ML17261A145: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/19/1979
| issue date = 10/19/1979
| title = LER 79-019/03L-0:on 790919,loose Nuts on Anchor Bolts Were Found on Pipe Supports & on Svc Water Piping to Standby Auxiliary Feedwater Pump.Caused by Nuts Working Loose During Sys Operation.Nuts Were Torqued to Current Requirement
| title = LER 79-019/03L-0:on 790919,loose Nuts on Anchor Bolts Were Found on Pipe Supports & on Svc Water Piping to Standby Auxiliary Feedwater Pump.Caused by Nuts Working Loose During Sys Operation.Nuts Were Torqued to Current Requirement
| author name = ST MARTIN J T
| author name = St Martin J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:U.S.NUCLEAR REGULATORY COMMISSION NT REPORT~(OAR 1339){PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
{{#Wiki_filter:NRC FORM 366 I7-77) r CONTROL BLOCK:
NRC FORM 366 I7-77)r f 79-019/CENSEE EVE CONTROL BLOCK: Qi 1 6 N Y R B G 1Q20 0-0 0 0 0 0-0 0 Q34 1 1 1 1 QE~QE 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58[oat 7 8 CON'T~8 7 8 REDRT~LQB 0 5 0 0 0 2 4 4 7 0 9 1 9 7 9 B 1 0 1 9 7 9 QB 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES
1 f
+10 During inspections required by IE Burietin 79-14, loose nuts on anchor bolts were~o3 found on pipe supports SW-1 4 1,-1 42,-1 43,-.1 45, and-1 46, on service water piping~o4 to the"D" standby auxiliary feedwater pump.Although the pump was declared'I~os inoperable (T~S~3~4~2.d)all three auxiliary feedwater pumps and the alternate~OB standby auxiliary f eedwater pump were operable.7~O7~OS 80 7 8 9~OB 7 8 SYSTEM CAUSE CAUSE COMP.VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE~OH Q77.~B Q72~O Q73 9 U P 0 R T Q74~B Q78~Z QE 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERIRO EVENT YEAR REPORT NO.CODE TYPE NO, Q17 REPoRT~79~~01 9+r~03~L++0 21 22 23 24 26 27 28 29 30 31 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.COMPONENT TAKEN ACTION ON PLANT METHOD HOURS l@2 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER Q18~Z Q18~ZQ20~Z Q27 0 0 0 0~N Q23~N Q24~A Q28 G 1 9 0 Q28 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o Construction requirements at the time of installation (1975-1977) did not detail anchor bolt torqueing requirements.
6 Qi 79-019/
Nuts worked loose during system operation.
CENSEE EVE NT REPORT U. S. NUCLEAR REGULATORY COMMISSION
Nuts were torqued to current requirements, and pump was then declared operable.These anchor 3 bolts will continue to be inspected in accordance with the station IS I program.4 7 8 9 FACILITY STATUS%POWER OTHER STATUS Q E 1 0 0 NA 44 METHOD OF DISCOVERY GR~Q28~CQ31 7 8 9 10 12 13 44 45 46 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY 6~Z Q33~ZQ34 NA 7 8 9 10 11 45 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 7~000 0 0 0Q3 7 Z Q3 8 NA 7 8 9 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 8~00 OQR NA DISCOVERY DESCRIPTION Q32 IE Bulletin 79-14 LOCATION OF RELEASE 80 80 80 80 7 8 7 8 o 7 8 9 11 12 LOSS OF OR DAMAGE TO FACILITY 43 TYPE DESCRIPTION Z Q4, NA 9 IO PUBLICITY ISSUED DESCRIPTION
                                                                                                                                                ~
~~NQ44 NA 9 10 80 80 79102203~NRC USE ONLY Tohn T.St Martin NAME OF PREPARER 7 68 69 80 ER PHDNE.7 1 6/546-2700, ext~29 1-253}}
{PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
(OAR 1339)
[oat            N Y         R     B     G     1Q20                 0         0     0   0   0       0         0   0 25 Q34           1     1     1     1   QE~QE 7        8    9       LICENSEE CODE             14       15                     LICENSE NUMBER                                 26       LICENSE TYPE       30   57 CAT 58 CON'T REDRT                      0                              2    4    4                                                            0          9          9
    ~8                             ~LQB                   5     0     0   0                       7     0   9     1     9     7     9     B     1           1         7         QB 7        8                      60           61               DOCKET NUMBER                 68     69       EVENT DATE               74       75       REPORT DATE           80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES +10 During inspections required by IE Burietin 79-14, loose nuts on anchor bolts were
    ~o3               found on pipe supports SW- 1 4 1,                                   - 1 42,   -1 43,     -. 1 45,     and     1 46,       on service water piping
    ~o4             to the "D" standby auxiliary feedwater pump. Although the pump was declared
'I
    ~os               inoperable             (T ~ S   ~   3 ~ 4 ~ 2 . d)   all three auxiliary feedwater                             pumps and the alternate
    ~OB             standby auxiliary feedwater pump were operable                                                 .
7
    ~O7
