ML17311A047: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/22/1997
| issue date = 05/22/1997
| title = Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr
| title = Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr
| author name = WIDAY J A
| author name = Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1-REGULATO INFORMATION DISTRIBUTION
{{#Wiki_filter:CATEGORY 1
,~TEM(RIDS)ACCESSION NBR:9706040174 DOC.DATE:
                    -REGULATO     INFORMATION DISTRIBUTION           ,~TEM (RIDS)
97/05/22NOTARIZED:
ACCESSION NBR:9706040174           DOC.DATE: 97/05/22        NOTARIZED: NO              DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant,. Unit 1, Rochester                   G  05000244 AUTH. NAME          AUTHOR AFFILIATION WIDAY,J.A.           Rochester Gas a Electric Corp.
NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,.Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION WIDAY,J.A.
RECIP.NAME           RECIPIENT AFFII IATION PM    . 5'/N/gI   /
Rochester GasaElectricCorp.RECIP.NAME RECIPIENT AFFIIIATIONPM.5'/N/gI/


==SUBJECT:==
==SUBJECT:==
RevisedEOPs,including procedures index,rev 5toATT-15.0, rev3toATT-15.2,rev 3toAP-ELEC.3,rev 13toECA-0.1&rev9toECA-0.2.W/970522 ltr.DISTRIBUTION CODE:A002DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:Inadequate CoreCooling(ItemII.F.2)GL82-28NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Revised EOPs,including procedures index,rev 5 to ATT-15.0, rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & rev 9 to ECA-0.2.W/970522       ltr.
05000244ERECIPIENT IDCODE/NAME PD1-1PDCOPIESRECIPIENT LTTRENCL..IDCODE/NAME 11VISSINGFG.
DISTRIBUTION CODE: A002D        COPIES RECEIVED:LTR         ENCL        SIZE:
COPIESLTTRENCL110INTERNAL.
TITLE: OR  Submittal:Inadequate       Core Cooling (Item      II.F.2)   GL  82-28 NOTES:License Exp date      in accordance with 10CFR2,2.109(9/19/72).                 05000244    E RECIPIENT            COPIES              RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL    .. ID CODE/NAME         LTTR ENCL                0 PD1-1 PD                  1    1        VISSINGFG.             1      1 INTERNAL.                   Ol        1      1      NRR/DRPM/PECB          1      1 NRR/DSSA/SRXB             1    '1      RES DE                  1      1 RES/DET/EIB               1      1      RES/DSIR/RPSB           1      1 EXTERNAL: NOAC                        1      1      NRC PDR                1      1 D
NRR/DSSA/SRXB RES/DET/EIB Ol111'111NRR/DRPM/PECB RESDERES/DSIR/RPSB 111111EXTERNAL:
U '
NOAC11NRCPDR11DU'NOTETOALL"RIDS"RECIPIENTS:
NOTE TO ALL  "RIDS" RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              10  ENCL    10
LTTR10ENCL10 IIIlIII]PlrZZrZEF/IllrllIZild IlrwLaat0\laaROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649<001 JOSEPHA.WIDAYPlantManagerGlnnaNuclearPkrntMay22,1997TELEPHONE AREACODE7t6546-2700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate l-1Washington, D.C.20555
 
Laat 0\laa Ilrw IIIlIII]Pl rZZrZ EF/   Il  lrllIZild ROCHESTER GASAND ELECTRIC CORPORATION o 89EASTA VENUE, ROCHESTER, N.Y. 14649<001 JOSEPH A. WIDAY                                                                                    TELEPHONE Plant Manager                                                                              AREA CODE 7t6 546-2700 Glnna Nuclear Pkrnt May 22, 1997 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate l-1 Washington, D.C. 20555


==Subject:==
==Subject:==
Emergency Operating Procedures R.E.GinnaNuclearPowerPlantDocketNo.50-244
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Vissing:==
 
As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours, se h A. Wid JAW/jdw XC:        U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector 9706040174 970522 PDR        ADOCK 05000244 PDR enclosure(s):
                                                                                                    @OD ATT Index                                AP-ELEC.3, Rev. -3 AP Index                                ECA-0.1, Rev. 13 ECA Index6 3 0 ~ ~                      ECA-0.2, Rev. 9 ATT-15.0, Rev. 5 ATT-15.2, Rev. 3 llllllllllllllllllll[IIIIIII)llllll
 
0 REPORT NO. 01 REPORT: NPSP0200 GINNA NUCLEAR POWER PLANT PROCEDURES INDEX 03/24/97    PAGE:  30 DOC TYPE: PRATT                                  EOP ATTACHMENTS PARAMETERS: DOC TYPES  -  PRAR        PRATI'RFR                                  5 YEARS ONLY:
PROCEDURE                                                                                    EFFECT                NEXT NUMBER                PROCEDURE  TITLE                                                        DATE                RBVIEW    ST ATT-1.0                ATTACHMENT AT POWER CCW ALIGNME                                001  0 I/26/94  02/19/93  02/19/98  BF ATT-2.0                ATTACHMENT AUX BLDG SW                                        003  07/26/94  04/21/93  04/21/98  EF A  -2.1              ATTACHMENT MIN SW                                              003    03/24/9I  03/26/93  03/26/98  EF ATT-2.2              ATTACHMENT SW ISOLATION                                        003    07/26/94  07/29/93  01/29/9    EF ATI'.3                ATTACHMENT SW LOADS    IN  CNMT                                003    01/25/95  01/25/95  01  5/00  EF ATT-3.0              ATTA      NT  CI/CVI                                          003  '07/26/94    02/11/9    02/11/99  EF ATZ-3. 1              ATTACHMENT        CLOSURB                                    002  07/26/94    0  11/94  02/11/99  EF ATT-4.0              ATTACHMENT CNNL'ECI        FANS                                003  07/26    4  06/17/93  06/17/98  EF ATT-5.0              ATTACHMENT COND TO S/G                                        004      /25/95 01/25/95    01/25/00  EF ATT-5.1              ATTACHMENT SAFW                                                      09/26196  11/08/94 5                        11/08/99  EF ATT-5.2              ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP                    002  10/26/95  03/04/94    03/04/99  EF ATT-6. 0              ATTACHMENT COND VACUUM                                        003  12/18/96  03/26/93    03/26/98'P ATT-7. 0              ATTACHMENT CR EVAC                                            002  12/18/96  03/26/93    03/26/98  EF ATT-8. 0              ATTACHMENT DC LOADS                                            003  07/26/94  01/26/94    01/26/99  EP ATT-8. 1            ATTACHMENT D/G STOP                                                  11/03/95  02/19/93    02/19/98  EP ATT-8. 2            ATTACHMENT GEN DEGAS                                            005              02/11/94 07      94            02/11/99  EF ATT-8.3              ATTACHMENT NONVITAL                                            003  07/26/94  02    93  02/19/98    EF ATT-8. 4            ATTACHMENT SI/UV                                              003    07/26/94  02/19/93  0      98  EF ATT-9. 0            ATTACHMENT L        WN                                        005    07/26/94  01/26/94  01/26/99  EF ATT-9. 1            ATTA          EXCESS  L/D                                      002    07/26/94  02/03/93  02/03/98  EP ATT 10.0                  ACHMENT FAULTED S/G                                      005    10/03/96  06/11/93  06/11/98  EF ATT-11.0            ATTACHMENT    IA CONCERNS                                      001    01/26/94  07/02/93  07/02/98  EP ATZ-11.1            ATTACHMENT    IA SUPPLY                                        001    07/26/94  07/02/93  07/02/98  EF ATT-12,0            ATTACHMENT N2 PORVS                                            003    03/24/97  02/03/93  02/03/98  EF
 
~  .
'1
 
REPORT NO. 01                                          GINNA NUCLEAR POWER PLANT                    03/24/97  PAGE:  31 REPORT:'NPSP0200                                            PROCEDURES INDEX DOC TYPE: PRATT                                  BOP ATTACHMENTS PARAMETERS: DOC TYPES  -  PRAR  . PRATT      PRFR                            5 YEARS ONLY:
PROCEDURB                                                                                  EFFECT    LAST      NEXT NUMBER                PROCEDURE TITLE                                              REV    DATE    REVIEW    REVIEW    ST ATT-13.0              ATTACHMENT NC                                                002  07/26/94 02/03/93  02/03/98  EF ATT-14.0              ATTACHMENT NORMAL RHR COOLING                                001. 07/26/94 10/19/94  10/19/99  Ef ATI'-14. 1            ATTACHMENT RHR COOL                                          003  07/26/94 03/06/93  03/06/98  EF ATI'-14.2              ATTACHMENT RHR ISOL                                          001  07/26/94 03/06/93  03/06/98  EP ATT-14.3              ATTACHMENT RHR NPSH                                          001  07/26/94 01/26/94  01/26/99  EP ATT-14.4              ATTACHMENT RHR SAMPLE                                        001  07/26/94 01/26/94  01/26/99  EF ATT 14.5              ATTACHMENT RHR SYSTEM                                        002  07/26/94 02/03/93  02/03/98  EF ATT-14. 6            ATTACHMENT RHR PRESS REDUCTION                                000  04/07/94 04/07/94  04/07/99  EF ATT-15. 0            ATTACHMENT RCP START                                          004  04/20/95 04/20/95  04/20/00  EF ATT-15. 1            ATTACHMENT RCP DIAGNOSTICS                                    002  09/26/96 02/19/93  02/19/98  EF ATT-15. 2            ATTACHMENT SEAL COOLING                                      002  07/26/94 02/03/93  02/03/98  EF ATT-16. 0            AT1'ACHMENT RUPTURED  S/G                                    006  10/03/96 11/08/94  11/08/99  EF ATT 17.0              ATTACHMENT SD-1                                              006  11/03/95 02/03/95  02/03/00  Ef ATT-17. 1            ATTACHMENT SD-2                                              005  09/26/96 01/26/94  01/26'/99  Ef ATT-18.0              ATTACHMENT SPP  - RWST                                      003  07/26/94 02/19/93  02/19/98  Ef ATT-19.0              ATTACHMENT SI FLUSH                                                01/25/95 ATT-20.0              ATTACHMENT VENT TIME                                          003  07/26/94 02/19/93  02/19/98  EF ATT-21.0              ATTACHMENT RCS ISOLATION                                      001  07/26/94 02/03/93  02/03/98  EF ATT-22.0              ATTACHMENT RESTORING fEED PLOW.                              000  03/24/97 03/24/97  03/24/02  EF TOTAL FOR PRATT        43
 
REPORT NO. 01                                          GINHA NUCLEAR POWER PLANT                            05/31/96  PAGE:  1 REPORT: HPSP0200                                            PROCEDURES INDEX DOC TYPE: PRAP                                  ABNORNAL PROCEDURE PARANETERS: DOC TYPES  - PRAP                                                  STATUS: 5 YEARS OHLY.:
PROCEDURE                                                                                        EFFECT      LASI'EXT HUHBER                PROCEDURE  TITLE                                                  REV    DATE      REVIEW    REVIEW  ST AP-CCM.1              LEAKAGE INTO THE COHPONEHT COOLING LOOP                            011  02/24/96  04/20/95  04/20/00 EF AP-CCW.2              LOSS OF CCM DURING POWER OPERATION                                  012  02/24/96  08/30/94  08/30/99 EF AP-CCM.3              LOSS OF CCM  - PLANI'HUTDOWN                                      010  03/29/96  08/30/94  08/30/99 EF AP-CR.1              CONTROL ROON  INACCESSIBILITY                                      013  11/17/94  11/17/94  11/17/99 EF AP-CVCS.1            CVCS LEAK                                                          010  02/24/96  04/20/95  04/20/00 EF AP-CVCS.2            DELETED                                                            XX    04/21/93                      DE AP-CM.'I              LOSS OF A CIRC WATER PUHP                                          005  03/13/96  04/21/93  04/21/98 QU AP-ELEC.1            LOSS OF 12A AHD/OR 12B BUSSES                                      012  02/24/96  03/21/95  03/21/00 EF AP-ELEC.2            SAFEGUARD BUSSES LOM VOLTAGE OR SYSTEH LOM FREQUEHCY                007  02/11/94  02/11/94  02/11/99 EF AP-ELEC.3            LOSS OF 12A AND/OR 12B TRAHSFORNER (BELOW    350 F)                002  02/24/96 ~ 03/06/93  03/06/98 EF AP-FM.1              PARTIAL  OR COHPLETE LOSS OF  IIAIH FEEDMATER                      009  04/21/93  04/21/93  04/21/98 EF AP- IA.1              LOSS OF INSTRUNEHT  AIR                                            011  10/26/95  09/09/94  09/09/99 EF AP-PRZR.1            ABNORNAL PRESSURIZER  PRESSURE                                    008  02/24/96  09/29/94  09/29/99 EF AP-RCC.1              CONTINUOUS CONTROL ROD MITNDRA'WAL/INSERTION                        006  02/24/96  06/04/93  06/04/98 EF AP-RCC.2              RCC/RPI HALFUHCTION                                                006  02/24/96  04/23/93  04/23/98 EF AP-RCC.3              DROPPED ROO RECOVERY                                                001  02/24/96  04/23/93  04/23/98 EF AP-RCP.1              RCP SEAI. IIALFUNCTION                                              010  05/31/96  04/20/95  04/20/00 EF AP-RCS.1              REACTOR COOLANT LEAK                                                010  02/24/96  04/20/95  04/20/00 EF AP-RCS.2              LOSS OF REACTOR COOLANT FLOW                                        007  06/09/94  10/08/93  10/08/98 EF AP-RCS.3              HIGH REACTOR COOLANT ACTIVITY                                      006  04/23/93  04/23/93  04/23/98 EF AP-RCS.4              SHUTDOWN LOCA                                                      004  04/20/95  04/20/95  04/20/00 EF AP-RNR.1              LOSS OF RHR                                                        010  03/29/96  03/06/93  03/06/98 EF AP-RHR.2              LOSS OF RNR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS    006  03/21/95  03/21/95  03/21/00 EF AP-SW.1-              SERVICE MATER LEAK                                                  010  02/24/96  07/29/93  07/29/98 EF
 
1 REPORT NO. 01                                      GINNA NUCLEAR POWER PLANT                          05/31/96  PAGE:  2 REPORT: NPSP0200                                        PROCEDURES INDEX DOC TYPE: PRAP                              ABNORMAL PROCEDURE PARANETERS: DOC TYPES - PRAP                                              STATUS: 5 YEARS ONLY:
PROCEDURE                                                                                  EFFECT    LAST      NEXT NUHBER              PROCEDURE    TITLE                                            REV    DATE    REVIEW    REVIEW  ST AP-TURB.1            TURBINE TRIP WITHOUT RX TRIP REQUIRED                          007  05/07/93 05/07/93  05/07/98 EF AP-TURB.2            TURBINE LOAD REJECTIOH                                          014  02/24/96 06/04/93  06/04/98 EF AP-TURB.3            TURB I HE V I BRAT ION                                          006  03/26/93 03/26/93  03/26/98 EF AP-TURB.4            LOSS OF CONDEHSER VACUUII                                      010  04/27/95 03/26/93  03/26/98 EF AP-TURB.S            RAPID LOAD REDUCTION                                            001  09/14/95 07/10/95  07/10/00 EF TOTAL FOR PRAP        29
 
REPORT NO. 01                                            GIHNA NUCLEAR POWER PLANT                  01/25/95  08:50  PAGE    3 REPORT NAME: DOC P001                                        PROCEDURES INDEX DOC TYPE: PRATT                                  EOP ATTACHMENTS PARAMETERS: DOC TYPES -    PRAP      PRATT      PRE      PRECA      PRER      STATUS: 5 YEARS ONLY:
PROCEDURE                                            PROCEDURE  TITLE                    REV    EFFECT      LAST      NEXT  ST NUMBER                                                                                            DATE      REVIE'W    REVIEW ATT-1.0              ATTACHMENT AT POWER CCW ALIGNMENT                                  001  07/26/94  02/19/93    08/19/95 EF ATT-2.0              ATTACHMENT AUX BLDG SW                                              003  07/26/94  04/21/93    10/21/95 EF ATT-2.1              ATTACHMENT MIN SW                                                  001  07/26/94  03/26/93    09/26/95 EF ATT-2.2              ATTACHMENT SW ISOLATION                                            003  07/26/94  07/29/93    01/29/96 EF ATT-2.3              ATTACHMENT SW LOADS    IN CNMT                                      003  01/25/95  01/25/95    07/25/97 EF ATT-3.0              ATTACHMENT  CI/CVI                                                  003  07/26/94  02/11/94    08/11/96 EF ATT-3.'I              ATTACHMENT CHMT CLOSURE                                            002  07/26/94  02/11/94    08/11/96 EF ATT-4.0              ATTACHMENT CHMT RECIRC FANS                                        003  07/26/94  06/17/93    12/17/95 EF ATT-5.0              ATTACHMENT COHO TO S/G                                              004  01/25/95  01/25/95    07/25/97 EF ATT-5.1              ATTACHMENT SAFW                                                    004  11/08/94  11/08/94  05/08/97 EF ATT-5.2              ATTACHMENI'IRE WATER COOLING TO    TDAFW PUHP                      001  07/26/94  03/04/94    09/04/96 EF ATT-6.0              ATTACHMENT COHD VACUUM                                              001  07/26/94  03/26/93    09/26/95 EF ATT-7.0              ATTACHMENT CR EVAC                                                  001  07/26/94  03/26/93    09/26/95 EF ATT-8.0              All'ACKMENT DC LOADS                                                003  07/26/94  01/26/94    07/26/96 EF ATT-8.1              ATTACHMENT  0/G  STOP                                              003  07/26/94  02/19/93    08/19/95 EF ATT-8.2              ATTACHMENT GEN DEGAS                                                005  07/26/94  02/11/94    08/11/96 EF ATT-8.3              ATTACHMENT NONVITAL                                                003  07/26/94  02/19/93    08/19/95 EF ATT-8.4              ATTACHMENT  SI/UV                                                  003  07/26/94  02/19/93    08/19/95 EF ATT-9.0              ATTACHMENT LETDOWN                                                  005  07/26/94  01/26/94    07/26/96 EF ATT-9.1              ATTACHMENT EXCESS    L/D                                            002  07/26/94  02/03/93    08/03/95 EF ATT-10.0              ATTACHMENT FAULTED S/G                                              004  07/26/94  06/11/93    12/11/95 EF ATT-11.0              ATTACHMENT  IA  CONCERNS                                            001  07/26/94  07/02/93    01/02/96 EF ATT-11.1              ATTACHMENT  IA  SUPPLY                                              00'I  07/26/94  07/02/93    01/02/96 EF ATT-12.0              ATTACHMENT N2 PORVS                                                002  07/26/94  02/03/93    08/03/95 EF ATT 13.0              ATTACHMENT NC                                                      002  07/26/94  02/03/93    08/03/95 EF
 
REPORT NO. 01                                          GINNA NUCLEAR POWER PLANT                    01/25/95  08:50  PAGE    4 REPORT NAME: DOC-P001                                      PROCEDURES INDEX OOC TYPE: PRAT'I                                EOP ATTACHMENTS PARAMETERS: OOC TYPES  - PRAP      PRATT      PRE      PRECA      PRER      STATUS: 5 YEARS ONLY:
PROCEDURE                                          PROCEDURE  TITLE                    REV    EFFECT      LAST      NEXT  ST NUMBER                                                                                          DATE      REVIEW    REVIEW ATT-14.0              ATTACHMENT NORMAL RHR COOLING                                      001  07/26/94    10/19/94  04/19/96 EF ATT-14.1              ATTACHHENT RHR COOL                                                003  07/26/94  03/06/93    09/06/95 EF ATI'-14.2            ATTACHMENT RHR ISOL                                                00'I  07/26/94  03/06/93    09/06/95 EF ATT-14.3              ATTACHMENT RHR HPSH                                                001  07/26/94  01/26/94    07/26/96 EF ATT-14.4              ATTACHMENT RHR SAMPLE                                              001  07/26/94  01/26/94    07/26/96 EF ATT-14.5              ATTACHMENT RHR SYSTEM                                              002  07/26/94  02/03/93    08/03/95 EF ATT-14.6              ATTACHMENT RHR PRESS  REDUCTION                                  000  04/07/94  04/07/94    10/07/96 EF ATT-15.0              ATTACKHENT RCP START                                              003  07/26/94  02/19/93    08/19/95 EF ATT-15.1              ATTACHMENT RCP DIAGNOSTICS                                        001  07/26/94  02/19/93    08/19/95 EF ATT-15.2              ATTACHMENT SEAL COOLING                                            002  07/26/94  02/03/93    08/03/95 EF ATT-16.0              ATTACHMENT RUPTURED S/G                                            005  11/08/94    11/08/94  05/08/97 EF ATT-17.0              ATTACHMENT SD-1                                                    004  07/26/94  02/19/93    08/19/95 EF ATT-17.1              ATTACHMENT SD-2                                                    004  07/26/94  01/26/94    07/26/96 EF ATT-18.0              ATTACHMENT SFP  - RWST                                            003  07/26/94  02/19/93    08/19/95 EF ATT-19.0              ATTACHMENT SI FLUSH                                              XX    01/25/95                        DE ATT-20.0              ATTACHMENT VENT TIME                                              003  07/26/94  02/19/93    08/19/95 EF ATT-21.0              ATTACHMENT RCS ISOLATION                                          001  07/26/94  02/03/93    08/03/95 EF TOTAL FOR PRATT          42
 
J I
 
REPORT NO. 01                                        GINNA NUCLEAR POWER PLANT                          05/31/96  PAGE:  1 REPORT: NPSP0200                                          PROCEDURES INDEX DOC TYPE: PRECA                              EMERGENCY CONTINGENCY ACTIONS PROC PARAMETERS: DOC TYPES - PRECA    PRFR                                      STATUS: 5 YEARS ONLY:
PROCEDURE                                                                                    EFFECT    LAST      NEXT NUMBER              PROCEDURE TITLE                                                  REV    DATE    REVIEW    REVIEW  ST ECA-O.O              LOSS OF ALL AC POWER                                              017  04/20/95 04/20/95  04/20/00 EF ECA.0.1              LOSS OF ALL AC POWER RECOVERY WITHOUT  Sl REQUIRED              012  05/31/96 04/20/95  04/20/00 EF ECA-0.2              LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED                    008  04/07/94 04/07/94  04/07/99 EF ECA-1.1              LOSS OF EMERGENCY COOLANT RECIRCULATION                          010  04/20/95 04/20/95  04/20/00 EF ECA-1.2              LOCA OUTSIDE CONTAINMENT                                          003  02/09/95 02/09/95  02/09/00 EF ECA-2.1              UNCONTROLLED DEPRESSURIZATION OF BOTH STEAM GENERATORS            012  05/31/96 04/2D/95  04/20/00 EF ECA-3.1              SGTR WITH LOSS OF REACTOR COOLANI'-SUBCOOLED RECOVERY DESIRED    011  04/20/95 04/20/95  04/20/00 EF ECA-3.2              SGTR WITH LOSS OF REACTOR COOLANT-SATURATED RECOVERY DESIRED      014  04/20/95 04/20/95 '04/20/00  EF ECA-3.3              SGTR WITHOUT PRESSURIZER  PRESSURE  CONTROL                      012  04/20/95 04/20/95  04/20/00 EF TOTAL FOR PRFR
 
0 0
 
EOP:            TITLE:
REV: 3 ATT-15.0                          ATTACHMENT RCP START PAGE 1  of 1 Superintendent                              Date  )          The  following are prerequisites for starting        an RCP:
A) o o
RCP RCP oil oil lift lift pump  running (-2 minutes) pressure white light LIT B)  In addition, the following conditions should          be met  prior to starting      an RCP:
o  Both    PRZR spray valves closed    DEMAND AT 04 o  CCW    in service to selected RCP(s) with flow and temperature alarms (A-7, A-15) extinguished.
o  Selected RCP(s) seal inlet temperature  LESS THAN 135'Z o  Selected RCP(s) motor bearing temperatures          LESS THAN  200'F (PPCS address is GD RCPS or use recorder,        if selected) o  Selected RCP(s) seal injection in service o Seal injection flow. GREATER THAN 6 GPM o Labyrinth seal D/P - GREATER THAN 15 INCHES          OF WATER o  Selected RCP(s) Nl seal D/P  GREATER THAN 220 PSID o  Selected RCP(s) oil levels:
o Level alarms (A-24, A-32)  EXTINGUISHED o Level indicators  ON SCALE o  Selected RCP(s) seal return alignment:
a)    RCP  Nl seal  outlet valve(s) open:
o  AOV-270A  for RCPA o  AOV-270B  for RCP B b)    IF'OV-313, seal return isolation, open, THEN verify the following:
o VCT pressure  GREATER THAN 15 PSIG o Selected RCP(s) Nl seal leakoff flow BETWEEN 0.25 GPM AND 5.5 GPM o Selected RCP(s) standpipe low level alarm (B-ll, B-12)  EXTINGUISHED c)    IF  MOV-313  closed,  THEN verify other RCP Nl seal parameters    normal  for selected RCP(s):
o RCP Nl seal inlet temperature  LESS THAN 135'F o RCP gl seal D/P - GREATER THAN 220 PSID NOTE:      RCP oil lift pump should be stopped after RCP is running.
 
g
    'I    C~
E J
 
EOP:            TI 'ALE:
REV  2 ATT-15.2                        ATTACHMENT SEAL COOLING PAGE 1 of 2 Superintendent ~                              Date 7 IF all RCP seal cooling has been lost, THEN CCW cooling should be restored before establishing seal injection.
A. Perform the following to restore          CCW flow to RCPs:
: 1)  IF RCP seal injection NOT in service, THEN verify RCP CCW return valves closed.
o      MOV-759A,  for  RCP A o      MOV-759B,  for  RCP B
: 2)  Verify adequate        power available to run one CCW pump (124 kw each pump).          IF power available, THEN start one CCW pump.
: 3)  Ensure MOV-817,        CCW  to CNMT  OPEN
: 4)  Open RCP      CCW supply valves and thermal barrier return valves for affected RCP:
o      MOV-749A and AOV-754A      for RCP A o      MOV-749B and AOV-754B      for RCP B
: 5)  Restore      CCW flow to RCP(s) as follows:
a)      IF RCP seal injection in service, THEN ensure RCP CCW return valve(s) open:
o  MOV-759A  for RCP A o  MOV-759B  for RCP B b)      IF RCP seal injection NOT established, THEN perform the following:
: 1)  Dispatch AO to locally crack open affected RCP CCW return valve(s):
o MOV-759A for RCP A o MOV-759B for RCP B
: 2)      WHEN affected RCP Nl seal outlet temperature      is LESS THAN  235'F,  THEN  manually open affected RCP CCW. Return  MOV  from control board.
 
i Ag
 
  ~
~
EOP:            LITLE:
REV' ATT-15.2                      ATTACHMENT SEAL COOLING PAGE 2 of 2 B. Perform the following to restore    RCP  seal injection:
: 1)  Verify    RCP 51 seal outlet temperatures  LESS THAN 235'F.
IF  NOT, THEN consult TSC  prior to restoring seal injection.
: 2)  Verify    any charging pump running.
NOTE:  RCP    seal cooldown rate should not exceed 1'F/min.
: 3)  Dispatch AO with an RWST area key to locally restore seal injection flow as follows:
a)    Verify seal injection valves, V-300A and V-300B, closed.
b)    Notify control room to monitor RCP gl seal outlet temperatures.
c)    Crack open RCP seal injection needle valves, V-300A and V-300B, until minimum flow i.s established.
d)    Adjust seal injection flow as directed by control room to maintain cooldown rate less than 1'F/min until normal seal injection flow is established.
 
