ML17271A354
| ML17271A354 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 08/21/2017 |
| From: | Walton R NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Walton R | |
| Shared Package | |
| ML17068A433 | List: |
| References | |
| Download: ML17271A354 (1) | |
Text
ES.30r Operating Test Qualitv Checklist Form ES-301-3 Facilitv: Dresden Station Date of Examination: Bl21l17 Operating Test Number: 2017-301
- 1. General Criteria lnitials a
b*
cu The ng test conforms to the previously approved outl ine; changes are consistent with ents 1 0 CFR function
- 4. d
\\)'ü
- b.
There is no day{o-day repetition between this and other operating tests to be administered durino this examination.
"/
$/
ç$\\)
c.
test shall not items from the Section D.1
/y' ril
\\t\\^J
- d.
Overlap with the written examination and between different parts of the operating test is within acceptable limits.
/ d rt\\ü e.
It appears that the operating test will differentiate between competent and less-than-competent aoolicants at the desiqnated license level.
r tI/
Kt\\
- 2. Walkthroush Criteria a.
Each JPM includes the following, as applicable:
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-
_(
_//
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steos, if applicable
/
t'/ Rl'\\
b.
Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-30'l-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g,, item distribution, bank use, repetition from the last two NRC examinations) soecified on those forms and Form ES-201-2,
/
VI s$d
- 3. Simulator Griteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4, and a copv is attached.
r rl5{
?r\\d a.
b.
c.
d.
Author Facility Reviewer (.)
NRC Chief Examiner (#)
r¿ff ls Date lP^Z6'l-l 6-2i/2 T,lza[-nw fld7 -a NRC Supervisor
- .sr) drdt1
. The facility licensee signature is not applicable for NRC-developed tests.
- The independent NRC reviewer initials items in column "c"; the chief examiner concurrence is required.