| : a. Direct HP to sample RCS and ruptured S/G for boron concentration | | : a. Direct HP to sample RCS and ruptured S/G for boron concentration |
| : b. Verify boron concentration- b. Borate as necessary. | | : b. Verify boron concentration- b. Borate as necessary. |
| GREATER THAN REQUIREMENTS OF FIGURE SDM | | GREATER THAN REQUIREMENTS OF FIGURE SDM CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1) ALTERNATE WATER SUPPLY TO AFW PUMPS). |
| *****************************************
| |
| CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1) ALTERNATE WATER SUPPLY TO AFW PUMPS). | |
| NOTE: TDAFW pump flow control valves fail open on loss of IA. | | NOTE: TDAFW pump flow control valves fail open on loss of IA. |
| 4 Check Intact S/G Level: | | 4 Check Intact S/G Level: |
Line 153: |
Line 151: |
|
| |
|
| 9 h | | 9 h |
| $
| |
| ~$ | | ~$ |
|
| |
|
Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
EOP:
REV: 5 ES-3 ' POST-SGTR COOLDOWN USING BACKFILL PAGE 1 of 8 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER D3 TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTENDENT EF EC IVE DATE CATEGORY 1.0 REVIEWED BY:-
9206Lb0403 920b05 PDR ADOCK 05000244 P PDR
'g l E% '
.t A
EOP: TITLE:
REVS 5 ES-3 ' POST-SGTR COOLDOWN USING BACKFILL PAGE 2 of 8 A. PURPOSE This procedure provides actions to cool down and depressurize the plant to cold shutdown conditions following a SGTR. This recovery method depressurizes the ruptured S/G by draining it through the ruptured S/G tubes into the RCS.
B. ENTRY CONDITIONS/SYMPTOMS
- 1. ENTRY CONDITIONS This procedure is entered from:
- a. E-3 STEAM GENERATOR TUBE RUPTURE, staff selects backfill method.
if plant b ~ I ES 3 ~ 2 / POST SGTR COOLDOWN US NG BLOWDOWNg when blowdown is not available and plant staff selects backfill method.
gf y'l e
r
EOP:
REV: 5 ES-3. 1 POST-SGTR COOLDOWN USING BACKFILL PAGE 3 of 8 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o FOLDOUT page should be open AND monitored periodically.
Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ R/hr.
1 Energize PRZR Heaters As Necessary To Saturate PRZR Water At Ruptured S/G Pressure 2 Check Isolated:
If SI ACCUMs Should Be
- a. Check the following: a. Go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED o RCS subcooling based on core RECOVERY DESIRED, Step 1.
exit T/Cs - GREATER THAN O' USING FIGURE MIN SUBCOOLING o PRZR level - GREATER THAN 5%
[30% adverse CNMT]
- b. Dispatch AO with locked valve key to locally close breakers for SI ACCUM discharge valves
~ MOV-841, MCC C position 12F
~ MOV-865, MCC D position 12C c, Close SI ACCUM outlet valves c. Vent any unisolated ACCUMs:
~ ACCUM A, MOV-841 1) Open vent valves for
~ ACCUM B) MOV-865 unisolated SI ACCUMs.
~ ACCUM A, AOV-834A
~ ACCUM B, AOV-834B
- 2) Open HCV-945.
- d. Locally reopen breakers for MOV-841 and MOV-865
l
~'
sJA&
EOP: TITLE:
REV: 5 ES-3.1 POST-SGTR COOLDOWN USING BACKFILL PAGE 4 of 8 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Leakage from ruptured S/G into RCS will dilute RCS boron concentration.
3 Verify Adequate Shutdown Margin
- a. Direct HP to sample RCS and ruptured S/G for boron concentration
- b. Verify boron concentration- b. Borate as necessary.
GREATER THAN REQUIREMENTS OF FIGURE SDM CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1) ALTERNATE WATER SUPPLY TO AFW PUMPS).
NOTE: TDAFW pump flow control valves fail open on loss of IA.
