOther(Qpec/fy)The1etteroftransmitta1tothe1icenseeandNoticeofAvai1abi1sty'ftheFinalIntegratedPlantSafetyAssessmentReport(NUREG-0821).
ROCHESTER GAS          8 ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POllER PLANT The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                         , dated Notice of Hearing on Application for Construction Permit.,
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendment No.                           to Application/SAR dated Construction Permit No. CPPR-                                           Amendment No                dated No.,
Facility Operating License No.                                             , Amendment                    dated Order Extending Construction Completion Date, dated Q    Other (Qpec/fy)         The 1 etter of transmi tta 1 to the                            1 icen see and    Noti ce of Avai 1 abi 1                  sty'f the Final Integrated Plant Safety Assessment Report (NUREG-0821).
ffice f Nuc ear Reacto Regulation Division of Licensing


==Enclosures:==
==Enclosures:==
AsstatedSenatorGaryHartfficefNucearReactoRegulationDivisionofLicensingOperatingReactorsBranchNo6QFFlcEIISURNAME)DATE/"11//82~~~~~0~~~0~~~~0~~~~~~~~~~~~~~'~~I~~~~~~~~~~~NRCFORM318(10/80)NRCM0240OFFICIALRECORDCOPY 4  
Operating Reactors Branch                  No      6 As stated Senator Gary Hart QFFlcEII                          ~ ~ ~ ~ ~ 0 SURNAME)                                                                                                  ~ ~ ~ ~~ ~ ~~   '
~~DFCP9198P.DISTRIBUTION'.DocketHSmithORB&#xb9;5ReadingSEPBReadingOCAAWangDOCKETNO(S).50-244TheHonorableNorrisK.Vda11,ChairmanSubcomitteeonEnergyandTheEnvironmentCoimitteeonInteriorandInsu1arAffairsUnitedStatesHouseofRepaeeentativesWashihgton,D.C.20515
                                                                                                                                ~ ~     I ~ ~~ ~ ~ ~ ~ ~~ ~   ~
DATE/      11/      /82                        ~ ~ ~ 0 ~               ~ ~ ~
                                                            ~ ~ ~ 0 ~ ~ ~
NRC FORM 318 (10/80) NRCM 0240                  OFFICIAL RECORD COPY
 
4
                                                            ~   ~
DFC P 9 198P.
                                                                                                                '. DocketDISTRIBUTION HSmith DOCKET NO(S). 50-244 ORB&#xb9;5 Reading The Honorable            Norris K. Vda11, Chairman                                                                      SEPB            Reading Subcomittee on Energy and The Environment                                                                              OCA Coimittee on Inter ior and Insu1ar Affairs                                                                              AWang United States House of Repaeeentatives Washihgton, D. C.               20515


==SUBJECT:==
==SUBJECT:==
-ROCHESTERGAS5ELECTRIC,CORPORATION,R.E.GINNANUCLEARPOWERPLANT,datedFacilityOperatingLicenseNo.,AmendmentNo.,datedOrderExtendingConstructionCompletionDate,datedg]other(sec//)The1etteroftransmitta1tothe1icenseeandNoticeofAvai1abi1ityoftheFina1IntegratedP1antSafetyAssessmentReport{NUREG-21).Thefollowingdocumentsconcerningour,reviewofthesubjectfacilityaretransmittedforyourinformation.NoticeofReceiptofApplication.Draft/FinalEnvironmentalStatement,datedNoticeofAvailabilityofDraft/FinalEnvironmentalStatement,datedJSafetyEvaluationReport,orSupplementNo.,datedNoticeofHearingonApplicationforConstructionPermit.NoticeofConsiderationofIssuanceofFacilityOperatingLicense.0ApplicationandSafetyAnalysisReport,VolumeAmendmentNo:,-toApplication/SARdatedConstructionPermitNo.CPPR-,AmendmentNo.
-         ROCHESTER GAS      5 ELECTRIC, CORPORATION, R. E. GINNA NUCLEAR                                    POWER PLANT The following documents concerning our,review of the subject facility are transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated J
Safety Evaluation Report, or Supplement          No.,             dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
0 Application and Safety Analysis Report, Volume Amendment No:,             -
to Application/SAR dated Construction Permit No. CPPR-                       Amendment No.                    ,dated No.,
Facility Operating License No.                          ,  Amendment                              dated Order Extending Construction Completion Date, dated g] other (s        ec// ) The    1 etter of transmi tta1 to the        1 icensee and Notice                                of Avai 1 abi 1 ity of the      Fina1 Integrated P1ant Safety Assessment Report {NUREG-                                      21).
ffi  e        Nuclear Reactor Regulation Division of Licensing


