{{#Wiki_filter:TQ-AA-150-J020 Revision 00 Page 1 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
{{#Wiki_filter:TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure ASD - Take Action for Recirc Pump Trip - (A)
Job Performance Measure ASD - Take Action for Recirc Pump Trip  
JPM Number: S-N-a Revision Number: 00 Date: 04 / 2017 Developed By:
- (A)   JPM Number:
Exam Author          Date Approved By:
S-N-a Revision Number:
Facility Representative    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
0 0  Date: 04 / 2017


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     1. Task description and number, JPM description and number are identified.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     2. Knowledge and Abilities (K/A) references are included.
________ 2. Knowledge and Abilities (K/A) references are included.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 3. Performance location specified. (in
________     4. Initial setup conditions are identified.
-plant, control room, simulator, or other)
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 4. Initial setup conditions are identified.
________     6. Task standards identified and verified by SME review.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 6. Task standards identified and verified by SME review.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DGP 03-01                 Rev: 132 Procedure DOA 0202-01               Rev: 044 Procedure DOP 0202-03               Rev: 044
Procedure DGP 03-01 Rev: 132 Procedure DOA 0202-01 Rev: 044 Procedure DOP 0202-03 Rev: 044 ________ 10. Verify cues both verbal and visual are free of conflict.
________     10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________     11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Subsequent validations, sign and date below:
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 00, Developed for 2017-301 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)
Revision 00,      Developed for 2017-301 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to an IC with the following: (IC 164 was used for validation)
: 1. Reset the simulator to an IC with the following: (IC 164 was used for validation)
Adjust core flow to establish recirc pump speeds < 68%
* Adjust core flow to establish recirc pump speeds < 68%
Verify FCL > 68%
* Verify FCL > 68%
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Insert following Malfunctions and/or Remotes
: 2. Insert following Malfunctions and/or Remotes:
None Verify Run CAEP - ASD JPM.cae
* None
: 3. A copy of DGP 03
* Verify
-01, Power Changes, marked up to the point of raising power with Recirc Flow. 4. A Maneuvering REMA marked up to the point of raising power with Recirc Flow
* Run CAEP - ASD JPM.cae
. 5. Clean copy of DOA 0202
: 3. A copy of DGP 03-01, Power Changes, marked up to the point of raising power with Recirc Flow.
-01, Recirculation (Recirc) Pump Trip  
: 4. A Maneuvering REMA marked up to the point of raising power with Recirc Flow.
- One of Both Pumps.
: 5. Clean copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One of Both Pumps.
: 6. Clean copy of DOP 0202
: 6. Clean copy of DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION
-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION 7. This completes the setup for this JPM.
: 7. This completes the setup for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 9 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO
: 1. You are the Unit 2 NSO.
. 2. Tech Spec 3.3.1.3 has been entered due to OPRM trip capability not maintained.
: 2. Tech Spec 3.3.1.3 has been entered due to OPRM trip capability not maintained.
: 3. Alternate method to detect and suppress thermal hydraulic instability oscillations has been initiated.
: 3. Alternate method to detect and suppress thermal hydraulic instability oscillations has been initiated.
: 4. Unit 2 load was dropped 2 hours ago per TSO direction
: 4. Unit 2 load was dropped 2 hours ago per TSO direction.
. 5. The TSO has requested raising Unit 2 load to 750 MWE. INITIATING CUE
: 5. The TSO has requested raising Unit 2 load to 750 MWE.
: 1. The Unit supervisor has directed you to raise Unit 2 load to 750 MWe using Recirc Flow in accordance with DGP 03
INITIATING CUE
-01 Power Changes step G.5
: 1. The Unit supervisor has directed you to raise Unit 2 load to 750 MWe using Recirc Flow in accordance with DGP 03-01 Power Changes step G.5.
. 2. Inform the Unit Supervisor when the task is complete
: 2. Inform the Unit Supervisor when the task is complete.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:
JPM Start Time:
Comment STEP                   ELEMENT                                 STANDARD             SAT   UNSAT Number NOTE:
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide the Examinee with the supplied copy of:
Provide the Examinee with the supplied copy of:
Maneuvering REMA DOP 0202-03, Reactor Recirculation Flow Control System Operation DGP 03-01, Power Changes During performance of this JPM, whenever the Examinee obtains a copy of DOA 0202
Maneuvering REMA DOP 0202-03, Reactor Recirculation Flow Control System Operation DGP 03-01, Power Changes During performance of this JPM, whenever the Examinee obtains a copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One of Both Pumps, hand him the supplied copy of it.
-01, Recirculation (Recirc) Pump Trip  
  *01     Depresses one of the Panel                 Depresses one of the following  ___  ___    ___
- One of Both Pumps, hand him the supplied copy of it.
902-5 Recirc Master Manual                 Panel 902-5 Recirc Master Control raise speed                        Manual Control raise speed pushbuttons. (Repeats this step            pushbuttons 0.5 sec, but < 10 to continue load pickup)                  sec:
*01 Depresses one of the Panel 902-5 Recirc Master Manual Control raise speed pushbuttons. (Repeats this step to continue load pickup)
RAISE HIGH (0.06%)
Depresses one of the following Panel 902-5 Recirc Master Manual Control raise speed pushbuttons 0.5 sec, but < 10 sec: RAISE HIGH (0.06%)
RAISE MED (0.18%)
RAISE MED (0.18%)
RAISE LOW (0.90%)
RAISE LOW (0.90%)
___ ___ ___ 02 Verifies expected response after each speed bump Verifies Recirc Pump speeds, Core Flow, Rx Power and other plant parameters change as expected ___ ___ ___ NOTE: An automatic Trigger is setup to trip 2A Recirc Pump when Generator load reaches xxx MWe BEGIN ALTERNATE PATH 03 Announces 2A Recirc Pump trip and enters DOA 0202
02     Verifies expected response                 Verifies Recirc Pump speeds,     ___  ___    ___
-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps Announces 2A Recirc Pump trip and enters DOA 0202
after each speed bump                      Core Flow, Rx Power and other plant parameters change as expected NOTE:
-01, Recirculation (Recirc) Pump Trip - One or Both Pumps
An automatic Trigger is setup to trip 2A Recirc Pump when Generator load reaches xxx MWe BEGIN ALTERNATE PATH 03     Announces 2A Recirc Pump trip             Announces 2A Recirc Pump trip    ___  ___    ___
___ ___ ___
and enters DOA 0202-01,                   and enters DOA 0202-01, Recirculation (Recirc) Pump                Recirculation (Recirc) Pump Trip - One Or Both Pumps                  Trip - One or Both Pumps SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 7 of 9  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 04 Determines operating in the Nominal Feedwater Heating Region of Figure 1, Feedwater Heating Regions, and goes to the Subsequent Operator Actions (Nominal Feedwater Heating) Flow Chart Determines operating in the Nominal Feedwater Heating Region of Figure 1, Feedwater Heating Regions, and goes to the Subsequent Operator Actions (Nominal Feedwater Heating) Flow Chart
___ ___ ___ *05 Determines a reactor scram is required based on plant conditions.
Depresses both scram pushbuttons and places the Mode Switch to S/D ___ ___ ___ CUE: After a reactor scram is inserted, state "another operator will carry out balance of plant scram actions." 06 Closes 2A Recirc Pump discharge valve MO 2
-0202-5A Rotates 2A PP DISCH VLV MO


2-202-5A CS to the CLOSE position. Verifies the valve's CLOSE light lit and OPEN light out
TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP                    ELEMENT                                  STANDARD              SAT  UNSAT Number 04      Determines operating in the                Determines operating in the        ___  ___    ___
___ ___ ___ CUE: After MO 2
Nominal Feedwater Heating                  Nominal Feedwater Heating Region of Figure 1, Feedwater              Region of Figure 1, Feedwater Heating Regions, and goes to              Heating Regions, and goes to the Subsequent Operator                    the Subsequent Operator Actions (Nominal Feedwater                Actions (Nominal Feedwater Heating) Flow Chart                        Heating) Flow Chart
-0202-5A indicates closed, Inform the examinee that 5 minutes has elapsed.
  *05    Determines a reactor scram is              Depresses both scram              ___  ___    ___
*07 After 5 minutes, opens Recirc Pump discharge valve previously closed Rotates 2A PP DISCH VLV MO  
required based on plant                    pushbuttons and places the conditions.                                Mode Switch to S/D CUE:
 
After a reactor scram is inserted, state another operator will carry out balance of plant scram actions.
2-202-5A CS to the OPEN position Verifies the valve's OPEN light lit and CLOSE light out
06      Closes 2A Recirc Pump                      Rotates 2A PP DISCH VLV MO        ___  ___    ___
___ ___ ___ CUE: Inform the examinee, "another operator will continue with scram actions, task complete."
discharge valve MO 2-0202-5A              2-202-5A CS to the CLOSE position.
Verifies the valves CLOSE light lit and OPEN light out CUE:
After MO 2-0202-5A indicates closed, Inform the examinee that 5 minutes has elapsed.
  *07     After 5 minutes, opens Recirc             Rotates 2A PP DISCH VLV MO         ___  ___    ___
Pump discharge valve                      2-202-5A CS to the OPEN previously closed                          position Verifies the valves OPEN light lit and CLOSE light out CUE:
Inform the examinee, another operator will continue with scram actions, task complete.
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 8 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job
Job Title: EO   RO SRO   FS   STA/IA   SRO Cert JPM Title:
 
ASD - Take Action for Recirc Pump Trip
==Title:==
- (A) JPM Number:
EO       RO     SRO           FS       STA/IA         SRO Cert JPM
S-N-a Revision Number:
 
00 Task Number and Title:
==Title:==
202L024, Change Recirc Pump Speed on Both Recirc Pumps Using ASD Tandem Controls K/A Number and Importance:
ASD - Take Action for Recirc Pump Trip - (A)
202001 A4.01     3.7 / 3.7 Suggested Testing Environment:
JPM Number: S-N-a                                   Revision Number: 00 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
202L024, Change Recirc Pump Speed on Both Recirc Pumps Using ASD Tandem Controls K/A Number and Importance: 202001 A4.01 3.7 / 3.7 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes     No Reference(s): DOP 0202-03, Rev 044, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION; DOA 0202-01, Rev 044, RECIRCULATION (RECIRC)
DOP 0202-03, Rev 044, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION; DOA 0202
PUMP TRIP - ONE OR BOTH PUMPS; DGP 03-01, Rev 132, POWER CHANGES Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 20 minutes                         Actual Time Used:           minutes EVALUATION  
-01, Rev 044, RECIRCULATION (RECIRC) PUMP TRIP  
- ONE OR BOTH PUMPS; DGP 03-01, Rev 132, POWER CHANGES Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name (Print):
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                   Evaluator's Name (Print):   Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
TQ-AA-150-J020 Revision 00 Page 9 of 9 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO
: 1. You are the Unit 2 NSO.
. 2. Tech Spec 3.3.1.3 has been entered due to OPRM trip capability not maintained.
: 2. Tech Spec 3.3.1.3 has been entered due to OPRM trip capability not maintained.
: 3. Alternate method to detect and suppress thermal hydraulic instability oscillations has been initiated.
: 3. Alternate method to detect and suppress thermal hydraulic instability oscillations has been initiated.
: 4. Unit 2 load was dropped 2 hours ago per TSO direction
: 4. Unit 2 load was dropped 2 hours ago per TSO direction.
. 5. The TSO has requested raising Unit 2 load to 750 MWE. INITIATING CUE
: 5. The TSO has requested raising Unit 2 load to 750 MWE.
: 1. The Unit supervisor has directed you to raise Unit 2 load to 750 MWe using Recirc Flow in accordance with DGP 03
INITIATING CUE
-01 Power Changes step G.5
: 1. The Unit supervisor has directed you to raise Unit 2 load to 750 MWe using Recirc Flow in accordance with DGP 03-01 Power Changes step G.5.
. 2. Inform the Unit Supervisor when the task is complete
: 2. Inform the Unit Supervisor when the task is complete.
.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 1 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Job Performance Measure Secure a RFP JPM Number:
TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure Secure a RFP JPM Number: S-N-b Revision Number: 00 Date: 04 / 2017 Developed By:
S-N-b  Revision Number:
Exam Author          Date Approved By:
0 0  Date: 04 / 2017
Facility Representative    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 3200-05                Rev: 40 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)
Revision 00,      Developed for 2017-301 NRC Exam SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
Exam Author Date  Approved By:
: 1. The simulator can be in any IC (IC 165 used for validation), but feed flow must be < 9.8 X 106 lbm/hr NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 3200-05  Rev: 40  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 0 0 , Developed for 2017
-301 NRC Exam TQ-AA-150-J020 Revision 00 Page 4 of 9  SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. The simulator can be in any IC (IC 165 used for validation), but feed flow must be < 9.8 X 10 6 lbm/hr NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. If using IC 12 for this JPM, reduce reactor power by first reducing FCL to <93% and then reducing recirc flow to achieve desired feed flow.
: 2. If using IC 12 for this JPM, reduce reactor power by first reducing FCL to <93% and then reducing recirc flow to achieve desired feed flow.
: 3. Prepare a copy of DOP 3200
: 3. Prepare a copy of DOP 3200-05 that is marked up (place kept) through step G.6 SRRS: 3D.100; There are no retention requirements for this section
-0 5 that is marked up (place kept) through step G.
 