4 Check Intact S/G Level:
- a. Narrow range level - GREATER a. Maintain total feed flow greater THAN 5% [25% adverse CNMT) than 200 gpm until narrow range I
~
level greater than 5% [25%
adverse CNMT] in the intact S/G.
- b. Control feed 'flow to maintain b. IF narrow range level in the narrow range level between 17% intact S/G continues to increase
[25% adverse CNMT] and 50% in an uncontrolled manner, THEN go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.
~ t A-W n,~
ri ep.
el:
l~
I r
(+
I
EOP: TITLE:
REV: 5 ES-3 ~ 1 POST-SGTR COOLDOWN USING BACKFILL PAGE 5 of 8 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Since ruptured S/G may continue to depressurize to less than the minimum RCS pressure necessary for continued RCP operation, cooldown to cold shutdown should be completed as quickly as possible, not to exceed 100'F/hr.
5 Initiate RCS Cooldown To Cold Shutdown:
- a. Establish and maintain cooldown rate in RCS cold legs - LESS THAN 100'F/HR
- b. Use RHR system if in service
- c. Dump steam to condenser from c. Manually or locally dump steam intact S/G using intact S/G ARV.
IF no intact S/G available and RHR system NOT in service, THEN perform the following:
o Use faulted S/G.
-OR-o Go to ECA-3.1, SGTR WITH LOSS I'efill OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, Step 1.
6 Check Ruptured S/G Narrow ruptured S/G to 67% [55%
Range Level GREATER THAN adverse CNMT) using feed flow.
174 [254 adverse CNMT]
IF either of the following conditions occurs, THEN stop feed flow to ruptured S/G:
o Ruptured S/G pressure decreases in an uncontrolled manner.
-OR-o Ruptured S/G pressure increases to 1020 psig.
QL c k
k
<W4IS
EOP:
REV: 5 ES-3 ' POST-SGTR COOLDOWN USING BACKFILL PAGE 6 of 8 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 7 Control RCS Makeup Flow And Letdown To Maintain PRZR Level:
- a. PRZR level - GREATER THAN 13% a, Increase RCS makeup flow as
[40$ adverse CNMT] necessary and go to Step 8.
- b. PRZR level - LESS THAN 75% [65% b. Decrease RCS makeup flow to adverse CNMT] decrease level and go to Step 10.
NOTE: The upper head region may void during RCS depressurization if RCPs are not running. This may result in a rapidly increasing PRZR level.
8 Depressurize RCS To Backfill From Ruptured S/G:
- a. Depressurize using normal PRZR a. IF letdown is in service, THEN spray depressurize using auxiliary spray valve (AOV-296). IF NOT, THEN use one PRZR PORV ~
- b. Maintain PRZR level - BETWEEN 13% AND 75% [BETWEEN 40% AND 65%
adverse CNMT]
- c. Check ruptured S/G level c. Stop RCS depressurization.
GREATER THAN 5% [25% adverse CNMT]
- d. Energize PRZR heaters as necessary
- e. Maintain RCS subcooling based on core exit T/Cs - GREATER THAN O'F USING FIGURE MIN SUBCOOLING
I I
t,.J fg 4 CK~
EOP:
REV: 5 ES-3 ~ 1 POST-SGTR COOLDOWN USING BACKFILL PAGE 7 of 8 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Establish Required RCS Hydrogen Concentration (Refer to S-3.3C, H2 Or 02 REMOVAL FROM PRIMARY SYSTEM BY BURPING VCT) 10 Check Can Be IfEstablished:
RHR Normal Cooling
- a. RCS cold leg temperature - LESS a. Go to Step 11.
THAN 350'F
- b. RCS pressure - LESS THAN b.'o to Step 11.
400 psig [300 psig adverse CNMT]
- c. Place RCS overpressure c. IF RCS overpressure protection protection system in service system can NOT be placed in (Refer to 0-7, ALIGNMENT AND service, THEN notify TSC of OPERATION OF THE REACTOR VESSEL potential Tech Spec violation if OVERPRESSURE PROTECTION SYSTEM) RHR system is placed in service.