EOP:          TITLE:
REV  1 P-ELEC.3      LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 350'F)                  PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTENDENT EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
 
EOP:          TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW          REV: 1 P-ELEC.3                              350'F)                    PAGE 2 of 20 A. PURPOSE    This procedure provides actions to respond to a loss
        'of 12A or  12B SS Transformer when RCS temperature is less than 350'F.
B. ENTRY CONDITIONS/SYMPTOMS
: 1. ENTRY CONDITIONS  This    procedure  may be  entered from:
: a. AP-ELEC.l, when busses 12A and/or 12B are found to be deenergized and RCS temperature is less than 350'F.
: 2. SYMPTOMS    The symptoms  of loss of  512A  or 12B SS Transformer are:
: a. Annunciator L-20,    12A XFMR OR 12A BUS TROUBLE, lit, or
: b. Annunciator  L-28, 12B  XFMR OR 12B BUS TROUBLE, lit.
 
lf 4 "I'+
I  I E e
l
  <<kr
 
EOP:            TITLE:
REV    1 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3                                  350'F)                          PAGE 3  of 20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED CAUTION o  IF THE RCS IS WATER SOLID, THEN ANY INCREASE IN RCS    TEMPERATURE MAY RESULT IN A SIGNIFICANT RCS PRESSURE INCREASE. RCS HEATUP    SHOULD BE PREVENTED.
o  OBSERVE D/G LOADING LIMITS OF 2300 KW FOR  1/2  HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.
o  ANYTIME EMERGENCY D/GS ARE THE ONLY SOURCE OF AC POWER TO THE PLANT, PERSONNEL SHOULD BE ASSIGNED TO MAINTAIN SURVEILLANCE OF THE D/GS.
o  IF ANY RADIOACTIVE RELEASE IN PROGRESS,  THEN  IT SHOULD BE TERMINATED  UNTIL SUPPORT CONDITIONS ARE EVALUATED.
  **********'x      0      0 *x x 4
4 x x %.** 0'    x x  % **x x**********
NOTE:    Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION).
1  Verify  Emergency D/G                  IF appropriate emergency D/G(s)    NOT Associated With    Dead Bus            running, THEN attempt to start RUNNING                                  manually. (Refer to ER-D/G.l, RESTORATION OF A FAILED  D/G.)
o  Bus 12A - D/G A o  Bus 12B - D/G B 2  Verify Both Trains    Of AC            Try to restore power to all AC Emergency Busses Energized To            emergency busses. IF power can  NOT At Least-420    VOLTS:                  be  restored to at least one train, THEN refer to ECA-O.O, LOSS OF ALL o  Bus 14 and bus 18                    AC POWER.
o  Bus 16 and bus 17
 
    * 'it(
iI f
 
EOP:              TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                        REV: 1 P-ELEC.3 350'F)                              PAGE 4    of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED NOTE:    When  restarting equipment for recovery,      it is  preferable to start equipment on busses being supplied from        offsite  power,  if  possible.
3  Verify Service Water          System Operation:
: a. SW  pumps    - AT LEAST ONE RUNNING      a. Verify selected                start SW  pumps IN  EACH LOOP                                  on a  timer (40 sec) after D/G start. IF NOT, THEN manually start pumps as conditions permit (258 kw each).
: b. SW  header pressure      - GREATER        b. Manually align valves as THAN 40 PSIG    IN  EACH LOOP                necessary.
4  Check    CCW Pump    Status:
: a. At  least  one  CCW  pump - RUNNING      a. Start  one  CCW  pump (124    kw).
: b. Annunciator A-22,      CCW PUMP          b. Start second    CCW  pump (124  kw).
DISCHARGE LO PRESS      60 PSIG EXTINGUISHED
 
kl o Ct 4
t
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3                                  350'F)                            PAGE 5    of 20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 5  Check  RCS    Temper'atua'e  STABLE    IF  RCS  temperature  increasing,  THEN stabilize temperature using available method.
                                                ~  RHR normal  cooling
                                                ~  Dump steam  and feed
                                                ~  Blowdown and feed IF RCS temperature decreasing,      THEN perform the following:
: a. Stop dumping steam or control RHR normal cooling.
: b. IF cooldown continues,      THEN perform the following:
l)  IF either  MDAFW pump operable,  THEN  ensure  TDAFW pump steam  supply valves in PULL STOP.
: 2)  WHEN  S/G level greater    than 5% in  one S/G, THEN  limit feed flow to that required to maintain S/G level.
 
14,) w ~ g E
p) r 4 .C e
k
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV: 1 P-ELEC.3 350'F)                              PAGE 6    of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE    NOT OBTAINED
  *******x**x%'**x                  x% *x x**x********x*******
CAUTION IF REFUELING IN PROGRESS,    THEN STOP REFUELING OPERATIONS      (NOTIFY REFUELING SRO).
  **************x                    x  **  x **x ***x          x **************
6  Restore Non-Safeguards Busses As  Follows:
: a. Verify non-safeguards busses              a. Close non-safeguards      bus tie ENERGIZED                                    breaker for affected bus(ses) possible:
if
            ~ Bus 13
            ~ Bus 15                                    ~ Bus 13    to bus  14 tie
                                                        ~ Bus 15    to bus  16 tie
: b. Verify MCC  A - ENERGIZED                b. Perform the following:
: 1) Ensure the    following pumps in PULL STOP:
                                                            ~  EH pump A
                                                            ~  Turning gear oil pump
                                                            ~  HP seal oil backup pump
: 2) Close  MCC A  supply breaker from bus 13.
: c. Verify MCC  B - ENERGIZED                c. Perform the following:
: 1) Ensure    EH pump B  in PULL STOP.
: 2) Close  MCC B  supply breaker from bus 15.
: d. Check  CNMT  vent sample  pump        ~" d. IF  CNMT  purge or mini-purge in RUNNING                                      progress,    THEN secure purging.
: e. Verify annunciator J-8,    480V  MCC      e. Restore power to other      MCCs  as SUPPLY BREAKER TRIP                          D/G    loading permits.
EXTINGUISHED
                                                        ~ MCC E
                                                        ~ MCC F
                                                        ~ MCC G
: f. Reset control room necessary lighting  if
 
4 e W
)1 I
t'
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV  1 P-ELEC.3 350'F)                            PAGE 7  of 20 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED t
7  Check IA System:
: a. Verify  2  IA compressors  - RUNNING    a. Manually    start IA compressors  as necessary    (75'w each).
: b. Check IA supply                            b. Dispatch an AO to locally reset and start IA compressors (75 kw o  Pressure      - GREATER THAN              each).
60 PSIG IF IA can NOT be established, o  Pressure      - STABLE OR                  THEN  refer  to AP-IA.1, LOSS OF INCREASING                                  INSTRUMENT AIR.
8  Check  RCS    Cooling:
: a. RHR system - PREVIOUSLY ALIGNED            a. Go  to Step 18.
FOR RHR NORMAL COOLING
: b. Check  RHR pumps      - ANY RUNNING        b. IF  RHR  normal cooling previously in service,    THEN go to Step 9.
IF RHR normal cooling NOT required, THEN go to Step 18.
: c. Go to Step      11
 
rl di, +
U
~ 4@I \
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV  1 P-ELEC.3                                      350'F)                            PAGE 8  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 9  Establish Conditions        To  Start RHR Pump:
: a. Any  RHR pump    - AVAILABLE              a. IF  RCS level greater than 64  inches,  THEN go -to AP-RHR.1, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
: b. Verify  CCW  cooling to  RHR system      b. Perform the following:
in service
: 1) Ensure  at least  one CCW pump o  CCW  pumps  - AT LEAST ONE                  running.
RUNNING
: 2) Open MOV-738A and MOV-738B as o  CCW  to  RHR  Hxs, MOV-738A AND              necessary.
MOV-738B - OPEN AS NECESSARY IF CCW can NOT be restored,    THEN
                                                        .continue attempts to restore    CCW (Refer to AP-CCW.3, LOSS OF    CCW PLANT SHUTDOWN).
: c. Place  RHR Hx bypass valve, HCV-626, to MANUAL and close valve
 
K'ic V(
I
 
EOP:            TITLE:
REV' LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3                                        350'F)                              PAGE 9    of 20 STEP      ACTION/EXPECTED RESPONSE                    RESPONSE  NOT OBTAINED
  *******          x ***x ** x
* P  x ***
CAUTION 0 0  x x  ***************  A o  STARTING AN RHR PUMP MAY RESULT        IN AN RCS LEVEL OR PRESSURE      DECREASE DUE TO SHRINK OR VOID COLLAPSE.
o  THE RHR HX OUTLET VALVES (HCV-624 AND HCV-625) WILL              FAIL OPEN  ON LOSS    OF INSTRUMENT AIR PRESSURE.
  **x ***x **            x x x x
* x x x
* x
* x '* x x  x  ********x ****x **
10  Restore RHR Flow:
: a. Start one RHR pump
: b. At least one RHR pump      - RUNNING        b. Go  to Step 10d.
: c. Establish    RHR flow - WITHIN              c. Manually adjust      RHR  flow  as LIMITS  OF TABLE BELOW                          necessary.
RCS  STATUS        MAXIMUM RHR FLOW RCS  LEVEL - ANY            3000 gpm LEVEL ABOVE 18" RCS  LEVEL < 18"            1000  GPM RCS  LEVEL < 10"              800 GPM RCS  LEVEL < 6"              500 GPM
: d. RHR  flow  - RESTORED                      d. IF  RCS  level greater than 64  inches,  THEN go to AP-RHR.1, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
: e. Place  RHR Hx  bypass valve, HCV-626,  controller in    AUTO  at desired flowrate
: f. Open RHR pump flow control valves as necessary to stabilize RCS  temperature
          ~ HCV-624
          ~ HCV-625
: g. Check core    exit T/Cs  - STABLE OR        g. Start another    RHR pump or DECREASING                                        increase  RHR flow to  establish required RCS cooling. DO NOT exceed RHR flow    limits  from table above.
 
V I W U
"'g ~
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV: 1 P-ELEC.3 350'F)                            PAGE 10  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED ll  Check  AFW Pump      Status:
: a. AFW pumps    - ANY RUNNING              a. Go  to Step 12.
I
: b. Both S/G levels      - AT DESIRED        b. Continue with Step 12.      WHEN LEVEL                                        desired  S/G  levels established, THEN do  Step  llc.
: c. Stop running AFW pumps and place switches in PULL STOP 12    Evaluate    RCS  Conditions:
: a. Check  RCS  status:                    a. IF  RCS  is open to atmosphere, THEN go  to Step 17.
o  RCS  - CLOSED o  RCS  pressure    - GREATER THAN ATMOSPHERIC
: b. Verify    RCP &#xb9;1 seal D/Ps                b. IF any    RCP running with &#xb9;1 seal GREATER THAN 220 PSID                        D/P  less than 220 psid, THEN stop affected    RCP.
 
k, W1 S
Pl
      . ~'Tp C
  ~I
    )
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV    1 P-ELEC.3 350'F)                              PAGE 11    of 20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE    NOT OBTAINED 13  Check Charging Pump Suction Aligned    To VCT:
: a. VCT level  - GREATER THAN 20%      a. IF    VCT  level  can  NOT be maintained greater than    5%, THEN perform the following:
: 1) Ensure charging pump    suction aligned to  RWST o  LCV-112B open o  LCV-112C  closed
: 2) Continue    with Step 14. WHEN VCT level greater    than  20%,
THEN do Step 13b.
: b. Verify charging pumps aligned to    b. Manually align valves as VCT                                      necessary.
o  LCV-112C open o  LCV-112B closed 14    Check Charging Pumps  ANY              IF charging pumps required,        THEN CHARGING PUMP RUNNING                  perform the following:
: a. Verify charging to loop    B  cold leg,  AOV-294, open.
: b. Verify charging flow control valve,    HCV-142, open as necessary.
: c. IF desired, THEN place letdown pressure controller, PCV-135, in MANUAL.
: d. Start  one charging pump (75 kw each pump).
: e. Increase    charging  pump speed  and control    PCV-135 as necessary    to control    PRZR  pressure or level.
 
EOP:            TtiLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV    1 P-ELEC.3 350'F)                            PAGE 12  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE    NOT OBTAINED 15  Monitor    RCS    Pressure:
: a. Pressure    - LESS THAN 390 PSIG      a. IF  RCS  is solid,  THEN  control charging and letdown pressure control valve (PCV-135) as necessary to stabilize RCS pressure.
IF PRZR bubble established,      THEN operate normal or auxiliary spray to decrease pressure.
: b. Pressure    - STABLE                    b. Stabilize    RCS pressure using appropriate means.
                                                      ~  Charging
                                                      ~  Letdown
                                                      ~  PCV-135  (solid)
                                                      ~ Normal spray
                                                      ~ Auxiliary spray
                                                      ~  PRZR  heaters 16    Check PRZR      Level:
: a. Narrow range      level - ON SCALE      a. IF RCS is    solid,  THEN go  to Step 17.
: b. Level  - TRENDING TO PROGRAM            b. Adjust charging pump speed as necessary to control PRZR level.
17  Monitor    RCS    Temperature
: a. Core  exit    T/Cs - STABLE  OR        a. Adjust    RCS cooling as necessary DECREASING                                and  return. to Step 3.
                                                      ~ S/G steaming
                                                      ~ S/G feeding
                                                      ~ RHR  cooling
: b. Go to Step    26
 
U I O'I g5 1.i I
l 1
 
EOP:            TITLE:
REV    1 P-ELEC.3        LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 350'F)                          PAGE 13    of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 18  Check  AFW  System  Status:
: a. Verify TDAFW  pump steam  supply      a. IF S/Gs providing heat sink, valves in  PULL STOP                      THEN perform the following:
: 1) Verify adequate  MDAFW  flow.
: 2) Pull stop  TDAFW pump.
: 3) Adjust  AFW flow as necessary to stabilize S/G level and RCS temperature.
: b. Verify MDAFW valves closed  ''
pump crosstie          b. Ensure at least one off. IF  two pumps MDAFW pump required, THEN close both  MDAFW pump crosstie valves.
17'tart
          ~ MOV-4000A
          ~ MOV-4000B 19    Check Any S/G Level        GREATER            MDAFW  pumps as  necessary  to THAN                                      restore  S/G  level.
20    Check RCS Pressure        GREATER        Increase RCS pressure to greater THAN 300 PSIG                              than 300 psig. IF RCP &#xb9;1 seal D/P can NOT be maintained greater than 220 psid, THEN trip any running RCP.
21  Check RCP Status        ANY RCP          Verify natural circulation (Refer RUNNING                                    to Attachment NC). IF natural circulation NOT verified, THEN increase dumping steam.
 
+11,
~C'
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                          REV  1 P-ELEC.3 350'F)                              PAGE 14    of 20 STEP      ACTION/EXPECTED RESPONSE                    RESPONSE  NOT OBTAINED 22  Monitor    RCS  Temperature                  Control S/G ARVs to stabilize RCS STABLE OR DECREASING                          temperature.      IF S/G ARVs do NOT provide adequate cooling, THEN perform the following:
: a. Initiate  S/G blowdown from  both S/Gs.
: b. Maintain both S/G levels stable by controlling    AFW  flow.
23    Check CVCS Operation:
: a. Charging pumps    - AT LEAST ONE            a. Perform the following:
RUNNING
: 1) Start charging pumps as necessary.
: 2) Establish greater than    20 gpm charging line flow.
: b. Check letdown indications:                  b. Perform the following:
o  Check PRZR  level  - GREATER                1) Close loop B cold leg to THAN 13%                                        REGEN Hx, AOV-427.
o  Letdown flow - APPROXIMATELY                  2) Close letdown orifice valves 40  GPM                                          (AOV-200A, AOV-200B, and AOV-202) o  Letdown flow    - STABLE
: 3) IF  PRZR  level greater than 13%, THEN go to Step 24.      IF NOT, THEN continue with Step 26. WHEN PRZR  level greater than    13%, THEN do Steps 24 and 25.
: c. Adjust charging pump speed and HCV-142 as necessary to level and labyrinth seal D/P restore'RZR
: d. Go to Step  25
 
I q 4'hd C
 
EOP:            TITLE:
REV: 1 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3                                      350'F)                            PAGE 15  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED NOTE:  Steps 24 and 25 may be performed concurrently.
24  Establish Normal Letdown:                  Perform the following steps in sequence  to establish excess
: a. Establish charging    line flow to      letdown:
REGEN Hx - GREATER THAN 20 GPM o  Place excess  letdown divert
: b. Verify the following switches in            valve, AOV-312, to    NORMAL CLOSE:
o  Ensure CCW from excess    letdown
          ~  Letdown  orifice valve                  open, AOV-745 (AOV-200A, AOV-200B, and AOV-202)                              o  Ensure  RCP  seal return isolation
          ~  Loop B cold leg to REGEN Hx              valve open,  MOV-313 AOV-427 o  Open excess letdown    isolation
: c. Place letdown    controllers in              valve, AOV-310 MANUAL at 40% open o  Slowly open HCV-123 to maintain
          ~ TCV-130                                    excess  letdown temperature less
          ~  PCV-135                                  than 195 'F and pressure less than 100 psig
: d. Open AOV-427
: e. Open letdown    orifice valves  as necessary
: f. Place TCV-130    in AUTO at 105'F
: g. Place PCV-135    in AUTO at 250  psig
: h. Adjust charging pump speed and HCV-142 as necessary
 
EOP:              TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW=                  REV: 1 P-ELEC.3 350'F)                          PAGE 16    of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 25  Verify    PRZR  Heaters Restored:          IF PRZR heaters required,    THEN perform the following:
o  PRZR proportional  heater breaker CLOSED                                a. Verify adequate D/G capacity available for PRZR heaters (400 o  PRZR  backup heater breaker                kw each  bank).
RESET/IN AUTO
: b. Reset and close    PRZR proportional heater breaker    if necessary.
: c. Reset  PRZR  backup heater breaker and  return to  AUTO if necessary.
IF  on  natural circulation and at least  100 kw of PRZR heaters can NOT be restored within 6 hours, THEN be on RHR within an additional 6  hours.    (Refer to Technical Specification 3.1.1.5)
NOTE:    Check Tech Spec  section 3.7 for limiting conditions for operation.
26    Restore Normal Electric System Alignment:
: a. Verify circuit  767  and/or  751        a. Continue with Step 28.      WHEN AVAILABLE                                    offsite power available,    THEN do Steps 26b, c, d and 27.
: b. Restore. power to 12A and/or 12B bus (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER)
: c. Verify all emergency    AC bus          c. Restore emergency AC busses to normal feed breakers    - CLOSED            normal power supply (Refer to ER-ELEC.1, RESTORATION OF
          ~  Bus  14                                  OFFSITE POWER)
          ~  Bus  16
          ~  Bus  17
          ~  Bus  18
: d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)
 
  ~ ~
cJ w
 
EOP:              TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV    1 P-ELEC. 3 350'F)                            PAGE 17    of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE    NOT OBTAINED 27  Check Started:
lf An    RCP  Should  Be
: a. Check the following:                      a. Go  to Step 28.
o  Both  RCPs  - OFF o  RCP  operation  - DESIRED
: b. RCS  pressure    - APPROXIMATELY          b. Control    PRZR heaters and/or 325 PSIG                                        charging pump speed as necessary to restore RCS pressure.
: c. Check  PRZR  level  - LESS THAN 38%      c. Verify S/G temperature      (obtained locally in  CNMT at  S/G handhole) less than  RCS cold  leg temperature. IF NOT, THEN go    to Step 28.
: d. Try to    start  an RCP                    d. IF an    RCP  can NOT  be started, THEN  continue to monitor natural
: 1)  Establish conditions for                  circulation conditions (Refer to starting    an RCP                        Attachment NC).
a) Bus 11A or 11B energized b) Refer to Attachment    RCP START
: 2)  Start  one RCP 28  Check    RCS    Temperature                  Adjust    RCS cooling  as necessary.
STABLE OR DECREASING
                                                      ~  S/G steaming
                                                      ~  S/G feeding
                                                      ~  RHR  cooling
 
  ~ % ~
Vi t>
 
EOP:            'f I TLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                REV    1 P-ELEC.3 350'F)                            PAGE 18  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 29  Establish Normal Shutdown Alignment:
: a. Verify turning gear oil      pump      a. IF turbine    oil system operation RUNNING                                    required, THEN perform the following:
: 1) Manually  start turning  gear oil  pump (42  kw).
: 2) Dispatch AO to place turbine on turning gear    if desired.
: b. Verify main generator                  b. Perform the following:
DEPRESSURIZED
: 1) Manually  start  the HP seal oil backup  pump
: 2) Dispatch  AO to locally perform the following:
o  Verify proper operation of the seal oil system (Refer to T-34B, GENERATOR SEAL OIL SYSTEM NORMAL OPERATION).
o  Ensure bearing drain vapor extractor running.
o  Ensure main lube  oil reservoir vapor extractor running.
: c. Check    RCS    temperature - LESS      c. Perform the following:
THAN  135'F
: 1) Ensure one Rx compartment cooling fan running (23 kw) .
: 2) Ensure one    control rod shroud fan running (45 kw).
: d. Dispatch AO to start waste gas compressor as necessary
 
kit< I 7t C
 
EOP:              TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                        REV: 1 P-ELEC.3 350'F)                            PAGE 19  of 20 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED 30  Restore Equipment Alignment:
: a. Verify at least    1 CNMT  recirc        a. Start  CNMT  recirc fans    as fan  - RUNNING                                  necessary'(240  kw  each).
: b. Check radiation monitoring,                b. Perform the following:
systems:
: 1) Restore  sample pumps and o    CNMT  vent sample  pump                      radiation monitors    as RUNNING                                        necessary.
o    Plant vent sample                          2) Restart                or ifpurge pump                                CNMT RUNNING                                        mini-purge      desired.
o  All area    and process monitors operating  as required
: c. Verify annunciator      L-l,  AUX BLDG      c. IF bus 11A or    11B  energized, VENT SYSTEM CONTROL PANEL                        THEN dispatch  AO  to restore  AUX EXTINGUISHED                                    BLDG  ventillation (Refer to T-35A,  AUX AND INTERMEDIATE BUILDING VENTILLATION STARTUP AND SHUTDOWN)
: d. Verify service air compressor      .-      d. Dispatch    AO  to locally start RUNNING                                          service desired.
air  compressor    if
: e. Verify motor fire    pump  breaker        e. Close motor    fire  pump  breaker.
CLOSED
: f. Check  control board annunciator          f. Perform alarm response panels    - ALARM STATUS VALID FOR              procedures for unexpected alarms.
PLANT CONDITIONS
: g. Verify control board valve                  g. Manually    align valves    as alignment - NORMAL (Refer to                    necessary.
0-6.13, DAILY SURVEILLANCE LOG)
 
EOP:            LITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV: 1 P-ELEC.3                                      350'F)                            PAGE 20    of 20 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED 31  Check Status Of        DC  System Loads:
: a. Verify    emergency  DC lube  oil        a. Manually stop emergency    DC lube pump - OFF                                    oil pump.
: b. Verify  TDAFW pump DG    oil pump        b. Perform the following:
OFF
: 1) Ensure TDAFW AC  oil pump running.
: 2) Stop  TDAFW pump DC  oil pump.
: c. Verify both    MFW  pump DC  oil          c. Stop  MFW  pump DC oil  pumps.
pumps  - OFF 32    Verify Offsite Power                        Continue attempts to restore RESTORED                                      offsite power (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).
33    Notify Higher Supervision NOTE:    Refer to 0-9.3,    NRC IMMEDIATE  NOTIFICATION,  for reporting requirements.
34  Return To Procedure Or Guidance In Effect
                                                -END-
 
      /
0 R
W'4 f3 I
 
EOP:      TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F)                  PAGE 1 of 1 AP-ELEC.3 APPENDIX LIST TITLE                            PAGES
: 1) FIGURE MIN SUBCOOLING
: 2) ATTACHMENT RCP START
: 3) ATTACHMENT NC
: 4) ATTACHMENT D/G STOP
 
<<Y
~ vari Ef
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                  REV' P-ELECT 3 350'F)                        PAGE 1  of  1 FIGURE MIN SUBCOOLING NOTE:    Subcooling Margin      =  Saturation Temperature    From  Figure Below  [-] Core Exit  T/C  Indication RC S PRESSURE    (PSIG) 2500 2400 2300            RCS PRESSURE INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 SUBCOOLED 1300                            REGION 1200 1100 1000 900 800 700                                                                  INADE(UATE SUBCOOLING 600                                                                    REGION ADVERS E CNMT 500 400 300 200                                          NORMAL CNMT                  TEMPERATURE 100                                                                      INCREMENTS 10'F n
0 200      250      300    350      400      450    500    550      600    650    700 CORE  EXIT SATURATION TEMPERATURE ('F)
 
i' EOP:          TITLE:
REV  12 ECA-0 1        LOSS OF ALL AC POWER RECOVERY WITHOUT  SI REQUIRED              PAGE 1  of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER G
RESP NSIBLE MANAGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
 
EOP:      '!TLE:                                              REV: 12 ECA-0.1      LOSS OF  ALL AC  POWER RECOVERY WITHOUT  SI REQUIRED                          of 20 PAGE 2 A. PURPOSE  - This  procedure provides actions to use normal operational systems to stabilize plant conditions following restoration of AC emergency power.
B. ENTRY CONDITIONS/SYMPTOMS
: l. ENTRY CONDITIONS  This  procedure is entered from:
: a. ECA-O.O, LOSS OF ALL AC POWER, when AC emergency power  is restored and SI is not required.
 