6 TQ-AA-150-J020 Revision 00 Page 5 of 9  SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS NOTE: Prior to reading task conditions give examinee a copy of DOP 3200
TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS NOTE: Prior to reading task conditions give examinee a copy of DOP 3200-05
-0 5 1. The 2 C RFP is to be secured to due to reducing power for scheduled maintenance
: 1. The 2C RFP is to be secured to due to reducing power for scheduled maintenance
: 2. All prerequisites for securing the 2 C RFP have been completed
: 2. All prerequisites for securing the 2C RFP have been completed
: 3. An EO has been briefed and is standing by for this operation
: 3. An EO has been briefed and is standing by for this operation
: 4. Zinc injection is lined up to the 2 B RFP INITIATING CUE The Unit Supervisor has directed you to secure the 2 C reactor feed pump IAW DOP 3200
: 4. Zinc injection is lined up to the 2B RFP INITIATING CUE The Unit Supervisor has directed you to secure the 2C reactor feed pump IAW DOP 3200-05, step G.7 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
-0 5 , step G.7 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:
JPM Start Time:
Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number 01     Proceeds to step G.7 of DOP               Proceeds to the correct step for   ___  ___    ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number 01 Proceeds to step G.
3200-05                                    securing the RFP 02     Place the 2C AUX OIL PP                   Places 2C AUX OIL PP C/S to       ___  ___    ___
7 of DOP 3200-0 5 Proceeds to the correct step for securing the RFP ___ ___ ___ 02 Place the 2 C AUX OIL PP control switch in AUTO Place s 2 C AUX OIL PP C/S to AUTO and verifies amber AUTO TRIP light illuminated
control switch in AUTO                    AUTO and verifies amber AUTO TRIP light illuminated
___ ___ ___ *03 Open 2 C RFP recirculation valve Place s 2C RFP RECIRC VLV PCV 2-3201C C/S to OPEN and verifies red OPEN light illuminated
  *03     Open 2C RFP recirculation                 Places 2C RFP RECIRC VLV   ___          ___    ___
___ ___ ___ 04 Verify RPV level stable Observes 902
valve                                      PCV 2-3201C C/S to OPEN and verifies red OPEN light illuminated 04     Verify RPV level stable                   Observes 902-5 panel NR           ___  ___    ___
-5 panel NR and/or MR level indication
and/or MR level indication 05     Close the RFP discharge valve             Places 2C RFP DISCH VLV MO ___          ___    ___
___ ___ ___ 05 Close the RFP discharge valve of the RFP which is to be stopped Places 2 C RFP DISCH VLV MO 2-3201C C/S to CLOSE and verifies dual valve indication CLOSED and OPEN lights illuminated
of the RFP which is to be                 2-3201C C/S to CLOSE and stopped                                    verifies dual valve indication CLOSED and OPEN lights illuminated 06     Verify RPV level stable                   Observes 902-5 panel NR           ___  ___    ___
___ ___ ___ 06 Verify RPV level stable Observes 902
and/or MR level indication 07      Verify the RFP discharge valve            Verifies RFP DISCH VLV,            ___  ___    ___
-5 panel NR and/or MR level indication
of the RFP which is to be                  MO 2-3201C green OPEN light stopped is fully closed                    is out and red CLOSED light illuminated
___ ___ ___ 07 Verify the RFP discharge valve
  *08    Stop the associated RFP                    Places 2C RFP C/S to TRIP          ___   ___     ___
and verifies green OFF light illuminated 09      As the RFP slows down, verify              Verifies 2C AUX OIL PP blue        ___  ___    ___
the associated Auxiliary Oil              ON light illuminated Pump automatically starts SRRS: 3D.105 (when utilized for operator initial or continuing training)


of the RFP which is to be stopped is fully closed Verifies RFP DISCH VLV , M O 2-3201C green OPEN light is out and red CLOSED light illuminated
TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP                   ELEMENT                                 STANDARD         SAT   UNSAT Number 10     Verify the running current of the         Verifies 2A and 2B PP AMPS    ___  ___    ___
___ ___ ___ *08 Stop the associated RFP Places 2 C RFP C/S to TRIP and verifies green OFF light illuminated
operating RFP(s) is below 1115             <1115 amps amps 11     Close 2C RFP recirculation                 Places 2C RFP RECIRC VLV     ___  ___    ___
___ ___ ___ 09 As the RFP slows down, verify the associated Auxiliary Oil Pump automatically starts Verifies 2 C AUX OIL PP blue ON light illuminated
valve                                      PCV 2-3201C C/S to CLOSE and verifies GREEN CLOSED light illuminated 12     Direct an Equipment Operator               Contact the EO to verify 2C  ___  ___    ___
___ ___ ___
to verify the 2C RFP has come             RFP is at rest to rest CUE:                 As the EO in the RFP room, inform the examinee 2C RFP is at rest
TQ-AA-150-J020 Revision 00 Page 7 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
  *13     Open 2C RFP discharge valve               Places 2C RFP DISCH VLV MO ___      ___    ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number 10 Verify the running current of the operating RFP(s) is below 1115 amps Verifies 2A and 2B PP AMPS <1115 amps
2-3201C C/S to OPEN and verifies green OPEN light illuminated 14     Direct an Equipment Operator   Contact the EO to verify 2C              ___  ___    ___
___ ___ ___ 11 Close 2 C RFP recirculation valve Places 2C RFP RECIRC VLV PCV 2-3201C C/S to CLOSE and verifies GREEN CLOSED light illuminated
to inspect 2C RFP to ensure the RFP is NOT rotating in the pump shaft is NOT rotating in   reverse direction the reverse direction CUE:             As the EO in the RFP room, inform the examinee 2C RFP is still at rest CUE:       Inform the examinee that another NSO will complete the procedure for securing 2C RFP 15     Informs US task is complete               Informs US task is complete   ___   ___     ___
___ ___ ___ 12 Direct an Equipment Operator to verify the 2 C RFP has come to rest Contact the EO to verify 2C RFP is at rest
CUE:                             Respond as US, Acknowledge task completion END JPM Stop Time:
___ ___ ___ CUE: As the EO in the RFP room, inform the examinee "2C RFP is at rest"
SRRS: 3D.105 (when utilized for operator initial or continuing training)
*13 Open 2C RFP discharge valve Places 2 C RFP DISCH VLV MO 2-3201C C/S to OPEN and verifies green OPEN light illuminated
___ ___ ___ 14 Direct an Equipment Operator to inspect 2 C RFP to ensure the pump shaft is NOT rotating in the reverse direction Contact the EO to verify 2C RFP is NOT rotating in the reverse direction
___ ___ ___ CUE: As the EO in the RFP room, inform the examinee "2C RFP is still at rest" CUE: Inform the examinee that another NSO will complete the procedure for securing 2C RFP 15 Informs US task is complete Informs US task is complete ___ ___ ___ CUE: Respond as US, Acknowledge task completion END   JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job
Job Title: EO   RO SRO   FS   STA/IA   SRO Cert JPM Title:
 
Secure a RFP JPM Number:
==Title:==
S-N-b Revision Number:
EO       RO     SRO           FS       STA/IA         SRO Cert JPM
0 0 Task Number and Title:
 
25 9 L0 05 Shutdown a reactor feed pump K/A Number and Importance:
==Title:==
2590001A4.0 4 3.1 / 2.9 Suggested Testing Environment: Simulator Alternate Path:
Secure a RFP JPM Number: S-N-b                               Revision Number: 00 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Reference(s): DOP 3200-05, Rev 040, REACTOR FEED PUMP SHUTDOWN Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Other Testing Method:
259L005 Shutdown a reactor feed pump K/A Number and Importance: 2590001A4.04 3.1 / 2.9 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes     No Reference(s): DOP 3200-05, Rev 040, REACTOR FEED PUMP SHUTDOWN Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:           minutes EVALUATION  
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name (Print):
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
TQ-AA-150-J020 Revision 00 Page 9 of 9 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS
: 1. The 2C RFP is to be secured to due to reducing power for scheduled maintenance
: 1. The 2C RFP is to be secured to due to reducing power for scheduled maintenance
: 2. All prerequisites for securing the 2C RFP have been completed
: 2. All prerequisites for securing the 2C RFP have been completed
: 3. An EO has been briefed and is standing by for this operation
: 3. An EO has been briefed and is standing by for this operation
: 4. Zinc injection is lined up to the 2B RFP INITIATING CUE The Unit Supervisor has directed you to secure the 2C reactor feed pump IAW DOP 3200
: 4. Zinc injection is lined up to the 2B RFP INITIATING CUE The Unit Supervisor has directed you to secure the 2C reactor feed pump IAW DOP 3200-05, step G.7 SRRS: 3D.100; There are no retention requirements for this section
-05, step G.7 TQ-AA-150-J020 Revision 00 Page 1 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)  Job Performance Measure Main Steam  
 
- Unisolate One Line Using Alternate Method JPM Number:
TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure Main Steam - Unisolate One Line Using Alternate Method JPM Number: S-N-c Revision Number: 01 Date: 04 / 2017 Developed By:
S-N-c Revision Number:
Exam Author          Date Approved By:
0 1  Date: 04 / 2017
Facility Representative    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0250-02                Rev: 14 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 00,     Developed for 2010 Cert Exam Revision 01,     Revised for 2017-301 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0250-02  Rev: 14  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 00, Developed for 2010 Cert Exam Revision 01, Revised for 2017-301 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 166 (<50% power).
: 1. Reset the simulator to IC 166 (<50% power).
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Power needs to be low enough so that isolating one main steam line will NOT cause a Group 1 high flow isolation.
: 2. Power needs to be low enough so that isolating one main steam line will NOT cause a Group 1 high flow isolation.
: 3. Close 'C' Main Steam Line Isolation Valves:
: 3. Close C Main Steam Line Isolation Valves:
AO-2-203-1C AO-2-203-2C 4. Verify Main Steam Line drain valves closed:
* AO-2-203-1C
MO 2-220-1, 2, 3 & 4 MO 2-220-90A, B, C & D
* AO-2-203-2C
: 4. Verify Main Steam Line drain valves closed:
* MO 2-220-1, 2, 3 & 4
* MO 2-220-90A, B, C & D
: 5. Place O.O.S. cards on Main Steam Line drain valves:
: 5. Place O.O.S. cards on Main Steam Line drain valves:
2-220-1 MSL DRN VLV 2-220-2 MSL DRN VLV
* 2-220-1 MSL DRN VLV
* 2-220-2 MSL DRN VLV
: 6. Insert following Malfunctions and/or Remotes:
: 6. Insert following Malfunctions and/or Remotes:
None 7. Setup the following Triggers:
* None
None 8. Clean copy of DOP 0250
: 7. Setup the following Triggers:
-02 TQ-AA-150-J020 Revision 00 Page 5 of 9  SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
* None
: 8. Clean copy of DOP 0250-02 SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Following maintenance work on the AO 2
: 2. Following maintenance work on the AO 2-203-2C MSIV, the C Main Steam Line is ready to be unisolated.
-203-2C MSIV, the "C" Main Steam Line is ready to be unisolated.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to unisolate the "C" Main Steam Line in accordance with DOP 0 250-02, step G.4.
: 1. The Unit Supervisor has directed you to unisolate the C Main Steam Line in accordance with DOP 0250-02, step G.4.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:
Comment STEP                    ELEMENT                                  STANDARD              SAT  UNSAT Number NOTE:
Provide the Examinee with the supplied copy of DOP 0250-02
: 1. Reviews procedure                          Determines that the MOs 2-220- ___      ___    ___
1 AND 2-220-2 are O.O.S.
closed and NOT available
: 2. Determines proper method                  Selects the alternate method to  ___  ___    ___
unisolated, based on MOs 2-220-1 NOT being available BEGIN ALTERNATE PATH
: 3. Contacts Main Steam system                Indicates he/she would call the  ___  ___    ___
engineer for concurrence to                system engineer or ask Unit unisolated the 2C Main Steam              Supervisor.
Line using the alternate method.
CUE      Inform the Examinee that the Main Steam system engineer has provide concurrence to unisolated the 2C main Steam Line using the alternate method
  *4. Open MO 2-220-3 MSL DRN                    RED light illuminated.            ___  ___    ___
VLV.
  *5. Open MO 2-220-90C MSL DRN                  RED light illuminated.            ___  ___    ___
VLV.
: 6. Wait a minimum of 5 minutes.              5 minutes elapsed OR verbal      ___  ___    ___
cue received.
CUE      Inform examinee that 5 minutes has elapsed
  *7. Open AO 2-203-2C MSIV.                    GREEN light illuminated.          ___  ___    ___
: 8. Wait a minimum of 30 minutes.              30 minutes elapsed OR verbal      ___  ___    ___
cue received.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP                   ELEMENT                                 STANDARD         SAT   UNSAT Number CUE     Inform examinee that 30 minutes has elapsed
JPM Start Time:  STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide the Examinee with the supplied copy of DOP 0250
  *9. Open AO 2-203-1C MSIV.                     GREEN light illuminated. ___   ___     ___
-02 1. Reviews procedure Determines that the MOs 2
*10. Close MO 2-220-90C MSL DRN GREEN light illuminated.                     ___   ___     ___
-220-1 AND 2-220-2 are O.O.S. closed and NOT available
VLV.
___ ___ ___ 2. Determines proper method Selects the alternate method to unisolated, based on MOs 2
*11. Close MO 2-220-3 MSL DRN                   GREEN light illuminated. ___   ___     ___
-220-1 NOT being available
VLV.
___ ___ ___ BEGIN ALTERNATE PATH
: 12. Informs Unit Supervisor task is           Examinee notifies the Unit   ___  ___    ___
: 3. Contacts Main Steam system engineer for concurrence to unisolated the 2C Main Steam Line using the alternate method. Indicates he/she would call the system engineer or ask Unit Supervisor.
complete.                                  Supervisor.
___ ___ ___ CUE Inform the Examinee that the Main Steam system engineer has provide concurrence to unisolated the 2C main Steam Line using the alternate method
CUE     Acknowledge report of task completion END JPM Stop Time:
*4. Open MO 2-220-3 MSL DRN VLV. RED light illuminated.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
___ ___ ___ *5. Open MO 2-220-90C MSL DRN VLV. RED light illuminated.
___ ___ ___ 6. Wait a minimum of 5 minutes.
5 minutes elapsed OR verbal cue received.
___ ___ ___ CUE Inform examinee that 5 minutes has elapsed
*7. Open AO 2-203-2C MSIV. GREEN light illuminated.
___ ___ ___ 8. Wait a minimum of 30 minutes.
30 minutes elapsed OR verbal cue received.
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 7 of 9  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE Inform examinee that 30 minutes has elapsed
*9. Open AO 2-203-1C MSIV. GREEN light illuminated.
___ ___ ___ *10. Close MO 2
-220-90C MSL DRN VLV. GREEN light illuminated.
___ ___ ___ *11. Close MO 2
-220-3 MSL DRN VLV. GREEN light illuminated.
___ ___ ___ 12. Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___ ___ ___ CUE Acknowledge report of task completion END   JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job
Job Title: EO   RO SRO   FS   STA/IA   SRO Cert JPM Title: Main Steam  
 
- Unisolate One Line Using Alternate Method JPM Number:
==Title:==
S-N-c Revision Number:
EO       RO     SRO           FS       STA/IA         SRO Cert JPM
00 Task Number and Title:
 
