| issue date = 01/30/1981
| issue date = 01/30/1981
| title = LER 81-002/03L-0:on 810109,safety Injection Pump C Did Not Start W/Bus Breaker 16.Probable Cause Due to Breaker in off-set Position.Personnel to Be Instructed in Proper Breaker Alignment
| title = LER 81-002/03L-0:on 810109,safety Injection Pump C Did Not Start W/Bus Breaker 16.Probable Cause Due to Breaker in off-set Position.Personnel to Be Instructed in Proper Breaker Alignment
| author name = BELUKE S R
| author name = Beluke S
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC FOQM 366 I7.77)2~o 7 8 CON'T~01 1 QB 0 1 3 0 8 1 OB 74 75 REPORT DATE 80~LQR 0 8 0 0 0 2 4 4 Q2 0 1 0 9 8~60 61 DOCKET NUMBER 68 69 EVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 During test C SL pŽp did not start with bus 16 breaker.(T.S.3.3.l.1c).The C pump 7 8 U.S.NUCLEAR REGULATORY COMMISSION 8 1-002/03 L-0 QL[CENSEE EVENT REPORT((BR 1228)CONTROL BLOCK: Q1 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
{{#Wiki_filter:NRC FOQM 366                                                                                                                             U. S. NUCLEAR REGULATORY COMMISSION I7.77)             2 8 1-002/03        L-0 QL[CENSEE EVENT REPORT                                                            (( BR 1228)
I 6 N Y R 8 G 1 Q2 0 0-0 0 0 0 0-0 0 Q3 4 1 1 1 1QR~QR 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 had been proven operable using bus 14 breaker during this test as well as the other 2 4 pumps~After examining breaker for position breaker was fully racked out, then fully racked in, and operation proved successful.
CONTROL BLOCK:                                                      Q1                (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
~OB~O7 I~OB 7 8 9 80 l jzz 7;8 SYSTEM~CAUSE CAUSE COMP.VALVE CODE CODE SUBCODE COMPONENTCODE SUBCODE SUBCODE~SF Q>>E Q12~Q13 C K T 8 K R Q4~BQ>>~2Q18 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LF RIRD EVENT YEAR REPORT NO.CODE TYPE NO.Q12 RRRRRR~81 Q~00 2 QZ~03 QL I=I 0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDX PRIME COMP.COMPONENT TAKEN ACTION ON PLANT METHOD HOURS O22 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER
I                                      6
~ROIS~HOB~ZO20 gJO2'~023~O24~026 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 027 o Breaker possibly in"off-set" position indicated by positioning device pin not moving freely in positioning stop bracket fully-racked-in slot~At next test electricians to examine breaker before closing and after opening.Training in proper breaker align-I~12 3 ment and reporting rack-in problems will be emphasized.
    ~o               N Y        R      8 G          1 14 Q2 15 0    0          0    0    0    0 LICENSE NUMBER 0    0          0 Q3 25      26 4    1      1 LICENSE TYPE 1    1QR~QR 30    57 CAT 58 7       8   9        LICENSEE CODE CON'T
Breaker is Westinghouse 4 DB-50 air circuit breaker, 500 amp.80 DISCOVERY DESCRIPTION Q32 Surveillance test 80 LOCATION OF RELEASE Q NA 80 80 80 80 NRC USE ONLY 68 69 80 o PHDNE 315/524-4446, ext.318 NAME oF PREPARER Stuart R.Beluke 7 8 9 FACILITY~30-METHOD OF STATUS%POWER OTHERSTATUS
    ~01                               ~LQR           0       8     0     0   0       2   4     4   Q2     0     1     0     9     8     1 QB        0      1    3    0  8    1  OB 8                                                                                      68    69        EVENT DATE                74      75        REPORT DATE        80 7                        ~       60           61                 DOCKET NUMBER EVENT DESCRIPTION AND PROBABLE CONSEQUENCES                                   Q10 During test C                 SL     p'p did             not start with bus               16   breaker.             (T.S. 3. 3.           l. 1c). The C pump had been proven operable using bus 14 breaker during this test as well as the other                                                                                   2 4       pumps       ~     After examining breaker for position breaker was fully racked out, then fully racked in, and operation proved successful.
~DISCOVERY~15 8 Q28~0Q28 N8~~Q31 7 8 9 10 12 13 44 45 46 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY Q 6~Z Q33~ZO34 NA 7 8 9 10 44 45 PERSONNEL EXPOSURES NUMBER~TYPE DESCRIPTION O39 1~00 0Q32 ZQ38.N8 7 8 9 11 12 13 PERSONNEL INJURIES 7 8 9 11 12 LOSS OF-OR DAMAGE TO FACILITY Q43 4 TYPE DESCRIPTION 9~Z 042 NA 8 9 10 PUBLICITY ISSUED DESCRIPTION
      ~OB
~B ego so5 o~'4 NA 7 8 9 10 (L J 1}}
    ~O7 I ~OB                                                                                                                                                                                     80 7       8 9 SYSTEM       ~