EOP:            T1TLE:
REV: 12 LOSS OF    ALL AC  POWER RECOVERY WITHOUT          SI ECA-0.1                                    REQUIRED                            PAGE 3          of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED CAUTION IF AN SI SIGNAL IS ACTUATED PRIOR TO PERFORMING STEP 10 OF THIS PROCEDURE, THEN SI SHOULD BE RESET TO PERMIT MANUAL LOADING OF EQUIPMENT ON AN AC EMERGENCY BUS.
NOTE:    o  CSFSTs    should be monitored for information only. FR procedures should not be implemented prior to completion of Step 10.
o  Adverse    CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ R/hr.
1  Check RCP Seal        Isolation Status:
: a. RCP seal    injection needle valves      a. Dispatch    AO  with key to  RWST CLOSED                                    gate to locally close valves before starting charging pump.
            ~ V-300A
            ~ V-300B b, RCP CCW  return valves  - CLOSED      b. IF valves open or position not known, THEN check    CCW  pump
            ~ MOV-759A                                  status:
            ~ MOV-759B
: 1) IF pump running, THEN go to Step 2 ~
: 2) IF pump    NOT  running,  THEN manually close valves.
IF valve(s) can NOT be closed, THEN place switches for RCP thermal barrier valves to CLOSE. CCW'utlet
                                                            ~ AOV-754A
                                                            ~ AOV-754B
 
I EOP:          TITLE SI    REV: 12 ECA-0.1        LOSS OF ALL AC  POWER RECOVERY WITHOUT REQUIRED                      PAGE 4  of 20 STEP    ACTION/EXPECTED RESPONSE          RESPONSE  NOT OBTAINED 2  Check CI Annunciator A-26,            Per form the  following:
CONTAINMENT ISOLATION EXTINGUISHED                          a. Depress CI reset pushbutton
: b. Verify annunciator A-26, CONTAINMENT ISOLATION, extinguished.
 
EOP:            TITLE:
REV: 12 LOSS OF    ALL AC    POWER RECOVERY WITHOUT        SI ECA-0 '                                    REQUIRED                          PAGE 5    of  20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE NOT OBTAINED 3 Establish IA to        CNMT;
: a. Verify non-safeguards    busses        a. Perform the following:
energized from    offsite  power
: 1) Close non-safeguards    bus  tie o  Bus 13 normal    feed -  CLOSED              breakers:
                        -OR-                                ~ Bus 13  to Bus 14  tie
                                                            ~ Bus 15  to Bus 16  tie o  Bus 15 normal    feed -  CLOSED
: b. Check at least two    SW  pumps          b. Manually start SW pumps as power RUNNING                                      supply permits (258 kw each).
IF less than two SW pumps running, THEN go to Step 4.
: c. Verify turbine building    SW          c. Manually align valves.
isolation valves - OPEN
            ~ MOV-4613 and MOV-4670
            ~ MOV-4614 and MOV-4664
: d. Start at least    two air                d. IF  air compressors can NOT be compressors  (75 kw each)                  started,  THEN dispatch AO to locally reset compressors as necessary.
: e. Check IA supply:                        e. Perform the    following:
o  Pressure  - GREATER THAN                1) Continue attempts to restore 60 PSIG                                      IA (Refer to AP-IA.1,    LOSS OF INSTRUMENT AIR).
o  Pressure  - STABLE OR INCREASING                                2) Continue with Step 6.      WHEN IA restored,  THEN do Steps  3f through 5.
: f. Reset both  trains of  XY relays for IA to  CNMT  (AOV-5392)  if necessary
: g. Verify IA to  CNMT  AOV-5392 - OPEN
 
EOP:            , TlTLK:
REV  12 ECA-F 1            LOSS OF ALL AC POWER RECOVERY WITHOUT            SI REQUIRED                          PAGE 6  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED CAUTION THE LOADS PLACED ON THE ENERGIZED AC EMERGENCY BUS SHOULD NOT EXCEED THE CAPACITY OF THE POWER SOURCE.
4 Manually Load Following Equipment On AC Emergency Busses:
: a. Start one CCW pump (124 kw) b..Energize MCCs as power supply permits
            ~ MCC A    from  Bus 13
            ~ MCC B    from  Bus 15
            ~ MCC E    from  Bus 15
            ~ MCC  F  from  Bus 15
: c. Verify instrument bus      D-            c. Restore power to instrument bus ENERGIZED                                    D from MCC B or MCC A (maintenance  supply).
: d. WHEN  bus 15 restored, THEN reset control room lighting
: e. Start at least one CNMT RECIRC fan
: f. Restore Rx head cooling as power supply permits:
: 1)  Start    one Rx compartment            '1) Perform the following:
cooling fan (23    kw each) o Dispatch AO to reset UV relays at MCC C and MCC D.
o Manually start one fan as power supply permits.
(23 kw)
: 2)  Start both control rod shroud            2) Manually start  at least one fans (45 kw each)                            fan (45 kw)
: g. Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1)
 
EOP $            TITLE$
SI        REV: 12 ECA-0 '          LOSS OF    ALL AC  POWER RECOVERY WITHOUT REQUIRED                            PAGE 7    of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED 5  Check  If  Charging Flow Has Been Established:
: a. Charging pumps -    ANY RUNNING        a. Perform the following:
: 1) Ensure seal    injection needle valves to both    RCPs  isolated:
                                                          ~  RCP  A, V-300A
                                                          ~  RCP  B, V-300B
: 2) Ensure HCV-142 open, demand at  Oa.
: b. Charging    pump suction aligned to    b. Manually align valves as RWST'                                      necessary.
o  LCV-112B - OPEN                        IF LCV-112B can NOT be opened, THEN perform the following:
o  LCV-112C - CLOSED
: 1) Verify charging    pump A NOT running and place in      PULL STOP.
: 2) Dispatch AO to locally open manual charging pump suction from  RWST  (V-358 located  in charging    pump room).
: 3) WHEN  V-358 open,  THEN  direct AO  to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
: c. Start charging pumps (75 kw each) as necessary and adjust charging flow to restore PRZR level
 
EOP              TITLE$
REV: 12 LOSS OF    ALL AC  POWER RECOVERY WITHOUT      SI ECA-0.1                                  REQUIRED                          PAGE 8  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED
* 6 Monitor SI        Initiation Criteria:
: a. RCS  subcooling based on core          a. Go  to ECA-0.2,  LOSS OF  ALL AC exit  T/Cs -    GREATER THAN O'            POWER RECOVERY WITH    SI REQUIRED, USING FIGURE MIN SUBCOOLING                Step  l.
: b. PRZR  level  - GREATER THAN  5%      b. Control charging flow to
[30%  adverse  CNMT]                      maintain PRZR level.
IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF  ALL AC  POWER RECOVERY WITH  SI REQUIRED, Step  l.
7  Check PRZR Level  GREATER                Control charging flow as necessary.
THAN  134'404      FOR ADVERSE CONTAINMENT]
 
EOP:              TITLE:
REV: 12 LOSS OF  ALL AC    POWER RECOVERY WITHOUT          SI ECA-0.1                                    REQUIRED                            PAGE 9    of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED CAUTION o  IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
o  IF S/G NR LEVEL DECREASES TO LESS THAN 5% [25% ADVERSE CNMT] AND FEED FLOW IS LESS THAN 200 GPM, THEN THE MDAFW PUMPS SHOULD BE MANUALLY LOADED ON AC EMERGENCY BUS TO SUPPLY WATER TO THE    S/G(S).
NOTE:    o  If MDAFW pump  operation is not required, pump switches should be maintained in PULL-STOP to prevent automatic start.
o  TDAFW pump  flow control valves  fail open  on loss  of IA.
* 8 Monitor Intact S/G Levels:
: a. Narrow range  level  - GREATER        a. Maintain    total  feed flow greater THAN 5%  [25% adverse  CNMT]              than 200  gpm  until  narrow range level greater than 5% [25%
adverse CNMT] in at least one S/G.
IF feed flow less than 200 gpm, THEN  perform the following:
: 1)  Verify MDAFW pump discharge valves open.
                                                              ~ MOV-4007
                                                              ~ MOV-4008
: 2) Manually  start  MDAFW  pumps as necessary    (228 KW  each)..
: b. Control feed flow to maintain narrow range level between 17a
[25$ adverse CNMT] and 52%
 
EOP:            T1TLE:
REV: 12 LOSS OF    ALL AC  POWER RECOVERY WITHOUT      SI ECA-0. 1                                  REQUIRED                        PAGE 10 of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED 9  Establish      S/G Pressure Control:
: a. Adjust S/G    ARV  controllers to maintain existing    S/G pressure
: b. Verify S/G    ARV  controllers in AUTO
: c. Dispatch AO to perform Attachment SD-2 CAUTION IF AN SI SIGNAL IS ACTUATED AFTER THE SI PUMP SWITCHES ARE PLACED IN AUTO, THEN ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, SHOULD BE PERFORMED.
NOTE:    Safeguards  pump  switches should be placed in  AUTO only  if associated bus  is energized.
10  Place Following        Pump  Switches In  AUTO:
        ~ SI pumps
        ~ RHR pumps
        ~ CNMT  spray pumps
 
EOP:              T1TLE:
REV: 12 LOSS OF    ALL AC    POWER RECOVERY WITHOUT      SI ECA-0. 1                                    REQUIRED                        PAGE 11  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE NOT OBTAINED NOTE:    FR  procedures may now be implemented as necessary.
ll Verify CCW  Hx:
Adequate      SW  Flow To
: a. Verify at least    two  SW pumps        a. Manually  start pumps as power RUNNING                                      supply permits (258 kw each).
IF less than two SW pumps can be operated, THEN go to Step 19.
: b. Verify AUX      BLDG SW  isolation        b. Establish SW to AUX BLDG (Refer valves    - OPEN                              to Attachment AUX BLDG SW).
            ~  MOV-4615 and MOV-4734                      Continue with Step 19. WHEN SW
            ~  MOV-4616 and MOV-4735                      restored to  AUX BLDG, THEN do Steps. 11c through 18.
c, Verify CNMT RECIRC fan                    c. Dispatch AO to locally throttle annunciator C-2, HIGH                        flow to CCW Hx to between TEMPERATURE AIARM      - EXTINGUISHED        5000 gpm and 6000 gpm  total flow.
12  Check Operation If Normal Can Be CVCS Established
: a. Verify IA restored:                      a. Continue with Step 19. WHEN IA restored, THEN do Steps 12 o  IA to    CNMT (AOV-5392) -  OPEN        through 18.
o  IA pressure    - GREATER THAN 60 PSIG
: b. Charging    pump - ANY RUNNING          b. Continue with Step 19. WHEN any charging pump running,  THEN do Steps 13 through 18.
 
EOP:              TITLE 0 SI      REV: 12 ECA-F 1            LOSS OF    ALL AC    POWER RECOVERY WITHOUT REQUIRED                        PAGE 12  of 20 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE NOT OBTAINED CAUTION o  RCP THERMAL BARRIER COOLING SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE POTENTIAL INTRODUCTION OF STEAM INTO THE CCW SYSTEM AND THERMAL SHOCK TO RCP.
o  RCP SEAL    INJECTION SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE RCP THERMAL STRESSES AND POTENTIAL SEAL FAILURES.
o  AS PART OF SUBSEQUENT RECOVERY ACTIONS, RCP(S) SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION UNLESS REQUIRED BY AN INADEQUATE CORE COOLING SITUATION.
I NOTE:    SW should be aligned to      CCW Hxs  before restoring  RCP seal cooling.
13  Check RCP Cooling:                              Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).
: a. Check    CCW  to  RCPs:
o  Annunciator A-7,      RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o  Annunciator A-15,      RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED
: b. Check    RCP  seal injection:
o  Labyrinth seal D/Ps      - GREATER THAN 15 INCHES      OF WATER
                            -OR-o  RCP    seal injection    flov to each RCP - GREATER THAN 6      GPM
 
EOP;              T!TLE:
SI      REV: 12 ECA-0.1            LOSS OF      ALL AC    POWER RECOVERY WITHOUT REQUIRED                          PAGE 13    of 20 STEP        ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 14  Check    If  Seal Return Flow Should Be Established:
: a. Verify RCP &#xb9;1 seal outlet                  a. Go  to Step 15.
temperature      - LESS THAN 235'F
: b. Verify    RCP  seal outlet valves-        b. Manually open valves as OPEN                                          necessary.
            ~  AOV-270A
            ~  AOV-270B
: c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313      if  necessary
: d. Open  RCP    seal return isolation        d. Perform the    following:
valve  MOV-313
: 1) Place MOV-313 switch    to  OPEN.
                                                    '. 2) Dispatch  AO with key to  RWST gate to  locally open MOV-313.
: e. Verify RCP &#xb9;1 seal leakoff flow                Close the affected  RCP  seal LESS THAN    6.0  GPM                      discharge valve:
                                                          ~  RCP A, AOV-270A
                                                          ~  RCP  B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 15.
: f. Verify RCP &#xb9;1      seal leakoff flow.      f. Refer to AP-RCP.1,  RCP SEAL
            -. GREATER THAN      0.8 GPM                  MALFUNCTION.
 
EOP!            TlTLE:
REV: 12 LOSS OF    ALL AC    POWER RECOVERY WITHOUT        SI ECA-0.1                                      REQUIRED                        PAGE 14    of 20 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED 15  Verify PRZR Level          GREATER            Continue with Step 19. WHEN PRZR THAN    134 [404 adverse        CNMT]          level increases to greater than 13%
[40% adverse CNMT], THEN do Steps 16 through 18.
16  Establish Normal Letdown:                      IF RCP seal return has been established, THEN establish excess
: a. Establish charging    line flow to        letdown as follows:
REGEN  Hx - GREATER THAN 20    GPM o  Place excess letdown  divert
: b. Pl'ace the  following switches to              valve, AOV-312, to  NORMAL.
CLOSE' o  Ensure CCW from excess  letdown Letdown  orifice valves                    open, (AOV-745).
(AOV-200A, AOV-200B, and AOV-202)                                o  Open excess letdown isolation
            ~ AOV-371, letdown isolation                  valve AOV-310, valve
            ~ AOV-427, loop    B  cold leg to          o  Slowly open HCV-123 to maintain REGEN Hx                                    excess letdown temperature less than 195'F and pressure less
: c. Place letdown controllers in                  than 100 psig.
MANUAL at 40% open o  Adjust charging  pump speed  as
            ~ TCV-130                                      necessary.
            ~ PCV-135 IF  RCP  seal return NOT established,
: d. Reset both  trains of  XY  relays        THEN  consult TSC to determine    if for  AOV-371 and AOV-427    if            excess letdown should be placed service.
in necessary
: e. Open AOV-371 and AOV-427
: f. Open letdown    orifice valves    as necessary
: g. Place TCV-130    in  AUTO at 105'F
: h. Place PCV-135 in    AUTO at  250  psig
: i. Adjust charging    pump speed    and HCV-142 as necessary
 
EOP:            TITLE:
SI        REV:
LOSS OF    ALL AC  POWER RECOVERY WITHOUT ECA-0. 1                                    REQUIRED 12"'AGE 15        of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 17  Check VCT Makeup System:
: a. Verify the following'.                  a. IF  VCT  auto makeup can NOT be established, THEN manually
: 1) Boric acid and    RMW  flow              control VCT level, (Refer to control valves    - SET FOR              ER-CVCS.1, REACTOR MAKEUP REQUIRED CSD CONCENTRATION                CONTROL MALFUNCTION).
(Refer to Figure    SDM)
: 2) At  least  one BA and  RMW pump in AUTO
: 3) RMW  mode  selector switch in AUTO
: 4) RMW  control  armed -  RED LIGHT LIT
: b. Check  VCT  level                      b. Manually increase      VCT makeup flow  as  follows:
o  Level  - GREATER THAN 20%
: 1) Ensure BA    transfer  pumps and
                          -OR-                              EHN pumps running.      IF NOT, THEN dispetch AO tc reset o  Level -  STABLE OR INCREASING              MCC C and MCC D UV lockouts as necessary.
: 2) Place    RMW  flow control valve HCV-111  in  MANUAL and increase  RMW  flow.
: 3) Increase    boric acid flow          as necessary.
IF VCT level can NOT be restored, THEN go to Step 19.


==DearMr.Vissing:==
EOP:              TITLE:
Asrequested, enclosedareGinnaStationEmergency Operating Procedures.
REV: 12 LOSS OF  ALL AC  POWER RECOVERY WITHOUT        SI ECA-0. 1                                   REQUIRED                          PAGE 16  of 20 STEP        ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 18  Check Charging Pump Suction Aligned      To VCT:
Verytrulyyours,sehA.WidJAW/jdwXC:U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406-1415 ATTIndexAPIndexECAIndex630~~ATT-15.0, Rev.5ATT-15.2, Rev.3AP-ELEC.3, Rev.-3ECA-0.1,Rev.13ECA-0.2,Rev.9llllllllllllllllllll[IIIIIII)llllll GinnaUSNRCSeniorResidentInspector 9706040174 970522PDRADOCK05000244PDRenclosure(s):
: a. VCT  level  - GREATER THAN 20%        a. IF  VCT  level  can NOT  be maintained greater than    5%, THEN perform the following:
@OD 0REPORTNO.01REPORT:NPSP0200DOCTYPE:PRATTGINNANUCLEARPOWERPLANTPROCEDURES INDEXEOPATTACHMENTS 03/24/97PAGE:30PARAMETERS:
: 1) Ensure charging pump suction aligned to  RWST:
DOCTYPES-PRARPRATI'RFR 5YEARSONLY:PROCEDURE NUMBERATT-1.0ATT-2.0A-2.1ATT-2.2ATI'.3ATT-3.0ATZ-3.1ATT-4.0ATT-5.0ATT-5.1ATT-5.2ATT-6.0ATT-7.0ATT-8.0ATT-8.1ATT-8.2ATT-8.3ATT-8.4ATT-9.0ATT-9.1ATT10.0ATT-11.0ATZ-11.1ATT-12,0PROCEDURE TITLEATTACHMENT ATPOWERCCWALIGNMEATTACHMENT AUXBLDGSWATTACHMENT MINSWATTACHMENT SWISOLATION ATTACHMENT SWLOADSINCNMTATTANTCI/CVIATTACHMENT CLOSURBATTACHMENT CNNL'ECIFANSATTACHMENT CONDTOS/GATTACHMENT SAFWATTAEXCESSL/DACHMENTFAULTEDS/GATTACHMENT IACONCERNSATTACHMENT IASUPPLYATTACHMENT N2PORVSATTACHMENT FIREWATERCOOLINGTOTDAFWPUMPATTACHMENT CONDVACUUMATTACHMENT CREVACATTACHMENT DCLOADSATTACHMENT D/GSTOPATTACHMENT GENDEGASATTACHMENT NONVITALATTACHMENT SI/UVATTACHMENT LWNEFFECTDATENEXTRBVIEWST0010I/26/9402/19/9302/19/98BF00307/26/9404/21/9304/21/98EF00303/24/9I03/26/9303/26/98EF00307/26/9407/29/9301/29/9EF00301/25/9501/25/95015/00EF003'07/26/94 02/11/902/11/99EF00207/26/94011/9402/11/99EF00307/26406/17/9306/17/98EF004/25/9501/25/9501/25/00EF005079402/11/9402/11/99EF00307/26/94029302/19/98EF00307/26/9402/19/93098EF00507/26/9401/26/9401/26/99EF00207/26/9402/03/9302/03/98EP00510/03/9606/11/9306/11/98EF00101/26/9407/02/9307/02/98EP00107/26/9407/02/9307/02/98EF00303/24/9702/03/9302/03/98EF509/2619611/08/9411/08/99EF00210/26/9503/04/9403/04/99EF00312/18/9603/26/9303/26/98'P 00212/18/9603/26/9303/26/98EF00307/26/9401/26/9401/26/99EP11/03/9502/19/9302/19/98EP
o  LCV-112B open o  LCV-112C  closed
~.'1 REPORTNO.01REPORT:'NPSP0200 DOCTYPE:PRATTGINNANUCLEARPOWERPLANTPROCEDURES INDEXBOPATTACHMENTS 03/24/97PAGE:31PARAMETERS:
: 2) Continue    with Step 19. WHEN VCT  level greater than  40%,
DOCTYPES-PRAR.PRATTPRFR5YEARSONLY:PROCEDURB NUMBERATT-13.0ATT-14.0ATI'-14.1ATI'-14.2 ATT-14.3ATT-14.4ATT14.5ATT-14.6ATT-15.0ATT-15.1ATT-15.2ATT-16.0ATT17.0ATT-17.1ATT-18.0ATT-19.0ATT-20.0ATT-21.0ATT-22.0PROCEDURE TITLEATTACHMENT NCATTACHMENT NORMALRHRCOOLINGATTACHMENT RHRCOOLATTACHMENT RHRISOLATTACHMENT RHRNPSHATTACHMENT RHRSAMPLEATTACHMENT RHRSYSTEMATTACHMENT RHRPRESSREDUCTION ATTACHMENT RCPSTARTATTACHMENT RCPDIAGNOSTICS ATTACHMENT SEALCOOLINGAT1'ACHMENT RUPTUREDS/GATTACHMENT SD-1ATTACHMENT SD-2ATTACHMENT SPP-RWSTATTACHMENT SIFLUSHATTACHMENT VENTTIMEATTACHMENT RCSISOLATION ATTACHMENT RESTORING fEEDPLOW.EFFECTREVDATELASTREVIEWNEXTREVIEWST00207/26/9402/03/9302/03/98EF001.07/26/9410/19/9410/19/99Ef00307/26/9403/06/9303/06/98EF00107/26/9403/06/9303/06/98EP00107/26/9401/26/9401/26/99EP00107/26/9401/26/9401/26/99EF00207/26/9402/03/9302/03/98EF00004/07/9404/07/9404/07/99EF00404/20/9504/20/9504/20/00EF00209/26/9602/19/9302/19/98EF00207/26/9402/03/9302/03/98EF00610/03/9611/08/9411/08/99EF00611/03/9502/03/9502/03/00Ef00500309/26/9601/26/9401/26'/99 Ef07/26/9402/19/9302/19/98Ef01/25/9500307/26/9402/19/9302/19/98EF00107/26/9402/03/9302/03/98EF00003/24/9703/24/9703/24/02EFTOTALFORPRATT43 REPORTNO.01REPORT:HPSP0200DOCTYPE:PRAPPARANETERS:
THEN do  Step 18b.
DOCTYPES-PRAPGINHANUCLEARPOWERPLANTPROCEDURES INDEXABNORNALPROCEDURE STATUS:5YEARSOHLY.:05/31/96PAGE:1PROCEDURE HUHBERAP-CCM.1AP-CCW.2AP-CCM.3AP-CR.1AP-CVCS.1 AP-CVCS.2 AP-CM.'IAP-ELEC.1 AP-ELEC.2 AP-ELEC.3 AP-FM.1AP-IA.1AP-PRZR.1 AP-RCC.1AP-RCC.2AP-RCC.3AP-RCP.1AP-RCS.1AP-RCS.2AP-RCS.3AP-RCS.4AP-RNR.1AP-RHR.2AP-SW.1-PROCEDURE TITLELEAKAGEINTOTHECOHPONEHT COOLINGLOOPLOSSOFCCMDURINGPOWEROPERATION LOSSOFCCM-PLANI'HUTDOWN CONTROLROONINACCESSIBILITY CVCSLEAKDELETEDLOSSOFACIRCWATERPUHPLOSSOF12AAHD/OR12BBUSSESSAFEGUARD BUSSESLOMVOLTAGEORSYSTEHLOMFREQUEHCY LOSSOF12AAND/OR12BTRAHSFORNER (BELOW350F)PARTIALORCOHPLETELOSSOFIIAIHFEEDMATER LOSSOFINSTRUNEHT AIRABNORNALPRESSURIZER PRESSURECONTINUOUS CONTROLRODMITNDRA'WAL/INSERTION RCC/RPIHALFUHCTION DROPPEDROORECOVERYRCPSEAI.IIALFUNCTION REACTORCOOLANTLEAKLOSSOFREACTORCOOLANTFLOWHIGHREACTORCOOLANTACTIVITYSHUTDOWNLOCALOSSOFRHRLOSSOFRNRWHILEOPERATING ATRCSREDUCEDINVENTORY CONDITIONS SERVICEMATERLEAKEFFECTREVDATE01102/24/96LASI'EXTREVIEWREVIEWST04/20/9504/20/00EF01202/24/9608/30/9408/30/99EF01003/29/9608/30/9408/30/99EF01311/17/9411/17/9411/17/99EF01002/24/9604/20/9504/20/00EFXX04/21/93DE00503/13/9604/21/9304/21/98QU01202/24/9603/21/9503/21/00EF00702/11/9402/11/9402/11/99EF00202/24/96~03/06/9303/06/98EF00904/21/9304/21/9304/21/98EF01110/26/9509/09/9409/09/99EF00802/24/9609/29/9409/29/99EF00602/24/9606/04/9306/04/98EF00602/24/9604/23/9304/23/98EF00102/24/9604/23/9304/23/98EF01005/31/9604/20/9504/20/00EF01002/24/9604/20/9504/20/00EF00706/09/9410/08/9310/08/98EF00604/23/9304/23/9304/23/98EF00404/20/9504/20/9504/20/00EF01003/29/9603/06/9303/06/98EF00603/21/9503/21/9503/21/00EF01002/24/9607/29/9307/29/98EF 1
: b. Verify charging    pumps aligned to    b. Manually align valves as VCT                                        necessary.
REPORTNO.01REPORT:NPSP0200DOCTYPE:PRAPPARANETERS:
o  LCV-112C - OPEN o  LCV-112B - CLOSED 19  Control      PRZR Level:
DOCTYPES-PRAPGINNANUCLEARPOWERPLANTPROCEDURES INDEXABNORMALPROCEDURE STATUS:5YEARSONLY:05/31/96PAGE:2PROCEDURE NUHBERAP-TURB.1 AP-TURB.2 AP-TURB.3 AP-TURB.4 AP-TURB.S PROCEDURE TITLETURBINETRIPWITHOUTRXTRIPREQUIREDTURBINELOADREJECTIOH TURBIHEVIBRATIONLOSSOFCONDEHSER VACUUIIRAPIDLOADREDUCTION EFFECTREVDATELASTREVIEWNEXTREVIEWST00705/07/9305/07/9305/07/98EF01402/24/9606/04/9306/04/98EF00603/26/9303/26/9303/26/98EF01004/27/9503/26/9303/26/98EF00109/14/9507/10/9507/10/00EFTOTALFORPRAP29 REPORTNO.01REPORTNAME:DOCP001DOCTYPE:PRATTGIHNANUCLEARPOWERPLANTPROCEDURES INDEXEOPATTACHMENTS 01/25/9508:50PAGE3PARAMETERS:
: a. Check letdown - IN SERVICE              a. Stop and    start charging  pumps as necessary  to control  PRZR level.
DOCTYPES-PRAPPRATTPREPRECAPRERSTATUS:5YEARSONLY:PROCEDURE NUMBERATT-1.0ATT-2.0ATT-2.1ATT-2.2ATT-2.3ATT-3.0ATT-3.'IATT-4.0ATT-5.0ATT-5.1ATT-5.2ATT-6.0ATT-7.0ATT-8.0ATT-8.1ATT-8.2ATT-8.3ATT-8.4ATT-9.0ATT-9.1ATT-10.0ATT-11.0ATT-11.1ATT-12.0ATT13.0PROCEDURE TITLEATTACHMENT ATPOWERCCWALIGNMENT ATTACHMENT AUXBLDGSWATTACHMENT MINSWATTACHMENT SWISOLATION ATTACHMENT SWLOADSINCNMTATTACHMENT CI/CVIATTACHMENT CHMTCLOSUREATTACHMENT CHMTRECIRCFANSATTACHMENT COHOTOS/GATTACHMENT SAFWATTACHMENI'IRE WATERCOOLINGTOTDAFWPUHPATTACHMENT COHDVACUUMATTACHMENT CREVACAll'ACKMENT DCLOADSATTACHMENT 0/GSTOPATTACHMENT GENDEGASATTACHMENT NONVITALATTACHMENT SI/UVATTACHMENT LETDOWNATTACHMENT EXCESSL/DATTACHMENT FAULTEDS/GATTACHMENT IACONCERNSATTACHMENT IASUPPLYATTACHMENT N2PORVSATTACHMENT NCREVEFFECTDATELASTREVIE'WNEXTSTREVIEW00'I00207/26/9407/02/9301/02/96EF07/26/9402/03/9308/03/95EF00207/26/9402/03/9308/03/95EF00107/26/9402/19/9308/19/95EF00307/26/9404/21/9310/21/95EF00107/26/9403/26/9309/26/95EF00307/26/9407/29/9301/29/96EF00301/25/9501/25/9507/25/97EF00307/26/9402/11/9408/11/96EF00207/26/9402/11/9408/11/96EF00307/26/9406/17/9312/17/95EF00401/25/9501/25/9507/25/97EF00411/08/9411/08/9405/08/97EF00107/26/9403/04/9409/04/96EF00107/26/9403/26/9309/26/95EF00107/26/9403/26/9309/26/95EF00307/26/9401/26/9407/26/96EF00307/26/9402/19/9308/19/95EF00507/26/9402/11/9408/11/96EF00307/26/9402/19/9308/19/95EF00307/26/9402/19/9308/19/95EF00507/26/9401/26/9407/26/96EF00207/26/9402/03/9308/03/95EF00407/26/9406/11/9312/11/95EF00107/26/9407/02/9301/02/96EF
: b. Maintain PRZR level between    13%
[40% adverse CNMTj and 50%


