{{#Wiki_filter:ATTACH1L1ENT | {{#Wiki_filter:ATTACH1L1ENT 2 TO AEP:NRC:0659F PROPOSED CHANGES TO THE DONALD C. COOK NUCLEAR PLANT UNIT NOS. 1 AND 2 TECHNICAL SPECIFICATIONS ogog pqzooa~~ 8 oos~~, | ||
ADMINISTRATIVE | ADOGK pOg ~ | ||
ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates. The Chairman or Acting Chairman"shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility. | |||
REVIEW 6.5.2.7 The NSDRC is responsible for assuring'ithat independent** reviews of the following are performed: | |||
a~ The safety evaluations for 1),,changes to procedures, equipment or systems and 2) tests or experiments compl'eted under 'the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety, question. | |||
a~ | : b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59. | ||
b. | C~ Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59. | ||
Significant operating abnormalities | : d. Proposed changes to Technical Specifications or this Operating License. | ||
* | : e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance. | ||
D.C.COOK | Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety. | ||
g All REPORTABLE EVENTS. | |||
: h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, and components. | |||
* Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest. | |||
** Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation. | |||
D. C. COOK UNIT 1 6-10 ~ | |||
a~ | Amendment No. | ||
b. | |||
Significant operating abnormalities | l J~ | ||
* | V 4 \ | ||
D.C.COOK- | II II i | ||
' | ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates. The Chairman or Acting Chairman shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility. | ||
REVIEW 6.5.2.7 The NSDRC is responsible for assuring that independent** reviews of the following are performed: | |||
Clarifications | a~ The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question. | ||
12)Consulting | : b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59. | ||
co Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59. | |||
Mr.R.W.Jurgensen, | : d. Proposed changes to Technical Specifications or this Operating License. | ||
Mr.R.F.Hering, | : e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance. | ||
Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety. | |||
gi All REPORTABLE EVENTS. | |||
~ | : h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structuresi systems, and components. | ||
()) | * Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest. | ||
Atthchment 3, | ** Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation. | ||
D. C. COOK UNIT 2 6-10 Amendment No. | |||
- | C 'P .g1 p-" | ||
~ 1 W | |||
He- | ~ 'p,y n I | ||
-.A. | ."f I, } | ||
I | |||
ATTACHMENT 3 TO AEP:NRC:0659F AMERICAN ELECTRIC POMER SERVICE CORPORATION | |||
'k AND DONALD C. COOK NUCLEAR'PLANT ORGANIZATION | |||
l f | |||
1, | 'E ' | ||
, page 1 The titles of the Regular Members of the NSDRC are given in Attachment 2 to our letter AEP:NRC:0659C, request for change to Technical Specification 6.5.2.2., Unit Nos. 1 and 2. Eleven of the fourteen members are identified by number on the organization chart in this attachment. | |||
Clarifications of the positions of the other members are as follows: | |||
: 2) Executive Assistant to the President, I&MECo. Mr. G. E. LeMasters, who currently holds this position, was Assistant Manager of the Kanawha River Plant from 1959 to 1966 and Manager of the Glen Lyn Plant from 1966 to 1969, when he was appointed to his present position. | |||
: 12) Consulting Engineer, Nuclear Operations Division. Mr. R. W. | |||
Jurgensen, who currently holds this position, was Manager of the D. C. | |||
--"FUNCTIONAL RESPONSIBILITY ASSISTANT | Cook Nuclear Plant from 1968 to 1977. He was Manager of the Nuclear Operations Division (formerly called the Nuclear Engineering Division) from 1977 to 1982, and Assistant Vice President, Nuolear Operations, from 1980 to 1982. | ||