CAUSE           CAUSE                                                           COMP.           VALVE CODE                 CODE         SUBCODE                 COMPONENTCODE                         SUBCODE           SUBCODE l  jzz 7;        8
                                        ~SF 9          10 Q>>
11 E     Q12   ~Q13 12            13 C K T           8     K     R 18 Q4       ~BQ>>
19
                                                                                                                                                                    ~2Q18 20 REVISION SEQUENTIAL                           OCCURRENCE             REPORT EVENT YEAR                                   REPORT NO.                               CODE                 TYPE                         NO.
Q12 LF RIRD RRRRRR         ~81 21        22 Q
23
                                                                                    ~00 24 2
26 QZ 27
                                                                                                                            ~03 28        29 QL 30 I=I 31         32 0
ACTION FUTURE                                                                                     ATTACHMENT             NPRDX         PRIME COMP.           COMPONENT
                                                                                                                                                              ~
EFFECT            SHUTDOWN TAKEN ACTION
                    ~ROIS 33
                                ~HOB 34 ON PLANT
                                                    ~ZO20 35 METHOD gJO2' 36              37 HOURS O22 40
                                                                                                                        ~
SUBMITTED 41 023 FORM SUB.
                                                                                                                                            ~O24 42 SUPPLIER 43 026 44 MANUFACTURER 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 027 o         Breaker possibly in                         "off-set" position indicated by positioning device pin not moving freely in positioning stop bracket fully-racked-in slot At next test electricians to                           ~
      ~12              examine breaker before closing and after opening. Training in proper breaker align-I 3           ment and reporting rack-in problems                                         will be       emphasized.                   Breaker is Westinghouse 4           DB-50 air circuit breaker, 500 amp.
8    9                                                                                                                                                                          80
                                                                                            ~
7 FACILITY                                                                   ~30     -METHOD OF STATUS               % POWER                           OTHERSTATUS                 DISCOVERY                                  DISCOVERY DESCRIPTION Q32
    ~15 7      8   9 8    Q28     ~0Q28 10              12        13 N8 44
                                                                                                        ~~Q31 45         46 Surveillance test 80 ACTIVITY CONTENT RELEASED OF RELEASE                             AMOUNT OF ACTIVITY NA Q                                              NA LOCATION OF RELEASE        Q 6       ~Z       Q33     ~ZO34 7       8   9               10                                                           44           45                                                                           80 PERSONNEL EXPOSURES NUMBER       ~       TYPE         DESCRIPTION O39 1
8
                  ~00             0Q32 12 ZQ38 13 N8 80 7             9                 11 PERSONNEL INJURIES 7       8   9                 11       12                                                                                                                                             80 LOSS OF-OR DAMAGE TO FACILITY                                 4 TYPE         DESCRIPTION                     Q43 9     ~Z     042                                             NA 80 ego so5 o ~'4 8   9           10 PUBLICITY                                                                                                                                         NRC USE ONLY ISSUED       DESCRIPTION       ~B NA 7       8   9           10                                                                                                                           68    69                        80 o NAME oF PREPARER Stuart R. Beluke                                                  PHDNE 315/524-4446, ext. 318
 