REPORTNO.01REPORTNAME:DOC-P001OOCTYPE:PRAT'IGINNANUCLEARPOWERPLANTPROCEDURES INDEXEOPATTACHMENTS 01/25/9508:50PAGE4PARAMETERS:
EOP:             TlTLF.:
OOCTYPES-PRAPPRATTPREPRECAPRERSTATUS:5YEARSONLY:PROCEDURE NUMBERATT-14.0ATT-14.1ATI'-14.2 ATT-14.3ATT-14.4ATT-14.5ATT-14.6ATT-15.0ATT-15.1ATT-15.2ATT-16.0ATT-17.0ATT-17.1ATT-18.0ATT-19.0ATT-20.0ATT-21.0PROCEDURE TITLEATTACHMENT NORMALRHRCOOLINGATTACHHENT RHRCOOLATTACHMENT RHRISOLATTACHMENT RHRHPSHATTACHMENT RHRSAMPLEATTACHMENT RHRSYSTEMATTACHMENT RHRPRESSREDUCTION ATTACKHENT RCPSTARTATTACHMENT RCPDIAGNOSTICS ATTACHMENT SEALCOOLINGATTACHMENT RUPTUREDS/GATTACHMENT SD-1ATTACHMENT SD-2ATTACHMENT SFP-RWSTATTACHMENT SIFLUSHATTACHMENT VENTTIMEATTACHMENT RCSISOLATION REVEFFECTDATELASTNEXTSTREVIEWREVIEW00107/26/9410/19/9404/19/96EF00307/26/9400'I07/26/9403/06/9309/06/95EF03/06/9309/06/95EF00107/26/9401/26/9407/26/96EF00100207/26/9407/26/9401/26/9407/26/96EF02/03/9308/03/95EFXX01/25/95DE00307/26/9402/19/9308/19/95EF00107/26/9402/03/9308/03/95EF00004/07/9404/07/9410/07/96EF00307/26/9402/19/9308/19/95EF00107/26/9402/19/9308/19/95EF00207/26/9402/03/9308/03/95EF00511/08/9411/08/9405/08/97EF00407/26/9402/19/9308/19/95EF00407/26/9401/26/9407/26/96EF00307/26/9402/19/9308/19/95EFTOTALFORPRATT42 JI REPORTNO.01REPORT:NPSP0200DOCTYPE:PRECAPARAMETERS:
REV    12 LOSS OP    ALL AC  POWER RECOVERY WITHOUT        SI ECA-0. 1                                   REQUIRED                          PAGE 17    of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE NOT OBTAINED NOTE:   o  If auxiliary spray    is in use, spray flow may    be increased by valves.
DOCTYPES-PRECAPRFRGINNANUCLEARPOWERPLANTPROCEDURES INDEXEMERGENCY CONTINGENCY ACTIONSPROCSTATUS:5YEARSONLY:05/31/96PAGE:1PROCEDURE NUMBERECA-O.OECA.0.1ECA-0.2ECA-1.1ECA-1.2ECA-2.1ECA-3.1ECA-3.2ECA-3.3PROCEDURE TITLELOSSOFALLACPOWERLOSSOFALLACPOWERRECOVERYWITHOUTSlREQUIREDLOSSOFALLACPOWERRECOVERYWITHSIREQUIREDLOSSOFEMERGENCY COOLANTRECIRCULATION LOCAOUTSIDECONTAINMENT UNCONTROLLED DEPRESSURIZATION OFBOTHSTEAMGENERATORS SGTRWITHLOSSOFREACTORCOOLANI'-SUBCOOLED RECOVERYDESIREDSGTRWITHLOSSOFREACTORCOOLANT-SATURATED RECOVERYDESIREDSGTRWITHOUTPRESSURIZER PRESSURECONTROLREVEFFECTDATELASTREVIEWNEXTREVIEWST01101404/20/9504/20/9504/20/9504/20/00EF04/20/95'04/20/00 EF01204/20/9504/20/9504/20/00EF01704/20/9504/20/9504/20/00EF01205/31/9604/20/9504/20/00EF00804/07/9404/07/9404/07/99EF01004/20/9504/20/9504/20/00EF00302/09/9502/09/9502/09/00EF01205/31/9604/2D/9504/20/00EFTOTALFORPRFR 00 EOP:ATT-15.0TITLE:ATTACHMENT RCPSTARTREV:3PAGE1of1Superintendent Date)-24-A)Thefollowing areprerequisites forstartinganRCP:oRCPoilliftpumprunning(-2minutes)oRCPoilliftpressurewhitelight-LITB)Inaddition, thefollowing conditions shouldbemetpriortostartinganRCP:oBothPRZRsprayvalvesclosed-DEMANDAT04oCCWinservicetoselectedRCP(s)withflowandtemperature alarms(A-7,A-15)extinguished.
closing normal charging valve    AOV-294 and normal PRZR spray o  When  using a PRZR PORV  select one with  an operable  block valve.
oSelectedRCP(s)sealinlettemperature
20  Establish      PRZR  Pressure Control:
-LESSTHAN135'ZoSelectedRCP(s)motorbearingtemperatures
: a. Check letdown - IN SERVICE               a. Perform the following:
-LESSTHAN200'F(PPCSaddressisGDRCPSoruserecorder, ifselected) oSelectedRCP(s)sealinjection inserviceoSealinjection flow.-GREATERTHAN6GPMoLabyrinth sealD/P-GREATERTHAN15INCHESOFWATERoSelectedRCP(s)NlsealD/P-GREATERTHAN220PSIDoSelectedRCP(s)oillevels:oLevelalarms(A-24,A-32)-EXTINGUISHED oLevelindicators
: 1) Use PRZR heaters  and one PRZR PORV to maintain  RCS  pressure.
-ONSCALEoSelectedRCP(s)sealreturnalignment:
IF IA NOT available,   THEN Refer to Attachment  N2 PORVS to operate PORV.
a)RCPNlsealoutletvalve(s)open:oAOV-270AforRCPAoAOV-270BforRCPBb)c)IF'OV-313, sealreturnisolation, open,THENverifythefollowing:
: 2) Go to Step 21.
oVCTpressure-GREATERTHAN15PSIGoSelectedRCP(s)Nlsealleakoffflow-BETWEEN0.25GPMAND5.5GPMoSelectedRCP(s)standpipe lowlevelalarm(B-ll,B-12)-EXTINGUISHED IFMOV-313closed,THENverifyotherRCPNlsealparameters normalforselectedRCP(s):oRCPNlsealinlettemperature
: b. Use PRZR heaters and auxiliary spray valve (AOV-296) to maintain RCS pressure 21  Verify Natural Circulation:                   Increase dumping steam from intact S/Gs.
-LESSTHAN135'FoRCPglsealD/P-GREATERTHAN220PSIDNOTE:RCPoilliftpumpshouldbestoppedafterRCPisrunning.
o  RCS  subcooling based on core exit  T/Cs - GREATER THAN O' USING FIGURE MIN SUBCOOLING o  S/G pressures    - STABLE OR DECREASING o  RCS  hot leg temperatures STABLE OR DECREASING o  Core  exit  T/Cs - STABLE OR DECREASING o  RCS  cold leg temperatures    - AT SATURATION TEMPERATURE FOR S/G PRESSURE
g''IC~EJ EOP:ATT-15.2TI'ALE:ATTACHMENT SEALCOOLINGREV2PAGE1of2Superintendent
~Date7IFallRCPsealcoolinghasbeenlost,THENCCWcoolingshouldberestoredbeforeestablishing sealinjection.
A.Performthefollowing torestoreCCWflowtoRCPs:1)IFRCPsealinjection NOTinservice,THENverifyRCPCCWreturnvalvesclosed.oMOV-759A, forRCPAoMOV-759B, forRCPB2)Verifyadequatepoweravailable torunoneCCWpump(124kweachpump).IFpoweravailable, THENstartoneCCWpump.3)EnsureMOV-817,CCWtoCNMT-OPEN4)OpenRCPCCWsupplyvalvesandthermalbarrierreturnvalvesforaffectedRCP:oMOV-749AandAOV-754AforRCPAoMOV-749BandAOV-754BforRCPB5)RestoreCCWflowtoRCP(s)asfollows:a)IFRCPsealinjection inservice,THENensureRCPCCWreturnvalve(s)open:oMOV-759AforRCPAoMOV-759BforRCPBb)IFRCPsealinjection NOTestablished, THENperformthefollowing:
1)DispatchAOtolocallycrackopenaffectedRCPCCWreturnvalve(s):
oMOV-759AforRCPAoMOV-759BforRCPB2)WHENaffectedRCPNlsealoutlettemperature isLESSTHAN235'F,THENmanuallyopenaffectedRCPCCW.ReturnMOVfromcontrolboard.
iAg
~~EOP:ATT-15.2LITLE:ATTACHMENT SEALCOOLINGREV'PAGE2of2B.Performthefollowing torestoreRCPsealinjection:
1)VerifyRCP51sealoutlettemperatures
-LESSTHAN235'F.IFNOT,THENconsultTSCpriortorestoring sealinjection.
2)Verifyanychargingpumprunning.NOTE:RCPsealcooldownrateshouldnotexceed1'F/min.3)DispatchAOwithanRWSTareakeytolocallyrestoresealinjection flowasfollows:a)Verifysealinjection valves,V-300AandV-300B,closed.b)NotifycontrolroomtomonitorRCPglsealoutlettemperatures.
c)CrackopenRCPsealinjection needlevalves,V-300AandV-300B,untilminimumflowi.sestablished.
d)Adjustsealinjection flowasdirectedbycontrolroomtomaintaincooldownratelessthan1'F/minuntilnormalsealinjection flowisestablished.
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE1of20ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERTECHNICAL REVIEWPORCREVIEWDATEPLANTSUPERINTENDENT EFFECTIVE DATECATEGORY1.0REVIEWEDBY:
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE2of20A.PURPOSE-Thisprocedure providesactionstorespondtoaloss'of12Aor12BSSTransformer whenRCStemperature islessthan350'F.B.ENTRYCONDITIONS/SYMPTOMS 1.ENTRYCONDITIONS
-Thisprocedure maybeenteredfrom:a.AP-ELEC.l, whenbusses12Aand/or12Barefoundtobedeenergized andRCStemperature islessthan350'F.2.SYMPTOMS-Thesymptomsoflossof512Aor12BSSTransformer are:a.Annunciator L-20,12AXFMROR12ABUSTROUBLE,lit,orb.Annunciator L-28,12BXFMROR12BBUSTROUBLE,lit.
lf4"I'+IIEel<<kr EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE3of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*****************************************CAUTIONoIFTHERCSISWATERSOLID,THENANYINCREASEINRCSTEMPERATURE MAYRESULTINASIGNIFICANT RCSPRESSUREINCREASE.
RCSHEATUPSHOULDBEPREVENTED.
oOBSERVED/GLOADINGLIMITSOF2300KWFOR1/2HOUR,2250KWFOR2HOURS,AND1950KWFORCONTINUOUS SERVICE.oANYTIMEEMERGENCY D/GSARETHEONLYSOURCEOFACPOWERTOTHEPLANT,PERSONNEL SHOULDBEASSIGNEDTOMAINTAINSURVEILLANCE OFTHED/GS.oIFANYRADIOACTIVE RELEASEINPROGRESS, THENITSHOULDBETERMINATED UNTILSUPPORTCONDITIONS AREEVALUATED.
********0**'x0*xx4xx%.**0'xx%**xx**********
4NOTE:Conditions shouldbeevaluated forsitecontingency reporting (RefertoEPIP-1.0, GINNASTATIONEVENTEVALUATION ANDCLASSIFICATION).
1VerifyEmergency D/GAssociated WithDeadBusRUNNINGoBus12A-D/GAoBus12B-D/GBIFappropriate emergency D/G(s)NOTrunning,THENattempttostartmanually.
(RefertoER-D/G.l, RESTORATION OFAFAILEDD/G.)2VerifyBothTrainsOfACEmergency BussesEnergized ToAtLeast-420 VOLTS:oBus14andbus18oBus16andbus17TrytorestorepowertoallACemergency busses.IFpowercanNOTberestoredtoatleastonetrain,THENrefertoECA-O.O,LOSSOFALLACPOWER.
*'it(iIf EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE4of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDNOTE:Whenrestarting equipment forrecovery, itispreferable tostartequipment onbussesbeingsuppliedfromoffsitepower,ifpossible.
3VerifyServiceWaterSystemOperation:
a.SWpumps-ATLEASTONERUNNINGINEACHLOOPa.VerifyselectedSWpumpsstartonatimer(40sec)afterD/Gstart.IFNOT,THENmanuallystartpumpsasconditions permit(258kweach).b.SWheaderpressure-GREATERTHAN40PSIGINEACHLOOPb.Manuallyalignvalvesasnecessary.
4CheckCCWPumpStatus:a.AtleastoneCCWpump-RUNNINGb.Annunciator A-22,CCWPUMPDISCHARGE LOPRESS60PSIGEXTINGUISHED a.StartoneCCWpump(124kw).b.StartsecondCCWpump(124kw).
kloCt4t EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE5of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED5CheckRCSTemper'atua'e
-STABLEIFRCStemperature increasing, THENstabilize temperature usingavailable method.~RHRnormalcooling~Dumpsteamandfeed~BlowdownandfeedIFRCStemperature decreasing, THENperformthefollowing:
a.StopdumpingsteamorcontrolRHRnormalcooling.b.IFcooldowncontinues, THENperformthefollowing:
l)IFeitherMDAFWpumpoperable, THENensureTDAFWpumpsteamsupplyvalvesinPULLSTOP.2)WHENS/Glevelgreaterthan5%inoneS/G,THENlimitfeedflowtothatrequiredtomaintainS/Glevel.
14,)w~gEp)r4.Cek EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE6of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*******x**x%'**x x%*xx**x********x*********
CAUTIONIFREFUELING INPROGRESS, THENSTOPREFUELING OPERATIONS (NOTIFYREFUELING SRO).**************xx**x**x***xx**************6RestoreNon-Safeguards BussesAsFollows:a.Verifynon-safeguards bussesENERGIZED
~Bus13~Bus15b.VerifyMCCA-ENERGIZED c.VerifyMCCB-ENERGIZED d.CheckCNMTventsamplepumpRUNNINGe.Verifyannunciator J-8,480VMCCSUPPLYBREAKERTRIPEXTINGUISHED f.Resetcontrolroomlightingifnecessary a.Closenon-safeguards bustiebreakerforaffectedbus(ses)ifpossible:
~Bus13tobus14tie~Bus15tobus16tieb.Performthefollowing:
1)Ensurethefollowing pumpsinPULLSTOP:~EHpumpA~Turninggearoilpump~HPsealoilbackuppump2)CloseMCCAsupplybreakerfrombus13.c.Performthefollowing:
1)EnsureEHpumpBinPULLSTOP.2)CloseMCCBsupplybreakerfrombus15.~"d.IFCNMTpurgeormini-purge inprogress, THENsecurepurging.e.RestorepowertootherMCCsasD/Gloadingpermits.~MCCE~MCCF~MCCG 4eW)1It' EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE7of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDt7CheckIASystem:a.Verify2IAcompressors
-RUNNINGb.CheckIAsupplyoPressure-GREATERTHAN60PSIGoPressure-STABLEORINCREASING a.ManuallystartIAcompressors asnecessary (75'weach).b.DispatchanAOtolocallyresetandstartIAcompressors (75kweach).IFIAcanNOTbeestablished, THENrefertoAP-IA.1,LOSSOFINSTRUMENT AIR.8CheckRCSCooling:a.RHRsystem-PREVIOUSLY ALIGNEDFORRHRNORMALCOOLINGb.CheckRHRpumps-ANYRUNNINGc.GotoStep11a.GotoStep18.b.IFRHRnormalcoolingpreviously inservice,THENgotoStep9.IFRHRnormalcoolingNOTrequired, THENgotoStep18.
rldi,+U~4@I\
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE8of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED9Establish Conditions ToStartRHRPump:a.AnyRHRpump-AVAILABLE a.IFRCSlevelgreaterthan64inches,THENgo-toAP-RHR.1, LOSSOFRHR.IFNOT,THENgotoAP-RHR.2, LOSSOFRHRWHILEOPERATING ATRCSREDUCEDINVENTORY CONDITIONS.
b.VerifyCCWcoolingtoRHRsysteminserviceoCCWpumps-ATLEASTONERUNNINGoCCWtoRHRHxs,MOV-738AANDMOV-738B-OPENASNECESSARY c.PlaceRHRHxbypassvalve,HCV-626,toMANUALandclosevalveb.Performthefollowing:
1)EnsureatleastoneCCWpumprunning.2)OpenMOV-738AandMOV-738Basnecessary.
IFCCWcanNOTberestored, THEN.continue attemptstorestoreCCW(RefertoAP-CCW.3, LOSSOFCCWPLANTSHUTDOWN).
K'icV(I EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV'PAGE9of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*******x***x**x*Px***00xx*******A********CAUTIONoSTARTINGANRHRPUMPMAYRESULTINANRCSLEVELORPRESSUREDECREASEDUETOSHRINKORVOIDCOLLAPSE.
oTHERHRHXOUTLETVALVES(HCV-624ANDHCV-625)WILLFAILOPENONLOSSOFINSTRUMENT AIRPRESSURE.
**x***x**xxxx*xxx*x*x'*xxx********x****x**10RestoreRHRFlow:a.StartoneRHRpumpb.AtleastoneRHRpump-RUNNINGc.Establish RHRflow-WITHINLIMITSOFTABLEBELOWRCSSTATUSRCSLEVEL-ANYLEVELABOVE18"RCSLEVEL<18"RCSLEVEL<10"RCSLEVEL<6"b.GotoStep10d.c.ManuallyadjustRHRflowasnecessary.
MAXIMUMRHRFLOW3000gpm1000GPM800GPM500GPMd.RHRflow-RESTOREDe.PlaceRHRHxbypassvalve,HCV-626,controller inAUTOatdesiredflowratef.OpenRHRpumpflowcontrolvalvesasnecessary tostabilize RCStemperature
~HCV-624~HCV-625g.CheckcoreexitT/Cs-STABLEORDECREASING d.IFRCSlevelgreaterthan64inches,THENgotoAP-RHR.1, LOSSOFRHR.IFNOT,THENgotoAP-RHR.2, LOSSOFRHRWHILEOPERATING ATRCSREDUCEDINVENTORY CONDITIONS.
g.StartanotherRHRpumporincreaseRHRflowtoestablish requiredRCScooling.DONOTexceedRHRflowlimitsfromtableabove.
VIWU"'g~
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE10of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDllCheckAFWPumpStatus:a.AFWpumps-ANYRUNNINGb.BothS/Glevels-ATDESIREDLEVELc.StoprunningAFWpumpsandplaceswitchesinPULLSTOPa.GotoStep12.Ib.ContinuewithStep12.WHENdesiredS/Glevelsestablished, THENdoStepllc.12EvaluateRCSConditions:
a.CheckRCSstatus:oRCS-CLOSEDa.IFRCSisopentoatmosphere, THENgotoStep17.oRCSpressure-GREATERTHANATMOSPHERIC b.VerifyRCP&#xb9;1sealD/PsGREATERTHAN220PSIDb.IFanyRCPrunningwith&#xb9;1sealD/Plessthan220psid,THENstopaffectedRCP.
k,W1SPl.~'TpC~I)
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE11of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED13CheckChargingPumpSuctionAlignedToVCT:a.VCTlevel-GREATERTHAN20%a.IFVCTlevelcanNOTbemaintained greaterthan5%,THENperformthefollowing:
1)EnsurechargingpumpsuctionalignedtoRWSToLCV-112BopenoLCV-112Cclosed2)ContinuewithStep14.WHENVCTlevelgreaterthan20%,THENdoStep13b.b.VerifychargingpumpsalignedtoVCToLCV-112CopenoLCV-112Bclosedb.Manuallyalignvalvesasnecessary.
14CheckChargingPumps-ANYCHARGINGPUMPRUNNINGIFchargingpumpsrequired, THENperformthefollowing:
a.VerifychargingtoloopBcoldleg,AOV-294,open.b.Verifychargingflowcontrolvalve,HCV-142,openasnecessary.
c.IFdesired,THENplaceletdownpressurecontroller, PCV-135,inMANUAL.d.Startonechargingpump(75kweachpump).e.IncreasechargingpumpspeedandcontrolPCV-135asnecessary tocontrolPRZRpressureorlevel.
EOP:P-ELEC.3TtiLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE12of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED15MonitorRCSPressure:
a.Pressure-LESSTHAN390PSIGa.IFRCSissolid,THENcontrolchargingandletdownpressurecontrolvalve(PCV-135) asnecessary tostabilize RCSpressure.
b.Pressure-STABLEIFPRZRbubbleestablished, THENoperatenormalorauxiliary spraytodecreasepressure.
b.Stabilize RCSpressureusingappropriate means.~Charging~Letdown~PCV-135(solid)~Normalspray~Auxiliary spray~PRZRheaters16CheckPRZRLevel:a.Narrowrangelevel-ONSCALEb.Level-TRENDINGTOPROGRAMa.IFRCSissolid,THENgotoStep17.b.Adjustchargingpumpspeedasnecessary tocontrolPRZRlevel.17MonitorRCSTemperature a.CoreexitT/Cs-STABLEORDECREASING b.GotoStep26a.AdjustRCScoolingasnecessary andreturn.toStep3.~S/Gsteaming~S/Gfeeding~RHRcooling UIO'Ig51.iIl1 EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE13of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED18CheckAFWSystemStatus:a.VerifyTDAFWpumpsteamsupplyvalvesinPULLSTOPa.IFS/Gsproviding heatsink,THENperformthefollowing:
1)VerifyadequateMDAFWflow.2)PullstopTDAFWpump.3)AdjustAFWflowasnecessary tostabilize S/GlevelandRCStemperature.
b.VerifyMDAFWpumpcrosstievalvesclosed''~MOV-4000A
~MOV-4000B b.EnsureatleastoneMDAFWpumpoff.IFtwopumpsrequired, THENclosebothMDAFWpumpcrosstievalves.19CheckAnyS/GLevel-GREATERTHAN17'tartMDAFWpumpsasnecessary torestoreS/Glevel.20CheckRCSPressure-GREATERTHAN300PSIGIncreaseRCSpressuretogreaterthan300psig.IFRCP&#xb9;1sealD/PcanNOTbemaintained greaterthan220psid,THENtripanyrunningRCP.21CheckRCPStatus-ANYRCPRUNNINGVerifynaturalcirculation (RefertoAttachment NC).IFnaturalcirculation NOTverified, THENincreasedumpingsteam.
+11,~C' EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE14of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED22MonitorRCSTemperature-STABLEORDECREASING ControlS/GARVstostabilize RCStemperature.
IFS/GARVsdoNOTprovideadequatecooling,THENperformthefollowing:
a.InitiateS/GblowdownfrombothS/Gs.b.MaintainbothS/Glevelsstablebycontrolling AFWflow.23CheckCVCSOperation:
a.Chargingpumps-ATLEASTONERUNNINGb.Checkletdownindications:
oCheckPRZRlevel-GREATERTHAN13%oLetdownflow-APPROXIMATELY 40GPMoLetdownflow-STABLEc.AdjustchargingpumpspeedandHCV-142asnecessary torestore'RZR levelandlabyrinth sealD/Pd.GotoStep25a.Performthefollowing:
1)Startchargingpumpsasnecessary.
2)Establish greaterthan20gpmcharginglineflow.b.Performthefollowing:
1)CloseloopBcoldlegtoREGENHx,AOV-427.2)Closeletdownorificevalves(AOV-200A, AOV-200B, andAOV-202)3)IFPRZRlevelgreaterthan13%,THENgotoStep24.IFNOT,THENcontinuewithStep26.WHENPRZRlevelgreaterthan13%,THENdoSteps24and25.
Iq4'hdC EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE15of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDNOTE:Steps24and25maybeperformed concurrently.
24Establish NormalLetdown:a.Establish charginglineflowtoREGENHx-GREATERTHAN20GPMb.Verifythefollowing switchesinCLOSE:~Letdownorificevalve(AOV-200A, AOV-200B, andAOV-202)~LoopBcoldlegtoREGENHxAOV-427c.Placeletdowncontrollers inMANUALat40%open~TCV-130~PCV-135d.OpenAOV-427e.Openletdownorificevalvesasnecessary f.PlaceTCV-130inAUTOat105'Fg.PlacePCV-135inAUTOat250psigh.AdjustchargingpumpspeedandHCV-142asnecessary Performthefollowing stepsinsequencetoestablish excessletdown:oPlaceexcessletdowndivertvalve,AOV-312,toNORMALoEnsureCCWfromexcessletdownopen,AOV-745oEnsureRCPsealreturnisolation valveopen,MOV-313oOpenexcessletdownisolation valve,AOV-310oSlowlyopenHCV-123tomaintainexcessletdowntemperature lessthan195'Fandpressurelessthan100psig


EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW=350'F)REV:1PAGE16of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED25VerifyPRZRHeatersRestored:
EOP,:             TLTLE:
oPRZRproportional heaterbreakerCLOSEDoPRZRbackupheaterbreakerRESET/INAUTOIFPRZRheatersrequired, THENperformthefollowing:
REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT              SI ECA-0 1                                       REQUIRED                          PAGE 18    of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED
a.VerifyadequateD/Gcapacityavailable forPRZRheaters(400kweachbank).b.ResetandclosePRZRproportional heaterbreakerifnecessary.
'OTE: Adverse          CNMT conditions or loss of forced    air cooling  may result in failure of    NIS  detectors.
c.ResetPRZRbackupheaterbreakerandreturntoAUTOifnecessary.
22  Check    If Source Detectors Should Range Be  Energized:
IFonnaturalcirculation andatleast100kwofPRZRheaterscanNOTberestoredwithin6hours,THENbeonRHRwithinanadditional 6hours.(RefertoTechnical Specification 3.1.1.5)NOTE:CheckTechSpecsection3.7forlimitingconditions foroperation.
: a. Source range channels      ;              a. Go  to Step 22e.
26RestoreNormalElectricSystemAlignment:
DEENERGIZED
a.Verifycircuit767and/or751AVAILABLE b.Restore.powerto12Aand/or12Bbus(RefertoER-ELEC.1, RESTORATION OFOFFSITEPOWER)a.ContinuewithStep28.WHENoffsitepoweravailable, THENdoSteps26b,c,dand27.c.Verifyallemergency ACbusnormalfeedbreakers-CLOSED~Bus14~Bus16~Bus17~Bus18c.Restoreemergency ACbussestonormalpowersupply(RefertoER-ELEC.1, RESTORATION OFOFFSITEPOWER)d.Stopanyunloadedemergency D/Gandplaceinstandby(RefertoAttachment D/GSTOP)
: b. Check intermediate range      flux-      b. Perform the following:
~~cJw EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE17of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED27ChecklfAnRCPShouldBeStarted:a.Checkthefollowing:
EITHER CHANNEL LESS THAN 10 10 AMPS                                    1) IF  neither intermediate range channel  is decreasing  THEN initiate boration.
oBothRCPs-OFFoRCPoperation
: 2) Continue  with Step 23. WHEN flux is LESS THAN 10      amps on any operable channel, THEN do Steps 22c through e.
-DESIREDb.RCSpressure-APPROXIMATELY 325PSIGa.GotoStep28.b.ControlPRZRheatersand/orchargingpumpspeedasnecessary torestoreRCSpressure.
: c. Check the following:                     c. Continue with Step 23. WHEN either condition met,   THEN do o  Both intermediate range                  Steps 22d and e.
c.CheckPRZRlevel-LESSTHAN38%d.TrytostartanRCP1)Establish conditions forstartinganRCPa)Bus11Aor11Benergized b)RefertoAttachment RCPSTARTc.VerifyS/Gtemperature (obtained locallyinCNMTatS/Ghandhole) lessthanRCScoldlegtemperature.
channels - LESS THAN 10 10 AMPS
IFNOT,THENgotoStep28.d.IFanRCPcanNOTbestarted,THENcontinuetomonitornaturalcirculation conditions (RefertoAttachment NC).2)StartoneRCP28CheckRCSTemperature-STABLEORDECREASING AdjustRCScoolingasnecessary.
                          -OR-o  Greater than    20 minutes  since reactor  trip
~S/Gsteaming~S/Gfeeding~RHRcooling
: d. Verify source range detectors            d. Manually energize source range ENERGIZED                                    detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).
~%~Vit>
IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR  MALFUNCTION and go to Step 23.
EOP:P-ELEC.3'fITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV1PAGE18of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED29Establish NormalShutdownAlignment:
: e. Transfer Rk-45 recorder to one source range and one intermediate range channel
a.VerifyturninggearoilpumpRUNNINGa.IFturbineoilsystemoperation
: required, THENperformthefollowing:
1)Manuallystartturninggearoilpump(42kw).b.Verifymaingenerator DEPRESSURIZED 2)DispatchAOtoplaceturbineonturninggearifdesired.b.Performthefollowing:
1)ManuallystarttheHPsealoilbackuppump2)DispatchAOtolocallyperformthefollowing:
oVerifyproperoperation ofthesealoilsystem(RefertoT-34B,GENERATOR SEALOILSYSTEMNORMALOPERATION).
oEnsurebearingdrainvaporextractor running.oEnsuremainlubeoilreservoir vaporextractor running.c.CheckRCStemperature
-LESSTHAN135'Fc.Performthefollowing:
1)EnsureoneRxcompartment coolingfanrunning(23kw).d.DispatchAOtostartwastegascompressor asnecessary 2)Ensureonecontrolrodshroudfanrunning(45kw).
kit<I7tC EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE19of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED30RestoreEquipment Alignment:
a.Verifyatleast1CNMTrecircfan-RUNNINGb.Checkradiation monitoring, systems:oCNMTventsamplepumpRUNNINGoPlantventsamplepumpRUNNINGoAllareaandprocessmonitorsoperating asrequiredc.Verifyannunciator L-l,AUXBLDGVENTSYSTEMCONTROLPANELEXTINGUISHED a.StartCNMTrecircfansasnecessary'(240 kweach).b.Performthefollowing:
1)Restoresamplepumpsandradiation monitorsasnecessary.
2)RestartCNMTpurgeormini-purge ifdesired.c.IFbus11Aor11Benergized, THENdispatchAOtorestoreAUXBLDGventillation (RefertoT-35A,AUXANDINTERMEDIATE BUILDINGVENTILLATION STARTUPANDSHUTDOWN) d.Verifyserviceaircompressor
.-RUNNINGd.DispatchAOtolocallystartserviceaircompressor ifdesired.e.VerifymotorfirepumpbreakerCLOSEDe.Closemotorfirepumpbreaker.f.Checkcontrolboardannunciator panels-ALARMSTATUSVALIDFORPLANTCONDITIONS f.Performalarmresponseprocedures forunexpected alarms.g.Verifycontrolboardvalvealignment
-NORMAL(Referto0-6.13,DAILYSURVEILLANCE LOG)g.Manuallyalignvalvesasnecessary.
EOP:P-ELEC.3LITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE20of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED31CheckStatusOfDCSystemLoads:a.Verifyemergency DClubeoilpump-OFFb.VerifyTDAFWpumpDGoilpumpOFFc.VerifybothMFWpumpDCoilpumps-OFFa.Manuallystopemergency DClubeoilpump.b.Performthefollowing:
1)EnsureTDAFWACoilpumprunning.2)StopTDAFWpumpDCoilpump.c.StopMFWpumpDCoilpumps.32VerifyOffsitePower-RESTOREDContinueattemptstorestoreoffsitepower(RefertoER-ELEC.1, RESTORATION OFOFFSITEPOWER).33NotifyHigherSupervision NOTE:Referto0-9.3,NRCIMMEDIATE NOTIFICATION, forreporting requirements.
34ReturnToProcedure OrGuidanceInEffect-END-
/0RW'4f3I EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV:1PAGE1of1AP-ELEC.3 APPENDIXLISTTITLEPAGES1)FIGUREMINSUBCOOLING 2)ATTACHMENT RCPSTART3)ATTACHMENT NC4)ATTACHMENT D/GSTOP
<<Y~variEf EOP:P-ELECT3TITLE:LOSSOF12AAND/OR12BTRANSFORMER (BELOW350'F)REV'PAGE1of1FIGUREMINSUBCOOLING NOTE:Subcooling Margin=Saturation Temperature FromFigureBelow[-]CoreExitT/CIndication SPRESSURE(PSIG)RC2500240023002200210020001900180017001600150013001200110010009008007006005004003002001000RCSPRESSUREINCREMENTS 20PSIGSUBCOOLED REGIONINADE(UATE SUBCOOLING REGIONADVERSECNMTTEMPERATURE INCREMENTS 10'FNORMALCNMTn200250300350400450500550600650700COREEXITSATURATION TEMPERATURE
('F) i' EOP:ECA-01TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV12PAGE1of20ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERGRESPNSIBLEMANAGEREFFECTIVE DATECATEGORY1.0REVIEWEDBY:
EOP:ECA-0.1'!TLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE2of20A.PURPOSE-Thisprocedure providesactionstousenormaloperational systemstostabilize plantconditions following restoration ofACemergency power.B.ENTRYCONDITIONS/SYMPTOMS l.ENTRYCONDITIONS
-Thisprocedure isenteredfrom:a.ECA-O.O,LOSSOFALLACPOWER,whenACemergency powerisrestoredandSIisnotrequired.


EOP:ECA-0.1T1TLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE3of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*****************************************CAUTIONIFANSISIGNALISACTUATEDPRIORTOPERFORMING STEP10OFTHISPROCEDURE, THENSISHOULDBERESETTOPERMITMANUALLOADINGOFEQUIPMENT ONANACEMERGENCY BUS.NOTE:oCSFSTsshouldbemonitored forinformation only.FRprocedures shouldnotbeimplemented priortocompletion ofStep10.oAdverseCNMTvaluesshouldbeusedwheneverCNMTpressureisgreaterthan4psigorCNMTradiation isgreaterthan10+R/hr.1CheckRCPSealIsolation Status:a.RCPsealinjection needlevalvesCLOSED~V-300A~V-300Ba.DispatchAOwithkeytoRWSTgatetolocallyclosevalvesbeforestartingchargingpump.b,RCPCCWreturnvalves-CLOSED~MOV-759A~MOV-759Bb.IFvalvesopenorpositionnotknown,THENcheckCCWpumpstatus:1)IFpumprunning,THENgotoStep2~2)IFpumpNOTrunning,THENmanuallyclosevalves.IFvalve(s)canNOTbeclosed,THENplaceswitchesforRCPthermalbarrierCCW'utlet valvestoCLOSE.~AOV-754A~AOV-754B I
EOP:               TITLE:
EOP:ECA-0.1TITLELOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE4of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED2CheckCIAnnunciator A-26,CONTAINMENT ISOLATION EXTINGUISHED Performthefollowing:
SI      REV: 12 ECA-0.1              LOSS OF    ALL AC  POWER RECOVERY WITHOUT REQUIRED                            PAGE 19  of 20 STEP          ACTION/EXPECTED RESPONSE              RESPONSE    NOT OBTAINED 23  Verify Adequate            Shutdown Margin:
a.DepressCIresetpushbutton b.Verifyannunciator A-26,CONTAINMENT ISOLATION, extinguished.
a,   Direct  RP  to sample RCS and PRZR liquid for    boron concentration
EOP:ECA-0'TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE5of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED3Establish IAtoCNMT;a.Verifynon-safeguards bussesenergized fromoffsitepoweroBus13normalfeed-CLOSEDa.Performthefollowing:
: b. Verify boron concentration-                  b. Borate as necessary.
1)Closenon-safeguards bustiebreakers:
            'REATER THAN REQUIREMENTS OF FIGURE SDM 24  Maintain Stable Plant Conditions
-OR-oBus15normalfeed-CLOSED~Bus13toBus14tie~Bus15toBus16tieb.CheckatleasttwoSWpumpsRUNNINGc.VerifyturbinebuildingSWisolation valves-OPENb.ManuallystartSWpumpsaspowersupplypermits(258kweach).IFlessthantwoSWpumpsrunning,THENgotoStep4.c.Manuallyalignvalves.~MOV-4613andMOV-4670~MOV-4614andMOV-4664d.Startatleasttwoaircompressors (75kweach)e.CheckIAsupply:oPressure-GREATERTHAN60PSIGoPressure-STABLEORINCREASING f.ResetbothtrainsofXYrelaysforIAtoCNMT(AOV-5392) ifnecessary g.VerifyIAtoCNMTAOV-5392-OPENd.IFaircompressors canNOTbestarted,THENdispatchAOtolocallyresetcompressors asnecessary.
: a. RCS  pressure    - STABLE                a. Control    PRZR  heaters and auxiliary spray    if available.
e.Performthefollowing:
: b. RCS  temperature    - STABLE            b. Control dumping steam as
1)ContinueattemptstorestoreIA(RefertoAP-IA.1,LOSSOFINSTRUMENT AIR).2)ContinuewithStep6.WHENIArestored, THENdoSteps3fthrough5.  
                                                          . necessary.
: c. PRZR  level    - BETWEEN 13%  [40%      c. Control charging as necessary.
adverse    CNMT] and 50%
: d. Intact    S/G  level  - BETWEEN 17%      d. Control S/G feed flow as
[25% adverse    CNMT] and 52%      !
necessary.
  *25  Monitor SI          Initiation Criteria:
: a. RCS  subcooling based on core            a. Go  to ECA-0.2,   LOSS OF ALL AC exit  T/Cs - GREATER THAN O'                  POWER RECOVERY    WITH SI REQUIRED, USING FIGURE MIN SUBCOOLING                    Step  l.
: b. PRZR  level -   GREATER THAN 5%        b. Control charging flow to
[30$ adverse    CNMT]                        maintain PRZR level.
IF  PRZR  level  can NOT be maintained,    THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH  SI REQUIRED, Step    l.


EOP:ECA-F1,TlTLK:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV12PAGE6of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*****************************************CAUTIONTHELOADSPLACEDONTHEENERGIZED ACEMERGENCY BUSSHOULDNOTEXCEEDTHECAPACITYOFTHEPOWERSOURCE.4ManuallyLoadFollowing Equipment OnACEmergency Busses:a.StartoneCCWpump(124kw)b..Energize MCCsaspowersupplypermits~MCCAfromBus13~MCCBfromBus15~MCCEfromBus15~MCCFfromBus15c.Verifyinstrument busD-ENERGIZED d.WHENbus15restored, THENresetcontrolroomlightinge.StartatleastoneCNMTRECIRCfanf.RestoreRxheadcoolingaspowersupplypermits:1)StartoneRxcompartment coolingfan(23kweach)2)Startbothcontrolrodshroudfans(45kweach)g.DispatchAOtoestablish normalshutdownalignment (RefertoAttachment SD-1)c.Restorepowertoinstrument busDfromMCCBorMCCA(maintenance supply).'1)Performthefollowing:
EOP:             TITLE:
oDispatchAOtoresetUVrelaysatMCCCandMCCD.oManuallystartonefanaspowersupplypermits.(23kw)2)Manuallystartatleastonefan(45kw)
REV: 12 LOSS OF  ALL AC  POWER RECOVERY WITHOUT        SI ECA-0.1                                REQUIRED                          PAGE 20 of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED 26  Try To Restore Offsite Power              Maintain. plant condition stable To All AC Busses (Refer to                using AC emergency power.
EOP$ECA-0'TITLE$LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE7of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED5CheckIfChargingFlowHasBeenEstablished:
ER-ELEC.1, RESTORATION OF OFFSITE POWER) 27  Determine Circulation IfCooldown Natural Is Required:
a.Chargingpumps-ANYRUNNINGa.Performthefollowing:
: a. Consult plant staff to determine      a. IF cooldown  NOT required, THEN if RCS cooldown is necessary              go to 0-3, HOT SHUTDOWN WITH XENON PRESENT.
1)Ensuresealinjection needlevalvestobothRCPsisolated:
: b. At least one  RCP - OPERABLE          b. Go to ES-0.2, NATURAL CIRCULATION COOLDOWN ~
~RCPA,V-300A~RCPB,V-300B2)EnsureHCV-142open,demandatOa.b.ChargingpumpsuctionalignedtoRWST'oLCV-112B-OPENoLCV-112C-CLOSEDb.Manuallyalignvalvesasnecessary.
: c. Go to 0-2.2, PLANT SHUTDOWN FROM HOT SHUTDOWN TO COLD SHUTDOWN
IFLCV-112BcanNOTbeopened,THENperformthefollowing:
                                            -END-
1)VerifychargingpumpANOTrunningandplaceinPULLSTOP.c.Startchargingpumps(75kweach)asnecessary andadjustchargingflowtorestorePRZRlevel2)DispatchAOtolocallyopenmanualchargingpumpsuctionfromRWST(V-358locatedinchargingpumproom).3)WHENV-358open,THENdirectAOtocloseV-268toisolatechargingpumpsBandCfromVCT(V-268locatedinchargingpumproom).
EOPECA-0.1TITLE$LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE8of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*6MonitorSIInitiation Criteria:
a.RCSsubcooling basedoncoreexitT/Cs-GREATERTHANO'USINGFIGUREMINSUBCOOLING b.PRZRlevel-GREATERTHAN5%[30%adverseCNMT]a.GotoECA-0.2,LOSSOFALLACPOWERRECOVERYWITHSIREQUIRED, Stepl.b.ControlchargingflowtomaintainPRZRlevel.IFPRZRlevelcanNOTbemaintained, THENgotoECA-0.2,LOSSOFALLACPOWERRECOVERYWITHSIREQUIRED, Stepl.7CheckPRZRLevel-GREATERTHAN134'404FORADVERSECONTAINMENT]
Controlchargingflowasnecessary.
EOP:ECA-0.1TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE9of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*****************************************CAUTIONoIFCSTLEVELDECREASES TOLESSTHAN5FEET,THENALTERNATE WATERSOURCESFORAFWPUMPSWILLBENECESSARY (REFERTOER-AFW.1, ALTERNATE WATERSUPPLYTOAFWPUMPS).oIFS/GNRLEVELDECREASES TOLESSTHAN5%[25%ADVERSECNMT]ANDFEEDFLOWISLESSTHAN200GPM,THENTHEMDAFWPUMPSSHOULDBEMANUALLYLOADEDONACEMERGENCY BUSTOSUPPLYWATERTOTHES/G(S).NOTE:oIfMDAFWpumpoperation isnotrequired, pumpswitchesshouldbemaintained inPULL-STOP topreventautomatic start.oTDAFWpumpflowcontrolvalvesfailopenonlossofIA.*8MonitorIntactS/GLevels:a.Narrowrangelevel-GREATERTHAN5%[25%adverseCNMT]a.Maintaintotalfeedflowgreaterthan200gpmuntilnarrowrangelevelgreaterthan5%[25%adverseCNMT]inatleastoneS/G.IFfeedflowlessthan200gpm,THENperformthefollowing:
1)VerifyMDAFWpumpdischarge valvesopen.~MOV-4007~MOV-4008b.Controlfeedflowtomaintainnarrowrangelevelbetween17a[25$adverseCNMT]and52%2)ManuallystartMDAFWpumpsasnecessary (228KWeach)..
EOP:ECA-0.1T1TLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE10of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED9Establish S/GPressureControl:a.AdjustS/GARVcontrollers tomaintainexistingS/Gpressureb.VerifyS/GARVcontrollers inAUTOc.DispatchAOtoperformAttachment SD-2*****************************************CAUTIONIFANSISIGNALISACTUATEDAFTERTHESIPUMPSWITCHESAREPLACEDINAUTO,THENECA-0.2,LOSSOFALLACPOWERRECOVERYWITHSIREQUIRED, SHOULDBEPERFORMED.
NOTE:Safeguards pumpswitchesshouldbeplacedinAUTOonlyifassociated busisenergized.
10PlaceFollowing PumpSwitchesInAUTO:~SIpumps~RHRpumps~CNMTspraypumps


EOP:ECA-0.1T1TLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE11of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDNOTE:FRprocedures maynowbeimplemented asnecessary.
EOP:         TITLE:
llVerifyAdequateSWFlowToCCWHx:a.VerifyatleasttwoSWpumpsRUNNINGb.VerifyAUXBLDGSWisolation valves-OPEN~MOV-4615andMOV-4734~MOV-4616andMOV-4735c,VerifyCNMTRECIRCfanannunciator C-2,HIGHTEMPERATURE AIARM-EXTINGUISHED a.Manuallystartpumpsaspowersupplypermits(258kweach).IFlessthantwoSWpumpscanbeoperated, THENgotoStep19.b.Establish SWtoAUXBLDG(RefertoAttachment AUXBLDGSW).ContinuewithStep19.WHENSWrestoredtoAUXBLDG,THENdoSteps.11cthrough18.c.DispatchAOtolocallythrottleflowtoCCWHxtobetween5000gpmand6000gpmtotalflow.12CheckIfNormalCVCSOperation CanBeEstablished a.VerifyIArestored:
SI    REV: 12 ECA-0. 1    LOSS OF  ALL AC POWER RECOVERY WITHOUT REQUIRED                  PAGE 1  of 1 ECA-0. 1 APPENDIX LIST TITLE                                PAGES
oIAtoCNMT(AOV-5392)
: 1) FIGURE MIN SUBCOOLING,
-OPENoIApressure-GREATERTHAN60PSIGa.ContinuewithStep19.WHENIArestored, THENdoSteps12through18.b.Chargingpump-ANYRUNNINGb.ContinuewithStep19.WHENanychargingpumprunning,THENdoSteps13through18.
: 2) FIGURE SDM
: 3) ATTACHMENT SD-1
: 4) ATTACHMENT SD-2
: 5) ATTACHMENT N2 PORVS
: 6) ATTACHMENT SEAL COOLING
: 7) ATTACHMENT AUX BLDG SW