: 14) Vice President, Fossil Plant Operations. Mr. R. F. Hering, who currently holds this position, was Assistant Vice President of the Mechanical Engineering Division from 1973 to 1977 and Vice President of that Division from 1977 to 1984, when he was named to his present position. | |||
Several current members of the NSDRC have served continually on the committee since it was required by the Technical Specifications in 1974: John E. Dolan, H. N. Scherer, Jr., R. W. Jurgensen, R. F. Hering, R. W. Reeves, and J. R. Struyk. Mr. LeMasters was an alternate member of the committee from 1974 to 1984, when he has made a regular member. Their experience and presence on the committee ensure the continuity of the review process. | |||
J C II ~ ~ 1 4 | |||
(~ | 4 I P | ||
V ~ ha '-VUC 11 | |||
~ | |||
MAINTENANCE | 4 O 1 ~" | ||
----Functional Responslbllily ASSISTANT Pt. | ~ 11 ~ I C I | ||
a U C | |||
---Funcllonel Responslblllly | lh | ||
~ 4 4 I 4 RU P | |||
~ U I,I,P 4 | |||
TECHNICAL ENGINEERING | 'I R | ||
SECUBITT/ | '4 C | ||
STANDARDS SUPERVISOR | ~ ~ ~ 1 Qll I' | ||
---- | |||
TECHNICAL- | CHAIRMANOF THE SOARD VICE CHAIRMAN ENGINEERING 6 ~ rt Dl CONSTRUCTION K | ||
EX. VICE PRESIDENT 6 | |||
CHIEF ENGINEER Qo ~ ~ ~ ~ ~ ~ o~ | |||
OPERATIONS | VICE PRESIDENT NUCLEAR OPERATIONS ll MANAGER OF DUALITYASSURANCE SST. VICE PRESIDENT CONSTRUCTION | ||
( | |||
/ENGINEER}} | 7 SR. VICE PRESIDENT ELECTRICAL ENGINEERING 6 DEPUTY CHIEF ENGINEER SST. VICE PRESIDEN VICE PRESIDENT SSK. VICE PRESIDEN ELECTRICAL PLANT MANAGER ENVIRONMENTAL ENGINEERING MECHANICAL ENGINEERING D.C. COOK PLANK ENGINEERING ADMINISTRATION ENGINEERING DEPARTMENT | ||
()) | |||
ENVIRONMENTAL DIVISION MANAGER MECHANICAL NUCLEAR PLANT DIVISION DEPARTMENT ENGINEERING CIVIL ENGINEERING OPERATIONS CONSTRUCTION MANAGERS SUPERINKENDENKS DIVISION ENGINEERING DIVISION DIVISION DIVISION | |||
()) | |||
SECTION SECTION SECTION SECTION SECTION SECTION SECTION MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS DIVISION MANAGER lP DESIGN ADMINISTRATIVEAND FUNCTIONAL DIRECTION SECTION MANAGERS | |||
~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ TECHNICAL LIAISON AMERICAN ELECTRIC POWER SERVICE CORPORATION ORGANIZATION FOR THE SUPPORT OF THE DONALD C. COOK NUCLEAR PLANT DIVISION MANAGER MATERIALS HANDLING | |||
~, ~ ~ | |||
FUNCTIONAL DIRECTION FOR COOK PLANT ACTIVITIES SECTION NOTES: (1) NOT PART OF AEPSC MANAGERS ORGANIZATION,SHOWN FOR INFORMATION ONLY. | |||
Atthchment 3, page 3 Vice President Nuclear Operations NOD Support C onsulting Staff i2 LE ngineer Manager Manager Manager Manager Nuclear Nuclear Radiological Nuclear Materials Safety h Support Operations 8 Fuel Licensing Management Nuclear 'uclear Radiological Nuclear Materials , Safety 4 " | |||
Support Operations 8 Fuel ," | |||
Licensing Section Section Managemen Section Section Organization of Nuclear Operations Division, AEPSC | |||
Attachment 3, page 4 Donald C. Cook Nuclear Plant Position Clarifications for Members of the PNSRC Plant Manager. Wilbur G. Smith, Jr., who currently holds this position, was hired in December 1,981. Prior to joining the Cook Plant, he held the position of Head Engineer, Nuclear Engineering Department, Norfolk Naval Shipyard from 1974 to 1981. | |||
Assistant Plant Manager, Operations. Bertil A. Svensson, who holds this position, -joined the Cook Plant in September 1969 as Operations Supervisor. He was appointed=Assistant Plant Manager in 1977. An engineer with AEP since 1955, he has worked at Ohio Power's Kammer. Plant and as Lead Startup Engineer-at the Canton, Ohio offices.- He-was assigned to the New York office to assist in the design of the Cook Plant from 1968 to 1969, prior to his transfer to Cook. | |||
I Assistant Plant Manager, Maintenance. -.A. Alan Blind was-promoted- to this position on April 1, 1985. Mr. Blind joined the Cook Plant in January 1976 as a Performance Engineer. He was promoted to Performance Supervising Engineer in 1980 and held this position until being named Technical Superintendent, Engineering in October 1983. | |||
