{{#Wiki_filter:Attachment 2 to AEP:NRC:0896R Existing Technical Specifications for Donald C.Cook Nuclear Plant Units 1 and 2 Marked to Reflect Proposed Changes 9312290104 931220., PDR ADOCK 05000315 | {{#Wiki_filter:Attachment 2 to AEP:NRC:0896R Existing Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2 Marked to Reflect Proposed Changes t,, | ||
9312290104 931220., | |||
PDR P | |||
ADOCK 05000315 | |||
',. '-PDR- | |||
TABLE 4 8-3 BATTERY EMERGENCY LOADS"N" | TABLE 4.8-2 BATTERY EMERGENCY LOADS AB Batter Loads Minimum Time | ||
TABLE 4 8-3 BATTERY EMERGENCY LOADS"N" Batte Loads Minimum Time Auxiliary feedwater turbine control bus FMO-211 valve FMO-221 valve FMO-231 valve FMO-241 valve TDTV valve | : 1. Channel III static inverter +P hrs | ||
: 2. Channel IY static inverter &phrs ll C,ssn+rssl c.ilC~s+S | |||
: 3. Pg hrs | |||
: 4. Feed pump turbine lE oil pump 'hr | |||
: 5. Control room emergency lighting + P'hrs | |||
: 6. Hain turbine backup oil pump ) phrs | |||
: 7. Isolation valve control 4 P'hrs | |||
~COB<<L I | |||
1.'hannel I static inverter +g hrs 2. | |||
s Channel II static inverter + P'hts | |||
: 3. BOP static inverter* +3 hrs | |||
: 4. Feed pump turbine 1M oil pump 1 hr | |||
: 5. Generator seal oil pump +g hrs | |||
: 6. Turbine emergency oil pump'. I 3 hr$ | |||
: 7. Isolation valves 'fg hrs | |||
: 8. Annunciators 4P hrs | |||
: 9. All control circuits 4g hrs power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test; D. C. COOK - UNIT 1 3/4 8-15 AMENDMENT NO. 125 | |||
TABLE 4.8-3 BATTERY EHERGENCY LOAOS "N" Batter Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours FHO-211 valve ~ ~hours FHO-221 val ve p 4w($ | |||
FMO-231 val ve v(S FHO-241 val ve + $ h >mrs TDTV valve q $ k~rs "Val ves will be operated through the following sequence: | |||
Beginning of test: open valves | |||
: 2. Five minutes after the beginning he test: close the valves. | |||
: 3. Ten minutes after(tk eginning of the test: reopen the val ves. | |||
: 4. Four hou after the beginning of the test: close the valves. | |||
End of the test. | |||
D. C. COOK - UNIT 1 3/4 8-19 AMENDMENT NO. 125 | |||
TABLE 4.8"2 BATTERY EMERGENCY LOADS | |||
~ABB<<B Minimum Time | |||
: 1. Channel III static inverter +P'rs | |||
: 2. Channel IV static inverter +8 hrs All Co~l C(rC 's+S | |||
: 3. 4g hrs | |||
: 4. Bop static inverter" +P'rs | |||
: 5. Feed pump turbine 2E oil pump 1 hr | |||
: 6. Control room emergency lighting +P'rs | |||
: 7. Hain turbine emergency oil pump I P'hrg. | |||
.8. | |||
'l: | |||
Isolation valve control +P'hrs CD Batter Loads | |||
: 1. Channel I static inverter Pg hrs | |||
: 2. Channel II static inverter 4-f hrs | |||
: 3. Feed pump turbine 2M oil pump ., 1 hr | |||
: 4. Generator seal oil pump +9 hrs | |||
'ain Ss | |||
: 5. turbine emergency oil pump l /he | |||
: 6. Isolation valves +8'rs | |||
: 7. Annunciators +5 hrs | |||
: 8. All control circuits <P hrs AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be . | |||
, left in this operating mode for the duration of the discharge test. | |||
D. C. COOK " UNIT 2 3/4 8-15 AMENDMENT NO. M2 | |||
TABLE 4. 8-3 BATTERY EMERGENCY LOADS "N" Batter Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours FMO-211 valve g ~h~u(Z FMO-221 valve y mhi~ps FMO-231 valve Q Mhnv/rX FMO-241 valve ~4m vl (g TDTV valve 0 ~hoon | |||
*Valves will be operated through the following sequence: | |||
Beginning of test: open valves | |||
: 2. Five minutes after the begi~in the test: close the valves. <~P QP %t | |||
: 3. Ten minutes after e beginning of the test: reopen the valves. | |||
: 4. Four urs after the beginning of the test: close the valves. | |||
End of the test. | |||
D. C. COOK UNIT 2 3/4 8".19 AMENDMENT NO. ~2 | |||
Attachment 3 to AEP:NRC:0896R Proposed Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2 | |||
TABLE 4 8-2 ATTERY EMERGENCY LOADS AB Batte Loads Minimum Time | |||