EOP:ECA-F1TITLE0LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE12of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED*****************************************CAUTIONoRCPTHERMALBARRIERCOOLINGSHOULDBEESTABLISHED SLOWLYTOMINIMIZEPOTENTIAL INTRODUCTION OFSTEAMINTOTHECCWSYSTEMANDTHERMALSHOCKTORCP.oRCPSEALINJECTION SHOULDBEESTABLISHED SLOWLYTOMINIMIZERCPTHERMALSTRESSESANDPOTENTIAL SEALFAILURES.
EOP:             T1TLE:
oASPARTOFSUBSEQUENT RECOVERYACTIONS,RCP(S)SHOULDNOTBESTARTEDPRIORTOASTATUSEVALUATION UNLESSREQUIREDBYANINADEQUATE CORECOOLINGSITUATION.
REV: 12 ECA-0.1         LOSS OF  ALL AC  POWER RECOVERY WITHOUT      SI REQUIRED                        PAGE 1   of  1 FIGURE MIN SUBCOOLING NOTE:   .Subcooling Margin    =  Saturation Temperature      From  Figure Below  t-]  Core Exit  T/C  Indication RC S PRESSURE  (PSIG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400                        SUBCOOLED 1300                          REGION 1200 1100 1000 900 800 INADEQUATE 700                                                              SUBCOOLING 600      ADVERSE CNMT REGION 500 400 300 200                                        NORMAL CNMT                    TEMPERATURE INCREMENTS 10'F 100 0
*'****************************************INOTE:SWshouldbealignedtoCCWHxsbeforerestoring RCPsealcooling.13CheckRCPCooling:a.CheckCCWtoRCPs:Establish normalcoolingtoRCPs(RefertoAttachment SEALCOOLING).
200      250      300    350    400    450    500    550      600    650    700 CORE EXIT SATURATION TEMPERATURE ( F)
oAnnunciator A-7,RCP1ACCWRETURNHIGHTEMPORLOWFLOWEXTINGUISHED oAnnunciator A-15,RCP1BCCWRETURNHIGHTEMPORLOWFLOWEXTINGUISHED b.CheckRCPsealinjection:
oLabyrinth sealD/Ps-GREATERTHAN15INCHESOFWATER-OR-oRCPsealinjection flovtoeachRCP-GREATERTHAN6GPM EOP;ECA-0.1T!TLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE13of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED14CheckIfSealReturnFlowShouldBeEstablished:
a.VerifyRCP&#xb9;1sealoutlettemperature
-LESSTHAN235'Fb.VerifyRCPsealoutletvalves-OPEN~AOV-270A~AOV-270Ba.GotoStep15.b.Manuallyopenvalvesasnecessary.
c.ResetbothtrainsofXYrelaysforRCPsealreturnisolation valveMOV-313ifnecessary d.OpenRCPsealreturnisolation valveMOV-313d.Performthefollowing:
1)PlaceMOV-313switchtoOPEN.2)DispatchAOwithkeytoRWSTgatetolocallyopenMOV-313.e.VerifyRCP&#xb9;1sealleakoffflow'.ClosetheaffectedRCPsealLESSTHAN6.0GPMdischarge valve:~RCPA,AOV-270A~RCPB,AOV-270BIFbothRCPsealdischarge valvesareshut,THENgotoStep15.f.VerifyRCP&#xb9;1sealleakoffflow.-.GREATERTHAN0.8GPMf.RefertoAP-RCP.1, RCPSEALMALFUNCTION.
EOP!ECA-0.1TlTLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE14of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED15VerifyPRZRLevel-GREATERTHAN134[404adverseCNMT]ContinuewithStep19.WHENPRZRlevelincreases togreaterthan13%[40%adverseCNMT],THENdoSteps16through18.16Establish NormalLetdown:a.Establish charginglineflowtoREGENHx-GREATERTHAN20GPMb.Pl'acethefollowing switchestoCLOSE'Letdownorificevalves(AOV-200A, AOV-200B, andAOV-202)~AOV-371,letdownisolation valve~AOV-427,loopBcoldlegtoREGENHxc.Placeletdowncontrollers inMANUALat40%open~TCV-130~PCV-135d.ResetbothtrainsofXYrelaysforAOV-371andAOV-427ifnecessary e.OpenAOV-371andAOV-427f.Openletdownorificevalvesasnecessary g.PlaceTCV-130inAUTOat105'Fh.PlacePCV-135inAUTOat250psigi.AdjustchargingpumpspeedandHCV-142asnecessary IFRCPsealreturnhasbeenestablished, THENestablish excessletdownasfollows:oPlaceexcessletdowndivertvalve,AOV-312,toNORMAL.oEnsureCCWfromexcessletdownopen,(AOV-745).
oOpenexcessletdownisolation valveAOV-310,oSlowlyopenHCV-123tomaintainexcessletdowntemperature lessthan195'Fandpressurelessthan100psig.oAdjustchargingpumpspeedasnecessary.
IFRCPsealreturnNOTestablished, THENconsultTSCtodetermine ifexcessletdownshouldbeplacedinservice.
EOP:ECA-0.1TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12"'AGE15of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED17CheckVCTMakeupSystem:a.Verifythefollowing'.
1)BoricacidandRMWflowcontrolvalves-SETFORREQUIREDCSDCONCENTRATION (RefertoFigureSDM)2)AtleastoneBAandRMWpumpinAUTOa.IFVCTautomakeupcanNOTbeestablished, THENmanuallycontrolVCTlevel,(RefertoER-CVCS.1, REACTORMAKEUPCONTROLMALFUNCTION).
3)RMWmodeselectorswitchinAUTO4)RMWcontrolarmed-REDLIGHTLITb.CheckVCTleveloLevel-GREATERTHAN20%-OR-oLevel-STABLEORINCREASING b.ManuallyincreaseVCTmakeupflowasfollows:1)EnsureBAtransferpumpsandEHNpumpsrunning.IFNOT,THENdispetchAOtcresetMCCCandMCCDUVlockoutsasnecessary.
2)PlaceRMWflowcontrolvalveHCV-111inMANUALandincreaseRMWflow.3)Increaseboricacidflowasnecessary.
IFVCTlevelcanNOTberestored, THENgotoStep19.
EOP:ECA-0.1TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE16of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED18CheckChargingPumpSuctionAlignedToVCT:a.VCTlevel-GREATERTHAN20%a.IFVCTlevelcanNOTbemaintained greaterthan5%,THENperformthefollowing:
1)EnsurechargingpumpsuctionalignedtoRWST:oLCV-112BopenoLCV-112Cclosedb.VerifychargingpumpsalignedtoVCToLCV-112C-OPENoLCV-112B-CLOSED2)ContinuewithStep19.WHENVCTlevelgreaterthan40%,THENdoStep18b.b.Manuallyalignvalvesasnecessary.
19ControlPRZRLevel:a.Checkletdown-INSERVICEb.MaintainPRZRlevelbetween13%[40%adverseCNMTjand50%a.Stopandstartchargingpumpsasnecessary tocontrolPRZRlevel.
EOP:ECA-0.1TlTLF.:LOSSOPALLACPOWERRECOVERYWITHOUTSIREQUIREDREV12PAGE17of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDNOTE:oIfauxiliary sprayisinuse,sprayflowmaybeincreased byclosingnormalchargingvalveAOV-294andnormalPRZRsprayvalves.oWhenusingaPRZRPORVselectonewithanoperableblockvalve.20Establish PRZRPressureControl:a.Checkletdown-INSERVICEa.Performthefollowing:
1)UsePRZRheatersandonePRZRPORVtomaintainRCSpressure.
IFIANOTavailable, THENRefertoAttachment N2PORVStooperatePORV.b.UsePRZRheatersandauxiliary sprayvalve(AOV-296) tomaintainRCSpressure2)GotoStep21.21VerifyNaturalCirculation:
oRCSsubcooling basedoncoreexitT/Cs-GREATERTHANO'USINGFIGUREMINSUBCOOLING IncreasedumpingsteamfromintactS/Gs.oS/Gpressures
-STABLEORDECREASING oRCShotlegtemperatures STABLEORDECREASING oCoreexitT/Cs-STABLEORDECREASING oRCScoldlegtemperatures
-ATSATURATION TEMPERATURE FORS/GPRESSURE EOP,:ECA-01TLTLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE18of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED'OTE:AdverseCNMTconditions orlossofforcedaircoolingmayresultinfailureofNISdetectors.
22CheckIfSourceRangeDetectors ShouldBeEnergized:
a.Sourcerangechannels;DEENERGIZED a.GotoStep22e.b.Checkintermediate rangeflux-EITHERCHANNELLESSTHAN1010AMPSb.Performthefollowing:
1)IFneitherintermediate rangechannelisdecreasing THENinitiateboration.
c.Checkthefollowing:
oBothintermediate rangechannels-LESSTHAN1010AMPS2)ContinuewithStep23.WHENfluxisLESSTHAN10ampsonanyoperablechannel,THENdoSteps22cthroughe.c.ContinuewithStep23.WHENeithercondition met,THENdoSteps22dande.-OR-oGreaterthan20minutessincereactortripd.Verifysourcerangedetectors ENERGIZED d.Manuallyenergizesourcerangedetectors bydepressing P-6permissive defeatpushbuttons (2of2).e.TransferRk-45recordertoonesourcerangeandoneintermediate rangechannelIFsourcerangescanNOTberestored, THENrefertoER-NIS.1, SRMALFUNCTION andgotoStep23.
EOP:ECA-0.1TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE19of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED23VerifyAdequateShutdownMargin:a,DirectRPtosampleRCSandPRZRliquidforboronconcentration b.Verifyboronconcentration-
'REATERTHANREQUIREMENTS OFFIGURESDMb.Borateasnecessary.
24MaintainStablePlantConditions a.RCSpressure-STABLEb.RCStemperature
-STABLEc.PRZRlevel-BETWEEN13%[40%adverseCNMT]and50%d.IntactS/Glevel-BETWEEN17%[25%adverseCNMT]and52%a.ControlPRZRheatersandauxiliary sprayifavailable.
b.Controldumpingsteamas.necessary.
c.Controlchargingasnecessary.
!d.ControlS/Gfeedflowasnecessary.
*25MonitorSIInitiation Criteria:
a.RCSsubcooling basedoncoreexitT/Cs-GREATERTHANO'USINGFIGUREMINSUBCOOLING b.PRZRlevel-GREATERTHAN5%[30$adverseCNMT]a.GotoECA-0.2,LOSSOFALLACPOWERRECOVERYWITHSIREQUIRED, Stepl.b.ControlchargingflowtomaintainPRZRlevel.IFPRZRlevelcanNOTbemaintained, THENgotoECA-0.2,LOSSOFALLACPOWERRECOVERYWITHSIREQUIRED, Stepl.
EOP:ECA-0.1TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE20of20STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED26TryToRestoreOffsitePowerToAllACBusses(RefertoER-ELEC.1, RESTORATION OFOFFSITEPOWER)Maintain.
plantcondition stableusingACemergency power.27Determine IfNaturalCirculation CooldownIsRequired:
a.Consultplantstafftodetermine ifRCScooldownisnecessary a.IFcooldownNOTrequired, THENgoto0-3,HOTSHUTDOWNWITHXENONPRESENT.b.AtleastoneRCP-OPERABLEb.GotoES-0.2,NATURALCIRCULATION COOLDOWN~c.Goto0-2.2,PLANTSHUTDOWNFROMHOTSHUTDOWNTOCOLDSHUTDOWN-END-EOP:ECA-0.1TITLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE1of1ECA-0.1APPENDIXLISTTITLEPAGES1)FIGUREMINSUBCOOLING, 2)FIGURESDM3)ATTACHMENT SD-14)ATTACHMENT SD-25)ATTACHMENT N2PORVS6)ATTACHMENT SEALCOOLING7)ATTACHMENT AUXBLDGSW


EOP:ECA-0.1T1TLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV:12PAGE1of1FIGUREMINSUBCOOLING NOTE:.Subcooling Margin=Saturation Temperature FromFigureBelowt-]CoreExitT/CIndication RC2500240023002200*2100200019001800170016001500140013001200110010009008007006005004003002001000SPRESSURE(PSIG)RCSPRESSUREINCREMENTS 20PSIGSUBCOOLED REGIONADVERSECNMTNORMALCNMTINADEQUATE SUBCOOLING REGIONTEMPERATURE INCREMENTS 10'F200250300350400450500550600650700COREEXITSATURATION TEMPERATURE (F)
EOP:           TlTLE:
EOP:ECA-0.1TlTLE:LOSSOFALLACPOWERRECOVERYWITHOUTSIREQUIREDREV12PAGE1of1FIGURESDMNOTE:oCurveincludesallowance foronestuckrod.Add100ppmforeachadditional stuckrod.oToobtaincoreburnup,usePPCSpointIDBURNUP.BORONCONCENTRATION (PPH)18001600BORONINCREHENTS 20PPH140012001000ADEQUATESDH100PPHCONSERVATISHINCLUDED800600400TEBORA200BURNUPINCREHENTS 200HWD/HTU2000400060008000'000012000140001600018000CYCLE26BURNUP(HWD/HTU)}}
REV    12 LOSS OF    ALL AC  POWER RECOVERY WITHOUT      SI ECA-0.1                                  REQUIRED                          PAGE 1    of  1 FIGURE SDM NOTE:     o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.
o To obtain core burnup, use PPCS point ID BURNUP.
BORON CONCENTRATION    (PPH) 1800 BORON INCREHENTS 20 PPH 1600 1400 ADEQUATE SDH 1200                                                        100 PPH CONS ERVATISH INCLUDED 1000 800 600 400 BORATE BURNUP 200 INCREHENTS 200 HWD/HTU 2000        4000      6000    8000  '0000      12000    14000    16000    18000 CYCLE 26 BURNUP (HWD/HTU)}}

Latest revision as of 04:03, 4 February 2020

Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr
ML17311A047
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/22/1997
From: Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PROC-970522, NUDOCS 9706040174
Download: ML17311A047 (89)


Text

CATEGORY 1

-REGULATO INFORMATION DISTRIBUTION ,~TEM (RIDS)

ACCESSION NBR:9706040174 DOC.DATE: 97/05/22 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant,. Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WIDAY,J.A. Rochester Gas a Electric Corp.

RECIP.NAME RECIPIENT AFFII IATION PM . 5'/N/gI /

SUBJECT:

Revised EOPs,including procedures index,rev 5 to ATT-15.0, rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & rev 9 to ECA-0.2.W/970522 ltr.

DISTRIBUTION CODE: A002D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:Inadequate Core Cooling (Item II.F.2) GL 82-28 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL .. ID CODE/NAME LTTR ENCL 0 PD1-1 PD 1 1 VISSINGFG. 1 1 INTERNAL. Ol 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SRXB 1 '1 RES DE 1 1 RES/DET/EIB 1 1 RES/DSIR/RPSB 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

U '

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Laat 0\laa Ilrw IIIlIII]Pl rZZrZ EF/ Il lrllIZild ROCHESTER GASAND ELECTRIC CORPORATION o 89EASTA VENUE, ROCHESTER, N.Y. 14649<001 JOSEPH A. WIDAY TELEPHONE Plant Manager AREA CODE 7t6 546-2700 Glnna Nuclear Pkrnt May 22, 1997 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate l-1 Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, se h A. Wid JAW/jdw XC: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector 9706040174 970522 PDR ADOCK 05000244 PDR enclosure(s):

@OD ATT Index AP-ELEC.3, Rev. -3 AP Index ECA-0.1, Rev. 13 ECA Index6 3 0 ~ ~ ECA-0.2, Rev. 9 ATT-15.0, Rev. 5 ATT-15.2, Rev. 3 llllllllllllllllllll[IIIIIII)llllll

0 REPORT NO. 01 REPORT: NPSP0200 GINNA NUCLEAR POWER PLANT PROCEDURES INDEX 03/24/97 PAGE: 30 DOC TYPE: PRATT EOP ATTACHMENTS PARAMETERS: DOC TYPES - PRAR PRATI'RFR 5 YEARS ONLY:

PROCEDURE EFFECT NEXT NUMBER PROCEDURE TITLE DATE RBVIEW ST ATT-1.0 ATTACHMENT AT POWER CCW ALIGNME 001 0 I/26/94 02/19/93 02/19/98 BF ATT-2.0 ATTACHMENT AUX BLDG SW 003 07/26/94 04/21/93 04/21/98 EF A -2.1 ATTACHMENT MIN SW 003 03/24/9I 03/26/93 03/26/98 EF ATT-2.2 ATTACHMENT SW ISOLATION 003 07/26/94 07/29/93 01/29/9 EF ATI'.3 ATTACHMENT SW LOADS IN CNMT 003 01/25/95 01/25/95 01 5/00 EF ATT-3.0 ATTA NT CI/CVI 003 '07/26/94 02/11/9 02/11/99 EF ATZ-3. 1 ATTACHMENT CLOSURB 002 07/26/94 0 11/94 02/11/99 EF ATT-4.0 ATTACHMENT CNNL'ECI FANS 003 07/26 4 06/17/93 06/17/98 EF ATT-5.0 ATTACHMENT COND TO S/G 004 /25/95 01/25/95 01/25/00 EF ATT-5.1 ATTACHMENT SAFW 09/26196 11/08/94 5 11/08/99 EF ATT-5.2 ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP 002 10/26/95 03/04/94 03/04/99 EF ATT-6. 0 ATTACHMENT COND VACUUM 003 12/18/96 03/26/93 03/26/98'P ATT-7. 0 ATTACHMENT CR EVAC 002 12/18/96 03/26/93 03/26/98 EF ATT-8. 0 ATTACHMENT DC LOADS 003 07/26/94 01/26/94 01/26/99 EP ATT-8. 1 ATTACHMENT D/G STOP 11/03/95 02/19/93 02/19/98 EP ATT-8. 2 ATTACHMENT GEN DEGAS 005 02/11/94 07 94 02/11/99 EF ATT-8.3 ATTACHMENT NONVITAL 003 07/26/94 02 93 02/19/98 EF ATT-8. 4 ATTACHMENT SI/UV 003 07/26/94 02/19/93 0 98 EF ATT-9. 0 ATTACHMENT L WN 005 07/26/94 01/26/94 01/26/99 EF ATT-9. 1 ATTA EXCESS L/D 002 07/26/94 02/03/93 02/03/98 EP ATT 10.0 ACHMENT FAULTED S/G 005 10/03/96 06/11/93 06/11/98 EF ATT-11.0 ATTACHMENT IA CONCERNS 001 01/26/94 07/02/93 07/02/98 EP ATZ-11.1 ATTACHMENT IA SUPPLY 001 07/26/94 07/02/93 07/02/98 EF ATT-12,0 ATTACHMENT N2 PORVS 003 03/24/97 02/03/93 02/03/98 EF

~ .

'1

REPORT NO. 01 GINNA NUCLEAR POWER PLANT 03/24/97 PAGE: 31 REPORT:'NPSP0200 PROCEDURES INDEX DOC TYPE: PRATT BOP ATTACHMENTS PARAMETERS: DOC TYPES - PRAR . PRATT PRFR 5 YEARS ONLY:

PROCEDURB EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST ATT-13.0 ATTACHMENT NC 002 07/26/94 02/03/93 02/03/98 EF ATT-14.0 ATTACHMENT NORMAL RHR COOLING 001. 07/26/94 10/19/94 10/19/99 Ef ATI'-14. 1 ATTACHMENT RHR COOL 003 07/26/94 03/06/93 03/06/98 EF ATI'-14.2 ATTACHMENT RHR ISOL 001 07/26/94 03/06/93 03/06/98 EP ATT-14.3 ATTACHMENT RHR NPSH 001 07/26/94 01/26/94 01/26/99 EP ATT-14.4 ATTACHMENT RHR SAMPLE 001 07/26/94 01/26/94 01/26/99 EF ATT 14.5 ATTACHMENT RHR SYSTEM 002 07/26/94 02/03/93 02/03/98 EF ATT-14. 6 ATTACHMENT RHR PRESS REDUCTION 000 04/07/94 04/07/94 04/07/99 EF ATT-15. 0 ATTACHMENT RCP START 004 04/20/95 04/20/95 04/20/00 EF ATT-15. 1 ATTACHMENT RCP DIAGNOSTICS 002 09/26/96 02/19/93 02/19/98 EF ATT-15. 2 ATTACHMENT SEAL COOLING 002 07/26/94 02/03/93 02/03/98 EF ATT-16. 0 AT1'ACHMENT RUPTURED S/G 006 10/03/96 11/08/94 11/08/99 EF ATT 17.0 ATTACHMENT SD-1 006 11/03/95 02/03/95 02/03/00 Ef ATT-17. 1 ATTACHMENT SD-2 005 09/26/96 01/26/94 01/26'/99 Ef ATT-18.0 ATTACHMENT SPP - RWST 003 07/26/94 02/19/93 02/19/98 Ef ATT-19.0 ATTACHMENT SI FLUSH 01/25/95 ATT-20.0 ATTACHMENT VENT TIME 003 07/26/94 02/19/93 02/19/98 EF ATT-21.0 ATTACHMENT RCS ISOLATION 001 07/26/94 02/03/93 02/03/98 EF ATT-22.0 ATTACHMENT RESTORING fEED PLOW. 000 03/24/97 03/24/97 03/24/02 EF TOTAL FOR PRATT 43

REPORT NO. 01 GINHA NUCLEAR POWER PLANT 05/31/96 PAGE: 1 REPORT: HPSP0200 PROCEDURES INDEX DOC TYPE: PRAP ABNORNAL PROCEDURE PARANETERS: DOC TYPES - PRAP STATUS: 5 YEARS OHLY.:

PROCEDURE EFFECT LASI'EXT HUHBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST AP-CCM.1 LEAKAGE INTO THE COHPONEHT COOLING LOOP 011 02/24/96 04/20/95 04/20/00 EF AP-CCW.2 LOSS OF CCM DURING POWER OPERATION 012 02/24/96 08/30/94 08/30/99 EF AP-CCM.3 LOSS OF CCM - PLANI'HUTDOWN 010 03/29/96 08/30/94 08/30/99 EF AP-CR.1 CONTROL ROON INACCESSIBILITY 013 11/17/94 11/17/94 11/17/99 EF AP-CVCS.1 CVCS LEAK 010 02/24/96 04/20/95 04/20/00 EF AP-CVCS.2 DELETED XX 04/21/93 DE AP-CM.'I LOSS OF A CIRC WATER PUHP 005 03/13/96 04/21/93 04/21/98 QU AP-ELEC.1 LOSS OF 12A AHD/OR 12B BUSSES 012 02/24/96 03/21/95 03/21/00 EF AP-ELEC.2 SAFEGUARD BUSSES LOM VOLTAGE OR SYSTEH LOM FREQUEHCY 007 02/11/94 02/11/94 02/11/99 EF AP-ELEC.3 LOSS OF 12A AND/OR 12B TRAHSFORNER (BELOW 350 F) 002 02/24/96 ~ 03/06/93 03/06/98 EF AP-FM.1 PARTIAL OR COHPLETE LOSS OF IIAIH FEEDMATER 009 04/21/93 04/21/93 04/21/98 EF AP- IA.1 LOSS OF INSTRUNEHT AIR 011 10/26/95 09/09/94 09/09/99 EF AP-PRZR.1 ABNORNAL PRESSURIZER PRESSURE 008 02/24/96 09/29/94 09/29/99 EF AP-RCC.1 CONTINUOUS CONTROL ROD MITNDRA'WAL/INSERTION 006 02/24/96 06/04/93 06/04/98 EF AP-RCC.2 RCC/RPI HALFUHCTION 006 02/24/96 04/23/93 04/23/98 EF AP-RCC.3 DROPPED ROO RECOVERY 001 02/24/96 04/23/93 04/23/98 EF AP-RCP.1 RCP SEAI. IIALFUNCTION 010 05/31/96 04/20/95 04/20/00 EF AP-RCS.1 REACTOR COOLANT LEAK 010 02/24/96 04/20/95 04/20/00 EF AP-RCS.2 LOSS OF REACTOR COOLANT FLOW 007 06/09/94 10/08/93 10/08/98 EF AP-RCS.3 HIGH REACTOR COOLANT ACTIVITY 006 04/23/93 04/23/93 04/23/98 EF AP-RCS.4 SHUTDOWN LOCA 004 04/20/95 04/20/95 04/20/00 EF AP-RNR.1 LOSS OF RHR 010 03/29/96 03/06/93 03/06/98 EF AP-RHR.2 LOSS OF RNR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS 006 03/21/95 03/21/95 03/21/00 EF AP-SW.1- SERVICE MATER LEAK 010 02/24/96 07/29/93 07/29/98 EF

1 REPORT NO. 01 GINNA NUCLEAR POWER PLANT 05/31/96 PAGE: 2 REPORT: NPSP0200 PROCEDURES INDEX DOC TYPE: PRAP ABNORMAL PROCEDURE PARANETERS: DOC TYPES - PRAP STATUS: 5 YEARS ONLY:

PROCEDURE EFFECT LAST NEXT NUHBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST AP-TURB.1 TURBINE TRIP WITHOUT RX TRIP REQUIRED 007 05/07/93 05/07/93 05/07/98 EF AP-TURB.2 TURBINE LOAD REJECTIOH 014 02/24/96 06/04/93 06/04/98 EF AP-TURB.3 TURB I HE V I BRAT ION 006 03/26/93 03/26/93 03/26/98 EF AP-TURB.4 LOSS OF CONDEHSER VACUUII 010 04/27/95 03/26/93 03/26/98 EF AP-TURB.S RAPID LOAD REDUCTION 001 09/14/95 07/10/95 07/10/00 EF TOTAL FOR PRAP 29