239L004 Unisolat e One Main Steam Line K/A Number and Importance:
==Title:==
239001.A4.01 4.2 / 4.0 Suggested Testing Environment:
Main Steam - Unisolate One Line Using Alternate Method JPM Number: S-N-c                                   Revision Number: 00 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
239L004 Unisolate One Main Steam Line K/A Number and Importance: 239001.A4.01                   4.2 / 4.0 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes     No Reference(s): DOP 0250-02, Rev 014, ISOLATING AND UN-ISOLATING ONE MAIN STEAM LINE Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 12 minutes                         Actual Time Used:           minutes EVALUATION  
DOP 0250-02, Rev 014, ISOLATING AND UN
-ISOLATING ONE MAIN STEAM LINE Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
12 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name (Print):
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
TQ-AA-150-J020 Revision 00 Page 9 of 9 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Following maintenance work on the AO 2
: 2. Following maintenance work on the AO 2-203-2C MSIV, the C Main Steam Line is ready to be unisolated.
-203-2C MSIV, the "C" Main Steam Line is ready to be unisolated.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to unisolate the "C" Main Steam Line in accordance with DOP 0250
: 1. The Unit Supervisor has directed you to unisolate the C Main Steam Line in accordance with DOP 0250-02, step G.4.
-02, step G.4.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 1 of 12 Job Performance Measure LPCI - Mitigate High Suction Pressure While Lining Up to CST Suction for Injection JPM Number: S-N-d Revision Number: 10 Date: 04 / 2017 Developed By:
Exam Author          Date Approved By:
Facility Representative    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 1 of 12 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Job Performance Measure LPCI - Mitigate High Suction Pressure While Lining Up to CST Suction for Injection JPM Number:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
S-N-d  Revision Number: 10 Date: 04 / 2017 
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-03              Rev: 23 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 12 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 06,     Bank JPM Revision 07,     Revised for ILT 12-1 Cert Exam Revision 08,     Revised for ILT 14-1 NRC Exam Revision 09,     Revised for ILT 15-1 (2016-301) NRC Exam Revision 10,     Revised for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 12  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-03  Rev: 23  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 12  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 0 6 , Bank JPM Revision 07, Revised for ILT 12
-1 Cert Exam Revision 08, Revised for ILT 14
-1 NRC Exam Revision 09, Revised for ILT 15
-1 (2016-301) NRC Exam Revision 10, Revised for ILT 16
-1 (2017-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 12 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
TQ-AA-150-J020 Revision 00 Page 4 of 12 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC (IC 165 was used for validation)
: 1. Reset the simulator to any IC (IC 165 was used for validation)
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify NO LPCI pumps operating
: 2. Verify NO LPCI pumps operating
: 3. Insert following Malfunctions and/or Remotes:
: 3. Insert following Malfunctions and/or Remotes:
* Setup Trigger 15 to open 2C LPCI PP suction to CST: irf lpcstppc (15) true
: 4. Setup the following Triggers
: 4. Setup the following Triggers
: 5. Provide a mark ed up copy of DEOP 0500
* None
-03, Alternate Water Injection Systems
: 5. Provide a marked up copy of DEOP 0500-03, Alternate Water Injection Systems SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 12 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 12 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO
: 1. You are the Unit 2 Aux NSO
: 2. A transient has occurred requiring Alternate Water Injection Examiner Note: The following parameters do not match the simulator indications
: 2. A transient has occurred requiring Alternate Water Injection Examiner Note: The following parameters do not match the simulator indications
: 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping
-65 inches and slowly dropping
: 4. RPV pressure is 375 psig and slowly dropping INITIATING CUE
: 4. RPV pressure is 375 psig and slowly dropping INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction with 2A LPCI pump running ready to inject
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction with 2A LPCI pump running ready to inject
: 2. Inform the Unit Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
: 2. Inform the Unit Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 6 of 12 JPM Start Time:
Comment STEP                    ELEMENT                                  STANDARD      SAT  UNSAT Number NOTE:
Provide the Examinee with the provided copy of DEOP 0500-03
: 1. Place 2A LPCI PP control                  ALL lights extinguished    ___  ___    ___
switch in Pull-to-Lock
: 2. Place PP SUCT VLV MO 2-                    RED light illuminated      ___  ___    ___
1501-5A control switch in Manual Bypass and verify closed
: 3. Verify MIN FLOW VLV 2-1501-                RED light illuminated      ___  ___    ___
13A closed if not needed CUE      2-1501-13A is not required for 2B LPCI pump NOTE:
The following valves may be verified in any order
: 4. Verify TORUS CLG/TEST                      GREEN lights illuminated  ___  ___    ___
valves 2-1501-20A and 2-1501-38A closed
: 5. Verify TORUS SPRAY valves 2- GREEN lights illuminated                ___  ___    ___
1501-19A and 2-1501-18A closed
: 6. Verify DW SPRAY valves 2-                  GREEN lights illuminated  ___  ___    ___
1501-28A and 2-1501-27A closed
: 7. Verify TORUS CLG/TEST                      GREEN lights illuminated  ___  ___    ___
valves 2-1501-20B and 2-1501-38B closed
: 8. Verify TORUS SPRAY valves 2- GREEN lights illuminated                ___  ___    ___
1501-19B and 2-1501-18B closed SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 7 of 12 Comment STEP                    ELEMENT                                  STANDARD            SAT  UNSAT Number
: 9. Verify DW SPRAY valves 2-                  GREEN lights illuminated        ___  ___    ___
1501-28B and 2-1501-27B closed NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8)
CUE      When directed, as the EO in the field, communicate that the steps (either individually or as a whole) have been completed
: 10. Unlock AND open 2-1501-74A,                Instructs EO to complete step  ___  ___    ___
U2 LPCI A PMP VENT VLV                    G.12.c.(5).(a)
: 11. Crack open 2-1501-15A, U2      Instructs EO to complete step              ___  ___    ___
LPCI A PMP Vent VLV until flow G.12.c.(5).(b) is observed from pipe
: 12. Close 2(3)-1501-15A, U2 LPCI              Instructs EO to complete step  ___  ___    ___
A PMP VENT VLV                            G.12.c.(5).(c)
: 13. Close AND lock 2-1501-74A,                Instructs EO to complete step  ___  ___    ___
U2(3) LPCI A PMP VENT VLV                  G.12.c.(5).(d)
: 14. Open 2-1501-47A-R, U2 LPCI A Instructs EO to obtain PI 2-                  ___  ___    ___
PUMP SUCT PI 2-1501-47A      1501-47A reading per step ROOT VLV (at pump) and verify G.12.c.(6) & G.12.c.(7)
PI 2-1501-47A indicates less than 15 psig CUE      PI 2-1501-47A indicates 15.5 psig
: 15. Recognizes reading is NOT less Determines reading is greater              ___  ___    ___
than 15 psig                  than 15 psig
: 16. Close 2-1501-47A-R, U2 LPCI                Instructs EO to close 2-1501-  ___  ___    ___
A PUMP SUCT PI 2-1501-47A                  47A per step G.12.c.(8)
ROOT VLV SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 6 of 12 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 12 Comment STEP                   ELEMENT                                 STANDARD           SAT   UNSAT Number CUE      2-1501-47A-R is Closed
JPM Start Time:
*17. Open PP SUCT VLV MO 2-                    GREEN light illuminated        ___  ___    ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide the Examinee with the provided copy of DEOP 0500-03 1. Place 2A LPCI PP control switch in Pull
1501-5A
-to-Lock ALL lights extinguished
*18. Place 2A LPCI PP control                  Depresses and places 2A LPCI    ___  ___    ___
___ ___ ___ 2. Place PP SUCT VLV MO 2
switch in AUTO                            PP c/s to center (AUTO) position
-1501-5A control switch in Manual Bypass and verify closed RED light illuminated
: 19. Notify Unit Supervisor that 2A            Examinee notifies Unit          ___  ___    ___
___ ___ ___ 3. Verify MIN FLOW VLV 2-1501-13A closed if not needed RED light illuminated
LPCI pump cannot be used with             Supervisor of 2A LPCI pump suction from the CST                      suction pressure problem when aligned to CST May recommend using another LPCI pump CUE      Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST BEGIN ALTERNATE PATH
___ ___ ___ CUE 2-1501-13A is not required for 2B LPCI pump NOTE: The following valves may be verified in any order
*20. Place 2C LPCI PP control                   ALL lights extinguished        ___  ___    ___
: 4. Verify TORUS CLG/TEST  
switch in Pull-to-Lock
*21. Place PP SUCT VLV MO 2-                    RED light illuminated          ___  ___    ___
1501-5C control switch in Manual Bypass and verify closed
: 22. Verify MIN FLOW VLV 2-1501-               RED light illuminated           ___   ___     ___
13B closed if not needed CUE     2-1501-13B is not required for 2D LPCI pump
: 23. Verify TORUS CLG/TEST                     GREEN lights illuminated        ___  ___    ___
valves 2-1501-20A and 2-1501-38A closed SRRS: 3D.105 (when utilized for operator initial or continuing training)


valves 2-1501-20A and 2-1501-38A closed GREEN lights illuminated
TQ-AA-150-J020 Revision 00 Page 9 of 12 Comment STEP                   ELEMENT                                 STANDARD           SAT   UNSAT Number
___ ___ ___ 5. Verify TORUS SPRAY valves 2-1501-19A and 2-1501-18A closed GREEN lights illuminated
: 24. Verify TORUS SPRAY VLVs 2-                 GREEN lights illuminated       ___   ___     ___
___ ___ ___ 6. Verify DW SPRAY valves 2-1501-28A and 2-1501-27A closed GREEN lights illuminated
1501-19A and 2-1501-18A closed
___ ___ ___ 7. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed GREEN lights illuminated
: 25. Verify DW SPRAY VLVs 2-                   GREEN lights illuminated       ___   ___     ___
___ ___ ___ 8. Verify TORUS SPRAY valves 2-1501-19B and 2-1501-18B closed GREEN lights illuminated
1501-28A and 2-1501-27A closed
___ ___ ___
: 26. Verify TORUS CLG/TEST VLVs                GREEN lights illuminated       ___   ___     ___
TQ-AA-150-J020 Revision 00 Page 7 of 12 SRRS: 3D.105 (when utilized for operator initial or continuing training)
2-1501-20B and 2-1501-38B closed
STEP ELEMENT STANDARD SAT UNSAT Comment Number 9. Verify DW SPRAY valves 2-1501-28B and 2-1501-27B closed GREEN lights illuminated
: 27. Verify TORUS SPRAY VLVs 2-                 GREEN lights illuminated       ___   ___     ___
___ ___ ___ NOTE: For bleeding off the pressure in the suction piping,  the examinee may communicate each of the following steps individually OR  instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8)
1501-19B and 2-1501-18B closed
CUE When directed, as the EO in the field, communicate that the steps (either individually or as a whole) have been completed
: 28. Verify DW SPRAY VLVs 2-                   GREEN lights illuminated       ___   ___     ___
: 10. Unlock AND ope n 2-1501-74A, U2 LPCI A PMP VENT VLV Instructs EO to complete step G.12.c.(5).(a)
1501-28B and 2-1501-27B closed
___ ___ ___ 11. Crack open 2
: 29. Unlock AND open 2-1501-74C,               Instructs EO to complete step  ___  ___    ___
-1501-15A, U2 LPCI A PMP Vent VLV until flow is observed from pipe Instructs EO to complete step G.12.c.(5).(b)
U2 LPCI C PMP VENT VLV                    G.12.c.(5).(a)
___ ___ ___ 12. Close 2(3)-1501-15A, U2 LPCI A PMP VENT VLV Instructs EO to complete step G.12.c.(5).(c)
: 30. Crack open 2-1501-15C, U2                 Instructs EO to complete step  ___  ___    ___
___ ___ ___ 13. Close AND lock 2
LPCI C PMP VENT VLV until                 G.12.e.(5).(b) flow is observed from pipe
-1501-74A, U2(3) LPCI A PMP VENT VLV Instructs EO to complete step G.12.c.(5).(d)
: 31. Close 2(3)-1501-15C, U2 LPCI               Instructs EO to complete step   ___  ___    ___
___ ___ ___ 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2
C PMP VENT VLV                            G.12.e.(5).(c)
-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig Instructs EO to obtain PI 2
: 32. Close AND lock 2-1501-74C,                 Instructs EO to complete step  ___  ___    ___
-1501-47A reading per step G.12.c.(6) & G.12.c.(7) ___ ___ ___ CUE PI 2-1501-47A indicates 15.5 psig
U2 LPCI C PMP VENT VLV                     G.12.e.(5).(d)
: 15. Recognizes reading is NOT less than 15 psig Determines reading is greater than 15 psig
: 33. Open 2-1501-47C-R, U2 LPCI   Instructs EO to obtain PI 2-                ___  ___    ___
___ ___ ___ 16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2
C PUMP SUCT PI 2-1501-47C     1501-47A reading per step G-ROOT VLV (at pump) and verify 12.e.(6)
-1501-47A ROOT VLV Instructs EO to close 2-1501-47A per step G.12.c.(8)
PI 2-1501-47C indicates less than 15 psig CUE     Pressure is 10 psig SRRS: 3D.105 (when utilized for operator initial or continuing training)
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 8 of 12  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE 2-1501-47A-R is Close d *17. Open PP SUCT VLV MO 2
-1501-5A GREEN light illuminated
___ ___ ___ *18. Place 2A LPCI PP control switch in AUTO Depresses and places 2A LPCI PP c/s  to center (AUTO) position ___ ___ ___ 19. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST May recommend using another LPCI pump ___ ___ ___ CUE Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST BEGIN ALTERNATE PATH
*20. Place 2C LPCI PP control switch in Pull
-to-Lock ALL lights extinguished
___ ___ ___ *21. Place PP SUCT VLV MO 2
-1501-5C control switch in Manual Bypass and verify closed RED light illuminated
___ ___ ___ 22. Verify MIN FLOW VLV 2
-1501-13B closed if not needed RED light illuminated
___ ___ ___ CUE 2-1501-13B is not required for 2D LPCI pump
: 23. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed GREEN lights illuminated
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 9 of 12  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 24. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed GREEN lights illuminated
___ ___ ___ 25. Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed GREEN lights illuminated
___ ___ ___ 26. Verify TORUS CLG/TEST VLV s 2-1501-20B and 2-1501-38B closed GREEN lights illuminated
___ ___ ___ 27. Verify TORUS SPRAY VLV s 2-1501-19B and 2-1501-18B closed GREEN lights illuminated
___ ___ ___ 28. Verify DW SPRAY VLV s 2-1501-28B and 2-1501-27B closed GREEN lights illuminated
___ ___ ___ 29. Unlock AND ope n 2-1501-74C, U2 LPCI C PMP VENT V LV Instructs EO to complete step G.12.c.(5).(a)
___ ___ ___ 30. Crack open 2
-1501-15C, U2 LPCI C PMP VENT V LV until flow is observed from pipe Instructs EO to complete step G.12.e.(5).(b)
___ ___ ___ 31. Close 2(3)
-1501-15C, U2 LPCI C PMP VENT VLV Instructs EO to complete step G.12.e.(5).(c)
___ ___ ___ 32. Close AND lock 2
-1501-74C, U2 LPCI C PMP VENT VLV Instructs EO to complete step G.12.e.(5).(d)
___ ___ ___ 33. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2
-1501-47C ROOT VLV (at pump) and verify PI 2-1501-47C indicates less than 15 psig Instructs EO to obtain PI 2
-1501-47A reading per step G
-12.e.(6) ___ ___ ___ CUE Pressure is 10 psig