- d. Establish RHR normal cooling (Refer to Attachment RHR COOL) ll Check If RCPs Must Be Stopped:
- a. RCPs - ANY RUNNING "
- a. Go to Step 12.
- b. Check the following: b. Go to Step 12.
o RCP ¹1 seal D/P - LESS THAN 220 PSID
-OR-o Check RCP seal leakage - LESS THAN 0.25 GPM
- c. Stop affected RCP(s)
EOP:
REV' ES;3 1 ~ POST-SGTR COOLDOHN USING BACKFILL PAGE 8 of 8 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 12 Check Core Exit T/Cs LESS Return to Step 3.
THAN 200'F 13 Evaluate Long Term Plant Status:
- a. Maintain cold shutdown conditions (Refer to 0-2.3, PLANT AT COLD OR REFUELING SHUTDOWN)
- b. Consult TSC
-END-
EOP:
REV: 5 ES-3 ' POST-SGTR COOLDOWN USING BACKFILL PAGE 1 of 1 ES-3. 1 APPENDIX LIST TITLE PAGES
- 1) RED PATH
SUMMARY
- 2) FIGURE MIN SUBCOOLING
- 3) FIGURE SDM
- 4) ATTACHMENT RHR COOL
- 5) FOLDOUT
9 h
~$
EOP:
REV: 5 ES-3.1 POST-SGTR COOLDOWN USING BACKFILL PAGE 1 of 1 RED PATH
SUMMARY
- a. SUBCRITICALITY Nuclear power greater than 5%
- b. CORE COOLING Core exit T/Cs greater than 1200'F
-OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs) less than 43% [46%
adverse CNMT)
- c. HEAT SINK Narrow range level in all S/Gs less than 54
[25% adverse CNMT] AND total feedwater flow less than 200 gpm
- d. INTEGRITY Cold leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F
- e. CONTAINMENT CNMT pressure greater than 60 psig
sJ IA y1 Pj L
% ~
EDP: TITLE:
REV' ES-3 ' POST-SGTR COOLDOWN USING BACKFILL PAGE 1 of, 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin = Saturation Temperature From Figure Below [-] Core Exit T/C Indication RC S PRESSURE (PSIG) 2500 2400 2300 RCS PRESSURE INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 700 INADE(UATE SUBCOOLING 600 REGION DV RSE CNMT 500 400 300 200 NORMAL CNMT TEMPERATURE INCREMENTS 10'F 100 0
200 250 300, 350 400 450 500 550 600 650'00 CORE EXIT SATURATION TEMPERATURE ('F)
~ I h I J
Vt 4a A
k
~2 V
4 9 +e Di
EOP: TITLE:
REV: 5 ES-3.1 POST-SGTR COOLDOWN USING BACKFILL PAGE 1 of 1 FIGURE SDM BORON CONCENTRATION (PPH) 1800 BORON INCREMENTS 20 PPH 1600 1400 ADEQUATE SDH 1200 100 PPH CONSERVATISH INCLUDED 1000 SOO 600 400 BO 200 BURNUP INCREMENTS 100 HWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 22 BURNUP (MWD/HTU)
NOTE: To obtain core burnup, use PPCS turn on code BURNUP.
EOP: T1TLE:
REV: 5 ES-3 ' POST-SGTR COOLDOWN USING BACKFILL PAGE 1 of 1 FOLDOUT PAGE 1~ SI REINITIATION CRITERIA IF either condition listed below occurs, THEN operate SI pumps manually as necessary and go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, Step 1:
o RCS subcooling based on core exit T/Cs LESS THAN O'F USING REQUIREMENTS OF FIGURE MIN SUBCOOLING.
OR o PRZR level CHARGING CAN NOT CONTROL LEVEL GREATER THAN 5%
[304 adverse CNMT]
2 ~ SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1.
3 ~ COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST level decreases to less than 284, THEN go to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, Step 1.
4 ~ AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.l, ALTERNATE WATER SUPPLY TO AFW PUMPS).