REPORT NO. 01 GIHNA NUCLEAR POWER PLANT 01/25/95 08:50 PAGE 3 REPORT NAME: DOC P001 PROCEDURES INDEX DOC TYPE: PRATT EOP ATTACHMENTS PARAMETERS: DOC TYPES - PRAP PRATT PRE PRECA PRER STATUS: 5 YEARS ONLY:

PROCEDURE PROCEDURE TITLE REV EFFECT LAST NEXT ST NUMBER DATE REVIE'W REVIEW ATT-1.0 ATTACHMENT AT POWER CCW ALIGNMENT 001 07/26/94 02/19/93 08/19/95 EF ATT-2.0 ATTACHMENT AUX BLDG SW 003 07/26/94 04/21/93 10/21/95 EF ATT-2.1 ATTACHMENT MIN SW 001 07/26/94 03/26/93 09/26/95 EF ATT-2.2 ATTACHMENT SW ISOLATION 003 07/26/94 07/29/93 01/29/96 EF ATT-2.3 ATTACHMENT SW LOADS IN CNMT 003 01/25/95 01/25/95 07/25/97 EF ATT-3.0 ATTACHMENT CI/CVI 003 07/26/94 02/11/94 08/11/96 EF ATT-3.'I ATTACHMENT CHMT CLOSURE 002 07/26/94 02/11/94 08/11/96 EF ATT-4.0 ATTACHMENT CHMT RECIRC FANS 003 07/26/94 06/17/93 12/17/95 EF ATT-5.0 ATTACHMENT COHO TO S/G 004 01/25/95 01/25/95 07/25/97 EF ATT-5.1 ATTACHMENT SAFW 004 11/08/94 11/08/94 05/08/97 EF ATT-5.2 ATTACHMENI'IRE WATER COOLING TO TDAFW PUHP 001 07/26/94 03/04/94 09/04/96 EF ATT-6.0 ATTACHMENT COHD VACUUM 001 07/26/94 03/26/93 09/26/95 EF ATT-7.0 ATTACHMENT CR EVAC 001 07/26/94 03/26/93 09/26/95 EF ATT-8.0 All'ACKMENT DC LOADS 003 07/26/94 01/26/94 07/26/96 EF ATT-8.1 ATTACHMENT 0/G STOP 003 07/26/94 02/19/93 08/19/95 EF ATT-8.2 ATTACHMENT GEN DEGAS 005 07/26/94 02/11/94 08/11/96 EF ATT-8.3 ATTACHMENT NONVITAL 003 07/26/94 02/19/93 08/19/95 EF ATT-8.4 ATTACHMENT SI/UV 003 07/26/94 02/19/93 08/19/95 EF ATT-9.0 ATTACHMENT LETDOWN 005 07/26/94 01/26/94 07/26/96 EF ATT-9.1 ATTACHMENT EXCESS L/D 002 07/26/94 02/03/93 08/03/95 EF ATT-10.0 ATTACHMENT FAULTED S/G 004 07/26/94 06/11/93 12/11/95 EF ATT-11.0 ATTACHMENT IA CONCERNS 001 07/26/94 07/02/93 01/02/96 EF ATT-11.1 ATTACHMENT IA SUPPLY 00'I 07/26/94 07/02/93 01/02/96 EF ATT-12.0 ATTACHMENT N2 PORVS 002 07/26/94 02/03/93 08/03/95 EF ATT 13.0 ATTACHMENT NC 002 07/26/94 02/03/93 08/03/95 EF

REPORT NO. 01 GINNA NUCLEAR POWER PLANT 01/25/95 08:50 PAGE 4 REPORT NAME: DOC-P001 PROCEDURES INDEX OOC TYPE: PRAT'I EOP ATTACHMENTS PARAMETERS: OOC TYPES - PRAP PRATT PRE PRECA PRER STATUS: 5 YEARS ONLY:

PROCEDURE PROCEDURE TITLE REV EFFECT LAST NEXT ST NUMBER DATE REVIEW REVIEW ATT-14.0 ATTACHMENT NORMAL RHR COOLING 001 07/26/94 10/19/94 04/19/96 EF ATT-14.1 ATTACHHENT RHR COOL 003 07/26/94 03/06/93 09/06/95 EF ATI'-14.2 ATTACHMENT RHR ISOL 00'I 07/26/94 03/06/93 09/06/95 EF ATT-14.3 ATTACHMENT RHR HPSH 001 07/26/94 01/26/94 07/26/96 EF ATT-14.4 ATTACHMENT RHR SAMPLE 001 07/26/94 01/26/94 07/26/96 EF ATT-14.5 ATTACHMENT RHR SYSTEM 002 07/26/94 02/03/93 08/03/95 EF ATT-14.6 ATTACHMENT RHR PRESS REDUCTION 000 04/07/94 04/07/94 10/07/96 EF ATT-15.0 ATTACKHENT RCP START 003 07/26/94 02/19/93 08/19/95 EF ATT-15.1 ATTACHMENT RCP DIAGNOSTICS 001 07/26/94 02/19/93 08/19/95 EF ATT-15.2 ATTACHMENT SEAL COOLING 002 07/26/94 02/03/93 08/03/95 EF ATT-16.0 ATTACHMENT RUPTURED S/G 005 11/08/94 11/08/94 05/08/97 EF ATT-17.0 ATTACHMENT SD-1 004 07/26/94 02/19/93 08/19/95 EF ATT-17.1 ATTACHMENT SD-2 004 07/26/94 01/26/94 07/26/96 EF ATT-18.0 ATTACHMENT SFP - RWST 003 07/26/94 02/19/93 08/19/95 EF ATT-19.0 ATTACHMENT SI FLUSH XX 01/25/95 DE ATT-20.0 ATTACHMENT VENT TIME 003 07/26/94 02/19/93 08/19/95 EF ATT-21.0 ATTACHMENT RCS ISOLATION 001 07/26/94 02/03/93 08/03/95 EF TOTAL FOR PRATT 42

J I

REPORT NO. 01 GINNA NUCLEAR POWER PLANT 05/31/96 PAGE: 1 REPORT: NPSP0200 PROCEDURES INDEX DOC TYPE: PRECA EMERGENCY CONTINGENCY ACTIONS PROC PARAMETERS: DOC TYPES - PRECA PRFR STATUS: 5 YEARS ONLY:

PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST ECA-O.O LOSS OF ALL AC POWER 017 04/20/95 04/20/95 04/20/00 EF ECA.0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT Sl REQUIRED 012 05/31/96 04/20/95 04/20/00 EF ECA-0.2 LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED 008 04/07/94 04/07/94 04/07/99 EF ECA-1.1 LOSS OF EMERGENCY COOLANT RECIRCULATION 010 04/20/95 04/20/95 04/20/00 EF ECA-1.2 LOCA OUTSIDE CONTAINMENT 003 02/09/95 02/09/95 02/09/00 EF ECA-2.1 UNCONTROLLED DEPRESSURIZATION OF BOTH STEAM GENERATORS 012 05/31/96 04/2D/95 04/20/00 EF ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANI'-SUBCOOLED RECOVERY DESIRED 011 04/20/95 04/20/95 04/20/00 EF ECA-3.2 SGTR WITH LOSS OF REACTOR COOLANT-SATURATED RECOVERY DESIRED 014 04/20/95 04/20/95 '04/20/00 EF ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL 012 04/20/95 04/20/95 04/20/00 EF TOTAL FOR PRFR

0 0

EOP: TITLE:

REV: 3 ATT-15.0 ATTACHMENT RCP START PAGE 1 of 1 Superintendent Date ) The following are prerequisites for starting an RCP:

A) o o

RCP RCP oil oil lift lift pump running (-2 minutes) pressure white light LIT B) In addition, the following conditions should be met prior to starting an RCP:

o Both PRZR spray valves closed DEMAND AT 04 o CCW in service to selected RCP(s) with flow and temperature alarms (A-7, A-15) extinguished.

o Selected RCP(s) seal inlet temperature LESS THAN 135'Z o Selected RCP(s) motor bearing temperatures LESS THAN 200'F (PPCS address is GD RCPS or use recorder, if selected) o Selected RCP(s) seal injection in service o Seal injection flow. GREATER THAN 6 GPM o Labyrinth seal D/P - GREATER THAN 15 INCHES OF WATER o Selected RCP(s) Nl seal D/P GREATER THAN 220 PSID o Selected RCP(s) oil levels:

o Level alarms (A-24, A-32) EXTINGUISHED o Level indicators ON SCALE o Selected RCP(s) seal return alignment:

a) RCP Nl seal outlet valve(s) open:

o AOV-270A for RCPA o AOV-270B for RCP B b) IF'OV-313, seal return isolation, open, THEN verify the following:

o VCT pressure GREATER THAN 15 PSIG o Selected RCP(s) Nl seal leakoff flow BETWEEN 0.25 GPM AND 5.5 GPM o Selected RCP(s) standpipe low level alarm (B-ll, B-12) EXTINGUISHED c) IF MOV-313 closed, THEN verify other RCP Nl seal parameters normal for selected RCP(s):

o RCP Nl seal inlet temperature LESS THAN 135'F o RCP gl seal D/P - GREATER THAN 220 PSID NOTE: RCP oil lift pump should be stopped after RCP is running.

g

'I C~

E J

EOP: TI 'ALE:

REV 2 ATT-15.2 ATTACHMENT SEAL COOLING PAGE 1 of 2 Superintendent ~ Date 7 IF all RCP seal cooling has been lost, THEN CCW cooling should be restored before establishing seal injection.

A. Perform the following to restore CCW flow to RCPs:

1) IF RCP seal injection NOT in service, THEN verify RCP CCW return valves closed.

o MOV-759A, for RCP A o MOV-759B, for RCP B

2) Verify adequate power available to run one CCW pump (124 kw each pump). IF power available, THEN start one CCW pump.
3) Ensure MOV-817, CCW to CNMT OPEN
4) Open RCP CCW supply valves and thermal barrier return valves for affected RCP:

o MOV-749A and AOV-754A for RCP A o MOV-749B and AOV-754B for RCP B

5) Restore CCW flow to RCP(s) as follows:

a) IF RCP seal injection in service, THEN ensure RCP CCW return valve(s) open:

o MOV-759A for RCP A o MOV-759B for RCP B b) IF RCP seal injection NOT established, THEN perform the following:

1) Dispatch AO to locally crack open affected RCP CCW return valve(s):

o MOV-759A for RCP A o MOV-759B for RCP B

2) WHEN affected RCP Nl seal outlet temperature is LESS THAN 235'F, THEN manually open affected RCP CCW. Return MOV from control board.

i Ag

~

~

EOP: LITLE:

REV' ATT-15.2 ATTACHMENT SEAL COOLING PAGE 2 of 2 B. Perform the following to restore RCP seal injection:

1) Verify RCP 51 seal outlet temperatures LESS THAN 235'F.

IF NOT, THEN consult TSC prior to restoring seal injection.

2) Verify any charging pump running.

NOTE: RCP seal cooldown rate should not exceed 1'F/min.

3) Dispatch AO with an RWST area key to locally restore seal injection flow as follows:

a) Verify seal injection valves, V-300A and V-300B, closed.

b) Notify control room to monitor RCP gl seal outlet temperatures.

c) Crack open RCP seal injection needle valves, V-300A and V-300B, until minimum flow i.s established.

d) Adjust seal injection flow as directed by control room to maintain cooldown rate less than 1'F/min until normal seal injection flow is established.

EOP: TITLE:

REV 1 P-ELEC.3 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 350'F) PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTENDENT EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 2 of 20 A. PURPOSE This procedure provides actions to respond to a loss

'of 12A or 12B SS Transformer when RCS temperature is less than 350'F.

B. ENTRY CONDITIONS/SYMPTOMS

1. ENTRY CONDITIONS This procedure may be entered from:
a. AP-ELEC.l, when busses 12A and/or 12B are found to be deenergized and RCS temperature is less than 350'F.
2. SYMPTOMS The symptoms of loss of 512A or 12B SS Transformer are:
a. Annunciator L-20, 12A XFMR OR 12A BUS TROUBLE, lit, or
b. Annunciator L-28, 12B XFMR OR 12B BUS TROUBLE, lit.

lf 4 "I'+

I I E e

l

<<kr

EOP: TITLE:

REV 1 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3 350'F) PAGE 3 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o IF THE RCS IS WATER SOLID, THEN ANY INCREASE IN RCS TEMPERATURE MAY RESULT IN A SIGNIFICANT RCS PRESSURE INCREASE. RCS HEATUP SHOULD BE PREVENTED.

o OBSERVE D/G LOADING LIMITS OF 2300 KW FOR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.

o ANYTIME EMERGENCY D/GS ARE THE ONLY SOURCE OF AC POWER TO THE PLANT, PERSONNEL SHOULD BE ASSIGNED TO MAINTAIN SURVEILLANCE OF THE D/GS.

o IF ANY RADIOACTIVE RELEASE IN PROGRESS, THEN IT SHOULD BE TERMINATED UNTIL SUPPORT CONDITIONS ARE EVALUATED.

                    • 'x 0 0 *x x 4

4 x x %.** 0' x x  % **x x**********

NOTE: Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION).

1 Verify Emergency D/G IF appropriate emergency D/G(s) NOT Associated With Dead Bus running, THEN attempt to start RUNNING manually. (Refer to ER-D/G.l, RESTORATION OF A FAILED D/G.)

o Bus 12A - D/G A o Bus 12B - D/G B 2 Verify Both Trains Of AC Try to restore power to all AC Emergency Busses Energized To emergency busses. IF power can NOT At Least-420 VOLTS: be restored to at least one train, THEN refer to ECA-O.O, LOSS OF ALL o Bus 14 and bus 18 AC POWER.

o Bus 16 and bus 17

  • 'it(

iI f

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 4 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: When restarting equipment for recovery, it is preferable to start equipment on busses being supplied from offsite power, if possible.

3 Verify Service Water System Operation:

a. SW pumps - AT LEAST ONE RUNNING a. Verify selected start SW pumps IN EACH LOOP on a timer (40 sec) after D/G start. IF NOT, THEN manually start pumps as conditions permit (258 kw each).
b. SW header pressure - GREATER b. Manually align valves as THAN 40 PSIG IN EACH LOOP necessary.

4 Check CCW Pump Status:

a. At least one CCW pump - RUNNING a. Start one CCW pump (124 kw).
b. Annunciator A-22, CCW PUMP b. Start second CCW pump (124 kw).

DISCHARGE LO PRESS 60 PSIG EXTINGUISHED

kl o Ct 4

t

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 5 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 5 Check RCS Temper'atua'e STABLE IF RCS temperature increasing, THEN stabilize temperature using available method.

~ RHR normal cooling

~ Dump steam and feed

~ Blowdown and feed IF RCS temperature decreasing, THEN perform the following:

a. Stop dumping steam or control RHR normal cooling.
b. IF cooldown continues, THEN perform the following:

l) IF either MDAFW pump operable, THEN ensure TDAFW pump steam supply valves in PULL STOP.

2) WHEN S/G level greater than 5% in one S/G, THEN limit feed flow to that required to maintain S/G level.

14,) w ~ g E

p) r 4 .C e

k

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 6 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

              • x**x%'**x x% *x x**x********x*******

CAUTION IF REFUELING IN PROGRESS, THEN STOP REFUELING OPERATIONS (NOTIFY REFUELING SRO).

                            • x x ** x **x ***x x **************

6 Restore Non-Safeguards Busses As Follows:

a. Verify non-safeguards busses a. Close non-safeguards bus tie ENERGIZED breaker for affected bus(ses) possible:

if

~ Bus 13

~ Bus 15 ~ Bus 13 to bus 14 tie

~ Bus 15 to bus 16 tie

b. Verify MCC A - ENERGIZED b. Perform the following:
1) Ensure the following pumps in PULL STOP:

~ EH pump A

~ Turning gear oil pump

~ HP seal oil backup pump

2) Close MCC A supply breaker from bus 13.
c. Verify MCC B - ENERGIZED c. Perform the following:
1) Ensure EH pump B in PULL STOP.
2) Close MCC B supply breaker from bus 15.
d. Check CNMT vent sample pump ~" d. IF CNMT purge or mini-purge in RUNNING progress, THEN secure purging.
e. Verify annunciator J-8, 480V MCC e. Restore power to other MCCs as SUPPLY BREAKER TRIP D/G loading permits.

EXTINGUISHED

~ MCC E

~ MCC F

~ MCC G

f. Reset control room necessary lighting if

4 e W

)1 I

t'

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 1 P-ELEC.3 350'F) PAGE 7 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED t

7 Check IA System:

a. Verify 2 IA compressors - RUNNING a. Manually start IA compressors as necessary (75'w each).
b. Check IA supply b. Dispatch an AO to locally reset and start IA compressors (75 kw o Pressure - GREATER THAN each).

60 PSIG IF IA can NOT be established, o Pressure - STABLE OR THEN refer to AP-IA.1, LOSS OF INCREASING INSTRUMENT AIR.

8 Check RCS Cooling:

a. RHR system - PREVIOUSLY ALIGNED a. Go to Step 18.

FOR RHR NORMAL COOLING

b. Check RHR pumps - ANY RUNNING b. IF RHR normal cooling previously in service, THEN go to Step 9.

IF RHR normal cooling NOT required, THEN go to Step 18.

c. Go to Step 11

rl di, +

U

~ 4@I \

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 1 P-ELEC.3 350'F) PAGE 8 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Establish Conditions To Start RHR Pump:

a. Any RHR pump - AVAILABLE a. IF RCS level greater than 64 inches, THEN go -to AP-RHR.1, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
b. Verify CCW cooling to RHR system b. Perform the following:

in service

1) Ensure at least one CCW pump o CCW pumps - AT LEAST ONE running.

RUNNING

2) Open MOV-738A and MOV-738B as o CCW to RHR Hxs, MOV-738A AND necessary.

MOV-738B - OPEN AS NECESSARY IF CCW can NOT be restored, THEN

.continue attempts to restore CCW (Refer to AP-CCW.3, LOSS OF CCW PLANT SHUTDOWN).

c. Place RHR Hx bypass valve, HCV-626, to MANUAL and close valve

K'ic V(

I

EOP: TITLE:

REV' LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3 350'F) PAGE 9 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

              • x ***x ** x
  • P x ***

CAUTION 0 0 x x *************** A o STARTING AN RHR PUMP MAY RESULT IN AN RCS LEVEL OR PRESSURE DECREASE DUE TO SHRINK OR VOID COLLAPSE.

o THE RHR HX OUTLET VALVES (HCV-624 AND HCV-625) WILL FAIL OPEN ON LOSS OF INSTRUMENT AIR PRESSURE.

    • x ***x ** x x x x
  • x x x
  • x
  • x '* x x x ********x ****x **

10 Restore RHR Flow:

a. Start one RHR pump
b. At least one RHR pump - RUNNING b. Go to Step 10d.
c. Establish RHR flow - WITHIN c. Manually adjust RHR flow as LIMITS OF TABLE BELOW necessary.

RCS STATUS MAXIMUM RHR FLOW RCS LEVEL - ANY 3000 gpm LEVEL ABOVE 18" RCS LEVEL < 18" 1000 GPM RCS LEVEL < 10" 800 GPM RCS LEVEL < 6" 500 GPM

d. RHR flow - RESTORED d. IF RCS level greater than 64 inches, THEN go to AP-RHR.1, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
e. Place RHR Hx bypass valve, HCV-626, controller in AUTO at desired flowrate
f. Open RHR pump flow control valves as necessary to stabilize RCS temperature

~ HCV-624

~ HCV-625

g. Check core exit T/Cs - STABLE OR g. Start another RHR pump or DECREASING increase RHR flow to establish required RCS cooling. DO NOT exceed RHR flow limits from table above.

V I W U

"'g ~

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 10 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED ll Check AFW Pump Status:

a. AFW pumps - ANY RUNNING a. Go to Step 12.

I

b. Both S/G levels - AT DESIRED b. Continue with Step 12. WHEN LEVEL desired S/G levels established, THEN do Step llc.
c. Stop running AFW pumps and place switches in PULL STOP 12 Evaluate RCS Conditions:
a. Check RCS status: a. IF RCS is open to atmosphere, THEN go to Step 17.

o RCS - CLOSED o RCS pressure - GREATER THAN ATMOSPHERIC

b. Verify RCP ¹1 seal D/Ps b. IF any RCP running with ¹1 seal GREATER THAN 220 PSID D/P less than 220 psid, THEN stop affected RCP.

k, W1 S

Pl

. ~'Tp C

~I

)

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 1 P-ELEC.3 350'F) PAGE 11 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check Charging Pump Suction Aligned To VCT:

a. VCT level - GREATER THAN 20% a. IF VCT level can NOT be maintained greater than 5%, THEN perform the following:
1) Ensure charging pump suction aligned to RWST o LCV-112B open o LCV-112C closed
2) Continue with Step 14. WHEN VCT level greater than 20%,

THEN do Step 13b.

b. Verify charging pumps aligned to b. Manually align valves as VCT necessary.

o LCV-112C open o LCV-112B closed 14 Check Charging Pumps ANY IF charging pumps required, THEN CHARGING PUMP RUNNING perform the following:

a. Verify charging to loop B cold leg, AOV-294, open.
b. Verify charging flow control valve, HCV-142, open as necessary.
c. IF desired, THEN place letdown pressure controller, PCV-135, in MANUAL.
d. Start one charging pump (75 kw each pump).
e. Increase charging pump speed and control PCV-135 as necessary to control PRZR pressure or level.

EOP: TtiLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 1 P-ELEC.3 350'F) PAGE 12 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Monitor RCS Pressure:

a. Pressure - LESS THAN 390 PSIG a. IF RCS is solid, THEN control charging and letdown pressure control valve (PCV-135) as necessary to stabilize RCS pressure.

IF PRZR bubble established, THEN operate normal or auxiliary spray to decrease pressure.

b. Pressure - STABLE b. Stabilize RCS pressure using appropriate means.

~ Charging

~ Letdown

~ PCV-135 (solid)

~ Normal spray

~ Auxiliary spray

~ PRZR heaters 16 Check PRZR Level:

a. Narrow range level - ON SCALE a. IF RCS is solid, THEN go to Step 17.
b. Level - TRENDING TO PROGRAM b. Adjust charging pump speed as necessary to control PRZR level.

17 Monitor RCS Temperature

a. Core exit T/Cs - STABLE OR a. Adjust RCS cooling as necessary DECREASING and return. to Step 3.

~ S/G steaming

~ S/G feeding

~ RHR cooling

b. Go to Step 26

U I O'I g5 1.i I

l 1

EOP: TITLE:

REV 1 P-ELEC.3 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 350'F) PAGE 13 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check AFW System Status:

a. Verify TDAFW pump steam supply a. IF S/Gs providing heat sink, valves in PULL STOP THEN perform the following:
1) Verify adequate MDAFW flow.
2) Pull stop TDAFW pump.
3) Adjust AFW flow as necessary to stabilize S/G level and RCS temperature.
b. Verify MDAFW valves closed

pump crosstie b. Ensure at least one off. IF two pumps MDAFW pump required, THEN close both MDAFW pump crosstie valves.

17'tart

~ MOV-4000A

~ MOV-4000B 19 Check Any S/G Level GREATER MDAFW pumps as necessary to THAN restore S/G level.

20 Check RCS Pressure GREATER Increase RCS pressure to greater THAN 300 PSIG than 300 psig. IF RCP ¹1 seal D/P can NOT be maintained greater than 220 psid, THEN trip any running RCP.

21 Check RCP Status ANY RCP Verify natural circulation (Refer RUNNING to Attachment NC). IF natural circulation NOT verified, THEN increase dumping steam.

+11,

~C'

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 1 P-ELEC.3 350'F) PAGE 14 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 22 Monitor RCS Temperature Control S/G ARVs to stabilize RCS STABLE OR DECREASING temperature. IF S/G ARVs do NOT provide adequate cooling, THEN perform the following:

a. Initiate S/G blowdown from both S/Gs.
b. Maintain both S/G levels stable by controlling AFW flow.

23 Check CVCS Operation:

a. Charging pumps - AT LEAST ONE a. Perform the following:

RUNNING

1) Start charging pumps as necessary.
2) Establish greater than 20 gpm charging line flow.
b. Check letdown indications: b. Perform the following:

o Check PRZR level - GREATER 1) Close loop B cold leg to THAN 13% REGEN Hx, AOV-427.

o Letdown flow - APPROXIMATELY 2) Close letdown orifice valves 40 GPM (AOV-200A, AOV-200B, and AOV-202) o Letdown flow - STABLE

3) IF PRZR level greater than 13%, THEN go to Step 24. IF NOT, THEN continue with Step 26. WHEN PRZR level greater than 13%, THEN do Steps 24 and 25.
c. Adjust charging pump speed and HCV-142 as necessary to level and labyrinth seal D/P restore'RZR
d. Go to Step 25

I q 4'hd C

EOP: TITLE:

REV: 1 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3 350'F) PAGE 15 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Steps 24 and 25 may be performed concurrently.

24 Establish Normal Letdown: Perform the following steps in sequence to establish excess

a. Establish charging line flow to letdown:

REGEN Hx - GREATER THAN 20 GPM o Place excess letdown divert

b. Verify the following switches in valve, AOV-312, to NORMAL CLOSE:

o Ensure CCW from excess letdown

~ Letdown orifice valve open, AOV-745 (AOV-200A, AOV-200B, and AOV-202) o Ensure RCP seal return isolation

~ Loop B cold leg to REGEN Hx valve open, MOV-313 AOV-427 o Open excess letdown isolation

c. Place letdown controllers in valve, AOV-310 MANUAL at 40% open o Slowly open HCV-123 to maintain

~ TCV-130 excess letdown temperature less

~ PCV-135 than 195 'F and pressure less than 100 psig

d. Open AOV-427
e. Open letdown orifice valves as necessary
f. Place TCV-130 in AUTO at 105'F
g. Place PCV-135 in AUTO at 250 psig
h. Adjust charging pump speed and HCV-142 as necessary

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW= REV: 1 P-ELEC.3 350'F) PAGE 16 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 25 Verify PRZR Heaters Restored: IF PRZR heaters required, THEN perform the following:

o PRZR proportional heater breaker CLOSED a. Verify adequate D/G capacity available for PRZR heaters (400 o PRZR backup heater breaker kw each bank).