Operations Superintendent. Kenneth R. Baker has held this position since January= 1982; From 1972 through 1980, Mr. Baker was an NRC Inspector and worked as Region III Section Chief in 1980 and 1981 prior to coming to the Cook Plant. From 1969 to 1972 he worked as a Startup Engineer for Combustion Engineering, involved with the construction and testing of Consumers Power's Palisades Plant. He holds a Senior Operator's License. | |||
Technical Superintendent, Engineering. Louis S. Gibson, who has held this position- since April 1985, was formerly employed in'the .Power Plant Projects Department of Consumers Power Company. His prior experience with Consumers extended from 1970-to April 1985-and included engineering, quality assurance) and operations responsibilities at the utility's corporate offices and the Palisades Nuclear Plant,'here he held a Senior Operator's License. | |||
Technical Superintendent, Physical Sciences. Thomas A. Kriesel, who has held this position since October 1983, joined the AEP system=in June- 1968 as a | |||
- Chemist Trainee at Huntington. He was an engineer at Tanners Creek from 1969 to 1971, transfer ring to the Cook Plant as Chemioal Foreman in May 1971. He was promoted to Environmental'Coordinator in April John D. Allard was promoted-to this position on 1976.'aintenance Superintendent. | |||
April 1, 1985. Mr. Allard-became a Cook Plant Maintenance Mechanic in November 1973 and was promoted to Maintenance Supervisor in July 1978. | |||
1,1 V | |||
~ I) II I | |||
),.M | |||
) I)H V | |||
Iy ll II M | |||
V P ~ | |||
~ M gll g (y | |||
* a | |||
, page 5 Plant Radiation Protection Supervisor. David C. Palmer has held this position since August 1977. From 1971 to 1977 he was employed at the Cook Plant as Radiation Protection Supervisor. His previous experience in the health physics field was with the Rural Cooperative Power Assooiation. | |||
Quality Control Superintendent. James F. Stietzel has held this=position since July 1977. He worked in varying technical engineering-assignments with AEPSC, New York, beginning in March 1971. He transferred to the Cook Plant in February 1976 as Quality Assurance Auditor. | |||
<<F I | |||
',',>()IF I I << | |||
A p I, | |||
~I ~ <<g I | |||
~ | |||
~ << | |||
~ | |||
L)I,I -')P | |||
~ fl f ~ << * ~ ~ <<. I~A - X ~ | |||
~" f<<~I <<a << . F<<l | |||
~ 'Ilf I ~ 5"1 P I<< | |||
F | |||
/ | |||
PLANT MANAGER STAFF PAGE 1 or 9 5/22/85 ADMINISTRATIVE RESPONSIBILITY PLANT --"FUNCTIONAL RESPONSIBILITY MANAGER PLANT NUCLEAR ASSISTANT SAFETY REVIEW ASSISTANT PLANT MANAGER COMMITTEE pLaN T MaNAGER MAINTENANCE OPERATIONS (SRO) auauTY TEC HN ICAL TECHNICAL MAINTENANCE PLANNING CONTROL SUPERINTENDENT SUPERINTENDENT ADMINISTRATIVE OPERATIONS SUPEfrINTENDENT SUPERINTENDENT SUPERINTE ENGINEERING PHYSICAL SCIENCE I SUPERINTENDENT SUPERINTENDENT (SRO This is a drawing and blueprint interlace with Planning Department activities. | |||
0 DEPARTMENT: OFFICE ADMINISTRATION/ | |||
Administrative Responsibility SHIFT TECHNICAL ADVISORS | |||
- -Functional Responsibility PAGE 2 ot 9 5/22/85 ASSISTANT PLANT MANAGER ISUPERVISOR L (~l MAINTENANCE I I | |||
I STORES ACCOUNTING AFF ASSISTANT SUPERVISOR SUPERV ISOR A SUPERVISOR(SRO STORES ACCOUNTING ADMINISTRATOR SENIOR SHIFT COOROINATOR TECH. ADVISOR SHIFT | |||
. ADVISOR IRO ENT CNTRL COOROI NATOR EMERGENCY PLANNING C | |||
~ SRO- Senior Reactor Operator License RO- Reactor Operator License | |||
Admlnlstrallve Responslblllly Funcllonel Responslblllly DEPARTMENT: MAINTENANCE PAGE 3 ol9 ASSISTANT 5/2Z/85 PLANT MANAGER MAINTENANCE MAINTENANCE SUPERINTENDENT GENERAL GENERAL GENERAL PRODUCTION SUPERVISOR SUPERVISOR SUPERVISOR CONTROLLER PRODUCTION ENGINEERING PRODUCTION SUPPORT ADMINISTRATIVE MAINTENANCE COMPLIANCE PERFORMANCE SUPERVISOR ENGINEER COORDINATOR UTILITY SENIOR SENIOR SUPERVISOR ADMINISTRATIVE PERFORMANCE COMPLIANCE ENGINEER COORDINATOR | |||
Admlnlsttattve ResponslblHty DEPARTMENT: PLANNING | |||