==Enclosures:==
==Enclosures:==
Asstatedcc:Rep.Nanua1LucanffieNuclearReactorRegulationDivisionofLicensingOPeratingReactorsBranchNo.5OFF<CEPISUR)AMEJ/DATE)NAGFOAM318(10/80)NACM0240~~~~~~~~~~~~OFFICIALRECORDCOPY"~~~~e,~~~~~~~~~~~~~~~~~~0~~~~~~~~~i~~~~~~~~
OPerating Reactors Branch No.                                                  5 As stated cc:   Rep. Nanua1 Lucan OFF<CEP I
0S'E0I
SUR)AMEJ                                                                                             ~   ~ ~ ~ e, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~
}}
  /DATE)                                                                    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~       0    ~ ~ ~ ~ ~
NAG FOAM 318 (10/80) NACM 0240              OFFICIAL RECORD COPY"
 
0 S
  'E 0
I}}

Latest revision as of 11:21, 4 February 2020

Requests Info Re Override Capability & Problems Encountered When Manual Isolation Bypassed,Per Press Release 83-17
ML17256A631
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/1983
From: Stoller A
AFFILIATION NOT ASSIGNED
To: Wang A
Office of Nuclear Reactor Regulation
References
NUDOCS 8304140103
Download: ML17256A631 (18)


Text

REGULATORY It RMATION DISTRIBUTION SYST (RIDS)

ACCESSION NBR:8304140103 DQCRDATE: 83/02/28 NOTARIZED: NO DOCKET FACIL:50 BYNAME244 Robert Emmet Ginna Nuclear Planti Unit 1E Rochester G 05000244 AUTH AUTHOR AFFILIATION STOLLER,A,A ~ Af f i 1 iation Unknown RECIP ~ NAME RECIPIENI AFFILIATION WANGzA ~ BR Division of Licensi,ng N

SUBJECT:

Requests info re override capability L problems encount,"ered when manual isolation bypassediper Press Release 83 17" DISTRIBUTION CODE: H001S COPIES RECEIVED:LTR ENCL ) SIZ E:

TITLE: File Location Distribution.'ocket 50 NOTES:NRR/DL/SEP 1cy, 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NTERNA , REG F LE 01 1 1 XTERNAL: LPDR 03 1 1 NRC PDR 02 NTIS 04 1 1 OTES: 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 ENCL 5

l'r. Ik I) i 't t 'iil .T (II.K g 'tT ~ )I I ~4,>if]i> Ii t t

> ) +,t )(If<;II tt i f I') I 'tt $ It 4 lt'I f 4',it ti,

')'ll jl III "Ii r,jf .< If

~

  • li f IA Ii,) II ll r Il j) Ir II ~ ~

'( s I )

(l -

Il t. 0 t l>II<f)')II>'> I~ ti9 l (/)f'j(1 4 MI q(0 ffC 'i >

'f' '. 'I "1 4'.<4 '4 ii f'(1' f  : 1 g Ivlt'I I fi, %i,g )'), g qt I'>t".g~ts'Ily I)3(l) Cg if

'T I I 4)fit(

t ;4 I', It "T ~ I f))I',)

IC4 .

