ES.30r Operating Test Qualitv Checklist Form ES-301-3 Facilitv: Dresden Station Date of Examination: Bl21l17 Operating Test Number: 2017-301 lnitials

1. General Criteria a b* cu The ng test conforms to the previously approved outl ine; changes are consistent with ents 1 0 CFR function 4. d \)'ü
b. There is no day{o-day repetition between this and other operating tests to be administered

"/

durino this examination. $/ ç$\)

c. test shall not items from the Section D.1

/y' ril \t\^J

d. Overlap with the written examination and between different parts of the operating test is within

/ d r

acceptable limits.

rt\ü It appears that the operating test will differentiate between competent and less-than-competent e.

aoolicants at the desiqnated license level.

tI/ Kt\

2. Walkthroush Criteria
a. Each JPM includes the following, as applicable:

. initial conditions

. initiating cues

. references and tools, including associated procedures

. reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee

. operationally important specific performance criteria that include- / t'/ Rl'\

! detailed expected actions with exact criteria and nomenclature system response and other examiner cues

_( statements describing important observations to be made by the applicant criteria for successful completion of the task

_/ identification of critical steps and their associated performance standards

/ restrictions on the sequence of steos, if applicable

b. Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-30'l-1 and ES-301-2) have not caused the test to deviate from any of the VI acceptance criteria (e.g,, item distribution, bank use, repetition from the last two NRC / s$d examinations) soecified on those forms and Form ES-201-2, Form ES-301-4, and a copv is attached.
3. Simulator Griteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with r rl5{

Date

?r\d

a. Author r¿ff ls lP^Z6'l-l
b. Facility Reviewer (.) 6-2i/2
c. NRC Chief Examiner (#) T,lza[-nw
d. NRC Supervisor  ;.sr) fld7 -a drd t1

. The facility licensee signature is not applicable for NRC-developed tests.

  1. The independent NRC reviewer initials items in column "c"; the chief examiner concurrence is required.