TQ-AA-150-J020 Revision 00 Page 10 of 12 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 10 of 12 Comment STEP                   ELEMENT                                 STANDARD             SAT   UNSAT Number
STEP ELEMENT STANDARD SAT UNSAT Comment Number 34. Recognizes reading is less than 15 psig Determines reading is LESS than 15 psig
: 34. Recognizes reading is less than           Determines reading is LESS       ___  ___    ___
___ ___ ___ 35. Close 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2
15 psig                                    than 15 psig
-1501-47C ROOT VLV Instructs EO to close 2
: 35. Close 2-1501-47C-R, U2 LPCI               Instructs EO to close 2-1501-    ___  ___    ___
-1501-47C per step G.12.e.(8)
C PUMP SUCT PI 2-1501-47C                 47C per step G.12.e.(8)
___ ___ ___ 36. Unlock AND open 2-1501-31C, U2 LPCI C PMP SUCT VLV FROM CST [at 2 C LPCI Pump]
ROOT VLV
Directs EO to perform step G
: 36. Unlock AND open 2-1501-31C,               Directs EO to perform step G-    ___  ___    ___
-12.e.(10)(a)
U2 LPCI C PMP SUCT VLV                    12.e.(10)(a)
___ ___ ___ CUE 2-1501-31C is open
FROM CST [at 2 C LPCI Pump]
: 37. Unlock AND open 2-1501-37, U2 LPCI & CS SUCT FROM 2/3A CST SV (located at 2/3A CST) Directs EO to perform step G.12.e.(10)(b)
CUE     2-1501-31C is open
___ ___ ___ Simulator Operator / Evaluator
: 37. Unlock AND open 2-1501-37,                 Directs EO to perform step        ___  ___    ___
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST CUE 2-1501-37 is open
U2 LPCI & CS SUCT FROM                     G.12.e.(10)(b) 2/3A CST SV (located at 2/3A CST)
  *38. Start 2C LPCI PP Places control switch to start RED light illuminated
Simulator Operator / Evaluator:
___ ___ ___ 39. Inform Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and injecting; the task is complete ___ ___ ___ CUE Acknowledge report of task completion END   JPM Stop Time:
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST CUE     2-1501-37 is open
  *38. Start 2C LPCI PP                           Places control switch to start   ___  ___    ___
RED light illuminated
: 39. Inform Unit Supervisor that 2C             Informs Unit Supervisor that 2C  ___  ___    ___
LPCI pump is lined up to the               LPCI pump is lined up to the CST and the task is complete              CST and injecting; the task is complete CUE     Acknowledge report of task completion END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 11 of 12 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 11 of 12 JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job
Job Title: EO   RO SRO   FS   STA/IA   SRO Cert JPM Title:
 
LPCI - Mitigate High Suction Pressure While Lining Up to CST Suction for Injection JPM Number:
==Title:==
S-N-d Revision Number:
EO       RO     SRO           FS       STA/IA         SRO Cert JPM
10 Task Number and Title:
 
29502LK061, Lineup LPCI to the CST K/A Number and Importance:
==Title:==
203000.A4.01 2.5 / 2.6 Suggested Testing Environment:
LPCI - Mitigate High Suction Pressure While Lining Up to CST Suction for Injection JPM Number: S-N-d                                   Revision Number: 10 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.01                   2.5 / 2.6 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes     No Reference(s): DEOP 0500-03, Rev 023, ALTERNATE WATER INJECTION SYSTEMS Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 38 minutes                           Actual Time Used:         minutes EVALUATION  
DEOP 0500-03, Rev 023, ALTERNATE WATER INJECTION SYSTEMS Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
38 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name (Print):
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
TQ-AA-150-J020 Revision 00 Page 12 of 12 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 12 of 12 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO
: 1. You are the Unit 2 Aux NSO
: 2. A transient has occurred requiring Alternate Water Injection
: 2. A transient has occurred requiring Alternate Water Injection
: 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping
-65 inches and slowly dropping
: 4. RPV pressure is 375 psig and slowly dropping INITIATING CUE
: 4. RPV pressure is 375 psig and slowly dropping INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction with 2A LPCI pump running ready to inject
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction with 2A LPCI pump running ready to inject
: 2. Inform the Unit Supervisor when the task is complete
: 2. Inform the Unit Supervisor when the task is complete SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 1 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 1 of 10 Job Performance Measure RBM - CLEAR RBM MALFUNCTION JPM Number: S-N-e Revision Number: 03 Date: 04 / 2017 Developed By:
Job Performance Measure RBM - CLEAR RBM MALFUNCTION JPM Number:
Exam Author          Date Approved By:
S-N-e Revision Number:
Facility Representative    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
0 3  Date: 04 / 2017


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     1. Task description and number, JPM description and number are identified.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     2. Knowledge and Abilities (K/A) references are included.
________ 2. Knowledge and Abilities (K/A) references are included.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 3. Performance location specified. (in
________     4. Initial setup conditions are identified.
-plant, control room, simulator, or other)
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 4. Initial setup conditions are identified.
________     6. Task standards identified and verified by SME review.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 6. Task standards identified and verified by SME review.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
Procedure DGP 03-01                 Rev: 132 Procedure DOA 0700-03               Rev: 13 Procedure DAN 902-5 A-7             Rev: 16 Procedure DGP 03-04                 Rev: 73 Procedure DOP 0400-01               Rev: 39
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     10. Verify cues both verbal and visual are free of conflict.
Procedure DGP 03-01 Rev: 132 Procedure DOA 0700-03 Rev: 13 Procedure DAN 902-5 A-7 Rev: 16 Procedure DGP 03-04 Rev: 73 Procedure DOP 0400-01 Rev: 39 ________ 10. Verify cues both verbal and visual are free of conflict.
________     11. Verify performance time is accurate
________ 11. Verify performance time is accurate
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
 
Revision 00, New JPM for 2014 LORT NRC Exam Revision 01, Revised JPM for 14
TQ-AA-150-J020 Revision 00 Page 3 of 10 Revision Record (Summary)
-1 ILT NRC Exam Revision 02, Revised for ILT 15
Revision 00,     New JPM for 2014 LORT NRC Exam Revision 01,     Revised JPM for 14-1 ILT NRC Exam Revision 02,     Revised for ILT 15-1 CERT Exam Revision 03,     Revised for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section
-1 CERT Exam Revision 03, Revised for ILT 1 6-1 (2017-301) NRC Exam TQ-AA-150-J020 Revision 00 Page 4 of 10  SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
 
TQ-AA-150-J020 Revision 00 Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC with: (IC 182 used for validation)
: 1. Reset the simulator to any IC with: (IC 182 used for validation)
FCL 90 - 96% A control rod available to withdraw which meets the following:
* FCL 90 - 96%
o In-sequence o Partially withdrawn o Non-edge NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
* A control rod available to withdraw which meets the following:
: 2. For development of this JPM, IC 182 with control rod sequence 2S.0.0 909D (step 15 partially withdrawn) was used with the following: Control rod F-04 inserted at position 0 0  Recirc flow reduced to 58 Mlbm/hr
o In-sequence o Partially withdrawn o Non-edge NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S
: 2. For development of this JPM, IC 182 with control rod sequence 2S.0.0 909D (step 15 partially withdrawn) was used with the following:
-N-e.cae 4. Mark up a copy of DGP 03
* Control rod F-04 inserted at position 00
-01, POWER CHANGES, through step G.2.v, step G.2.w is the next step to be performed
* Recirc flow reduced to 58 Mlbm/hr
. 5. Clean copy of DGP 03
: 3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-e.cae
-04, CONTROL ROD MOVEMENTS
: 4. Mark up a copy of DGP 03-01, POWER CHANGES, through step G.2.v, step G.2.w is the next step to be performed.
: 6. Clean copy of DAN 902
: 5. Clean copy of DGP 03-04, CONTROL ROD MOVEMENTS
-5 A-7, RBM HI/INOP.
: 6. Clean copy of DAN 902-5 A-7, RBM HI/INOP.
: 7. Clean copy of DOA 0700
: 7. Clean copy of DOA 0700-03, ROD OUT BLOCKS.
-03, ROD OUT BLOCKS.
: 8. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 8. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 9. This completes the setup for this JPM.
: 9. This completes the setup for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 10 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 10 INITIAL CONDITIONS
: 1. You are the NSO assigned to move control rods.
: 1. You are the NSO assigned to move control rods.
: 2. The QNE requests withdrawing control rod F
: 2. The QNE requests withdrawing control rod F-04 from position 00-06 using single notch.
-04 from position 00
-06 using single notch.
: 3. The Unit Supervisor has approved and authorized the REMA with all initial conditions verified to be met.
: 3. The Unit Supervisor has approved and authorized the REMA with all initial conditions verified to be met.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to withdraw control rod F
: 1. The Unit Supervisor has directed you to withdraw control rod F-04 from position 00 to position 06 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
-04 from position 00 to position 06 using single notching IAW DGP 03
: 2. Inform the Unit Supervisor when the task is complete.
-01, Power Changes, step G.2.w
. 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 6 of 10 JPM Start Time:
JPM Start Time:
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number NOTE Although not a procedure step a second verifier is required. Second Verifier Duties:
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE Although not a procedure step a second verifier is required. Second Verifier Duties:
Proper rod selected Insert and Withdraw limits understood.
Proper rod selected Insert and Withdraw limits understood.
Verifies RWM is in exercise mode, has no errors and has blocks enabled.
Verifies RWM is in exercise mode, has no errors and has blocks enabled.
Check off each control rod movement on the CRD Exercise Checklist.
Check off each control rod movement on the CRD Exercise Checklist.
01 Request a second verifier VERIFIES second verifier available.
01     Request a second verifier                 VERIFIES second verifier             ___  ___    ___
___ ___ ___ CUE Inform examinee that you will perform duties of second verifier.
available.
*02 Selects Control Rod F-04. Depresses Select Pushbutton for Control Rod F-04. Observes Full Core Display and Apron Select lights for control rod F-04 lit. ___ ___ ___ NOTE An automatic Trigger inserts a failure for RBM 7 as control rod F-04 settles to position 0 4. *03 Single notches out Control Rod  
CUE     Inform examinee that you will perform duties of second verifier.
  *02     Selects Control Rod F-04.                 Depresses Select Pushbutton         ___  ___    ___
for Control Rod F-04. Observes Full Core Display and Apron Select lights for control rod F-04 lit.
NOTE An automatic Trigger inserts a failure for RBM 7 as control rod F-04 settles to position 04.
  *03     Single notches out Control Rod
* Momentarily places Rod          ___  ___    ___
F-04 from position 00 to position              Movement Control switch to
: 04.                                            Rod Out.
* Verifies Control Rod F-04 latches at position 04.
04      Observe annunciator 902-5 A-7, Announces annunciator 902-5                      ___  ___    ___
RBM HI/INOP is received.      A-7, RBM HI/INOP is received.
BEGIN ALTERNATE PATH 05      Depress the appropriate RBM                Depresses the RBM PUSH TO            ___  ___    ___
PUSH TO SET-UP Push                        SET-UP Push Button for RBM Buttons.                                  7.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


F-04 from position 0 0 to position
TQ-AA-150-J020 Revision 00 Page 7 of 10 Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number 06     Verify only one Control Rod is            Verifies only one rod is selected  ___  ___    ___
: 04. Momentarily places Rod Movement Control switch to Rod Out. Verifies Control Rod F-04 latches at position
selected for movement, and that           on the rod select matrix and the it is in the proper sequence (the         NO ROD SELECTED light for NO ROD SELECTED Light on                   RBM 7 at panel 902-37 is Panel 902(3)-37 should be                 extinguished.
: 04. ___ ___ ___ 04 Observe annunciator 902
extinguished).
-5 A-7, RBM HI/INOP is received.
07     Check that there are NO                   Verifies that there are no high    ___  ___    ___
Announces annunciator 902
unusually high LPRM                       LPRM indications and RBM 7 indications, and that there are           has the proper number of the proper number of assigned             LPRMs assigned.
-5 A-7, RBM HI/INOP is received.
LPRMs for each of the RBM Channels.
___ ___ ___ BEGIN ALTERNATE PATH 05 Depress the appropriate RBM PUSH TO SET
CUE     When the examinee begins to use the Plant Process computer to obtain printouts, inform the examinee Another NSO has printed the Control Rod Printout and a LPRM Printout, the QNE has reviewed the printouts and has no concerns.
-UP Push Buttons. Depresses the RBM PUSH TO SET-UP Push Button for RBM
08     Obtain a Control Rod Printout             Uses a Plant Process Computer      ___  ___    ___
: 7. ___ ___ ___
and a LPRM Printout from the               terminal to print Control Rod process computer (Reference               and LPRM printouts.
TQ-AA-150-J020 Revision 00 Page 7 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
DOP 9950-03 AND DOP 9950-
STEP ELEMENT STANDARD SAT UNSAT Comment Number 06 Verify only one Control Rod is selected for movement, and that it is in the proper sequence (the NO ROD SELECTED Light on Panel 902(3)
: 07) to verify proper Control Rod Position and LPRM flux profile.
-37 should be extinguished).
  *09     Place the RBM 7 Mode Selector             Places the RBM 7 Mode              ___  ___    ___
Verifies only one rod is selected on the rod select matrix and the NO ROD SELECTED light for RBM 7 at panel 902
Switch to the ZERO 2 position             Selector Switch to the ZERO 2 and then move it to the                   position AND then to STANDBY Position.                          STANDBY.
-37 is extinguished.
NOTE This will cause the card to perform a nulling sequence, the RBM 7 INOP light will go on and the NO BALANCE Light for RBM 7 on Panel 902-37 will go out.
___ ___ ___ 07 Check that there are NO unusually high LPRM indications, and that there are the proper number of assigned LPRMs for each of the RBM Channels. Verifies that there are no high LPRM indications and RBM 7 has the proper number of LPRMs assigned.
  *10     Place the RBM Mode Selector               Places the RBM 7 Mode               ___  ___    ___
___ ___ ___ CUE When the examinee begins to use the Plant Process computer to obtain printouts, inform the examinee "Another NSO has printed the Control Rod Printout and a LPRM Printout, the QNE has reviewed the printouts and has no concerns."
Switch to the OPERATE                      Selector Switch to OPERATE Position.
08 Obtain a Control Rod Printout and a LPRM Printout from the process computer (Reference DOP 9950-03 AND DOP 9950
NOTE The RBM 7 INOP light on Panel 902-37 will go out.
-07) to verify proper Control Rod Position and LPRM flux profile.
END ALTERNATE PATH SRRS: 3D.105 (when utilized for operator initial or continuing training)
Uses a Plant Process Computer terminal to print Control Rod and LPRM printouts.
___ ___ ___ *09 Place the RBM 7 Mode Selector Switch to the ZERO 2 position and then move it to the STANDBY Position.
Places the RBM 7 Mode Selector Switch to the ZERO 2 position AND then to STANDBY. ___ ___ ___ NOTE This will cause the card to perform a nulling sequence, the RBM 7 INOP light will go on and the NO BALANCE Light for RBM 7 on Panel 902
-37 will go out.
*10 Place the RBM Mode Selector Switch to the OPERATE Position. Places the RBM 7 Mode Selector Switch to OPERATE
___ ___ ___ NOTE The RBM 7 INOP light on Panel 902-37 will go out.
END ALTERNATE PATH