----Functional Responslbllily ASSISTANT PAGE/ ol 9 Pt.ANT MANAGER 5/22/85 MAINTENANCE PLANNING SUPERINTENDANT STAFF GENERAL MANAGEMENT DESIGN CHANGE ENGINEER ERVtSOR UNIT1- INFORMATION SUPERVISOR OUTAGE PRQIECTS SPECIALIST DESIGN CHA~NGE ADMINIST~RATOR SENIOR OUTAGE PROJECT ENGINEER ASSISTANT DESIGN CHANGE SUPERVtSOR PERFORMANCE ENGINEER-SENIOR DESIGN CHANGE COORDINATOR | |||
Adminislvetlve Responslblllly P.LANT DEPARTMENT: QUALITY CONTROL MANAGER | |||
---Funcllonel Responslblllly PAGE 5 ol 9 5/22/85 I | |||
I ASSISTANT I LANT MANAGER MAINTENANCE I | |||
I I | |||
OUALITY CONTROL SUPERINTENDENT ASSISTANT OUAUTV CONTROL SUPERINTENDENT NOH- DESTRUCTIVE OUALIT'VCONTROL IS I /NPRDS FIRE PROTECTION ADMINISTRATIVE EXAMINATION SUPERVISOR SUPERVISOR COORDINATOR COMPLIANCE SUPERVISOR COORDINATOR SENIOR ASSISTANT ADMINISTRATIVE ISI SUPERVISOR COMPLIANCE COORDIHATOR NRPDS COORDINATOR | |||
Admlnlslrelive RasponslbUlty DEPARTMENT: TECHNICAL ENGINEERING Funcllonel Responslblllly PAGE 6 ol 9 ASSISTANT 5/2 2/85 PLANT MANAGER MAINTENANCE TECHNICAL SUPERINTENDENT ENGINEERING NUCLEAR PERFORMANCE CONTROL OUTAGE STAFF COMPUTER/ | |||
ENGINEERING SUPERVISING INSTRUMENT COORDINATOR ENGIN SECUBITT/ | |||
SUPERVISOR ENGINEER SUPERVISOR STANDARDS SUPERVISOR ADMINISTRATIVE COMPLIANCE PERFORMANCE PERFORMANCE INSTRUMENT ENGINEER COORDINATOR ENGINEER MAINTENANCE COMPUTER SENIOR SENIOR SENIOR SUPERVISOR ANALTST PERFORMANCE PERFORMANCE ADMINISTRATIVE ENGINEER ENGINEER SIMULATOR COMPLIANCE PER FORAIANCE SUPERVISOR COOB 0 INATOB ENGINEER SENIOR ENGINEERIHG ENGINEERING TECI IHOLOGIST TECI%0LOGIST PERFORMANCE SIMULATOR ENGINEER COMPUTER SPECIALIST | |||
I PLA NT ff't MANAGER 0 | |||
Administrative Responsibility | |||
- - - -Funct iona I Responsibility ASSISTANT PLANT DEPARTMENT: TECHNICAL- PHYSICAL SCIENCE PAGE Tel 9 MANAGER-MAINTENANCE 5/22/85 TECHNI C A L SUPERINTENDENT PHYSICAL SCIENCE ENVIRONMENTAL PLANT CHEMICAL ALARA COOBDINATOB PLANT RADIATION ADMINISTRATIVE SUPERVISOR COORDINATOR PROTECTI0 N COMPLIANCE SUPERVISOR COORDINATOR SENIOR RADIATION WASTE CHEMICAL ENGINEERING HANDLING TECHNOLOGIST ADMINISTRATIVE SUPERVISOR SUPERVISOR COMPLIANCE RAD I AT I 0 N COO BD INAmR PROTECTION CHEMIST SENIOR SUPERVISOR PERFORMANCE ENGINEER CHEMIST SENIOR PERFORMANCE PERFORMANCE PERFORMANCE ENGINEER ENGINEER ENGINEER SENIOR SENIOR PERFORMANCE PERFORMANCE ENGINEER ENGINEERING TECHNOLOGIST ENGINEER | |||
PLANT MANAGER DEPAflTMEHT: ADMlfi(STRATION ADMINISTRATIVE REPORTING PAGE 8 of 8 FUNCTIONAL REPORTING ASSISTANT PLANT MANAGER 5 r22/85 (A OPERATIONS (SRO AD MIN ISTRATIVE SUPERINTENDANT TRAINING COORDINATOR SIMULATOR (SRO CHIEF SECURITY TRAINING PERSONNEL SUPERVISOR MANAGER SUPERVISOR ACCESS CONTROL TRAINING PERSONNEL SUPERVISOR COORDINATOR (SRO ASSISTANT SHIFT SECURITY SUPERVISOR SKILLS OPERATIONS TRAINING SIMULATOR TRAINING TRAINING SUPPORT TRAINING SUPE R SUPERVISOR ISRO) SUPERVISOR SUPERVISOR (SRO SENIOR SENIOR SENIOR CURRICULUM SIMULATOR TRAINING TRAINING TRAINING DEVELOPMENT TRAINING INSTRUCTOR INSTRUCTOR (SRO> INSTRUCTOR COORDINATOR INSTRUCTOR SRO TRAINING TRAINING TRAINING INSTRUCTIONAL S IMULATOR INSTRUCTOR INSTRUCTOR ( RO) INSTRUCTOR TECHNOLOGIST ENGINEER ASSOCIATE ASSOCIATE ASSOCIATE A. Onmatters relative to Plant Licensed Operator Training TRAINING TRAINING TRAINING GRAPHICS INSTRUCTOR INSTRUCTOR INSTRUCTOR SPECIALIST SRO-Senior Reactor Operator License RO -.Reactor Operator License | |||
DEPARTMENT: OPERATIONS Admlnlslrellve Responslblllty ASS ISTAH T PAGE 9 ol 9 | |||
---Functional Responslblllly PLANT MANAGER 5/22/85 0 P E R AT ION 9 OPERATIONS SUPERINTENDENTISBO PRODUCTION | |||
. SUPERVISOR OPERATION S (SRUTI SHIFT PRODUCTION CONTROL BOOM PROCEDQlE ADMINISTRATIVE SUPERVISOR (SBO UPERVI SING ADMNISTBATIVE COORDINATOR S COMPLIANCE r- m ASSISTANT I | |||
I ENGINEER COORDINATOR COORDINATOR SENIOR L | |||
DISTAFF STA SUPERVISOR PERFORMANCE ENGINEER ADMINISTRATIVE COMPLIANCE SENIOR COORDINATOR ASSISTANT SHIFT SUPERVISOR (SRO PER IOR MANCE ENGINEER UNIT SUPERVISOR (SBO ENGVIEEBING TECHNOLOGIST IYDRO COOBDVIAlOB | |||
/ ENGINEER}} |
Latest revision as of 01:33, 4 February 2020
ML17321A658 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 06/04/1985 |