(L J
1}}

Latest revision as of 04:36, 4 February 2020

LER 81-002/03L-0:on 810109,safety Injection Pump C Did Not Start W/Bus Breaker 16.Probable Cause Due to Breaker in off-set Position.Personnel to Be Instructed in Proper Breaker Alignment
ML17309A124
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/30/1981
From: Beluke S
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17258A757 List:
References
LER-81-002-03L, LER-81-2-3L, NUDOCS 8102050598
Download: ML17309A124 (2)


Text

NRC FOQM 366 U. S. NUCLEAR REGULATORY COMMISSION I7.77) 2 8 1-002/03 L-0 QL[CENSEE EVENT REPORT (( BR 1228)

CONTROL BLOCK: Q1 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I 6

~o N Y R 8 G 1 14 Q2 15 0 0 0 0 0 0 LICENSE NUMBER 0 0 0 Q3 25 26 4 1 1 LICENSE TYPE 1 1QR~QR 30 57 CAT 58 7 8 9 LICENSEE CODE CON'T

~01 ~LQR 0 8 0 0 0 2 4 4 Q2 0 1 0 9 8 1 QB 0 1 3 0 8 1 OB 8 68 69 EVENT DATE 74 75 REPORT DATE 80 7 ~ 60 61 DOCKET NUMBER EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 During test C SL p'p did not start with bus 16 breaker. (T.S. 3. 3. l. 1c). The C pump had been proven operable using bus 14 breaker during this test as well as the other 2 4 pumps ~ After examining breaker for position breaker was fully racked out, then fully racked in, and operation proved successful.

~OB

~O7 I ~OB 80 7 8 9 SYSTEM ~

CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENTCODE SUBCODE SUBCODE l jzz 7; 8

~SF 9 10 Q>>

11 E Q12 ~Q13 12 13 C K T 8 K R 18 Q4 ~BQ>>

19

~2Q18 20 REVISION SEQUENTIAL OCCURRENCE REPORT EVENT YEAR REPORT NO. CODE TYPE NO.

Q12 LF RIRD RRRRRR ~81 21 22 Q

23

~00 24 2

26 QZ 27

~03 28 29 QL 30 I=I 31 32 0

ACTION FUTURE ATTACHMENT NPRDX PRIME COMP. COMPONENT

~

EFFECT SHUTDOWN TAKEN ACTION

~ROIS 33

~HOB 34 ON PLANT

~ZO20 35 METHOD gJO2' 36 37 HOURS O22 40

~

SUBMITTED 41 023 FORM SUB.

~O24 42 SUPPLIER 43 026 44 MANUFACTURER 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 027 o Breaker possibly in "off-set" position indicated by positioning device pin not moving freely in positioning stop bracket fully-racked-in slot At next test electricians to ~

~12 examine breaker before closing and after opening. Training in proper breaker align-I 3 ment and reporting rack-in problems will be emphasized. Breaker is Westinghouse 4 DB-50 air circuit breaker, 500 amp.

8 9 80

~

7 FACILITY ~30 -METHOD OF STATUS  % POWER OTHERSTATUS DISCOVERY DISCOVERY DESCRIPTION Q32

~15 7 8 9 8 Q28 ~0Q28 10 12 13 N8 44

~~Q31 45 46 Surveillance test 80 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY NA Q NA LOCATION OF RELEASE Q 6 ~Z Q33 ~ZO34 7 8 9 10 44 45 80 PERSONNEL EXPOSURES NUMBER ~ TYPE DESCRIPTION O39 1

8

~00 0Q32 12 ZQ38 13 N8 80 7 9 11 PERSONNEL INJURIES 7 8 9 11 12 80 LOSS OF-OR DAMAGE TO FACILITY 4 TYPE DESCRIPTION Q43 9 ~Z 042 NA 80 ego so5 o ~'4 8 9 10 PUBLICITY NRC USE ONLY ISSUED DESCRIPTION ~B NA 7 8 9 10 68 69 80 o NAME oF PREPARER Stuart R. Beluke PHDNE 315/524-4446, ext. 318

(L J

1