TQ-AA-150-J020 Revision 00 Page 8 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 10 Comment STEP                   ELEMENT                                 STANDARD             SAT   UNSAT Number
STEP ELEMENT STANDARD SAT UNSAT Comment Number *11 Single notches out Control Rod F-04 from position 0 4 to position
  *11     Single notches out Control Rod
: 06. Momentarily places Rod Movement Control switch to Rod Out. Verifies Control Rod F-04 latches at position
* Momentarily places Rod      ___  ___    ___
: 06. ___ ___ ___ NOTE At this point the JPM is complete 13 Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
F-04 from position 04 to position             Movement Control switch to
___ ___ ___ CUE Acknowledge the report JPM Stop Time:
: 06.                                           Rod Out.
* Verifies Control Rod F-04 latches at position 06.
NOTE At this point the JPM is complete 13     Informs Unit Supervisor task is           Examinee notifies the Unit       ___  ___    ___
complete.                                  Supervisor.
CUE     Acknowledge the report JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 9 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 10 JPM  
JPM  


==SUMMARY==
==SUMMARY==
Operator's Name
 
:   Emp. ID#: ____________
Operators Name:                                                 Emp. ID#: ____________
Job Title: EO   RO SRO   FS   STA/IA   SRO Cert JPM Title:
Job
RBM - Clear RBM Malfunction JPM Number:
 
S-N-e Revision Number:
==Title:==
03 Task Number and Title:
EO       RO     SRO           FS       STA/IA         SRO Cert JPM
201L016, Respond to a rod out block K/A Number and Importance:
 
215002.A2.05     3.2 / 3.3 Suggested Testing Environment:
==Title:==
Simulator Alternate Path:
RBM - Clear RBM Malfunction JPM Number: S-N-e                                   Revision Number: 03 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Reference(s):
==Title:==
DOA 0700-03, Rev 013, ROD OUT BLOCKS; DAN 902(3)
201L016, Respond to a rod out block K/A Number and Importance: 215002.A2.05 3.2 / 3.3 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes     No Reference(s): DOA 0700-03, Rev 013, ROD OUT BLOCKS; DAN 902(3)-5 A-7, Rev 016, RBM HI-INOP; DGP 03-01, Rev 132, POWER CHANGES; DGP 03-04, Rev 073, CONTROL ROD MOVEMENTS; DOP 0400-01, Rev 039, REACTOR MANUAL CONTROL SYSTEM OPERATION Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 40 minutes                         Actual Time Used:           minutes EVALUATION  
-5 A-7, Rev 016, RBM HI-INOP; DGP 03-01, Rev 132, POWER CHANGES
; DGP 03-04, Rev 073, CONTROL ROD MOVEMENTS
; DOP 0400-01, Rev 039, REACTOR MANUAL CONTROL SYSTEM OPERATION Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
40 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name (Print):
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
TQ-AA-150-J020 Revision 00 Page 10 of 10 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 10 of 10 INITIAL CONDITIONS
: 1. You are the NSO assigned to move control rods.
: 1. You are the NSO assigned to move control rods.
: 2. The QNE requests withdrawing control rod F-04 from position 0 0-06 using single notch.
: 2. The QNE requests withdrawing control rod F-04 from position 00-06 using single notch.
: 3. The Unit Supervisor has approved and authorized the REMA with all initial conditions verified to be met.
: 3. The Unit Supervisor has approved and authorized the REMA with all initial conditions verified to be met.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to withdraw control rod F-04 from position 0 0 to position 06 using single notching IAW DGP 03
: 1. The Unit Supervisor has directed you to withdraw control rod F-04 from position 00 to position 06 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
-01, Power Changes, step G.2.w.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 1 of 10 Job Performance Measure AUX POWER - Transfer Aux Power JPM Number: S-N-f Revision Number: 03 Date: 04 / 2017 Developed By:
Exam Author          Date Approved By:
Facility Representative    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 1 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Job Performance Measure AUX POWER
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- Transfer Aux Power JPM Number:
________    1. Task description and number, JPM description and number are identified.
S-N-f  Revision Number: 03  Date: 04 / 2017 
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 6500-01                Rev: 14 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 10 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 02,     Bank JPM Revision 03,     Revised for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 6500-01  Rev: 14  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 02 , Bank JPM Revision 03, Revised for ILT 16
-1 (2017-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 10 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
TQ-AA-150-J020 Revision 00 Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 166 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset the simulator to IC 166 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure ONLY 2 RFPs operating.
: 2. Ensure ONLY 2 RFPs operating.
: 3. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
: 3. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
: 4. Mark up a copy of DOP 6500
: 4. Mark up a copy of DOP 6500-01 through step F.5
-01 through step F.5
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 6. This completes the setup for this JPM.
: 6. This completes the setup for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 10 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 10 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 was operating at rated power when the TR
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
-21 trouble alarm is received.
: 3. The EO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
: 3. The EO, dispatched to TR
: 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
-21, report ed that the TR
: 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
-21 cooling fans are not all operating and the transformer temperature is rising
. 4. The Unit Supervisor has decided to unload TR
-21 by transferring auxiliary power to TR-22. 5. Another operator will verify TR
-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 in accordance with DOP 6500-01 Transfer of 4160 Volt Bus Power Supply.
-22 in accordance with DOP 6500
-01 Transfer of 4160 Volt Bus Power Supply.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 6 of 10 JPM Start Time:
JPM Start Time:
Comment STEP                   ELEMENT                                 STANDARD           SAT   UNSAT Number NOTE Provide the examinee with the provided copy of DOP 6500-01.
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE Provide the examinee with the provided copy of DOP 6500
This task has two parts, which can be performed in any order.
-01. This task has two parts, which can be performed in any order.
CUE     IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
CUE IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
TRANSFER BUS 21 TO TR-22
TRANSFER BUS 21 TO TR
  *01     Position TR-22 to Bus 21                   Switch in ON position.         ___   ___     ___
-22 *01 Position TR
SYNCHROSCOPE selector switch to ON.
-22 to Bus 21 SYNCHROSCOPE selector switch to ON.
02     Verify:                                                                   ___  ___    ___
Switch in ON position.
INCOMING VOLTS and                         Voltages approximately equal.
___ ___ ___ 02 Verify: INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 o'clock position and NOT rotating. SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.
Meter NOT rotating.
White lights extinguished.
___ ___ ___ *03 Position TR
-22 to Bus 21  breaker control switch to CLOSE. RED light illuminated.
___ ___ ___ 04 Verify: SYNCHRONIZING meter at 12 o'clock position.
TR-22 to Bus 21 breaker indicates CLOSED.
Annunciator 902
-8 D-1 in alarm.
Meter NOT rotating.
Meter NOT rotating.
SYNCHRONIZING meter at 12 oclock position and NOT rotating.
SYNCHRONIZING meter lights                White lights extinguished.
NOT glowing.
  *03    Position TR-22 to Bus 21                  RED light illuminated.          ___  ___    ___
breaker control switch to CLOSE.
04      Verify:                                                                    ___  ___    ___
SYNCHRONIZING meter at 12                  Meter NOT rotating.
oclock position.
TR-22 to Bus 21 breaker                    RED light illuminated.
indicates CLOSED.
Annunciator 902-8 D-1 Annunciator 902-8 D-1 in alarm.
illuminated.
  *05    Position TR-21 to Bus 21                  GREEN light illuminated.        ___  ___    ___
breaker control switch to TRIP.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 7 of 10 Comment STEP                    ELEMENT                                  STANDARD            SAT  UNSAT Number 06      Verify:                                                                    ___  ___    ___
TR-21 to Bus 21 breaker                    GREEN light illuminated.
indicates OPEN.                            Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears.              extinguished.
07      Position TR-22 to Bus 21                  Switch in OFF position.          ___  ___    ___
synchroscope selector switch to OFF.
08      Verify Bus 21 AMMETER and                  Verifies Bus 21 amps and volts  ___  ___    ___
VOLTMETER indications are                  are normal.
normal.
NOTE Amps may vary depending on conditions, and volts are normally ~ 4160.
TRANSFER BUS 23 TO TR-22
  *09    Position TR-22 to Bus 23                  Switch in ON position.          ___  ___    ___
SYNCHROSCOPE selector switch to ON.
10      Verify:                                                                    ___  ___    ___
INCOMING VOLTS and                        Voltages approximately equal.
RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT                  Meter NOT rotating.
rotating.
SYNCHRONIZING meter lights                White lights extinguished.
NOT glowing.
  *11    Position TR-22 to Bus 23                  RED light illuminated.          ___  ___    ___
breaker control switch to CLOSE.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RED light illuminated.
TQ-AA-150-J020 Revision 00 Page 8 of 10 Comment STEP                    ELEMENT                                  STANDARD            SAT  UNSAT Number 12      Verify:                                                                    ___  ___    ___
Annunciator 902
SYNCHRONIZING meter at 12                  Meter NOT rotating.
-8 D-1 illuminated.
oclock position.
___ ___ ___ *05 Position TR
TR-22 to Bus 23 breaker                    RED light illuminated.
-21 to Bus 21 breaker control switch to TRIP.
indicates CLOSED.
GREEN light illuminated.
Annunciator 902-8 C-3 Annunciator 902-8 C-3 in alarm.            illuminated.
___ ___ ___
  *13    Position TR-21 to Bus 23                  GREEN light illuminated.         ___   ___     ___
TQ-AA-150-J020 Revision 00 Page 7 of 10  SRRS: 3D.105 (when utilized for operator initial or continuing training)
breaker control switch to TRIP.
STEP ELEMENT STANDARD SAT UNSAT Comment Number 06 Verify: TR-21 to Bus 21 breaker indicates OPEN.
14      Verify:                                                                     ___  ___    ___
Annunciator 902
TR-21 to Bus 23 breaker                   GREEN light illuminated.
-8 D-1 clears. GREEN light illuminated.
indicates OPEN.                           Annunciator 902-8 C-3 Annunciator 902-8 C-3 clears.              extinguished.
Annunciator 902
15      Position TR-22 to Bus 23                  Switch in OFF position.         ___   ___     ___
-8 D-1 extinguished.
synchroscope selector switch to OFF.
___ ___ ___ 07 Position TR
16      Verify Bus 23 AMMETER and                 Verifies Bus 23 amps and volts   ___  ___    ___
-22 to Bus 21  synchroscope selector switch to OFF. Switch in OFF position.
VOLTMETER indications are                  are normal.
___ ___ ___ 08 Verify Bus 21 AMMETER and VOLTMETER indications are normal. Verifies Bus 21 amps and volts are normal.
normal.
___ ___ ___ NOTE Amps may vary depending on conditions, and volts are normally ~ 4160.
NOTE Amps may vary depending on conditions, and volts are normally ~ 4160.
TRANSFER BUS 23 TO TR
17      Informs Unit Supervisor task is            Examinee notifies the Unit      ___  ___    ___
-22 *09 Position TR
complete.                                  Supervisor.
-22 to Bus 23  SYNCHROSCOPE selector switch to ON.
CUE      Acknowledge report of task completion.
Switch in ON position.
END JPM Stop Time:
___ ___ ___ 10 Verify: INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SYNCHRONIZING meter at 12 o'clock position and NOT rotating. SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.


Meter NOT rotating.
TQ-AA-150-J020 Revision 00 Page 9 of 10 JPM


White lights extinguished.
==SUMMARY==
___ ___ ___ *11 Position TR
-22 to Bus 23  breaker control switch to CLOSE. RED light illuminated.
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 8 of 10  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 12 Verify: SYNCHRONIZING meter at 12 o'clock position.
TR-22 to Bus 23 breaker indicates CLOSED.
Annunciator 902
-8 C-3 in alarm.
Meter NOT rotating.


RED light illuminated.
Operators Name:                                                Emp. ID#: ____________
Annunciator 902
Job
-8 C-3 illuminated.
___ ___ ___ *13 Position TR
-21 to Bus 23 breaker control switch to TRIP.
GREEN light illuminated.
___ ___ ___ 14 Verify: TR-21 to Bus 23 breaker indicates OPEN.
Annunciator 902
-8 C-3 clears.
GREEN light illuminated.
Annunciator 902
-8 C-3 extinguished.
___ ___ ___ 15 Position TR
-22 to Bus 23  synchroscope selector switch to OFF. Switch in OFF position.
___ ___ ___ 16 Verify Bus 23 AMMETER and VOLTMETER indications are normal. Verifies Bus 23 amps and volts are normal.
___ ___ ___ NOTE Amps may vary depending on conditions, and volts are normally ~ 4160.
17 Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___ ___ ___ CUE Acknowledge report of task completion.
END  JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 9 of 10  SRRS: 3D.105 (when utilized for operator initial or continuing training)
==Title:==
JPM  
EO        RO      SRO          FS        STA/IA        SRO Cert JPM


==SUMMARY==
==Title:==
AUX POWER - Transfer Aux Power JPM Number: S-N-f                                    Revision Number: 03 Task Number and