From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
To: | |
Shared Package | |
ML17321A657 | List: |
References | |
NUDOCS 8506100261 | |
Download: ML17321A658 (24) | |
Text
ATTACH1L1ENT 2 TO AEP:NRC:0659F PROPOSED CHANGES TO THE DONALD C. COOK NUCLEAR PLANT UNIT NOS. 1 AND 2 TECHNICAL SPECIFICATIONS ogog pqzooa~~ 8 oos~~,
ADOGK pOg ~
ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates. The Chairman or Acting Chairman"shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.
REVIEW 6.5.2.7 The NSDRC is responsible for assuring'ithat independent** reviews of the following are performed:
a~ The safety evaluations for 1),,changes to procedures, equipment or systems and 2) tests or experiments compl'eted under 'the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety, question.
- b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.
C~ Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.
- d. Proposed changes to Technical Specifications or this Operating License.
- e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety.
g All REPORTABLE EVENTS.
- h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, and components.
- Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.
- Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.
D. C. COOK UNIT 1 6-10 ~
Amendment No.
l J~
V 4 \
II II i
ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates. The Chairman or Acting Chairman shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.
REVIEW 6.5.2.7 The NSDRC is responsible for assuring that independent** reviews of the following are performed:
a~ The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.
- b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.
co Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.
- d. Proposed changes to Technical Specifications or this Operating License.
- e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety.
gi All REPORTABLE EVENTS.
- h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structuresi systems, and components.
- Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.
- Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.
D. C. COOK UNIT 2 6-10 Amendment No.
C 'P .g1 p-"
~ 1 W
~ 'p,y n I
."f I, }
I
ATTACHMENT 3 TO AEP:NRC:0659F AMERICAN ELECTRIC POMER SERVICE CORPORATION
'k AND DONALD C. COOK NUCLEAR'PLANT ORGANIZATION
l f
'E '
, page 1 The titles of the Regular Members of the NSDRC are given in Attachment 2 to our letter AEP:NRC:0659C, request for change to Technical Specification 6.5.2.2., Unit Nos. 1 and 2. Eleven of the fourteen members are identified by number on the organization chart in this attachment.
Clarifications of the positions of the other members are as follows:
- 2) Executive Assistant to the President, I&MECo. Mr. G. E. LeMasters, who currently holds this position, was Assistant Manager of the Kanawha River Plant from 1959 to 1966 and Manager of the Glen Lyn Plant from 1966 to 1969, when he was appointed to his present position.
- 12) Consulting Engineer, Nuclear Operations Division. Mr. R. W.
Jurgensen, who currently holds this position, was Manager of the D. C.
Cook Nuclear Plant from 1968 to 1977. He was Manager of the Nuclear Operations Division (formerly called the Nuclear Engineering Division) from 1977 to 1982, and Assistant Vice President, Nuolear Operations, from 1980 to 1982.
- 14) Vice President, Fossil Plant Operations. Mr. R. F. Hering, who currently holds this position, was Assistant Vice President of the Mechanical Engineering Division from 1973 to 1977 and Vice President of that Division from 1977 to 1984, when he was named to his present position.
Several current members of the NSDRC have served continually on the committee since it was required by the Technical Specifications in 1974: John E. Dolan, H. N. Scherer, Jr., R. W. Jurgensen, R. F. Hering, R. W. Reeves, and J. R. Struyk. Mr. LeMasters was an alternate member of the committee from 1974 to 1984, when he has made a regular member. Their experience and presence on the committee ensure the continuity of the review process.