    ~OS 7         8 9                                                                                                                                                                           80 SYSTEM                 CAUSE         CAUSE                                                           COMP.           VALVE CODE                 CODE       SUBCODE                   COMPONENT CODE                     SUBCODE           SUBCODE
    ~OB                              ~OH             Q77.       ~B     Q72   ~O     Q73       9     U     P   0     R   T     Q74       ~B     Q78     ~Z     QE 7        8                      9           10             11             12             13                               18           19               20 SEQUENTIAL                           OCCURRENCE               REPORT                       REVISION Q17 LERIRO REPoRT ACTION FUTURE EVENT YEAR
                                      ~79 21        22 EFFECT
                                                                ~
23 SHUTDOWN
                                                                              ~01 24 REPORT NO.
9 26
                                                                                                        +r 27
                                                                                                                        ~03 28 ATTACHMENT CODE 29 NPRDQ TYPE
                                                                                                                                                ~L 30 PRIME COMP.
                                                                                                                                                                +31
                                                                                                                                                                              +0 NO, COMPONENT TAKEN ACTION                 ON PLANT               METHOD                   HOURS l@2         SUBMITTED           FORM SUB.         SUPPLIER           MANUFACTURER Q18 ~Z     Q18         ~ZQ20                 ~Z   Q27           0   0   0     0       ~N     Q23       ~N     Q24       ~A     Q28       G     1   9 0   Q28 33         34                 35                   36             37                   40     41                 42                 43             44               47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o         Construction requirements at the time of installation (1975-1977) did not detail anchor bolt torqueing requirements.                                 Nuts worked loose during system operation.                                             Nuts were torqued to current requirements, and pump was then declared operable.                                                                             These anchor 3         bolts     will continue                 to be inspected in accordance with the station IS I program                                                     .
4 7       8     9                                                                                                                                                                       80 FACILITY Q        METHOD OF 7        8 STATUS 9
E  GR      ~Q28 10 1
                                    % POWER 0      0 12        13 OTHER STATUS NA 44 DISCOVERY
                                                                                                    ~CQ31 45         46 IE  Bulletin 79-14 DISCOVERY DESCRIPTION Q32 80 ACTIVITY CONTENT RELEASED OF RELEASE                           AMOUNT OF ACTIVITY                                                           LOCATION OF RELEASE 6       ~Z     Q33   ~ZQ34                             NA 7       8   9             10           11                                             44            45                                                                             80 PERSONNEL EXPOSURES NUMBER             TYPE         DESCRIPTION Q39 7       ~0000 00Q3 7               Z   Q3 8             NA 7       8   9               11       12           13                                                                                                                               80 PERSONNEL INJURIES NUMBER             DESCRIPTIONQ41 7
8 8
                ~00 9
OQR 12 NA 11                                                                                                                                                      80 LOSS OF OR DAMAGE TO FACILITY                 43 TYPE       DESCRIPTION Z   Q4,                                       NA 7        8    9           IO                                                                                                                                                           80 o
ISSUED
                ~NQ44 PUBLICITY DESCRIPTION      ~                   NA 79102203~                                                         NRC USE ONLY 7
7        8    9          10                                                                                                                        68    69                          80  ER NAME OF PREPARER                          Tohn T. St           Martin                                   PHDNE.7 1     6/546-2700, ext 29 1- 253     ~}}

