{{#Wiki_filter:Attachment 2toAEP:NRC:0896R ExistingTechnical Specifications forDonaldC.CookNuclearPlantUnits1and2MarkedtoReflectProposedChanges9312290104 931220.,PDRADOCK05000315Pt,,',.'-PDR-TABLE4.8-2BATTERYEMERGENCY LOADSABBatterLoads1.ChannelIIIstaticinverter2.ChannelIYstaticinverter3.llC,ssn+rssl c.ilC~s+S MinimumTime+Phrs&phrsPghrs4.FeedpumpturbinelEoilpump5.Controlroomemergency lighting6.Hainturbinebackupoilpump7.Isolation valvecontrol'hr+P'hrs)phrs4P'hrs~COB<<LI1.'hannel Istaticinverter2.ChannelIIstaticinverters3.BOPstaticinverter*
{{#Wiki_filter:Attachment 2 to AEP:NRC:0896R Existing Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2 Marked to Reflect Proposed Changes t,,
4.Feedpumpturbine1Moilpump5.Generator sealoilpump6.Turbineemergency oilpump'.7.Isolation valves8.Annunciators 9.Allcontrolcircuits+ghrs+P'hts+3hrs1hr+ghrsI3hr$'fghrs4Phrs4ghrspowersourcestotheinverters shallbeturnedoffatthestartofthetestandmaybeturnedonattheendofthespecified timeinterval.
9312290104 931220.,
Inverters maybeleftinthisoperating modeforthedurationofthedischarge test;D.C.COOK-UNIT13/48-15AMENDMENT NO.125 TABLE4.8-3BATTERYEHERGENCY LOAOS"N"BatterLoadsAuxiliary feedwater turbinecontrolbusFHO-211valveFHO-221valveFMO-231valveFHO-241valveTDTVvalveMinimumTime4hours~~hoursp4w($v(S+$h>mrsq$k~rs"Valves2.3.willbeoperatedthroughthefollowing sequence:
PDR P
Beginning oftest:openvalvesFiveminutesafterthebeginning hetest:closethevalves.Tenminutesafter(tkeginningofthetest:reopenthevalves.4.Fourhouafterthebeginning ofthetest:closethevalves.Endofthetest.D.C.COOK-UNIT13/48-19AMENDMENT NO.125 TABLE4.8"2BATTERYEMERGENCY LOADS~ABB<<B1.ChannelIIIstaticinverter2.ChannelIVstaticinverterAllCo~lC(rC's+S3.4.Bopstaticinverter" 5.Feedpumpturbine2Eoilpump6.Controlroomemergency lighting7.Hainturbineemergency oilpump.8.Isolation valvecontrol'l:MinimumTime+P'rs+8hrs4ghrs+P'rs1hr+P'rsIP'hrg.+P'hrsSsCDBatterLoads1.ChannelIstaticinverter2.ChannelIIstaticinverter3.Feedpumpturbine2Moilpump.,4.Generator sealoilpump5.'ainturbineemergency oilpump6.Isolation valves7.Annunciators 8.AllcontrolcircuitsPghrs4-fhrs1hr+9hrsl/he+8'rs+5hrs<PhrsACpowersourcestotheinverters shallbeturnedoffatthestartofthetestandmaybeturnedonattheendofthespecified timeinterval.
ADOCK 05000315
Inverters maybe.,leftinthisoperating modeforthedurationofthedischarge test.D.C.COOK"UNIT23/48-15AMENDMENT NO.M2 TABLE4.8-3BATTERYEMERGENCY LOADS"N"BatterLoadsAuxiliary feedwater turbinecontrolbusFMO-211valveFMO-221valveFMO-231valveFMO-241valveTDTVvalveMinimumTime4hoursg~h~u(Zymhi~psQMhnv/rX~4mvl(g0~hoon*Valves2.3.willbeoperatedthroughthefollowing sequence:
            ',. '-PDR-
Beginning oftest:openvalvesTenminutesaftervalves.Fiveminutesafterthebegi~inthetest:closethevalves.<~PQP%tebeginning ofthetest:reopenthe4.Fourursafterthebeginning ofthetest:closethevalves.Endofthetest.D.C.COOK-UNIT23/48".19AMENDMENT NO.~2 Attachment 3toAEP:NRC:0896R ProposedTechnical Specifications forDonaldC.CookNuclearPlantUnits1and2 TABLE48-2ATTERYEMERGENCY LOADSABBatteLoads1.ChannelIIIstaticinverter2.ChannelIVstaticinverter3.AllcontrolcircuitsMinimumTime4hrs4hrs4hrs4.Feedpumpturbine1Eoilpump5.Controlroomemergency lighting6.Mainturbinebackupoilpump7.Isolation
~alvecontrol1hr4hrs1hrs4hrsCDBatterLoads1.ChannelIstaticinverter2.ChannelIIstaticinverter3.BOPstaticinverter*
4.Feedpumpturbine1Woilpump5.Generator sealoilpump6.Turbineemergency oilpump7.Isolation valves8.Annunciators 9.Allcontrolcircuits4hrs4hrs4hrs1hr4hrs1hrs4hrs4hrs4hrs*ACpoversourcestotheinverters shallbeturnedoffatthestartofthetestandmaybeturnedonattheendofthespecified timeinterval.
Inverters maybeleftinthisoperating modeforthedurationofthedischarge test.COOKNUCLEARPLANT-UNIT13/48-15.AMENDMENT NO.
TABLE48-2BATTERYEMERGENCY LOADSABBatteLoads1.ChannelIIIstaticinverter2.ChannelIVstaticinverter3.Allcontrolcircuits4.Bopstaticinverter*
5.Feedpumpturbine2Eoilpump6.Controlroomemergency lighting7.Mainturbineemergency oilpump8.Isolation valvecontrolMinimumTime4hrs4hrs4hrs4hrs1hr4hrs1hrs4hrsCDBatteLoads1.ChannelIstaticinverter2.ChannelIIstaticinverter3.Feedpumpturbine2Woilpump4hrs4hrs1hr4.Generator sealoilpump5.Mainturbineemergency oilpump6.Isolation valves7.Annunciators 8.Allcontrolcircuits4hrs1hrs4hrs4hrs4hrs'*ACpowersourcestotheinverters shallbeturnedoffatthestartofthetestandmaybeturnedonattheendofthespecified timeinterval.
Inverters maybeleftinthisoperating modeforthedurationofthedischarge test.COOKNUCLEARPLANT-.UNIT23/48-15AMENDMENT NO.