J C II ~ ~ 1 4
4 I P
V ~ ha '-VUC 11
~
4 O 1 ~"
~ 11 ~ I C I
a U C
lh
~ 4 4 I 4 RU P
~ U I,I,P 4
'I R
'4 C
~ ~ ~ 1 Qll I'
CHAIRMANOF THE SOARD VICE CHAIRMAN ENGINEERING 6 ~ rt Dl CONSTRUCTION K
EX. VICE PRESIDENT 6
CHIEF ENGINEER Qo ~ ~ ~ ~ ~ ~ o~
VICE PRESIDENT NUCLEAR OPERATIONS ll MANAGER OF DUALITYASSURANCE SST. VICE PRESIDENT CONSTRUCTION
(
7 SR. VICE PRESIDENT ELECTRICAL ENGINEERING 6 DEPUTY CHIEF ENGINEER SST. VICE PRESIDEN VICE PRESIDENT SSK. VICE PRESIDEN ELECTRICAL PLANT MANAGER ENVIRONMENTAL ENGINEERING MECHANICAL ENGINEERING D.C. COOK PLANK ENGINEERING ADMINISTRATION ENGINEERING DEPARTMENT
())
ENVIRONMENTAL DIVISION MANAGER MECHANICAL NUCLEAR PLANT DIVISION DEPARTMENT ENGINEERING CIVIL ENGINEERING OPERATIONS CONSTRUCTION MANAGERS SUPERINKENDENKS DIVISION ENGINEERING DIVISION DIVISION DIVISION
())
SECTION SECTION SECTION SECTION SECTION SECTION SECTION MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS DIVISION MANAGER lP DESIGN ADMINISTRATIVEAND FUNCTIONAL DIRECTION SECTION MANAGERS
~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ TECHNICAL LIAISON AMERICAN ELECTRIC POWER SERVICE CORPORATION ORGANIZATION FOR THE SUPPORT OF THE DONALD C. COOK NUCLEAR PLANT DIVISION MANAGER MATERIALS HANDLING
~, ~ ~
FUNCTIONAL DIRECTION FOR COOK PLANT ACTIVITIES SECTION NOTES: (1) NOT PART OF AEPSC MANAGERS ORGANIZATION,SHOWN FOR INFORMATION ONLY.
Atthchment 3, page 3 Vice President Nuclear Operations NOD Support C onsulting Staff i2 LE ngineer Manager Manager Manager Manager Nuclear Nuclear Radiological Nuclear Materials Safety h Support Operations 8 Fuel Licensing Management Nuclear 'uclear Radiological Nuclear Materials , Safety 4 "
Support Operations 8 Fuel ,"
Licensing Section Section Managemen Section Section Organization of Nuclear Operations Division, AEPSC
Attachment 3, page 4 Donald C. Cook Nuclear Plant Position Clarifications for Members of the PNSRC Plant Manager. Wilbur G. Smith, Jr., who currently holds this position, was hired in December 1,981. Prior to joining the Cook Plant, he held the position of Head Engineer, Nuclear Engineering Department, Norfolk Naval Shipyard from 1974 to 1981.
Assistant Plant Manager, Operations. Bertil A. Svensson, who holds this position, -joined the Cook Plant in September 1969 as Operations Supervisor. He was appointed=Assistant Plant Manager in 1977. An engineer with AEP since 1955, he has worked at Ohio Power's Kammer. Plant and as Lead Startup Engineer-at the Canton, Ohio offices.- He-was assigned to the New York office to assist in the design of the Cook Plant from 1968 to 1969, prior to his transfer to Cook.
I Assistant Plant Manager, Maintenance. -.A. Alan Blind was-promoted- to this position on April 1, 1985. Mr. Blind joined the Cook Plant in January 1976 as a Performance Engineer. He was promoted to Performance Supervising Engineer in 1980 and held this position until being named Technical Superintendent, Engineering in October 1983.
Operations Superintendent. Kenneth R. Baker has held this position since January= 1982; From 1972 through 1980, Mr. Baker was an NRC Inspector and worked as Region III Section Chief in 1980 and 1981 prior to coming to the Cook Plant. From 1969 to 1972 he worked as a Startup Engineer for Combustion Engineering, involved with the construction and testing of Consumers Power's Palisades Plant. He holds a Senior Operator's License.
Technical Superintendent, Engineering. Louis S. Gibson, who has held this position- since April 1985, was formerly employed in'the .Power Plant Projects Department of Consumers Power Company. His prior experience with Consumers extended from 1970-to April 1985-and included engineering, quality assurance) and operations responsibilities at the utility's corporate offices and the Palisades Nuclear Plant,'here he held a Senior Operator's License.
Technical Superintendent, Physical Sciences. Thomas A. Kriesel, who has held this position since October 1983, joined the AEP system=in June- 1968 as a
- Chemist Trainee at Huntington. He was an engineer at Tanners Creek from 1969 to 1971, transfer ring to the Cook Plant as Chemioal Foreman in May 1971. He was promoted to Environmental'Coordinator in April John D. Allard was promoted-to this position on 1976.'aintenance Superintendent.
April 1, 1985. Mr. Allard-became a Cook Plant Maintenance Mechanic in November 1973 and was promoted to Maintenance Supervisor in July 1978.
