ML17335A212: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEl LANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test'The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.C.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.'I g.i Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.
{{#Wiki_filter:3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7   PLANT SYSTEMS SURVEl LANCE RE UIREMENTS Continued 4.7.1.2       Each auxiliary feedwater pump shall be demonstrated           OPERABLE when tested pursuant to Specification 4.0.5 by:
COOK NUCLEAR PLANT-UNIT I Page 3/4 7-6 AMENDMENT 400, 434, 444, 444, 203 9809ii0034 97080i eOa aOOCV 050003is P PDR e
: a.       Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEIL'LANCE'E UlREMENTS 4.7.1.2 Each a'uxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test'The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.d.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam'enerator level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.g Verifying at least once per 18 months during shutdown that each auxiliaty feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling,'tlie valves will be verified to be in their closed positions.
: b.       Verifying that the turbine driven auxiliary feedwater pump's developed head at the test The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.
COOK NUCLEAR PLANT-UNIT 2 Page 3/4 7-6 AMENDMENT VV,%, 446, 484, 449,~, 489, 188 ATTACHMENT 3 TO AEP:NRC:0906H PROPOSED REVISED TECHNICAL SPECIFICATION PAGES V
C.       Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.
0~3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliaty feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliaty feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is'not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.
Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.
COOK NUCLEAR PLANT-UNIT I Page 3/4 7A AMENDMENT 400, 48k, 444, 444, t'
Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.1.2 Each auxiliary fecdwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.c.'erifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator level.e.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.
Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
COOK NUCLIDE PLANT-UNIT 2 Page 3/4 7A AMENDMENT W, 97, 4','484, 449, 4$8, 489, 48S,}}
                    'I
: g. i Verifying at   least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling, the valves will be verified to be in their closed positions.
COOK NUCLEAR PLANT-UNIT I                         Page 3/4 7-6         AMENDMENT400, 434, 444, 444, 203 9809ii0034 97080i eOa aOOCV 050003is P                       PDR
 
e 3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7   PLANT SYSTEMS SURVEIL'LANCE'E UlREMENTS 4.7.1.2       Each a'uxiliary feedwater pump shall be demonstrated         OPERABLE when tested pursuant to Specification 4.0.5 by:
: a.       Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.
: b.       Verifying that the turbine driven auxiliary feedwater pump's developed head at the test The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.
Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.
: d.       Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam level.                                                                            'enerator Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
Verifying at least once per 18 months during shutdown that each auxiliaty feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
g        Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling,'tlie valves will be verified to be in their closed positions.
COOK NUCLEAR PLANT-UNIT2                          Page 3/4 7-6           AMENDMENTVV, %, 446, 484, 449,
                                                                                                    ~, 489, 188
 
ATTACHMENT 3 TO AEP:NRC:0906H PROPOSED REVISED TECHNICAL SPECIFICATION PAGES
 
V 0                                                 ~
3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7   PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.1.2       Each auxiliaty feedwater pump shall be demonstrated         OPERABLE when tested pursuant to Specification 4.0.5 by:
Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.
Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.
Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.
Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliaty feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is'not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.
Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling, the valves will be verified to be in their closed positions.
COOK NUCLEAR PLANT-UNITI                          Page 3/4 7A             AMENDMENT400, 48k, 444, 444,
 
t' 3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7   PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.1.2       Each auxiliary fecdwater pump shall be demonstrated         OPERABLE when tested pursuant to Specification 4.0.5 by:
: a.       Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.
: b.       Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.
: c. 'erifying that each         non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.
Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator level.
: e.       Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.
Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling, the valves will be verified to be in their closed positions.
COOK NUCLIDE PLANT-UNIT2                        Page 3/4 7A           AMENDMENTW, 97,           4','484,   449, 4$ 8, 489, 48S,}}

Latest revision as of 00:32, 4 February 2020

Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig.
ML17335A212
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/1997
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17335A211 List:
References
NUDOCS 9809110034
Download: ML17335A212 (9)


Text

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEl LANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by:

a. Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.
b. Verifying that the turbine driven auxiliary feedwater pump's developed head at the test The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

C. Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.

Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

'I

g. i Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNIT I Page 3/4 7-6 AMENDMENT400, 434, 444, 444, 203 9809ii0034 97080i eOa aOOCV 050003is P PDR

e 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEIL'LANCE'E UlREMENTS 4.7.1.2 Each a'uxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by:

a. Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.
b. Verifying that the turbine driven auxiliary feedwater pump's developed head at the test The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

d. Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam level. 'enerator Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

Verifying at least once per 18 months during shutdown that each auxiliaty feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

g Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling,'tlie valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 7-6 AMENDMENTVV, %, 446, 484, 449,

~, 489, 188

ATTACHMENT 3 TO AEP:NRC:0906H PROPOSED REVISED TECHNICAL SPECIFICATION PAGES

V 0 ~

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliaty feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by:

Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.

Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliaty feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is'not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.

Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNITI Page 3/4 7A AMENDMENT400, 48k, 444, 444,

t' 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.1.2 Each auxiliary fecdwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by:

a. Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.
b. Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.
c. 'erifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator level.

e. Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLIDE PLANT-UNIT2 Page 3/4 7A AMENDMENTW, 97, 4','484, 449, 4$ 8, 489, 48S,