TABLE48-3BATTERYEMERGENCY LOADS"N"BatteLoadsAuxiliary feedwater turbinecontrolbusFMO-211valveFMO-221FMO-231FMO-241TDTVinimumTime4hours4hours4hours4hours4hours4hoursCOOKNUCLEARPLANT-UNIT13/48-19AMENDMENT NO.~
TABLE  4.8-2 BATTERY EMERGENCY LOADS AB Batter      Loads                              Minimum Time
TABLE48-3BATTERYEMERGENCY LOADS"N"BatteLoadsMinimumTimeAuxiliary feedwater turbinecontrolbusFMO-211valveFMO-221valveFMO-231valveFMO-241valveTDTVvalve4hours4hours4hours4hours4hours4hoursCOOKNUCLEARPLANT-UNIT23/48-19AMENDMENT NO.~}}
: 1. Channel    III static      inverter          +P    hrs
: 2. Channel    IY  static inverter              &phrs ll C,ssn+rssl  c.ilC~s+S
: 3.                                                  Pg hrs
: 4. Feed pump      turbine lE oil      pump      'hr
: 5. Control room emergency lighting              + P'hrs
: 6. Hain turbine backup          oil  pump        )  phrs
: 7. Isolation valve control                      4 P'hrs
              ~COB<<L I
1.'hannel I static inverter                          +g hrs 2.
s Channel    II static      inverter          + P'hts
: 3. BOP  static inverter*                        +3 hrs
: 4. Feed pump      turbine    1M  oil  pump          1 hr
: 5. Generator seal        oil  pump              +g  hrs
: 6. Turbine emergency          oil  pump'.        I 3 hr$
: 7. Isolation valves                                'fg hrs
: 8. Annunciators                                  4P hrs
: 9. All control circuits                          4g  hrs power sources  to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test; D. C. COOK -  UNIT 1                        3/4 8-15        AMENDMENT NO. 125
 