Operator's Name
==Title:==
:  Emp. ID#: ____________
262L024, Transfer a 4160 volt bus between power supplies K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes     No Reference(s): DOP 6500-01, Rev 014, TRANSFER OF 4160 VOLT BUS POWER SUPPLY Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 14 minutes                         Actual Time Used:           minutes EVALUATION  
Job Title:  EO  RO  SRO    FS    STA/IA    SRO Cert JPM Title:
AUX POWER
- Transfer Aux Power JPM Number:
S-N-f Revision Number:
03 Task Number and Title:
262L024, Transfer a 4160 volt bus between power supplies K/A Number and Importance:
262001.A4.04     3.6 / 3.7 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
DOP 6500-01, Rev 014, TRANSFER OF 4160 VOLT BUS POWER SUPPLY Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
14 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name (Print):
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
TQ-AA-150-J020 Revision 00 Page 10 of 10 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 10 of 10 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 was operating at rated power when the TR
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
-21 trouble alarm is received.
: 3. The EO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
: 3. The EO, dispatched to TR
: 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
-21, report ed that the TR
: 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
-21 cooling fans are not all operating and the transformer temperature is rising
. 4. The Unit Supervisor has decided to unload TR
-21 by transferring auxiliary power to TR
-22. 5. Another operator will verify TR
-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 in accordance with DOP 6500-01 Transfer of 4160 Volt Bus Power Supply.
-22 in accordance with DOP 6500
-01 Transfer of 4160 Volt Bus Power Supply.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure RBCCW - SWAP RBCCW PUMPS with Pump Trip JPM Number: S-N-g Revision Number: 00 Date: 04 / 2017 Developed By:
Exam Author          Date Approved By:
Facility Representative    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 1 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Job Performance Measure RBCCW - SWAP RBCCW PUMPS with Pump Trip JPM Number:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
S-N-g  Revision Number: 00  Date: 04 / 2017 
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOA 3700-01                Rev: 020 Procedure DOP 3700-02                Rev: 041 Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 00,     Developed for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOA 3700-01  Rev: 020  Procedure DOP 3700-02  Rev: 041  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 00, Developed for ILT 16
-1 (2017-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 165 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset the simulator to IC 165 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure 2B and 2/3 RBCCW pumps are running and 2A RBCCW pump is secured.
: 2. Ensure 2B and 2/3 RBCCW pumps are running and 2A RBCCW pump is secured.
: 3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S
: 3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-g.cae
-N-g.cae 4. Mark up a copy of DOP 3700-02, Rev 041, REACTOR BUILDING CLOSED COOLING WATER SYSTEM OPERATION through step G.6.f.(2), step G.6.g is the next step to be performed.
: 4. Mark up a copy of DOP 3700-02, Rev 041, REACTOR BUILDING CLOSED COOLING WATER SYSTEM OPERATION through step G.6.f.(2), step G.6.g is the next step to be performed.
: 5. Clean copy of DOA 3700-01, Rev 020, LOSS OF COOLING BY REACTOR BUILDING CLOSED COOLING WATER (RBCCW) SYSTEM
: 5. Clean copy of DOA 3700-01, Rev 020, LOSS OF COOLING BY REACTOR BUILDING CLOSED COOLING WATER (RBCCW) SYSTEM
: 6. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 6. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 7. This completes the setup for this JPM.
: 7. This completes the setup for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 9 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Maintenance has just been completed on 2A RBCCW pump. 3. Fill and vent of the 2A RBCCW pump has been completed.
: 2. Maintenance has just been completed on 2A RBCCW pump.
: 3. Fill and vent of the 2A RBCCW pump has been completed.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to start 2A RBCCW pump for post maintenance testing and secure 2B RBCCW pump IAW DOP 3700
: 1. The Unit Supervisor has directed you to start 2A RBCCW pump for post maintenance testing and secure 2B RBCCW pump IAW DOP 3700-02.
-02. 2. Inform the Unit Supervisor when the task is complete. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
: 2. Inform the Unit Supervisor when the task is complete.
Information For Evaluator's Use:
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:
Comment STEP                    ELEMENT                                  STANDARD              SAT  UNSAT Number
  *01    Start on coming RBCCW pump                Places 2A RBCCW PP C/S to          ___  ___    ___
CLOSE position and verifies blue ON light illuminated 02      Verify proper operation                    Verifies 2A RBCCW PP AMPS spike then return to approximately 30 amps Contacts EO to verify proper operation of 2A RBCCW pump CUE      As the EO, inform the examinee 2A RBCCW pump is operating normally
  *03    Stop off going RBCCW pump                  Places 2B RBCCW PP C/S to          ___  ___    ___
TRIP position and verifies green OFF light illuminated NOTE An automatic Trigger inserts a trip of the 2A RBCCW pump 10 seconds after the 2B RBCCW pump is secured.
BEGIN ALTERNATE PATH 04      Announces 2A RBCCW pump                    Announces 2A RBCCW pump            ___  ___    ___
trip and enters DOA 3700-01,              trip and enters DOA 3700-01, Loss Of Cooling By Reactor                Loss Of Cooling By Reactor Building Closed Cooling Water              Building Closed Cooling Water (RBCCW) System                            (RBCCW) System
  *05    Start a standby RBCCW Pump                Places 2B RBCCW PP C/S to          ___  ___    ___
(DOA immediate action)                    CLOSE position and verifies blue ON light illuminated 06      Verify proper operation                    Verifies 2B RBCCW PP AMPS          ___  ___    ___
spike then return to approximately 30 amps Contacts EO to verify proper operation of 2B RBCCW pump SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP                   ELEMENT                                 STANDARD         SAT   UNSAT Number 07     Informs the Unit Supervisor 2B             Examinee notifies the Unit  ___  ___    ___
JPM Start Time:
RBCCW pump was restarted                   Supervisor.
STEP ELEMENT STANDARD SAT UNSAT Comment Number *01 Start on coming RBCCW pump Places 2A R BCCW PP C/S to CLOSE position and verifies blue ON light illuminated
due to a trip of 2A RBCCW pump CUE     Acknowledge the report CUE     Inform the examinee Another NSO will complete DOA 3700-01actions.
___ ___ ___ 02 Verify proper operation Verifies 2A RBCCW PP AMPS spike then return to approximately 30 amps Contacts EO to verify proper operation of 2A RBCCW pump CUE As the EO, inform the examinee "2A RBCCW pump is operating normally"
NOTE At this point the JPM is complete 08     Informs Unit Supervisor task is           Examinee notifies the Unit   ___  ___    ___
*03 Stop off going RBCCW pump Places 2 B R BCCW PP C/S to TRIP position and verifies green OFF light illuminated
complete.                                  Supervisor.
___ ___ ___ NOTE An automatic Trigger inserts a trip of the 2A RBCCW pump 10 seconds after the 2B RBCCW pump is secured
CUE     Acknowledge the report JPM Stop Time:
. BEGIN ALTERNATE PATH 04 Announces 2A RBCCW pump trip and enters DOA 3700
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-01, Loss Of Cooling By Reactor Building Closed Cooling Water (RBCCW) System Announces 2A RBCCW pump trip and enters DOA 3700-01, Loss Of Cooling By Reactor Building Closed Cooling Water (RBCCW) System ___ ___ ___ *05 Start a standby RBCCW Pump (DOA immediate action)
Places 2B RBCCW PP C/S to CLOSE position and verifies blue ON light illuminated
___ ___ ___ 06 Verify proper operation Verifies 2B RBCCW PP AMPS spike then return to approximately 30 amps Contacts EO to verify proper operation of 2B RBCCW pump
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 7 of 9  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 07 Informs the Unit Supervisor 2B RBCCW pump was restarted due to a trip of 2A RBCCW pump Examinee notifies the Unit Supervisor.
___ ___ ___ CUE Acknowledge the report CUE Inform the examinee "Another NSO will complete DOA 3700
-01actions".
NOTE At this point the JPM is complete 08 Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___ ___ ___ CUE Acknowledge the report JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job
Job Title: EO   RO SRO   FS   STA/IA   SRO Cert JPM Title:
 
RBCCW - SWAP RBCCW PUMPS with Pump Trip JPM Number:
==Title:==
S-N-g Revision Number:
EO       RO     SRO           FS       STA/IA         SRO Cert JPM
00 Task Number and Title:
 
208N008, Perform RBCCW pump and heat exchanger lineup combinations K/A Number and Importance:
==Title:==
400000.A4.01     3.1 / 3.0 Suggested Testing Environment: Simulator Alternate Path:
RBCCW - SWAP RBCCW PUMPS with Pump Trip JPM Number: S-N-g                                   Revision Number: 00 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Reference(s):
==Title:==
DOA 3700-01, Rev 020, LOSS OF COOLING BY REACTOR BUILDING CLOSED COOLING WATER (RBCCW) SYSTEM
208N008, Perform RBCCW pump and heat exchanger lineup combinations K/A Number and Importance: 400000.A4.01 3.1 / 3.0 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes     No Reference(s): DOA 3700-01, Rev 020, LOSS OF COOLING BY REACTOR BUILDING CLOSED COOLING WATER (RBCCW) SYSTEM; DOP 3700-02, Rev 041, REACTOR BUILDING CLOSED COOLING WATER SYSTEM OPERATION Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:           minutes EVALUATION  
; DOP 3700-02, Rev 041, REACTOR BUILDING CLOSED COOLING WATER SYSTEM OPERATION Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name (Print):
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
TQ-AA-150-J020 Revision 00 Page 9 of 9 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Maintenance has just been completed on 2A RBCCW pump.
: 2. Maintenance has just been completed on 2A RBCCW pump.
: 3. Fill and vent of the 2A RBCCW pump has been completed.
: 3. Fill and vent of the 2A RBCCW pump has been completed.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to start 2A RBCCW pump for post maintenance testing and secure 2B RBCCW pump IAW DOP 3700
: 1. The Unit Supervisor has directed you to start 2A RBCCW pump for post maintenance testing and secure 2B RBCCW pump IAW DOP 3700-02.
-02. 2. Inform the Unit Supervisor when the task is complete.}}
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section}}

Latest revision as of 09:41, 4 February 2020

Simulator JPMs
ML17271A379
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/21/2017
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Walton R
Shared Package
ML17068A433 List:
References
Download: ML17271A379 (68)


Text

TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure ASD - Take Action for Recirc Pump Trip - (A)

JPM Number: S-N-a Revision Number: 00 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DGP 03-01 Rev: 132 Procedure DOA 0202-01 Rev: 044 Procedure DOP 0202-03 Rev: 044

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)

Revision 00, Developed for 2017-301 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the following: (IC 164 was used for validation)
  • Adjust core flow to establish recirc pump speeds < 68%
  • Verify FCL > 68%

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • None
  • Verify
3. A copy of DGP 03-01, Power Changes, marked up to the point of raising power with Recirc Flow.
4. A Maneuvering REMA marked up to the point of raising power with Recirc Flow.
5. Clean copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One of Both Pumps.
6. Clean copy of DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION
7. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Tech Spec 3.3.1.3 has been entered due to OPRM trip capability not maintained.
3. Alternate method to detect and suppress thermal hydraulic instability oscillations has been initiated.
4. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
5. The TSO has requested raising Unit 2 load to 750 MWE.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 load to 750 MWe using Recirc Flow in accordance with DGP 03-01 Power Changes step G.5.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide the Examinee with the supplied copy of:

Maneuvering REMA DOP 0202-03, Reactor Recirculation Flow Control System Operation DGP 03-01, Power Changes During performance of this JPM, whenever the Examinee obtains a copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One of Both Pumps, hand him the supplied copy of it.

  • 01 Depresses one of the Panel Depresses one of the following ___ ___ ___

902-5 Recirc Master Manual Panel 902-5 Recirc Master Control raise speed Manual Control raise speed pushbuttons. (Repeats this step pushbuttons 0.5 sec, but < 10 to continue load pickup) sec:

RAISE HIGH (0.06%)

RAISE MED (0.18%)

RAISE LOW (0.90%)

02 Verifies expected response Verifies Recirc Pump speeds, ___ ___ ___

after each speed bump Core Flow, Rx Power and other plant parameters change as expected NOTE:

An automatic Trigger is setup to trip 2A Recirc Pump when Generator load reaches xxx MWe BEGIN ALTERNATE PATH 03 Announces 2A Recirc Pump trip Announces 2A Recirc Pump trip ___ ___ ___

and enters DOA 0202-01, and enters DOA 0202-01, Recirculation (Recirc) Pump Recirculation (Recirc) Pump Trip - One Or Both Pumps Trip - One or Both Pumps SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number 04 Determines operating in the Determines operating in the ___ ___ ___

Nominal Feedwater Heating Nominal Feedwater Heating Region of Figure 1, Feedwater Region of Figure 1, Feedwater Heating Regions, and goes to Heating Regions, and goes to the Subsequent Operator the Subsequent Operator Actions (Nominal Feedwater Actions (Nominal Feedwater Heating) Flow Chart Heating) Flow Chart

  • 05 Determines a reactor scram is Depresses both scram ___ ___ ___

required based on plant pushbuttons and places the conditions. Mode Switch to S/D CUE:

After a reactor scram is inserted, state another operator will carry out balance of plant scram actions.

06 Closes 2A Recirc Pump Rotates 2A PP DISCH VLV MO ___ ___ ___

discharge valve MO 2-0202-5A 2-202-5A CS to the CLOSE position.

Verifies the valves CLOSE light lit and OPEN light out CUE:

After MO 2-0202-5A indicates closed, Inform the examinee that 5 minutes has elapsed.

  • 07 After 5 minutes, opens Recirc Rotates 2A PP DISCH VLV MO ___ ___ ___

Pump discharge valve 2-202-5A CS to the OPEN previously closed position Verifies the valves OPEN light lit and CLOSE light out CUE:

Inform the examinee, another operator will continue with scram actions, task complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

ASD - Take Action for Recirc Pump Trip - (A)

JPM Number: S-N-a Revision Number: 00 Task Number and

Title:

202L024, Change Recirc Pump Speed on Both Recirc Pumps Using ASD Tandem Controls K/A Number and Importance: 202001 A4.01 3.7 / 3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0202-03, Rev 044, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION; DOA 0202-01, Rev 044, RECIRCULATION (RECIRC)

PUMP TRIP - ONE OR BOTH PUMPS; DGP 03-01, Rev 132, POWER CHANGES Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Tech Spec 3.3.1.3 has been entered due to OPRM trip capability not maintained.
3. Alternate method to detect and suppress thermal hydraulic instability oscillations has been initiated.
4. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
5. The TSO has requested raising Unit 2 load to 750 MWE.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 load to 750 MWe using Recirc Flow in accordance with DGP 03-01 Power Changes step G.5.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure Secure a RFP JPM Number: S-N-b Revision Number: 00 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 3200-05 Rev: 40 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)

Revision 00, Developed for 2017-301 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. The simulator can be in any IC (IC 165 used for validation), but feed flow must be < 9.8 X 106 lbm/hr NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. If using IC 12 for this JPM, reduce reactor power by first reducing FCL to <93% and then reducing recirc flow to achieve desired feed flow.
3. Prepare a copy of DOP 3200-05 that is marked up (place kept) through step G.6 SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS NOTE: Prior to reading task conditions give examinee a copy of DOP 3200-05

1. The 2C RFP is to be secured to due to reducing power for scheduled maintenance
2. All prerequisites for securing the 2C RFP have been completed
3. An EO has been briefed and is standing by for this operation
4. Zinc injection is lined up to the 2B RFP INITIATING CUE The Unit Supervisor has directed you to secure the 2C reactor feed pump IAW DOP 3200-05, step G.7 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number 01 Proceeds to step G.7 of DOP Proceeds to the correct step for ___ ___ ___