: 1. Channel III static inverter 4 hrs | |||
: 2. Channel IV static inverter 4 hrs | |||
: 3. All control circuits 4 hrs | |||
: 4. Feed pump turbine 1E oil pump 1 hr | |||
: 5. Control room emergency lighting 4 hrs | |||
: 6. Main turbine backup oil pump 1 hrs | |||
: 7. Isolation ~alve control 4 hrs CD Batter Loads | |||
: 1. Channel I static inverter 4 hrs | |||
: 2. Channel II static inverter 4 hrs | |||
: 3. BOP static inverter* 4 hrs | |||
: 4. Feed pump turbine 1W oil pump 1 hr | |||
: 5. Generator seal oil pump 4 hrs | |||
: 6. Turbine emergency oil pump 1 hrs | |||
: 7. Isolation valves 4 hrs | |||
: 8. Annunciators 4 hrs | |||
: 9. All control circuits 4 hrs | |||
* AC pover sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test. | |||
COOK NUCLEAR PLANT - UNIT 1 3/4 8-15. AMENDMENT NO. | |||
TABLE 4 8-2 BATTERY EMERGENCY LOADS AB Batte Loads Minimum Time | |||
: 1. Channel III static inverter 4 hrs | |||
: 2. Channel IV static inverter 4 hrs | |||
: 3. All control circuits 4 hrs | |||
: 4. Bop static inverter* 4 hrs | |||
: 5. Feed pump turbine 2E oil pump 1 hr | |||
: 6. Control room emergency lighting 4 hrs | |||
: 7. Main turbine emergency oil pump 1 hrs | |||
: 8. Isolation valve control 4 hrs CD Batte Loads | |||
: 1. Channel I static inverter 4 hrs | |||
: 2. Channel II static inverter 4 hrs | |||
: 3. Feed pump turbine 2W oil pump 1 hr | |||
: 4. Generator seal oil pump 4 hrs | |||
: 5. Main turbine emergency oil pump 1 hrs | |||
: 6. Isolation valves 4 hrs | |||
: 7. Annunciators 4 hrs | |||
: 8. All control circuits 4 hrs | |||
'* AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test. | |||
COOK NUCLEAR PLANT -. UNIT 2 3/4 8-15 AMENDMENT NO. | |||
TABLE 4 8-3 BATTERY EMERGENCY LOADS "N" Batte Loads inimum Time Auxiliary feedwater turbine control bus 4 hours FMO-211 valve 4 hours FMO-221 4 hours FMO-231 4 hours FMO-241 4 hours TDTV 4 hours COOK NUCLEAR PLANT - UNIT 1 3/4 8-19 AMENDMENT NO.~ | |||
TABLE 4 8-3 BATTERY EMERGENCY LOADS "N" Batte Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours FMO-211 valve 4 hours FMO-221 valve 4 hours FMO-231 valve 4 hours FMO-241 valve 4 hours TDTV valve 4 hours COOK NUCLEAR PLANT - UNIT 2 3/4 8-19 AMENDMENT NO.~}} |
Latest revision as of 01:28, 4 February 2020
ML17331B145 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 12/20/1993 |
From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
To: | |
Shared Package | |
ML17331B144 | List: |
References | |
NUDOCS 9312290104 | |
Download: ML17331B145 (11) | |
Text
Attachment 2 to AEP:NRC:0896R Existing Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2 Marked to Reflect Proposed Changes t,,
9312290104 931220.,
PDR P
ADOCK 05000315
',. '-PDR-
TABLE 4.8-2 BATTERY EMERGENCY LOADS AB Batter Loads Minimum Time
- 1. Channel III static inverter +P hrs
- 2. Channel IY static inverter &phrs ll C,ssn+rssl c.ilC~s+S
- 3. Pg hrs
- 4. Feed pump turbine lE oil pump 'hr
- 5. Control room emergency lighting + P'hrs
- 6. Hain turbine backup oil pump ) phrs
- 7. Isolation valve control 4 P'hrs
~COB<<L I
1.'hannel I static inverter +g hrs 2.
s Channel II static inverter + P'hts
- 3. BOP static inverter* +3 hrs
- 4. Feed pump turbine 1M oil pump 1 hr
- 5. Generator seal oil pump +g hrs
- 6. Turbine emergency oil pump'. I 3 hr$
- 7. Isolation valves 'fg hrs
- 8. Annunciators 4P hrs
- 9. All control circuits 4g hrs power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test; D. C. COOK - UNIT 1 3/4 8-15 AMENDMENT NO. 125
TABLE 4.8-3 BATTERY EHERGENCY LOAOS "N" Batter Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FHO-211 valve ~ ~hours FHO-221 val ve p 4w($
FMO-231 val ve v(S FHO-241 val ve + $ h >mrs TDTV valve q $ k~rs "Val ves will be operated through the following sequence:
Beginning of test: open valves
- 2. Five minutes after the beginning he test: close the valves.