TABLE 4.8-3 BATTERY EHERGENCY LOAOS "N" Batter    Loads                                        Minimum Time Auxiliary feedwater turbine control    bus                    4 hours FHO-211  valve                                                ~ ~hours FHO-221  val ve                                                  p 4w($
FMO-231  val ve                                                        v(S FHO-241  val ve                                                + $ h >mrs TDTV    valve                                                  q $ k~rs "Val ves will be  operated through the following sequence:
Beginning of test:    open valves
: 2. Five minutes after the beginning        he  test:  close the valves.
: 3. Ten minutes    after(tk  eginning of the  test:  reopen the val ves.
: 4. Four hou      after the beginning of the test:    close the valves.
End  of the test.
D. C. COOK  -  UNIT 1                3/4 8-19        AMENDMENT NO. 125
 
TABLE  4.8"2 BATTERY EMERGENCY LOADS
                    ~ABB<<B                                            Minimum Time
: 1. Channel  III static    inverter            +P'rs
: 2. Channel IV    static inverter                +8 hrs All  Co~l      C(rC 's+S
: 3.                                                  4g hrs
: 4. Bop  static inverter"                        +P'rs
: 5. Feed pump    turbine  2E  oil pump              1 hr
: 6. Control room emergency lighting              +P'rs
: 7. Hain turbine emergency      oil  pump        I P'hrg.
                    .8.
                    'l:
Isolation valve control                    +P'hrs CD    Batter    Loads
: 1. Channel    I static inverter                  Pg    hrs
: 2. Channel    II static  inverter              4-f hrs
: 3. Feed pump    turbine  2M  oil pump  .,          1  hr
: 4. Generator seal    oil  pump                  +9 hrs
                        'ain Ss
: 5.            turbine emergency oil    pump        l  /he
: 6. Isolation valves                              +8'rs
: 7. Annunciators                                  +5 hrs
: 8. All control circuits                          <P hrs AC power sources to the inverters        shall be turned off at the start of the test and may be turned on at the end of        the specified time interval. Inverters may be .
  , left in this operating    mode  for the duration of the discharge test.
D. C. COOK " UNIT 2                      3/4 8-15            AMENDMENT NO. M2
 
TABLE 4. 8-3 BATTERY EMERGENCY LOADS "N" Batter    Loads                                          Minimum Time Auxiliary feedwater turbine control      bus                    4 hours FMO-211  valve                                                  g ~h~u(Z FMO-221  valve                                                  y mhi~ps FMO-231  valve                                                  Q  Mhnv/rX FMO-241  valve                                                      ~4m vl (g TDTV    valve                                                  0 ~hoon
*Valves  will be  operated through the following sequence:
Beginning of test:    open valves
: 2. Five minutes after the begi~in          the test:  close the valves.                  <~P QP                            %t
: 3. Ten minutes    after  e  beginning of the test:    reopen the valves.
: 4. Four    urs after the beginning of the test:      close the valves.
End  of the test.
D. C. COOK    UNIT 2                  3/4 8".19        AMENDMENT NO.  ~2
 
Attachment 3 to AEP:NRC:0896R Proposed Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2
 
TABLE 4  8-2 ATTERY EMERGENCY LOADS AB  Batte    Loads                        Minimum Time
: 1. Channel  III static  inverter          4  hrs
: 2. Channel IV  static inverter            4  hrs
: 3. All control circuits                    4  hrs
: 4. Feed pump  turbine  1E  oil pump        1 hr
: 5. Control room emergency lighting          4 hrs
: 6. Main turbine backup    oil pump          1 hrs
: 7. Isolation ~alve control                  4 hrs CD Batter  Loads
: 1. Channel  I static inverter                4 hrs
: 2. Channel  II static inverter              4 hrs
: 3. BOP  static inverter*                    4 hrs
: 4. Feed pump  turbine  1W  oil pump        1 hr
: 5. Generator seal    oil pump                4 hrs
: 6. Turbine  emergency oil pump              1 hrs
: 7. Isolation valves                          4 hrs
: 8. Annunciators                              4 hrs
: 9. All control circuits                      4 hrs
* AC pover sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test.
COOK NUCLEAR PLANT  - UNIT 1          3/4 8-15.                  AMENDMENT NO.
 