RESET/IN AUTO

b. Reset and close PRZR proportional heater breaker if necessary.
c. Reset PRZR backup heater breaker and return to AUTO if necessary.

IF on natural circulation and at least 100 kw of PRZR heaters can NOT be restored within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, THEN be on RHR within an additional 6 hours. (Refer to Technical Specification 3.1.1.5)

NOTE: Check Tech Spec section 3.7 for limiting conditions for operation.

26 Restore Normal Electric System Alignment:

a. Verify circuit 767 and/or 751 a. Continue with Step 28. WHEN AVAILABLE offsite power available, THEN do Steps 26b, c, d and 27.
b. Restore. power to 12A and/or 12B bus (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER)
c. Verify all emergency AC bus c. Restore emergency AC busses to normal feed breakers - CLOSED normal power supply (Refer to ER-ELEC.1, RESTORATION OF

~ Bus 14 OFFSITE POWER)

~ Bus 16

~ Bus 17

~ Bus 18

d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)

~ ~

cJ w

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 1 P-ELEC. 3 350'F) PAGE 17 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 27 Check Started:

lf An RCP Should Be

a. Check the following: a. Go to Step 28.

o Both RCPs - OFF o RCP operation - DESIRED

b. RCS pressure - APPROXIMATELY b. Control PRZR heaters and/or 325 PSIG charging pump speed as necessary to restore RCS pressure.
c. Check PRZR level - LESS THAN 38% c. Verify S/G temperature (obtained locally in CNMT at S/G handhole) less than RCS cold leg temperature. IF NOT, THEN go to Step 28.
d. Try to start an RCP d. IF an RCP can NOT be started, THEN continue to monitor natural
1) Establish conditions for circulation conditions (Refer to starting an RCP Attachment NC).

a) Bus 11A or 11B energized b) Refer to Attachment RCP START

2) Start one RCP 28 Check RCS Temperature Adjust RCS cooling as necessary.

STABLE OR DECREASING

~ S/G steaming

~ S/G feeding

~ RHR cooling

~ % ~

Vi t>

EOP: 'f I TLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 1 P-ELEC.3 350'F) PAGE 18 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 29 Establish Normal Shutdown Alignment:

a. Verify turning gear oil pump a. IF turbine oil system operation RUNNING required, THEN perform the following:
1) Manually start turning gear oil pump (42 kw).
2) Dispatch AO to place turbine on turning gear if desired.
b. Verify main generator b. Perform the following:

DEPRESSURIZED

1) Manually start the HP seal oil backup pump
2) Dispatch AO to locally perform the following:

o Verify proper operation of the seal oil system (Refer to T-34B, GENERATOR SEAL OIL SYSTEM NORMAL OPERATION).

o Ensure bearing drain vapor extractor running.

o Ensure main lube oil reservoir vapor extractor running.

c. Check RCS temperature - LESS c. Perform the following:

THAN 135'F

1) Ensure one Rx compartment cooling fan running (23 kw) .
2) Ensure one control rod shroud fan running (45 kw).
d. Dispatch AO to start waste gas compressor as necessary

kit< I 7t C

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 19 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 30 Restore Equipment Alignment:

a. Verify at least 1 CNMT recirc a. Start CNMT recirc fans as fan - RUNNING necessary'(240 kw each).
b. Check radiation monitoring, b. Perform the following:

systems:

1) Restore sample pumps and o CNMT vent sample pump radiation monitors as RUNNING necessary.

o Plant vent sample 2) Restart or ifpurge pump CNMT RUNNING mini-purge desired.

o All area and process monitors operating as required

c. Verify annunciator L-l, AUX BLDG c. IF bus 11A or 11B energized, VENT SYSTEM CONTROL PANEL THEN dispatch AO to restore AUX EXTINGUISHED BLDG ventillation (Refer to T-35A, AUX AND INTERMEDIATE BUILDING VENTILLATION STARTUP AND SHUTDOWN)
d. Verify service air compressor .- d. Dispatch AO to locally start RUNNING service desired.

air compressor if

e. Verify motor fire pump breaker e. Close motor fire pump breaker.

CLOSED

f. Check control board annunciator f. Perform alarm response panels - ALARM STATUS VALID FOR procedures for unexpected alarms.

PLANT CONDITIONS

g. Verify control board valve g. Manually align valves as alignment - NORMAL (Refer to necessary.

0-6.13, DAILY SURVEILLANCE LOG)

EOP: LITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 20 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 31 Check Status Of DC System Loads:

a. Verify emergency DC lube oil a. Manually stop emergency DC lube pump - OFF oil pump.
b. Verify TDAFW pump DG oil pump b. Perform the following:

OFF

1) Ensure TDAFW AC oil pump running.
2) Stop TDAFW pump DC oil pump.
c. Verify both MFW pump DC oil c. Stop MFW pump DC oil pumps.

pumps - OFF 32 Verify Offsite Power Continue attempts to restore RESTORED offsite power (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).

33 Notify Higher Supervision NOTE: Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements.

34 Return To Procedure Or Guidance In Effect

-END-

/

0 R

W'4 f3 I

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 1 P-ELEC.3 350'F) PAGE 1 of 1 AP-ELEC.3 APPENDIX LIST TITLE PAGES

1) FIGURE MIN SUBCOOLING
2) ATTACHMENT RCP START
3) ATTACHMENT NC
4) ATTACHMENT D/G STOP

<<Y

~ vari Ef

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV' P-ELECT 3 350'F) PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin = Saturation Temperature From Figure Below [-] Core Exit T/C Indication RC S PRESSURE (PSIG) 2500 2400 2300 RCS PRESSURE INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 700 INADE(UATE SUBCOOLING 600 REGION ADVERS E CNMT 500 400 300 200 NORMAL CNMT TEMPERATURE 100 INCREMENTS 10'F n

0 200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE ('F)

i' EOP: TITLE:

REV 12 ECA-0 1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER G

RESP NSIBLE MANAGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

EOP: '!TLE: REV: 12 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED of 20 PAGE 2 A. PURPOSE - This procedure provides actions to use normal operational systems to stabilize plant conditions following restoration of AC emergency power.

B. ENTRY CONDITIONS/SYMPTOMS

l. ENTRY CONDITIONS This procedure is entered from:
a. ECA-O.O, LOSS OF ALL AC POWER, when AC emergency power is restored and SI is not required.

EOP: T1TLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0.1 REQUIRED PAGE 3 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION IF AN SI SIGNAL IS ACTUATED PRIOR TO PERFORMING STEP 10 OF THIS PROCEDURE, THEN SI SHOULD BE RESET TO PERMIT MANUAL LOADING OF EQUIPMENT ON AN AC EMERGENCY BUS.

NOTE: o CSFSTs should be monitored for information only. FR procedures should not be implemented prior to completion of Step 10.

o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ R/hr.

1 Check RCP Seal Isolation Status:

a. RCP seal injection needle valves a. Dispatch AO with key to RWST CLOSED gate to locally close valves before starting charging pump.

~ V-300A

~ V-300B b, RCP CCW return valves - CLOSED b. IF valves open or position not known, THEN check CCW pump

~ MOV-759A status:

~ MOV-759B

1) IF pump running, THEN go to Step 2 ~
2) IF pump NOT running, THEN manually close valves.

IF valve(s) can NOT be closed, THEN place switches for RCP thermal barrier valves to CLOSE. CCW'utlet

~ AOV-754A

~ AOV-754B

I EOP: TITLE SI REV: 12 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED PAGE 4 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2 Check CI Annunciator A-26, Per form the following:

CONTAINMENT ISOLATION EXTINGUISHED a. Depress CI reset pushbutton

b. Verify annunciator A-26, CONTAINMENT ISOLATION, extinguished.

EOP: TITLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0 ' REQUIRED PAGE 5 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Establish IA to CNMT;

a. Verify non-safeguards busses a. Perform the following:

energized from offsite power

1) Close non-safeguards bus tie o Bus 13 normal feed - CLOSED breakers:

-OR- ~ Bus 13 to Bus 14 tie

~ Bus 15 to Bus 16 tie o Bus 15 normal feed - CLOSED

b. Check at least two SW pumps b. Manually start SW pumps as power RUNNING supply permits (258 kw each).

IF less than two SW pumps running, THEN go to Step 4.

c. Verify turbine building SW c. Manually align valves.

isolation valves - OPEN

~ MOV-4613 and MOV-4670

~ MOV-4614 and MOV-4664

d. Start at least two air d. IF air compressors can NOT be compressors (75 kw each) started, THEN dispatch AO to locally reset compressors as necessary.
e. Check IA supply: e. Perform the following:

o Pressure - GREATER THAN 1) Continue attempts to restore 60 PSIG IA (Refer to AP-IA.1, LOSS OF INSTRUMENT AIR).

o Pressure - STABLE OR INCREASING 2) Continue with Step 6. WHEN IA restored, THEN do Steps 3f through 5.

f. Reset both trains of XY relays for IA to CNMT (AOV-5392) if necessary
g. Verify IA to CNMT AOV-5392 - OPEN

EOP: , TlTLK:

REV 12 ECA-F 1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 6 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION THE LOADS PLACED ON THE ENERGIZED AC EMERGENCY BUS SHOULD NOT EXCEED THE CAPACITY OF THE POWER SOURCE.

4 Manually Load Following Equipment On AC Emergency Busses:

a. Start one CCW pump (124 kw) b..Energize MCCs as power supply permits

~ MCC A from Bus 13

~ MCC B from Bus 15

~ MCC E from Bus 15

~ MCC F from Bus 15

c. Verify instrument bus D- c. Restore power to instrument bus ENERGIZED D from MCC B or MCC A (maintenance supply).
d. WHEN bus 15 restored, THEN reset control room lighting
e. Start at least one CNMT RECIRC fan
f. Restore Rx head cooling as power supply permits:
1) Start one Rx compartment '1) Perform the following:

cooling fan (23 kw each) o Dispatch AO to reset UV relays at MCC C and MCC D.

o Manually start one fan as power supply permits.

(23 kw)

2) Start both control rod shroud 2) Manually start at least one fans (45 kw each) fan (45 kw)
g. Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1)

EOP $ TITLE$

SI REV: 12 ECA-0 ' LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED PAGE 7 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 5 Check If Charging Flow Has Been Established:

a. Charging pumps - ANY RUNNING a. Perform the following:
1) Ensure seal injection needle valves to both RCPs isolated:

~ RCP A, V-300A

~ RCP B, V-300B

2) Ensure HCV-142 open, demand at Oa.
b. Charging pump suction aligned to b. Manually align valves as RWST' necessary.

o LCV-112B - OPEN IF LCV-112B can NOT be opened, THEN perform the following:

o LCV-112C - CLOSED

1) Verify charging pump A NOT running and place in PULL STOP.
2) Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).
3) WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
c. Start charging pumps (75 kw each) as necessary and adjust charging flow to restore PRZR level

EOP TITLE$

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0.1 REQUIRED PAGE 8 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

  • 6 Monitor SI Initiation Criteria:
a. RCS subcooling based on core a. Go to ECA-0.2, LOSS OF ALL AC exit T/Cs - GREATER THAN O' POWER RECOVERY WITH SI REQUIRED, USING FIGURE MIN SUBCOOLING Step l.
b. PRZR level - GREATER THAN 5% b. Control charging flow to

[30% adverse CNMT] maintain PRZR level.

IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step l.

7 Check PRZR Level GREATER Control charging flow as necessary.

THAN 134'404 FOR ADVERSE CONTAINMENT]

EOP: TITLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0.1 REQUIRED PAGE 9 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).

o IF S/G NR LEVEL DECREASES TO LESS THAN 5% [25% ADVERSE CNMT] AND FEED FLOW IS LESS THAN 200 GPM, THEN THE MDAFW PUMPS SHOULD BE MANUALLY LOADED ON AC EMERGENCY BUS TO SUPPLY WATER TO THE S/G(S).

NOTE: o If MDAFW pump operation is not required, pump switches should be maintained in PULL-STOP to prevent automatic start.

o TDAFW pump flow control valves fail open on loss of IA.

  • 8 Monitor Intact S/G Levels:
a. Narrow range level - GREATER a. Maintain total feed flow greater THAN 5% [25% adverse CNMT] than 200 gpm until narrow range level greater than 5% [25%

adverse CNMT] in at least one S/G.

IF feed flow less than 200 gpm, THEN perform the following:

1) Verify MDAFW pump discharge valves open.

~ MOV-4007

~ MOV-4008

2) Manually start MDAFW pumps as necessary (228 KW each)..
b. Control feed flow to maintain narrow range level between 17a

[25$ adverse CNMT] and 52%

EOP: T1TLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0. 1 REQUIRED PAGE 10 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Establish S/G Pressure Control:

a. Adjust S/G ARV controllers to maintain existing S/G pressure
b. Verify S/G ARV controllers in AUTO
c. Dispatch AO to perform Attachment SD-2 CAUTION IF AN SI SIGNAL IS ACTUATED AFTER THE SI PUMP SWITCHES ARE PLACED IN AUTO, THEN ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, SHOULD BE PERFORMED.

NOTE: Safeguards pump switches should be placed in AUTO only if associated bus is energized.

10 Place Following Pump Switches In AUTO:

~ SI pumps

~ RHR pumps

~ CNMT spray pumps

EOP: T1TLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0. 1 REQUIRED PAGE 11 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: FR procedures may now be implemented as necessary.

ll Verify CCW Hx:

Adequate SW Flow To

a. Verify at least two SW pumps a. Manually start pumps as power RUNNING supply permits (258 kw each).

IF less than two SW pumps can be operated, THEN go to Step 19.

b. Verify AUX BLDG SW isolation b. Establish SW to AUX BLDG (Refer valves - OPEN to Attachment AUX BLDG SW).

~ MOV-4615 and MOV-4734 Continue with Step 19. WHEN SW

~ MOV-4616 and MOV-4735 restored to AUX BLDG, THEN do Steps. 11c through 18.

c, Verify CNMT RECIRC fan c. Dispatch AO to locally throttle annunciator C-2, HIGH flow to CCW Hx to between TEMPERATURE AIARM - EXTINGUISHED 5000 gpm and 6000 gpm total flow.

12 Check Operation If Normal Can Be CVCS Established

a. Verify IA restored: a. Continue with Step 19. WHEN IA restored, THEN do Steps 12 o IA to CNMT (AOV-5392) - OPEN through 18.

o IA pressure - GREATER THAN 60 PSIG

b. Charging pump - ANY RUNNING b. Continue with Step 19. WHEN any charging pump running, THEN do Steps 13 through 18.

EOP: TITLE 0 SI REV: 12 ECA-F 1 LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED PAGE 12 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o RCP THERMAL BARRIER COOLING SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE POTENTIAL INTRODUCTION OF STEAM INTO THE CCW SYSTEM AND THERMAL SHOCK TO RCP.

o RCP SEAL INJECTION SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE RCP THERMAL STRESSES AND POTENTIAL SEAL FAILURES.

o AS PART OF SUBSEQUENT RECOVERY ACTIONS, RCP(S) SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION UNLESS REQUIRED BY AN INADEQUATE CORE COOLING SITUATION.

I NOTE: SW should be aligned to CCW Hxs before restoring RCP seal cooling.

13 Check RCP Cooling: Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).

a. Check CCW to RCPs:

o Annunciator A-7, RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED

b. Check RCP seal injection:

o Labyrinth seal D/Ps - GREATER THAN 15 INCHES OF WATER

-OR-o RCP seal injection flov to each RCP - GREATER THAN 6 GPM

EOP; T!TLE:

SI REV: 12 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED PAGE 13 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 14 Check If Seal Return Flow Should Be Established:

a. Verify RCP ¹1 seal outlet a. Go to Step 15.

temperature - LESS THAN 235'F

b. Verify RCP seal outlet valves- b. Manually open valves as OPEN necessary.

~ AOV-270A

~ AOV-270B

c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313 if necessary
d. Open RCP seal return isolation d. Perform the following:

valve MOV-313

1) Place MOV-313 switch to OPEN.

'. 2) Dispatch AO with key to RWST gate to locally open MOV-313.

e. Verify RCP ¹1 seal leakoff flow Close the affected RCP seal LESS THAN 6.0 GPM discharge valve:

~ RCP A, AOV-270A

~ RCP B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 15.

f. Verify RCP ¹1 seal leakoff flow. f. Refer to AP-RCP.1, RCP SEAL

-. GREATER THAN 0.8 GPM MALFUNCTION.

EOP! TlTLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0.1 REQUIRED PAGE 14 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Verify PRZR Level GREATER Continue with Step 19. WHEN PRZR THAN 134 [404 adverse CNMT] level increases to greater than 13%

[40% adverse CNMT], THEN do Steps 16 through 18.

16 Establish Normal Letdown: IF RCP seal return has been established, THEN establish excess

a. Establish charging line flow to letdown as follows:

REGEN Hx - GREATER THAN 20 GPM o Place excess letdown divert

b. Pl'ace the following switches to valve, AOV-312, to NORMAL.

CLOSE' o Ensure CCW from excess letdown Letdown orifice valves open, (AOV-745).

(AOV-200A, AOV-200B, and AOV-202) o Open excess letdown isolation

~ AOV-371, letdown isolation valve AOV-310, valve

~ AOV-427, loop B cold leg to o Slowly open HCV-123 to maintain REGEN Hx excess letdown temperature less than 195'F and pressure less

c. Place letdown controllers in than 100 psig.

MANUAL at 40% open o Adjust charging pump speed as

~ TCV-130 necessary.

~ PCV-135 IF RCP seal return NOT established,

d. Reset both trains of XY relays THEN consult TSC to determine if for AOV-371 and AOV-427 if excess letdown should be placed service.

in necessary

e. Open AOV-371 and AOV-427
f. Open letdown orifice valves as necessary
g. Place TCV-130 in AUTO at 105'F
h. Place PCV-135 in AUTO at 250 psig
i. Adjust charging pump speed and HCV-142 as necessary

EOP: TITLE:

SI REV:

LOSS OF ALL AC POWER RECOVERY WITHOUT ECA-0. 1 REQUIRED 12"'AGE 15 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Check VCT Makeup System:

a. Verify the following'. a. IF VCT auto makeup can NOT be established, THEN manually
1) Boric acid and RMW flow control VCT level, (Refer to control valves - SET FOR ER-CVCS.1, REACTOR MAKEUP REQUIRED CSD CONCENTRATION CONTROL MALFUNCTION).

(Refer to Figure SDM)

2) At least one BA and RMW pump in AUTO
3) RMW mode selector switch in AUTO
4) RMW control armed - RED LIGHT LIT
b. Check VCT level b. Manually increase VCT makeup flow as follows:

o Level - GREATER THAN 20%

1) Ensure BA transfer pumps and

-OR- EHN pumps running. IF NOT, THEN dispetch AO tc reset o Level - STABLE OR INCREASING MCC C and MCC D UV lockouts as necessary.

2) Place RMW flow control valve HCV-111 in MANUAL and increase RMW flow.
3) Increase boric acid flow as necessary.

IF VCT level can NOT be restored, THEN go to Step 19.

EOP: TITLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0. 1 REQUIRED PAGE 16 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check Charging Pump Suction Aligned To VCT:

a. VCT level - GREATER THAN 20% a. IF VCT level can NOT be maintained greater than 5%, THEN perform the following:
1) Ensure charging pump suction aligned to RWST:

o LCV-112B open o LCV-112C closed

2) Continue with Step 19. WHEN VCT level greater than 40%,

THEN do Step 18b.

b. Verify charging pumps aligned to b. Manually align valves as VCT necessary.

o LCV-112C - OPEN o LCV-112B - CLOSED 19 Control PRZR Level:

a. Check letdown - IN SERVICE a. Stop and start charging pumps as necessary to control PRZR level.
b. Maintain PRZR level between 13%

[40% adverse CNMTj and 50%

EOP: TlTLF.:

REV 12 LOSS OP ALL AC POWER RECOVERY WITHOUT SI ECA-0. 1 REQUIRED PAGE 17 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o If auxiliary spray is in use, spray flow may be increased by valves.

closing normal charging valve AOV-294 and normal PRZR spray o When using a PRZR PORV select one with an operable block valve.

20 Establish PRZR Pressure Control:

a. Check letdown - IN SERVICE a. Perform the following:
1) Use PRZR heaters and one PRZR PORV to maintain RCS pressure.

IF IA NOT available, THEN Refer to Attachment N2 PORVS to operate PORV.

2) Go to Step 21.
b. Use PRZR heaters and auxiliary spray valve (AOV-296) to maintain RCS pressure 21 Verify Natural Circulation: Increase dumping steam from intact S/Gs.

o RCS subcooling based on core exit T/Cs - GREATER THAN O' USING FIGURE MIN SUBCOOLING o S/G pressures - STABLE OR DECREASING o RCS hot leg temperatures STABLE OR DECREASING o Core exit T/Cs - STABLE OR DECREASING o RCS cold leg temperatures - AT SATURATION TEMPERATURE FOR S/G PRESSURE

EOP,: TLTLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0 1 REQUIRED PAGE 18 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

'OTE: Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.

22 Check If Source Detectors Should Range Be Energized:

a. Source range channels  ; a. Go to Step 22e.

DEENERGIZED

b. Check intermediate range flux- b. Perform the following:

EITHER CHANNEL LESS THAN 10 10 AMPS 1) IF neither intermediate range channel is decreasing THEN initiate boration.

2) Continue with Step 23. WHEN flux is LESS THAN 10 amps on any operable channel, THEN do Steps 22c through e.
c. Check the following: c. Continue with Step 23. WHEN either condition met, THEN do o Both intermediate range Steps 22d and e.

channels - LESS THAN 10 10 AMPS

-OR-o Greater than 20 minutes since reactor trip

d. Verify source range detectors d. Manually energize source range ENERGIZED detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).

IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION and go to Step 23.

e. Transfer Rk-45 recorder to one source range and one intermediate range channel

EOP: TITLE:

SI REV: 12 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED PAGE 19 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 23 Verify Adequate Shutdown Margin:

a, Direct RP to sample RCS and PRZR liquid for boron concentration

b. Verify boron concentration- b. Borate as necessary.

'REATER THAN REQUIREMENTS OF FIGURE SDM 24 Maintain Stable Plant Conditions

a. RCS pressure - STABLE a. Control PRZR heaters and auxiliary spray if available.
b. RCS temperature - STABLE b. Control dumping steam as

. necessary.

c. PRZR level - BETWEEN 13% [40% c. Control charging as necessary.

adverse CNMT] and 50%

d. Intact S/G level - BETWEEN 17% d. Control S/G feed flow as

[25% adverse CNMT] and 52%  !

necessary.

  • 25 Monitor SI Initiation Criteria:
a. RCS subcooling based on core a. Go to ECA-0.2, LOSS OF ALL AC exit T/Cs - GREATER THAN O' POWER RECOVERY WITH SI REQUIRED, USING FIGURE MIN SUBCOOLING Step l.
b. PRZR level - GREATER THAN 5% b. Control charging flow to

[30$ adverse CNMT] maintain PRZR level.

IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step l.

EOP: TITLE:

REV: 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0.1 REQUIRED PAGE 20 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 26 Try To Restore Offsite Power Maintain. plant condition stable To All AC Busses (Refer to using AC emergency power.

ER-ELEC.1, RESTORATION OF OFFSITE POWER) 27 Determine Circulation IfCooldown Natural Is Required:

a. Consult plant staff to determine a. IF cooldown NOT required, THEN if RCS cooldown is necessary go to 0-3, HOT SHUTDOWN WITH XENON PRESENT.
b. At least one RCP - OPERABLE b. Go to ES-0.2, NATURAL CIRCULATION COOLDOWN ~
c. Go to 0-2.2, PLANT SHUTDOWN FROM HOT SHUTDOWN TO COLD SHUTDOWN

-END-

EOP: TITLE:

SI REV: 12 ECA-0. 1 LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED PAGE 1 of 1 ECA-0. 1 APPENDIX LIST TITLE PAGES

1) FIGURE MIN SUBCOOLING,
2) FIGURE SDM
3) ATTACHMENT SD-1
4) ATTACHMENT SD-2
5) ATTACHMENT N2 PORVS
6) ATTACHMENT SEAL COOLING
7) ATTACHMENT AUX BLDG SW

EOP: T1TLE:

REV: 12 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: .Subcooling Margin = Saturation Temperature From Figure Below t-] Core Exit T/C Indication RC S PRESSURE (PSIG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 1400 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 INADEQUATE 700 SUBCOOLING 600 ADVERSE CNMT REGION 500 400 300 200 NORMAL CNMT TEMPERATURE INCREMENTS 10'F 100 0

200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE ( F)

EOP: TlTLE:

REV 12 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0.1 REQUIRED PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.

o To obtain core burnup, use PPCS point ID BURNUP.

BORON CONCENTRATION (PPH) 1800 BORON INCREHENTS 20 PPH 1600 1400 ADEQUATE SDH 1200 100 PPH CONS ERVATISH INCLUDED 1000 800 600 400 BORATE BURNUP 200 INCREHENTS 200 HWD/HTU 2000 4000 6000 8000 '0000 12000 14000 16000 18000 CYCLE 26 BURNUP (HWD/HTU)