Latest revision as of 10:04, 4 February 2020

LER 79-019/03L-0:on 790919,loose Nuts on Anchor Bolts Were Found on Pipe Supports & on Svc Water Piping to Standby Auxiliary Feedwater Pump.Caused by Nuts Working Loose During Sys Operation.Nuts Were Torqued to Current Requirement
ML17261A145
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/19/1979
From: St Martin J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17249A212 List:
References
LER-79-019-03L, LER-79-19-3L, NUDOCS 7910220354
Download: ML17261A145 (2)


Text

NRC FORM 366 I7-77) r CONTROL BLOCK:

1 f

6 Qi 79-019/

CENSEE EVE NT REPORT U. S. NUCLEAR REGULATORY COMMISSION

~

{PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

(OAR 1339)

[oat N Y R B G 1Q20 0 0 0 0 0 0 0 0 25 Q34 1 1 1 1 QE~QE 7 8 9 LICENSEE CODE 14 15 LICENSE NUMBER 26 LICENSE TYPE 30 57 CAT 58 CON'T REDRT 0 2 4 4 0 9 9

~8 ~LQB 5 0 0 0 7 0 9 1 9 7 9 B 1 1 7 QB 7 8 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES +10 During inspections required by IE Burietin 79-14, loose nuts on anchor bolts were

~o3 found on pipe supports SW- 1 4 1, - 1 42, -1 43, -. 1 45, and 1 46, on service water piping

~o4 to the "D" standby auxiliary feedwater pump. Although the pump was declared

'I

~os inoperable (T ~ S ~ 3 ~ 4 ~ 2 . d) all three auxiliary feedwater pumps and the alternate

~OB standby auxiliary feedwater pump were operable .

7

~O7

~OS 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~OB ~OH Q77. ~B Q72 ~O Q73 9 U P 0 R T Q74 ~B Q78 ~Z QE 7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION Q17 LERIRO REPoRT ACTION FUTURE EVENT YEAR

~79 21 22 EFFECT

~

23 SHUTDOWN

~01 24 REPORT NO.

9 26

+r 27

~03 28 ATTACHMENT CODE 29 NPRDQ TYPE

~L 30 PRIME COMP.

+31

+0 NO, COMPONENT TAKEN ACTION ON PLANT METHOD HOURS l@2 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER Q18 ~Z Q18 ~ZQ20 ~Z Q27 0 0 0 0 ~N Q23 ~N Q24 ~A Q28 G 1 9 0 Q28 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o Construction requirements at the time of installation (1975-1977) did not detail anchor bolt torqueing requirements. Nuts worked loose during system operation. Nuts were torqued to current requirements, and pump was then declared operable. These anchor 3 bolts will continue to be inspected in accordance with the station IS I program .

4 7 8 9 80 FACILITY Q METHOD OF 7 8 STATUS 9

E GR ~Q28 10 1

% POWER 0 0 12 13 OTHER STATUS NA 44 DISCOVERY

~CQ31 45 46 IE Bulletin 79-14 DISCOVERY DESCRIPTION Q32 80 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE 6 ~Z Q33 ~ZQ34 NA 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 7 ~0000 00Q3 7 Z Q3 8 NA 7 8 9 11 12 13 80 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 7

8 8

~00 9

OQR 12 NA 11 80 LOSS OF OR DAMAGE TO FACILITY 43 TYPE DESCRIPTION Z Q4, NA 7 8 9 IO 80 o

ISSUED

~NQ44 PUBLICITY DESCRIPTION ~ NA 79102203~ NRC USE ONLY 7

7 8 9 10 68 69 80 ER NAME OF PREPARER Tohn T. St Martin PHDNE.7 1 6/546-2700, ext 29 1- 253 ~