TABLE 4 8-2 BATTERY EMERGENCY LOADS AB Batte    Loads                        Minimum Time
: 1. Channel  III static  inverter          4 hrs
: 2. Channel IV  static inverter            4 hrs
: 3. All control circuits                      4 hrs
: 4. Bop static inverter*                    4 hrs
: 5. Feed pump  turbine  2E oil pump        1 hr
: 6. Control room emergency lighting          4 hrs
: 7. Main turbine emergency    oil pump      1 hrs
: 8. Isolation valve control                  4 hrs CD Batte    Loads
: 1. Channel  I static inverter              4 hrs
: 2. Channel  II static inverter              4 hrs
: 3. Feed pump  turbine  2W  oil pump        1 hr
: 4. Generator seal    oil pump                4 hrs
: 5. Main turbine emergency    oil pump      1 hrs
: 6. Isolation valves                          4 hrs
: 7. Annunciators                              4 hrs
: 8. All control circuits                      4 hrs
'* AC power sources to the inverters shall be turned off at the start of the test and may be turned on  at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test.
COOK NUCLEAR PLANT  -. UNIT 2          3/4 8-15                  AMENDMENT NO.
 
TABLE 4 8-3 BATTERY EMERGENCY LOADS "N" Batte  Loads                                        inimum Time Auxiliary feedwater turbine control bus                  4 hours FMO-211 valve                                            4 hours FMO-221                                                  4  hours FMO-231                                                  4 hours FMO-241                                                  4 hours TDTV                                                    4 hours COOK NUCLEAR PLANT  - UNIT 1        3/4 8-19                  AMENDMENT NO.~
 
TABLE 4  8-3 BATTERY EMERGENCY LOADS "N" Batte    Loads                              Minimum Time Auxiliary feedwater turbine control bus          4 hours FMO-211  valve                                    4 hours FMO-221  valve                                    4 hours FMO-231  valve                                    4 hours FMO-241  valve                                    4 hours TDTV    valve                                    4 hours COOK NUCLEAR PLANT  - UNIT 2            3/4 8-19 AMENDMENT  NO.~}}

Latest revision as of 01:28, 4 February 2020

Proposed TS Table 4.8-2, Battery Emergency Loads.
ML17331B145
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/20/1993
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B144 List:
References
NUDOCS 9312290104
Download: ML17331B145 (11)


Text

Attachment 2 to AEP:NRC:0896R Existing Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2 Marked to Reflect Proposed Changes t,,

9312290104 931220.,

PDR P

ADOCK 05000315

',. '-PDR-

TABLE 4.8-2 BATTERY EMERGENCY LOADS AB Batter Loads Minimum Time

1. Channel III static inverter +P hrs
2. Channel IY static inverter &phrs ll C,ssn+rssl c.ilC~s+S
3. Pg hrs
4. Feed pump turbine lE oil pump 'hr
5. Control room emergency lighting + P'hrs
6. Hain turbine backup oil pump ) phrs
7. Isolation valve control 4 P'hrs

~COB<<L I

1.'hannel I static inverter +g hrs 2.

s Channel II static inverter + P'hts

3. BOP static inverter* +3 hrs
4. Feed pump turbine 1M oil pump 1 hr
5. Generator seal oil pump +g hrs
6. Turbine emergency oil pump'. I 3 hr$
7. Isolation valves 'fg hrs
8. Annunciators 4P hrs
9. All control circuits 4g hrs power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test; D. C. COOK - UNIT 1 3/4 8-15 AMENDMENT NO. 125

TABLE 4.8-3 BATTERY EHERGENCY LOAOS "N" Batter Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FHO-211 valve ~ ~hours FHO-221 val ve p 4w($

FMO-231 val ve v(S FHO-241 val ve + $ h >mrs TDTV valve q $ k~rs "Val ves will be operated through the following sequence:

Beginning of test: open valves

2. Five minutes after the beginning he test: close the valves.
3. Ten minutes after(tk eginning of the test: reopen the val ves.
4. Four hou after the beginning of the test: close the valves.

End of the test.