II'lit

)it () j C 4' il )

I i

) 3 $ 4 y I' (il j I I; ILj) sV~) ~

P < f'/l,? tf'4'> I",l 41~II )III I l,l '),il'T ll I I( t,'4lI,,) li g t ( '

$ , ll II 4 I t I, 5 j(,

) ) 'ii) J ~" (jI . I ., Is II ) ] (

A.A. STOLLER P.O. Box 544 Nevada City. CA 95959 g ~

Pebruary 28, 1983 Mr. A.B. Wang Div. of Licensing U.S. MRC Washington, D.C. 20555

Dear Mr. Wang:

I'm interested in your recent report on the Ginna plant, especially regarding override capability (g5 in the list of safety improvements in press release f83-17). Could you send me information on this, and the problems encountered when manual isolation is bypassed.

Thank you for your assistance.

Sincerely,

. SSoe140103 830228

'DR I'J~

PDR ADOCK 05000204,-,',

"-H '"

J' a I

F~

~ '%

i ~

t'

'C 4

Q /

Date

)POUTING AND TRANSMITI'AL SLIP 4/12/83 TO1 (Name, oNce symbol, room number, Initials Date building, Agency!Post)

Document Control Branch:

S.

ction File Note and Return roval For Clearance Per Conversation s Re uested For Correction Prepare Repl ircuiate For Your Information See Me omment investigate Signature Coordination fustl REMARKS r-Please docket the attached letter on Docket No. 50-244 (R. E. Ginna). If by chance, you see a letter to R. Stoller, pl'ease docket the attached letter as background.

Thank you.

DO NOT: use, this form as a RECORD of approvals, concurrences, disposals, ciearances, and similar actions FROM: (Name, org. symbol, Agency/Post) Room No.8ldg.

Debbie Kragh 'pc

~1-102 OPTIONAL FORM 41 (Rev, 7-76)

Prescribed bv GSA

  • GFO: $ 41-529 (101) FPM R (41 CFR) 101-11.206 1981 0

February 2 1983, ,

DISTRIBUTION Docket ORB Reading DOCKET NO(S). 50-244 HSmith SEE .THOSE ON THE ATTACHED LIST.

R. E. Ginna Nuclear Plant, located in Hayne County, New York.

The following documents concerning our review of the subject facility are transmitted for your information.-'otice of Receipt of Application.

Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. , dated Notice of Hearing on Application for Construction Permit.

Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report, Volume Amendment No. to Application/SAR dated Construction Permit No. CPPR- , Amendment No. , dated Facility Operating License No. , Amendment No. , dated Order Extending Construction Completion Date, dated X Othpp($ ppp/fy) Forwards Monthly Operatin Report for November 1982 ~

/Q ~ii P~

Office f Nuclear Reactor Reg latio Division of Licensing

Enclosures:

Operating Reactors Branch E/5 As stated CC:

OFFICE/

B o ~ ~ ~ ~ ~ ~

SURNAME) '. QS.

DATE) O /83 NRC FORM 318 (10/80) NREM 0240 OFFICIAL RECORD COPY

L g ~

Chief Di vi si on of Ecological Services Bureau of Sport Fisheries and Wildlife Department of the Interior ='.'S.

Washington, D. C. 20240 Joyce th. Wood, Director Office of Ecology and Conservation National Oceani.c and Atmospheric Administration U. S. Department of Commerce, RH 5813 (PP/EC) 14th and Constitution Ave., N. W..

Washington, D. C. 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Rm. B108 Washington, D. C. 20234 U, S. Environmental Protection Agency Region II Office ATTN: Regional Radiation Representative 26 Federal Plaza New York, New York 10007

DISTRIBUTION Docket january 3, 1983 HSmith ORB Reading DOCKET NO(S). 5O-2"4 SUBJFCT '.:

SEE THOSE ON THE ATTACHED LIST Ginna,'Nuclear Power Plant 1ocated in Wayne County, The. following documents concerning our review of the subject New facility are transmitted for your information.

York of Receipt of Application. 'otice Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental. Statement, dated Safety Evaluation Report, or Supplement No. , dated Notice of Hearing on Application for Construction Permit.

Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report, Volume Amendment No. to Application/SAR dated Construction Permit No. CPPR- , Amendment No. , dated Facility Operating License No. , Amendment No. , dated Order Extending Construction Completion Date, dated K other(Specify) Monthly OPerating RePort for October 1982.

Office o uclear Reactor Re ulation Division of Licensing

Enclosures:

Operating Reactors Branch 85 As stated CC:

oFFIcEIF DL: OR P5 SURNAME) pig. 8P..

DATE/ 1I.3l ~ ~ ~ I~ ~ ~ ~ ~ \~~ ~~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

NRC FORM 318 n0/80) NRCM 0240 OFFICIAL RECORD COPY

Chief Division of Ecological Services Bureau of Sport Fisheries and Wildlife U. S. Department of the Interior Washington, D. C. 20240 Joyce N. Wood, Director Office of Ecology and Conservation National Oceanic and Atmospheric Administration U. S. Department of Commerce, Rt< 5813 (PP/EC) 14th and Constitution Ave., N. W..

Washington, D. C. 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Rm.'108 Washington, D. C. 20234 U; S. Environmental Protection Agency Region II Office ATTN: Regional Radiation Representative 26 Federal Plaza

. New York, New York 10007

0 DEC2 9 1982 DI',STRI BUT ION

Docket HSjjth, ORB¹5 Reqdjng SEI'8 Reading OCQ DOCKET NO(S).60-244 AWang The Honorable Toby Noffett, Chairman Subcomrbittee on Environment, Energy and Natural Resources Comtittee on Government Operations Un1ted States House of Representattves Mash1n ton, O. C. 20515 ROCHESTER GAS 5 ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POHER PLANT The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application.

Draft/Final Environmental Statement, dated Notice of Availability of DraftiFinal Environmental Statement, dated I Safety Evaluation Report, or Supplement No. , dated r Notice of Hearing on Application for Construction Permit.

Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report, Volume Amendment No. to ApplicatloniSAR dated s

Construction Permit No. CPPR- Amendment No. ,dated No.,

.Facility Operating License No. , Amendment dated Order Extending Construction Completion Date, dated 8 Other(Specify'he letter of transmittel to.the 'licensee and Notice of Availabilit of the Final Inte mated Plant Safet Assessment Re ort NUREG-0821 .

0 ic f Nucl ar React r egulationt 1 Div>sion of Licensing Enclosures Operating Reactors Branch No. 5 As stated cc: Rep. Joel Deckard OFFICEI .o.L.:.

8 P SURNAME) H / bl '

slit I~~ ~ i \~

~ ~ ~ t~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

OATE P 11( /82 ~ ~ ~ ~ ~ 0 I ~ ~ ~ ~ i~ ~ ~ ~~ ~ ~ ~ ~ ~ I~ ~ ~ ~ ~

NRC FORM 318 (10/80) NRCM 0240 OFFlCIAL RECORD COPY

1 fc 1

I f 1I I 1

~, < I 1 ~

I ~

\

~ ~ I f

~ ~

1 'I "

~

g% g f

1 I

f ~ ~

f I I

  • ~ 1fg f I fl ~ ~

DEC 2 9 1982 DISTRIBUTION

'ocket HSSith -,

NO(S). 50>>244 ORB¹5 Reading The Honorable Richard L. Ottinger, Chairman SEPB Reading Subcomittee on Energy Conservation and Power OCA AWang'OCKET Conmittee on Energy and Commerce United States House of Representatives llashington, D.C. 20515

SUBJECT:

ROCHESTER GAS 5 ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POWER PLANT The following documents concerning our review of the subject facility are transmitted for your information."

Notice of Receipt of Application.

Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated t

Safety Evaluation Report, or Supplement No., dated Notice of Hearing on Application for Construction Permit.

Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report, Volume t,

Amendment.No. to Application/SAR dated Construction Permit No. CPPR , Amendment No , dated Facility Operating License No. , Amendment No. , dated Order Extending Construction Completion Date, dated 4

Qx Other ($pec//y) The letter of transmittal to the 1 icensee and Notice of Availabil it of the. Final Inte rated Plant Safet Assessment Re ort NUREG- 821 .