3200-05 securing the RFP 02 Place the 2C AUX OIL PP Places 2C AUX OIL PP C/S to ___ ___ ___

control switch in AUTO AUTO and verifies amber AUTO TRIP light illuminated

  • 03 Open 2C RFP recirculation Places 2C RFP RECIRC VLV ___ ___ ___

valve PCV 2-3201C C/S to OPEN and verifies red OPEN light illuminated 04 Verify RPV level stable Observes 902-5 panel NR ___ ___ ___

and/or MR level indication 05 Close the RFP discharge valve Places 2C RFP DISCH VLV MO ___ ___ ___

of the RFP which is to be 2-3201C C/S to CLOSE and stopped verifies dual valve indication CLOSED and OPEN lights illuminated 06 Verify RPV level stable Observes 902-5 panel NR ___ ___ ___

and/or MR level indication 07 Verify the RFP discharge valve Verifies RFP DISCH VLV, ___ ___ ___

of the RFP which is to be MO 2-3201C green OPEN light stopped is fully closed is out and red CLOSED light illuminated

  • 08 Stop the associated RFP Places 2C RFP C/S to TRIP ___ ___ ___

and verifies green OFF light illuminated 09 As the RFP slows down, verify Verifies 2C AUX OIL PP blue ___ ___ ___

the associated Auxiliary Oil ON light illuminated Pump automatically starts SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number 10 Verify the running current of the Verifies 2A and 2B PP AMPS ___ ___ ___

operating RFP(s) is below 1115 <1115 amps amps 11 Close 2C RFP recirculation Places 2C RFP RECIRC VLV ___ ___ ___

valve PCV 2-3201C C/S to CLOSE and verifies GREEN CLOSED light illuminated 12 Direct an Equipment Operator Contact the EO to verify 2C ___ ___ ___

to verify the 2C RFP has come RFP is at rest to rest CUE: As the EO in the RFP room, inform the examinee 2C RFP is at rest

  • 13 Open 2C RFP discharge valve Places 2C RFP DISCH VLV MO ___ ___ ___

2-3201C C/S to OPEN and verifies green OPEN light illuminated 14 Direct an Equipment Operator Contact the EO to verify 2C ___ ___ ___

to inspect 2C RFP to ensure the RFP is NOT rotating in the pump shaft is NOT rotating in reverse direction the reverse direction CUE: As the EO in the RFP room, inform the examinee 2C RFP is still at rest CUE: Inform the examinee that another NSO will complete the procedure for securing 2C RFP 15 Informs US task is complete Informs US task is complete ___ ___ ___

CUE: Respond as US, Acknowledge task completion END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Secure a RFP JPM Number: S-N-b Revision Number: 00 Task Number and

Title:

259L005 Shutdown a reactor feed pump K/A Number and Importance: 2590001A4.04 3.1 / 2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 3200-05, Rev 040, REACTOR FEED PUMP SHUTDOWN Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS

1. The 2C RFP is to be secured to due to reducing power for scheduled maintenance
2. All prerequisites for securing the 2C RFP have been completed
3. An EO has been briefed and is standing by for this operation
4. Zinc injection is lined up to the 2B RFP INITIATING CUE The Unit Supervisor has directed you to secure the 2C reactor feed pump IAW DOP 3200-05, step G.7 SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure Main Steam - Unisolate One Line Using Alternate Method JPM Number: S-N-c Revision Number: 01 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0250-02 Rev: 14 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)

Revision 00, Developed for 2010 Cert Exam Revision 01, Revised for 2017-301 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 166 (<50% power).

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Power needs to be low enough so that isolating one main steam line will NOT cause a Group 1 high flow isolation.
3. Close C Main Steam Line Isolation Valves:
  • AO-2-203-1C
  • AO-2-203-2C
4. Verify Main Steam Line drain valves closed:
  • MO 2-220-1, 2, 3 & 4
  • MO 2-220-90A, B, C & D
5. Place O.O.S. cards on Main Steam Line drain valves:
6. Insert following Malfunctions and/or Remotes:
  • None
7. Setup the following Triggers:
  • None
8. Clean copy of DOP 0250-02 SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Following maintenance work on the AO 2-203-2C MSIV, the C Main Steam Line is ready to be unisolated.

INITIATING CUE

1. The Unit Supervisor has directed you to unisolate the C Main Steam Line in accordance with DOP 0250-02, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide the Examinee with the supplied copy of DOP 0250-02

1. Reviews procedure Determines that the MOs 2-220- ___ ___ ___

1 AND 2-220-2 are O.O.S.

closed and NOT available

2. Determines proper method Selects the alternate method to ___ ___ ___

unisolated, based on MOs 2-220-1 NOT being available BEGIN ALTERNATE PATH

3. Contacts Main Steam system Indicates he/she would call the ___ ___ ___

engineer for concurrence to system engineer or ask Unit unisolated the 2C Main Steam Supervisor.

Line using the alternate method.

CUE Inform the Examinee that the Main Steam system engineer has provide concurrence to unisolated the 2C main Steam Line using the alternate method

  • 4. Open MO 2-220-3 MSL DRN RED light illuminated. ___ ___ ___

VLV.

  • 5. Open MO 2-220-90C MSL DRN RED light illuminated. ___ ___ ___

VLV.

6. Wait a minimum of 5 minutes. 5 minutes elapsed OR verbal ___ ___ ___

cue received.

CUE Inform examinee that 5 minutes has elapsed

  • 7. Open AO 2-203-2C MSIV. GREEN light illuminated. ___ ___ ___
8. Wait a minimum of 30 minutes. 30 minutes elapsed OR verbal ___ ___ ___

cue received.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE Inform examinee that 30 minutes has elapsed

  • 9. Open AO 2-203-1C MSIV. GREEN light illuminated. ___ ___ ___
  • 10. Close MO 2-220-90C MSL DRN GREEN light illuminated. ___ ___ ___

VLV.

  • 11. Close MO 2-220-3 MSL DRN GREEN light illuminated. ___ ___ ___

VLV.

12. Informs Unit Supervisor task is Examinee notifies the Unit ___ ___ ___

complete. Supervisor.

CUE Acknowledge report of task completion END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Main Steam - Unisolate One Line Using Alternate Method JPM Number: S-N-c Revision Number: 00 Task Number and

Title:

239L004 Unisolate One Main Steam Line K/A Number and Importance: 239001.A4.01 4.2 / 4.0 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0250-02, Rev 014, ISOLATING AND UN-ISOLATING ONE MAIN STEAM LINE Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Following maintenance work on the AO 2-203-2C MSIV, the C Main Steam Line is ready to be unisolated.

INITIATING CUE

1. The Unit Supervisor has directed you to unisolate the C Main Steam Line in accordance with DOP 0250-02, step G.4.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 12 Job Performance Measure LPCI - Mitigate High Suction Pressure While Lining Up to CST Suction for Injection JPM Number: S-N-d Revision Number: 10 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-03 Rev: 23 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 12 Revision Record (Summary)

Revision 06, Bank JPM Revision 07, Revised for ILT 12-1 Cert Exam Revision 08, Revised for ILT 14-1 NRC Exam Revision 09, Revised for ILT 15-1 (2016-301) NRC Exam Revision 10, Revised for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 12 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC (IC 165 was used for validation)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify NO LPCI pumps operating
3. Insert following Malfunctions and/or Remotes:
  • Setup Trigger 15 to open 2C LPCI PP suction to CST: irf lpcstppc (15) true
4. Setup the following Triggers
  • None
5. Provide a marked up copy of DEOP 0500-03, Alternate Water Injection Systems SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 12 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO
2. A transient has occurred requiring Alternate Water Injection Examiner Note: The following parameters do not match the simulator indications
3. RPV level is -65 inches and slowly dropping
4. RPV pressure is 375 psig and slowly dropping INITIATING CUE
1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction with 2A LPCI pump running ready to inject
2. Inform the Unit Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 12 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03

1. Place 2A LPCI PP control ALL lights extinguished ___ ___ ___

switch in Pull-to-Lock

2. Place PP SUCT VLV MO 2- RED light illuminated ___ ___ ___

1501-5A control switch in Manual Bypass and verify closed

3. Verify MIN FLOW VLV 2-1501- RED light illuminated ___ ___ ___

13A closed if not needed CUE 2-1501-13A is not required for 2B LPCI pump NOTE:

The following valves may be verified in any order

4. Verify TORUS CLG/TEST GREEN lights illuminated ___ ___ ___

valves 2-1501-20A and 2-1501-38A closed

5. Verify TORUS SPRAY valves 2- GREEN lights illuminated ___ ___ ___

1501-19A and 2-1501-18A closed

6. Verify DW SPRAY valves 2- GREEN lights illuminated ___ ___ ___

1501-28A and 2-1501-27A closed

7. Verify TORUS CLG/TEST GREEN lights illuminated ___ ___ ___

valves 2-1501-20B and 2-1501-38B closed

8. Verify TORUS SPRAY valves 2- GREEN lights illuminated ___ ___ ___

1501-19B and 2-1501-18B closed SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 12 Comment STEP ELEMENT STANDARD SAT UNSAT Number

9. Verify DW SPRAY valves 2- GREEN lights illuminated ___ ___ ___

1501-28B and 2-1501-27B closed NOTE:

For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8)

CUE When directed, as the EO in the field, communicate that the steps (either individually or as a whole) have been completed

10. Unlock AND open 2-1501-74A, Instructs EO to complete step ___ ___ ___

U2 LPCI A PMP VENT VLV G.12.c.(5).(a)

11. Crack open 2-1501-15A, U2 Instructs EO to complete step ___ ___ ___

LPCI A PMP Vent VLV until flow G.12.c.(5).(b) is observed from pipe

12. Close 2(3)-1501-15A, U2 LPCI Instructs EO to complete step ___ ___ ___

A PMP VENT VLV G.12.c.(5).(c)

13. Close AND lock 2-1501-74A, Instructs EO to complete step ___ ___ ___

U2(3) LPCI A PMP VENT VLV G.12.c.(5).(d)

14. Open 2-1501-47A-R, U2 LPCI A Instructs EO to obtain PI 2- ___ ___ ___

PUMP SUCT PI 2-1501-47A 1501-47A reading per step ROOT VLV (at pump) and verify G.12.c.(6) & G.12.c.(7)

PI 2-1501-47A indicates less than 15 psig CUE PI 2-1501-47A indicates 15.5 psig

15. Recognizes reading is NOT less Determines reading is greater ___ ___ ___

than 15 psig than 15 psig

16. Close 2-1501-47A-R, U2 LPCI Instructs EO to close 2-1501- ___ ___ ___

A PUMP SUCT PI 2-1501-47A 47A per step G.12.c.(8)

ROOT VLV SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 12 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE 2-1501-47A-R is Closed

  • 17. Open PP SUCT VLV MO 2- GREEN light illuminated ___ ___ ___

1501-5A

  • 18. Place 2A LPCI PP control Depresses and places 2A LPCI ___ ___ ___

switch in AUTO PP c/s to center (AUTO) position

19. Notify Unit Supervisor that 2A Examinee notifies Unit ___ ___ ___

LPCI pump cannot be used with Supervisor of 2A LPCI pump suction from the CST suction pressure problem when aligned to CST May recommend using another LPCI pump CUE Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST BEGIN ALTERNATE PATH

  • 20. Place 2C LPCI PP control ALL lights extinguished ___ ___ ___

switch in Pull-to-Lock

  • 21. Place PP SUCT VLV MO 2- RED light illuminated ___ ___ ___

1501-5C control switch in Manual Bypass and verify closed

22. Verify MIN FLOW VLV 2-1501- RED light illuminated ___ ___ ___

13B closed if not needed CUE 2-1501-13B is not required for 2D LPCI pump

23. Verify TORUS CLG/TEST GREEN lights illuminated ___ ___ ___

valves 2-1501-20A and 2-1501-38A closed SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 12 Comment STEP ELEMENT STANDARD SAT UNSAT Number

24. Verify TORUS SPRAY VLVs 2- GREEN lights illuminated ___ ___ ___

1501-19A and 2-1501-18A closed

25. Verify DW SPRAY VLVs 2- GREEN lights illuminated ___ ___ ___

1501-28A and 2-1501-27A closed

26. Verify TORUS CLG/TEST VLVs GREEN lights illuminated ___ ___ ___

2-1501-20B and 2-1501-38B closed

27. Verify TORUS SPRAY VLVs 2- GREEN lights illuminated ___ ___ ___

1501-19B and 2-1501-18B closed

28. Verify DW SPRAY VLVs 2- GREEN lights illuminated ___ ___ ___

1501-28B and 2-1501-27B closed

29. Unlock AND open 2-1501-74C, Instructs EO to complete step ___ ___ ___

U2 LPCI C PMP VENT VLV G.12.c.(5).(a)

30. Crack open 2-1501-15C, U2 Instructs EO to complete step ___ ___ ___

LPCI C PMP VENT VLV until G.12.e.(5).(b) flow is observed from pipe

31. Close 2(3)-1501-15C, U2 LPCI Instructs EO to complete step ___ ___ ___

C PMP VENT VLV G.12.e.(5).(c)

32. Close AND lock 2-1501-74C, Instructs EO to complete step ___ ___ ___

U2 LPCI C PMP VENT VLV G.12.e.(5).(d)

33. Open 2-1501-47C-R, U2 LPCI Instructs EO to obtain PI 2- ___ ___ ___

C PUMP SUCT PI 2-1501-47C 1501-47A reading per step G-ROOT VLV (at pump) and verify 12.e.(6)

PI 2-1501-47C indicates less than 15 psig CUE Pressure is 10 psig SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 10 of 12 Comment STEP ELEMENT STANDARD SAT UNSAT Number

34. Recognizes reading is less than Determines reading is LESS ___ ___ ___

15 psig than 15 psig

35. Close 2-1501-47C-R, U2 LPCI Instructs EO to close 2-1501- ___ ___ ___

C PUMP SUCT PI 2-1501-47C 47C per step G.12.e.(8)

ROOT VLV

36. Unlock AND open 2-1501-31C, Directs EO to perform step G- ___ ___ ___

U2 LPCI C PMP SUCT VLV 12.e.(10)(a)

FROM CST [at 2 C LPCI Pump]

CUE 2-1501-31C is open

37. Unlock AND open 2-1501-37, Directs EO to perform step ___ ___ ___

U2 LPCI & CS SUCT FROM G.12.e.(10)(b) 2/3A CST SV (located at 2/3A CST)

Simulator Operator / Evaluator:

Activate Trigger 15 to lineup 2C LPCI pump suction to the CST CUE 2-1501-37 is open

  • 38. Start 2C LPCI PP Places control switch to start ___ ___ ___

RED light illuminated

39. Inform Unit Supervisor that 2C Informs Unit Supervisor that 2C ___ ___ ___

LPCI pump is lined up to the LPCI pump is lined up to the CST and the task is complete CST and injecting; the task is complete CUE Acknowledge report of task completion END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 11 of 12 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

LPCI - Mitigate High Suction Pressure While Lining Up to CST Suction for Injection JPM Number: S-N-d Revision Number: 10 Task Number and

Title:

29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.01 2.5 / 2.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-03, Rev 023, ALTERNATE WATER INJECTION SYSTEMS Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 12 of 12 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO
2. A transient has occurred requiring Alternate Water Injection
3. RPV level is -65 inches and slowly dropping
4. RPV pressure is 375 psig and slowly dropping INITIATING CUE
1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction with 2A LPCI pump running ready to inject
2. Inform the Unit Supervisor when the task is complete SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 10 Job Performance Measure RBM - CLEAR RBM MALFUNCTION JPM Number: S-N-e Revision Number: 03 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DGP 03-01 Rev: 132 Procedure DOA 0700-03 Rev: 13 Procedure DAN 902-5 A-7 Rev: 16 Procedure DGP 03-04 Rev: 73 Procedure DOP 0400-01 Rev: 39

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 10 Revision Record (Summary)

Revision 00, New JPM for 2014 LORT NRC Exam Revision 01, Revised JPM for 14-1 ILT NRC Exam Revision 02, Revised for ILT 15-1 CERT Exam Revision 03, Revised for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with: (IC 182 used for validation)
  • FCL 90 - 96%
  • A control rod available to withdraw which meets the following:

o In-sequence o Partially withdrawn o Non-edge NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. For development of this JPM, IC 182 with control rod sequence 2S.0.0 909D (step 15 partially withdrawn) was used with the following:
  • Recirc flow reduced to 58 Mlbm/hr
3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-e.cae
4. Mark up a copy of DGP 03-01, POWER CHANGES, through step G.2.v, step G.2.w is the next step to be performed.
5. Clean copy of DGP 03-04, CONTROL ROD MOVEMENTS
6. Clean copy of DAN 902-5 A-7, RBM HI/INOP.
7. Clean copy of DOA 0700-03, ROD OUT BLOCKS.
8. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
9. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 10 INITIAL CONDITIONS

1. You are the NSO assigned to move control rods.
2. The QNE requests withdrawing control rod F-04 from position 00-06 using single notch.
3. The Unit Supervisor has approved and authorized the REMA with all initial conditions verified to be met.