1,1 V
~ I) II I
),.M
) I)H V
Iy ll II M
V P ~
~ M gll g (y
- a
, page 5 Plant Radiation Protection Supervisor. David C. Palmer has held this position since August 1977. From 1971 to 1977 he was employed at the Cook Plant as Radiation Protection Supervisor. His previous experience in the health physics field was with the Rural Cooperative Power Assooiation.
Quality Control Superintendent. James F. Stietzel has held this=position since July 1977. He worked in varying technical engineering-assignments with AEPSC, New York, beginning in March 1971. He transferred to the Cook Plant in February 1976 as Quality Assurance Auditor.
<<F I
',',>()IF I I <<
A p I,
~I ~ <<g I
~
~ <<
~
L)I,I -')P
~ fl f ~ << * ~ ~ <<. I~A - X ~
~" f<<~I <<a << . F<<l
~ 'Ilf I ~ 5"1 P I<<
F
/
PLANT MANAGER STAFF PAGE 1 or 9 5/22/85 ADMINISTRATIVE RESPONSIBILITY PLANT --"FUNCTIONAL RESPONSIBILITY MANAGER PLANT NUCLEAR ASSISTANT SAFETY REVIEW ASSISTANT PLANT MANAGER COMMITTEE pLaN T MaNAGER MAINTENANCE OPERATIONS (SRO) auauTY TEC HN ICAL TECHNICAL MAINTENANCE PLANNING CONTROL SUPERINTENDENT SUPERINTENDENT ADMINISTRATIVE OPERATIONS SUPEfrINTENDENT SUPERINTENDENT SUPERINTE ENGINEERING PHYSICAL SCIENCE I SUPERINTENDENT SUPERINTENDENT (SRO This is a drawing and blueprint interlace with Planning Department activities.
0 DEPARTMENT: OFFICE ADMINISTRATION/
Administrative Responsibility SHIFT TECHNICAL ADVISORS
- -Functional Responsibility PAGE 2 ot 9 5/22/85 ASSISTANT PLANT MANAGER ISUPERVISOR L (~l MAINTENANCE I I
I STORES ACCOUNTING AFF ASSISTANT SUPERVISOR SUPERV ISOR A SUPERVISOR(SRO STORES ACCOUNTING ADMINISTRATOR SENIOR SHIFT COOROINATOR TECH. ADVISOR SHIFT
. ADVISOR IRO ENT CNTRL COOROI NATOR EMERGENCY PLANNING C
~ SRO- Senior Reactor Operator License RO- Reactor Operator License
Admlnlstrallve Responslblllly Funcllonel Responslblllly DEPARTMENT: MAINTENANCE PAGE 3 ol9 ASSISTANT 5/2Z/85 PLANT MANAGER MAINTENANCE MAINTENANCE SUPERINTENDENT GENERAL GENERAL GENERAL PRODUCTION SUPERVISOR SUPERVISOR SUPERVISOR CONTROLLER PRODUCTION ENGINEERING PRODUCTION SUPPORT ADMINISTRATIVE MAINTENANCE COMPLIANCE PERFORMANCE SUPERVISOR ENGINEER COORDINATOR UTILITY SENIOR SENIOR SUPERVISOR ADMINISTRATIVE PERFORMANCE COMPLIANCE ENGINEER COORDINATOR
Admlnlsttattve ResponslblHty DEPARTMENT: PLANNING
Functional Responslbllily ASSISTANT PAGE/ ol 9 Pt.ANT MANAGER 5/22/85 MAINTENANCE PLANNING SUPERINTENDANT STAFF GENERAL MANAGEMENT DESIGN CHANGE ENGINEER ERVtSOR UNIT1- INFORMATION SUPERVISOR OUTAGE PRQIECTS SPECIALIST DESIGN CHA~NGE ADMINIST~RATOR SENIOR OUTAGE PROJECT ENGINEER ASSISTANT DESIGN CHANGE SUPERVtSOR PERFORMANCE ENGINEER-SENIOR DESIGN CHANGE COORDINATOR
Adminislvetlve Responslblllly P.LANT DEPARTMENT: QUALITY CONTROL MANAGER
---Funcllonel Responslblllly PAGE 5 ol 9 5/22/85 I
I ASSISTANT I LANT MANAGER MAINTENANCE I
I I
OUALITY CONTROL SUPERINTENDENT ASSISTANT OUAUTV CONTROL SUPERINTENDENT NOH- DESTRUCTIVE OUALIT'VCONTROL IS I /NPRDS FIRE PROTECTION ADMINISTRATIVE EXAMINATION SUPERVISOR SUPERVISOR COORDINATOR COMPLIANCE SUPERVISOR COORDINATOR SENIOR ASSISTANT ADMINISTRATIVE ISI SUPERVISOR COMPLIANCE COORDIHATOR NRPDS COORDINATOR