Of ic of Nuclear Reactor Regulation 1 of Licensing 'ivision

Enclosures:

. Operating Reactors Branch No. 5

~ As stated cc: Rep. Carlos Hoorhead

/

V OFFICE) 'DL:ORB+ ' ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ 0 ~ OA SURNAME)

.bl .. ~ ~~ ~~~ ~ 0 ~ ~ ~ ~~~ ~~ ~ ~ ~ ~

DATE P

j. . .l...(.82... ~ j ~ ~ ~ ~ Og ~ ~ ~ ~ ~ I~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ J ~ ~ ~ ~ ~ ~

NRC FORM SI8 (IO/ NRCM 0240 OFFICIAL RECORD COPY

0

~ ~

, ~

4

PE,C-2'9 1982; DISTRIBUTION I Docket .

DOCKET NO(S). 50-244 ORB05 Reading The Honorable Alan Simpson, Chairman SEPB Reading Subcommittee on Energy and The Environment OCA Committee on Interior and Insular Affairs AWang United States House of Representatives Washington, D. C. 20515

SUBJECT:

ROCHESTER GAS 8 ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POllER PLANT The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application.

Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. , dated Notice of Hearing on Application for Construction Permit.,

Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report, Volume Amendment No. to Application/SAR dated Construction Permit No. CPPR- Amendment No dated No.,

Facility Operating License No. , Amendment dated Order Extending Construction Completion Date, dated Q Other (Qpec/fy) The 1 etter of transmi tta 1 to the 1 icen see and Noti ce of Avai 1 abi 1 sty'f the Final Integrated Plant Safety Assessment Report (NUREG-0821).

ffice f Nuc ear Reacto Regulation Division of Licensing

Enclosures:

Operating Reactors Branch No 6 As stated Senator Gary Hart QFFlcEII ~ ~ ~ ~ ~ 0 SURNAME) ~ ~ ~ ~~ ~ ~~ '

~ ~ I ~ ~~ ~ ~ ~ ~ ~~ ~ ~

DATE/ 11/ /82 ~ ~ ~ 0 ~ ~ ~ ~

~ ~ ~ 0 ~ ~ ~

NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD COPY

4

~ ~

DFC P 9 198P.

'. DocketDISTRIBUTION HSmith DOCKET NO(S). 50-244 ORB¹5 Reading The Honorable Norris K. Vda11, Chairman SEPB Reading Subcomittee on Energy and The Environment OCA Coimittee on Inter ior and Insu1ar Affairs AWang United States House of Repaeeentatives Washihgton, D. C. 20515

SUBJECT:

- ROCHESTER GAS 5 ELECTRIC, CORPORATION, R. E. GINNA NUCLEAR POWER PLANT The following documents concerning our,review of the subject facility are transmitted for your information.

Notice of Receipt of Application.

Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated J

Safety Evaluation Report, or Supplement No., dated Notice of Hearing on Application for Construction Permit.

Notice of Consideration of Issuance of Facility Operating License.

0 Application and Safety Analysis Report, Volume Amendment No:, -

to Application/SAR dated Construction Permit No. CPPR- Amendment No. ,dated No.,

Facility Operating License No. , Amendment dated Order Extending Construction Completion Date, dated g] other (s ec// ) The 1 etter of transmi tta1 to the 1 icensee and Notice of Avai 1 abi 1 ity of the Fina1 Integrated P1ant Safety Assessment Report {NUREG- 21).

ffi e Nuclear Reactor Regulation Division of Licensing

Enclosures:

OPerating Reactors Branch No. 5 As stated cc: Rep. Nanua1 Lucan OFF<CEP I

SUR)AMEJ ~ ~ ~ ~ e, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~

/DATE) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~

NAG FOAM 318 (10/80) NACM 0240 OFFICIAL RECORD COPY"

0 S

'E 0

I