INITIATING CUE

1. The Unit Supervisor has directed you to withdraw control rod F-04 from position 00 to position 06 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 10 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE Although not a procedure step a second verifier is required. Second Verifier Duties:

Proper rod selected Insert and Withdraw limits understood.

Verifies RWM is in exercise mode, has no errors and has blocks enabled.

Check off each control rod movement on the CRD Exercise Checklist.

01 Request a second verifier VERIFIES second verifier ___ ___ ___

available.

CUE Inform examinee that you will perform duties of second verifier.

  • 02 Selects Control Rod F-04. Depresses Select Pushbutton ___ ___ ___

for Control Rod F-04. Observes Full Core Display and Apron Select lights for control rod F-04 lit.

NOTE An automatic Trigger inserts a failure for RBM 7 as control rod F-04 settles to position 04.

  • Momentarily places Rod ___ ___ ___

F-04 from position 00 to position Movement Control switch to

04. Rod Out.

04 Observe annunciator 902-5 A-7, Announces annunciator 902-5 ___ ___ ___

RBM HI/INOP is received. A-7, RBM HI/INOP is received.

BEGIN ALTERNATE PATH 05 Depress the appropriate RBM Depresses the RBM PUSH TO ___ ___ ___

PUSH TO SET-UP Push SET-UP Push Button for RBM Buttons. 7.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 10 Comment STEP ELEMENT STANDARD SAT UNSAT Number 06 Verify only one Control Rod is Verifies only one rod is selected ___ ___ ___

selected for movement, and that on the rod select matrix and the it is in the proper sequence (the NO ROD SELECTED light for NO ROD SELECTED Light on RBM 7 at panel 902-37 is Panel 902(3)-37 should be extinguished.

extinguished).

07 Check that there are NO Verifies that there are no high ___ ___ ___

unusually high LPRM LPRM indications and RBM 7 indications, and that there are has the proper number of the proper number of assigned LPRMs assigned.

LPRMs for each of the RBM Channels.

CUE When the examinee begins to use the Plant Process computer to obtain printouts, inform the examinee Another NSO has printed the Control Rod Printout and a LPRM Printout, the QNE has reviewed the printouts and has no concerns.

08 Obtain a Control Rod Printout Uses a Plant Process Computer ___ ___ ___

and a LPRM Printout from the terminal to print Control Rod process computer (Reference and LPRM printouts.

DOP 9950-03 AND DOP 9950-

07) to verify proper Control Rod Position and LPRM flux profile.
  • 09 Place the RBM 7 Mode Selector Places the RBM 7 Mode ___ ___ ___

Switch to the ZERO 2 position Selector Switch to the ZERO 2 and then move it to the position AND then to STANDBY Position. STANDBY.

NOTE This will cause the card to perform a nulling sequence, the RBM 7 INOP light will go on and the NO BALANCE Light for RBM 7 on Panel 902-37 will go out.

  • 10 Place the RBM Mode Selector Places the RBM 7 Mode ___ ___ ___

Switch to the OPERATE Selector Switch to OPERATE Position.

NOTE The RBM 7 INOP light on Panel 902-37 will go out.

END ALTERNATE PATH SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 10 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • Momentarily places Rod ___ ___ ___

F-04 from position 04 to position Movement Control switch to

06. Rod Out.

NOTE At this point the JPM is complete 13 Informs Unit Supervisor task is Examinee notifies the Unit ___ ___ ___

complete. Supervisor.

CUE Acknowledge the report JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 10 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

RBM - Clear RBM Malfunction JPM Number: S-N-e Revision Number: 03 Task Number and

Title:

201L016, Respond to a rod out block K/A Number and Importance: 215002.A2.05 3.2 / 3.3 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOA 0700-03, Rev 013, ROD OUT BLOCKS; DAN 902(3)-5 A-7, Rev 016, RBM HI-INOP; DGP 03-01, Rev 132, POWER CHANGES; DGP 03-04, Rev 073, CONTROL ROD MOVEMENTS; DOP 0400-01, Rev 039, REACTOR MANUAL CONTROL SYSTEM OPERATION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 40 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 10 of 10 INITIAL CONDITIONS

1. You are the NSO assigned to move control rods.
2. The QNE requests withdrawing control rod F-04 from position 00-06 using single notch.
3. The Unit Supervisor has approved and authorized the REMA with all initial conditions verified to be met.

INITIATING CUE

1. The Unit Supervisor has directed you to withdraw control rod F-04 from position 00 to position 06 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 10 Job Performance Measure AUX POWER - Transfer Aux Power JPM Number: S-N-f Revision Number: 03 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 6500-01 Rev: 14 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 10 Revision Record (Summary)

Revision 02, Bank JPM Revision 03, Revised for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 166 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Ensure ONLY 2 RFPs operating.
3. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
4. Mark up a copy of DOP 6500-01 through step F.5
5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
6. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 10 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The EO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 in accordance with DOP 6500-01 Transfer of 4160 Volt Bus Power Supply.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 10 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE Provide the examinee with the provided copy of DOP 6500-01.

This task has two parts, which can be performed in any order.

CUE IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.

TRANSFER BUS 21 TO TR-22

  • 01 Position TR-22 to Bus 21 Switch in ON position. ___ ___ ___

SYNCHROSCOPE selector switch to ON.

02 Verify: ___ ___ ___

INCOMING VOLTS and Voltages approximately equal.

RUNNING VOLTS meters approximately equal.

Meter NOT rotating.

SYNCHRONIZING meter at 12 oclock position and NOT rotating.

SYNCHRONIZING meter lights White lights extinguished.

NOT glowing.

  • 03 Position TR-22 to Bus 21 RED light illuminated. ___ ___ ___

breaker control switch to CLOSE.

04 Verify: ___ ___ ___

SYNCHRONIZING meter at 12 Meter NOT rotating.

oclock position.

TR-22 to Bus 21 breaker RED light illuminated.

indicates CLOSED.

Annunciator 902-8 D-1 Annunciator 902-8 D-1 in alarm.

illuminated.

  • 05 Position TR-21 to Bus 21 GREEN light illuminated. ___ ___ ___

breaker control switch to TRIP.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 10 Comment STEP ELEMENT STANDARD SAT UNSAT Number 06 Verify: ___ ___ ___

TR-21 to Bus 21 breaker GREEN light illuminated.

indicates OPEN. Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears. extinguished.

07 Position TR-22 to Bus 21 Switch in OFF position. ___ ___ ___

synchroscope selector switch to OFF.

08 Verify Bus 21 AMMETER and Verifies Bus 21 amps and volts ___ ___ ___

VOLTMETER indications are are normal.

normal.

NOTE Amps may vary depending on conditions, and volts are normally ~ 4160.

TRANSFER BUS 23 TO TR-22

  • 09 Position TR-22 to Bus 23 Switch in ON position. ___ ___ ___

SYNCHROSCOPE selector switch to ON.

10 Verify: ___ ___ ___

INCOMING VOLTS and Voltages approximately equal.

RUNNING VOLTS meters approximately equal.

SYNCHRONIZING meter at 12 oclock position and NOT Meter NOT rotating.

rotating.

SYNCHRONIZING meter lights White lights extinguished.

NOT glowing.

  • 11 Position TR-22 to Bus 23 RED light illuminated. ___ ___ ___

breaker control switch to CLOSE.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 10 Comment STEP ELEMENT STANDARD SAT UNSAT Number 12 Verify: ___ ___ ___

SYNCHRONIZING meter at 12 Meter NOT rotating.

oclock position.

TR-22 to Bus 23 breaker RED light illuminated.

indicates CLOSED.

Annunciator 902-8 C-3 Annunciator 902-8 C-3 in alarm. illuminated.

  • 13 Position TR-21 to Bus 23 GREEN light illuminated. ___ ___ ___

breaker control switch to TRIP.

14 Verify: ___ ___ ___

TR-21 to Bus 23 breaker GREEN light illuminated.

indicates OPEN. Annunciator 902-8 C-3 Annunciator 902-8 C-3 clears. extinguished.

15 Position TR-22 to Bus 23 Switch in OFF position. ___ ___ ___

synchroscope selector switch to OFF.

16 Verify Bus 23 AMMETER and Verifies Bus 23 amps and volts ___ ___ ___

VOLTMETER indications are are normal.

normal.

NOTE Amps may vary depending on conditions, and volts are normally ~ 4160.

17 Informs Unit Supervisor task is Examinee notifies the Unit ___ ___ ___

complete. Supervisor.

CUE Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 10 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

AUX POWER - Transfer Aux Power JPM Number: S-N-f Revision Number: 03 Task Number and

Title:

262L024, Transfer a 4160 volt bus between power supplies K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 6500-01, Rev 014, TRANSFER OF 4160 VOLT BUS POWER SUPPLY Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 14 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 10 of 10 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The EO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 in accordance with DOP 6500-01 Transfer of 4160 Volt Bus Power Supply.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure RBCCW - SWAP RBCCW PUMPS with Pump Trip JPM Number: S-N-g Revision Number: 00 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOA 3700-01 Rev: 020 Procedure DOP 3700-02 Rev: 041 Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)

Revision 00, Developed for ILT 16-1 (2017-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 165 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Ensure 2B and 2/3 RBCCW pumps are running and 2A RBCCW pump is secured.
3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-g.cae
4. Mark up a copy of DOP 3700-02, Rev 041, REACTOR BUILDING CLOSED COOLING WATER SYSTEM OPERATION through step G.6.f.(2), step G.6.g is the next step to be performed.
5. Clean copy of DOA 3700-01, Rev 020, LOSS OF COOLING BY REACTOR BUILDING CLOSED COOLING WATER (RBCCW) SYSTEM
6. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Maintenance has just been completed on 2A RBCCW pump.
3. Fill and vent of the 2A RBCCW pump has been completed.

INITIATING CUE

1. The Unit Supervisor has directed you to start 2A RBCCW pump for post maintenance testing and secure 2B RBCCW pump IAW DOP 3700-02.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 01 Start on coming RBCCW pump Places 2A RBCCW PP C/S to ___ ___ ___

CLOSE position and verifies blue ON light illuminated 02 Verify proper operation Verifies 2A RBCCW PP AMPS spike then return to approximately 30 amps Contacts EO to verify proper operation of 2A RBCCW pump CUE As the EO, inform the examinee 2A RBCCW pump is operating normally

  • 03 Stop off going RBCCW pump Places 2B RBCCW PP C/S to ___ ___ ___

TRIP position and verifies green OFF light illuminated NOTE An automatic Trigger inserts a trip of the 2A RBCCW pump 10 seconds after the 2B RBCCW pump is secured.

BEGIN ALTERNATE PATH 04 Announces 2A RBCCW pump Announces 2A RBCCW pump ___ ___ ___

trip and enters DOA 3700-01, trip and enters DOA 3700-01, Loss Of Cooling By Reactor Loss Of Cooling By Reactor Building Closed Cooling Water Building Closed Cooling Water (RBCCW) System (RBCCW) System

  • 05 Start a standby RBCCW Pump Places 2B RBCCW PP C/S to ___ ___ ___

(DOA immediate action) CLOSE position and verifies blue ON light illuminated 06 Verify proper operation Verifies 2B RBCCW PP AMPS ___ ___ ___

spike then return to approximately 30 amps Contacts EO to verify proper operation of 2B RBCCW pump SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number 07 Informs the Unit Supervisor 2B Examinee notifies the Unit ___ ___ ___

RBCCW pump was restarted Supervisor.

due to a trip of 2A RBCCW pump CUE Acknowledge the report CUE Inform the examinee Another NSO will complete DOA 3700-01actions.

NOTE At this point the JPM is complete 08 Informs Unit Supervisor task is Examinee notifies the Unit ___ ___ ___

complete. Supervisor.

CUE Acknowledge the report JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

RBCCW - SWAP RBCCW PUMPS with Pump Trip JPM Number: S-N-g Revision Number: 00 Task Number and

Title:

208N008, Perform RBCCW pump and heat exchanger lineup combinations K/A Number and Importance: 400000.A4.01 3.1 / 3.0 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOA 3700-01, Rev 020, LOSS OF COOLING BY REACTOR BUILDING CLOSED COOLING WATER (RBCCW) SYSTEM; DOP 3700-02, Rev 041, REACTOR BUILDING CLOSED COOLING WATER SYSTEM OPERATION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Maintenance has just been completed on 2A RBCCW pump.
3. Fill and vent of the 2A RBCCW pump has been completed.

INITIATING CUE

1. The Unit Supervisor has directed you to start 2A RBCCW pump for post maintenance testing and secure 2B RBCCW pump IAW DOP 3700-02.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section