D. C. COOK - UNIT 1 3/4 8-19 AMENDMENT NO. 125

TABLE 4.8"2 BATTERY EMERGENCY LOADS

~ABB<<B Minimum Time

1. Channel III static inverter +P'rs
2. Channel IV static inverter +8 hrs All Co~l C(rC 's+S
3. 4g hrs
4. Bop static inverter" +P'rs
5. Feed pump turbine 2E oil pump 1 hr
6. Control room emergency lighting +P'rs
7. Hain turbine emergency oil pump I P'hrg.

.8.

'l:

Isolation valve control +P'hrs CD Batter Loads

1. Channel I static inverter Pg hrs
2. Channel II static inverter 4-f hrs
3. Feed pump turbine 2M oil pump ., 1 hr
4. Generator seal oil pump +9 hrs

'ain Ss

5. turbine emergency oil pump l /he
6. Isolation valves +8'rs
7. Annunciators +5 hrs
8. All control circuits <P hrs AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be .

, left in this operating mode for the duration of the discharge test.

D. C. COOK " UNIT 2 3/4 8-15 AMENDMENT NO. M2

TABLE 4. 8-3 BATTERY EMERGENCY LOADS "N" Batter Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve g ~h~u(Z FMO-221 valve y mhi~ps FMO-231 valve Q Mhnv/rX FMO-241 valve ~4m vl (g TDTV valve 0 ~hoon

  • Valves will be operated through the following sequence:

Beginning of test: open valves

2. Five minutes after the begi~in the test: close the valves. <~P QP %t
3. Ten minutes after e beginning of the test: reopen the valves.
4. Four urs after the beginning of the test: close the valves.

End of the test.

D. C. COOK UNIT 2 3/4 8".19 AMENDMENT NO. ~2

Attachment 3 to AEP:NRC:0896R Proposed Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2

TABLE 4 8-2 ATTERY EMERGENCY LOADS AB Batte Loads Minimum Time

1. Channel III static inverter 4 hrs
2. Channel IV static inverter 4 hrs
3. All control circuits 4 hrs
4. Feed pump turbine 1E oil pump 1 hr
5. Control room emergency lighting 4 hrs
6. Main turbine backup oil pump 1 hrs
7. Isolation ~alve control 4 hrs CD Batter Loads
1. Channel I static inverter 4 hrs
2. Channel II static inverter 4 hrs
3. BOP static inverter* 4 hrs
4. Feed pump turbine 1W oil pump 1 hr
5. Generator seal oil pump 4 hrs
6. Turbine emergency oil pump 1 hrs
7. Isolation valves 4 hrs
8. Annunciators 4 hrs
9. All control circuits 4 hrs
  • AC pover sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test.

COOK NUCLEAR PLANT - UNIT 1 3/4 8-15. AMENDMENT NO.

TABLE 4 8-2 BATTERY EMERGENCY LOADS AB Batte Loads Minimum Time

1. Channel III static inverter 4 hrs
2. Channel IV static inverter 4 hrs
3. All control circuits 4 hrs
4. Bop static inverter* 4 hrs
5. Feed pump turbine 2E oil pump 1 hr
6. Control room emergency lighting 4 hrs
7. Main turbine emergency oil pump 1 hrs
8. Isolation valve control 4 hrs CD Batte Loads
1. Channel I static inverter 4 hrs
2. Channel II static inverter 4 hrs
3. Feed pump turbine 2W oil pump 1 hr
4. Generator seal oil pump 4 hrs
5. Main turbine emergency oil pump 1 hrs
6. Isolation valves 4 hrs
7. Annunciators 4 hrs
8. All control circuits 4 hrs

'* AC power sources to the inverters shall be turned off at the start of the test and may be turned on at the end of the specified time interval. Inverters may be left in this operating mode for the duration of the discharge test.

COOK NUCLEAR PLANT -. UNIT 2 3/4 8-15 AMENDMENT NO.

TABLE 4 8-3 BATTERY EMERGENCY LOADS "N" Batte Loads inimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-221 4 hours FMO-231 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-241 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> TDTV 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> COOK NUCLEAR PLANT - UNIT 1 3/4 8-19 AMENDMENT NO.~

TABLE 4 8-3 BATTERY EMERGENCY LOADS "N" Batte Loads Minimum Time Auxiliary feedwater turbine control bus 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-211 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-221 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-231 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> FMO-241 valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> TDTV valve 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> COOK NUCLEAR PLANT - UNIT 2 3/4 8-19 AMENDMENT NO.~