- 3. Ten minutes after(tk eginning of the test: reopen the val ves.
- 4. Four hou after the beginning of the test: close the valves.
End of the test.
D. C. COOK - UNIT 1 3/4 8-19 AMENDMENT NO. 125
TABLE 4.8"2 BATTERY EMERGENCY LOADS
~ABB<<B Minimum Time
- 1. Channel III static inverter +P'rs
- 2. Channel IV static inverter +8 hrs All Co~l C(rC 's+S
- 3. 4g hrs
- 4. Bop static inverter" +P'rs
- 5. Feed pump turbine 2E oil pump 1 hr
- 6. Control room emergency lighting +P'rs
- 7. Hain turbine emergency oil pump I P'hrg.
.8.
'l:
Isolation valve control +P'hrs CD Batter Loads
- 1. Channel I static inverter Pg hrs
- 2. Channel II static inverter 4-f hrs
- 3. Feed pump turbine 2M oil pump ., 1 hr
- 4. Generator seal oil pump +9 hrs
'ain Ss
- 5. turbine emergency oil pump l /he
- 6. Isolation valves +8'rs
- 7. Annunciators +5 hrs
- 8. All control circuits <P hrs AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be .
, left in this operating mode for the duration of the discharge test.
D. C. COOK " UNIT 2 3/4 8-15 AMENDMENT NO. M2
TABLE 4. 8-3 BATTERY EMERGENCY LOADS "N" Batter Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve g ~h~u(Z FMO-221 valve y mhi~ps FMO-231 valve Q Mhnv/rX FMO-241 valve ~4m vl (g TDTV valve 0 ~hoon
- Valves will be operated through the following sequence:
Beginning of test: open valves
- 2. Five minutes after the begi~in the test: close the valves. <~P QP %t
- 3. Ten minutes after e beginning of the test: reopen the valves.
- 4. Four urs after the beginning of the test: close the valves.
End of the test.
D. C. COOK UNIT 2 3/4 8".19 AMENDMENT NO. ~2
Attachment 3 to AEP:NRC:0896R Proposed Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2
TABLE 4 8-2 ATTERY EMERGENCY LOADS AB Batte Loads Minimum Time
- 1. Channel III static inverter 4 hrs
- 2. Channel IV static inverter 4 hrs
- 3. All control circuits 4 hrs
- 4. Feed pump turbine 1E oil pump 1 hr
- 5. Control room emergency lighting 4 hrs
- 6. Main turbine backup oil pump 1 hrs
- 7. Isolation ~alve control 4 hrs CD Batter Loads
- 1. Channel I static inverter 4 hrs
- 2. Channel II static inverter 4 hrs
- 3. BOP static inverter* 4 hrs
- 4. Feed pump turbine 1W oil pump 1 hr
- 5. Generator seal oil pump 4 hrs
- 6. Turbine emergency oil pump 1 hrs
- 7. Isolation valves 4 hrs
- 8. Annunciators 4 hrs
- 9. All control circuits 4 hrs
- AC pover sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test.
COOK NUCLEAR PLANT - UNIT 1 3/4 8-15. AMENDMENT NO.
TABLE 4 8-2 BATTERY EMERGENCY LOADS AB Batte Loads Minimum Time
- 1. Channel III static inverter 4 hrs
- 2. Channel IV static inverter 4 hrs
- 3. All control circuits 4 hrs
- 4. Bop static inverter* 4 hrs
- 5. Feed pump turbine 2E oil pump 1 hr
- 6. Control room emergency lighting 4 hrs
- 7. Main turbine emergency oil pump 1 hrs
- 8. Isolation valve control 4 hrs CD Batte Loads
- 1. Channel I static inverter 4 hrs
- 2. Channel II static inverter 4 hrs
- 3. Feed pump turbine 2W oil pump 1 hr
- 4. Generator seal oil pump 4 hrs
- 5. Main turbine emergency oil pump 1 hrs
- 6. Isolation valves 4 hrs
- 7. Annunciators 4 hrs
- 8. All control circuits 4 hrs
'* AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test.
COOK NUCLEAR PLANT -. UNIT 2 3/4 8-15 AMENDMENT NO.
TABLE 4 8-3 BATTERY EMERGENCY LOADS "N" Batte Loads inimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-221 4 hours FMO-231 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-241 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> TDTV 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> COOK NUCLEAR PLANT - UNIT 1 3/4 8-19 AMENDMENT NO.~
TABLE 4 8-3 BATTERY EMERGENCY LOADS "N" Batte Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-221 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-231 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-241 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> TDTV valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> COOK NUCLEAR PLANT - UNIT 2 3/4 8-19 AMENDMENT NO.~