Admlnlslrelive RasponslbUlty DEPARTMENT: TECHNICAL ENGINEERING Funcllonel Responslblllly PAGE 6 ol 9 ASSISTANT 5/2 2/85 PLANT MANAGER MAINTENANCE TECHNICAL SUPERINTENDENT ENGINEERING NUCLEAR PERFORMANCE CONTROL OUTAGE STAFF COMPUTER/
ENGINEERING SUPERVISING INSTRUMENT COORDINATOR ENGIN SECUBITT/
SUPERVISOR ENGINEER SUPERVISOR STANDARDS SUPERVISOR ADMINISTRATIVE COMPLIANCE PERFORMANCE PERFORMANCE INSTRUMENT ENGINEER COORDINATOR ENGINEER MAINTENANCE COMPUTER SENIOR SENIOR SENIOR SUPERVISOR ANALTST PERFORMANCE PERFORMANCE ADMINISTRATIVE ENGINEER ENGINEER SIMULATOR COMPLIANCE PER FORAIANCE SUPERVISOR COOB 0 INATOB ENGINEER SENIOR ENGINEERIHG ENGINEERING TECI IHOLOGIST TECI%0LOGIST PERFORMANCE SIMULATOR ENGINEER COMPUTER SPECIALIST
I PLA NT ff't MANAGER 0
Administrative Responsibility
- - - -Funct iona I Responsibility ASSISTANT PLANT DEPARTMENT: TECHNICAL- PHYSICAL SCIENCE PAGE Tel 9 MANAGER-MAINTENANCE 5/22/85 TECHNI C A L SUPERINTENDENT PHYSICAL SCIENCE ENVIRONMENTAL PLANT CHEMICAL ALARA COOBDINATOB PLANT RADIATION ADMINISTRATIVE SUPERVISOR COORDINATOR PROTECTI0 N COMPLIANCE SUPERVISOR COORDINATOR SENIOR RADIATION WASTE CHEMICAL ENGINEERING HANDLING TECHNOLOGIST ADMINISTRATIVE SUPERVISOR SUPERVISOR COMPLIANCE RAD I AT I 0 N COO BD INAmR PROTECTION CHEMIST SENIOR SUPERVISOR PERFORMANCE ENGINEER CHEMIST SENIOR PERFORMANCE PERFORMANCE PERFORMANCE ENGINEER ENGINEER ENGINEER SENIOR SENIOR PERFORMANCE PERFORMANCE ENGINEER ENGINEERING TECHNOLOGIST ENGINEER
PLANT MANAGER DEPAflTMEHT: ADMlfi(STRATION ADMINISTRATIVE REPORTING PAGE 8 of 8 FUNCTIONAL REPORTING ASSISTANT PLANT MANAGER 5 r22/85 (A OPERATIONS (SRO AD MIN ISTRATIVE SUPERINTENDANT TRAINING COORDINATOR SIMULATOR (SRO CHIEF SECURITY TRAINING PERSONNEL SUPERVISOR MANAGER SUPERVISOR ACCESS CONTROL TRAINING PERSONNEL SUPERVISOR COORDINATOR (SRO ASSISTANT SHIFT SECURITY SUPERVISOR SKILLS OPERATIONS TRAINING SIMULATOR TRAINING TRAINING SUPPORT TRAINING SUPE R SUPERVISOR ISRO) SUPERVISOR SUPERVISOR (SRO SENIOR SENIOR SENIOR CURRICULUM SIMULATOR TRAINING TRAINING TRAINING DEVELOPMENT TRAINING INSTRUCTOR INSTRUCTOR (SRO> INSTRUCTOR COORDINATOR INSTRUCTOR SRO TRAINING TRAINING TRAINING INSTRUCTIONAL S IMULATOR INSTRUCTOR INSTRUCTOR ( RO) INSTRUCTOR TECHNOLOGIST ENGINEER ASSOCIATE ASSOCIATE ASSOCIATE A. Onmatters relative to Plant Licensed Operator Training TRAINING TRAINING TRAINING GRAPHICS INSTRUCTOR INSTRUCTOR INSTRUCTOR SPECIALIST SRO-Senior Reactor Operator License RO -.Reactor Operator License
DEPARTMENT: OPERATIONS Admlnlslrellve Responslblllty ASS ISTAH T PAGE 9 ol 9
---Functional Responslblllly PLANT MANAGER 5/22/85 0 P E R AT ION 9 OPERATIONS SUPERINTENDENTISBO PRODUCTION
. SUPERVISOR OPERATION S (SRUTI SHIFT PRODUCTION CONTROL BOOM PROCEDQlE ADMINISTRATIVE SUPERVISOR (SBO UPERVI SING ADMNISTBATIVE COORDINATOR S COMPLIANCE r- m ASSISTANT I
I ENGINEER COORDINATOR COORDINATOR SENIOR L
DISTAFF STA SUPERVISOR PERFORMANCE ENGINEER ADMINISTRATIVE COMPLIANCE SENIOR COORDINATOR ASSISTANT SHIFT SUPERVISOR (SRO PER IOR MANCE ENGINEER UNIT SUPERVISOR (SBO ENGVIEEBING TECHNOLOGIST IYDRO COOBDVIAlOB
/ ENGINEER