{{#Wiki_filter:POWER    DISTRIBUTION LIMITS 3/4.2.5      ONB PARAMETERS LIMITING CONDITION        FOR OPERATION 3.2.5 The following DNB-related parameters shall            be  maintained within the following limits:
: a. Reactor Coolant System g yy.~ F' T
                                                  < 5~7~
: b. Pressurizer Pressure              ~2    psig",    and    u~>5    ps'
: c. Reactor Coolant System Flow            0O gpm      a7H~      gpss APPLICABILITY:        MODE  1.
ACTION:
With any of the above parameters exceeding its limit, restore the parameter to within'ts limit within 2 hours or reduce THERMAL POWER to less than 5X of RATED THERMAL POWER within the next 4 hours.
SURVEILLANCE RE UIREMENTS 4.2.5. 1  Each  of the parameters  shown above  shall  be  verified to    be within its limits at least        once per 12 hours.
: 4. 2. 5.2    The RCS flow rate indicators shall be      subjected to    a CHANNEL CALIBRATION at least once per 18 months.
4.2.5.3      The  RCS  flow rate shall  be demonstrated    by measurement    once per 18 months.
  "Limit not applicable during either        a THERMAL  POWER  ramp  in  excess  of  5X  of RATED THERMAL POWER        per minute or a  THERMAL POWER    step in excess of    10K  of RATED THERMAL POWER.
,T~+<EY POINT      - UNITS 3 4 4        3/4 2-16            AMENDMENT NOS.131 AND      132
      . 9i04i50044 910403 PDR    ADOCK    05000250 P                      PDR
 
rj I POWER    DISTRIBUTION LIMITS BASES 3/4.2.4      UADRANT POWER  TILT RATIO The QUADRANT POWER TILT RATIO limit assures that the radial power dis-tribution satisfies the design values used in the power capability analysis.
Radial power distribution measurements are made during STARTUP testing and periodically during power operation.
The limit of 1.02, at which corrective action is required, provides DNB and  linear heat generation rate protection with x-y plane power tilts. A limit of 1.02 was selected to provide an allowance for the uncertainty asso-ciated with the indicated power        tilt.
The 2-hour time allowance for operation with a        tilt  condition greater than 1.02 but less than 1.09 is provided to allow identification and correc-tion of a dropped or misaligned control rod. In the event such action action does not correct the      tilt,  the margin for uncertainty on F (Z) is reinstated by reducing the maximum allowed power by 3X for each percent of of  1.
tilt in excess For purposes of monitoring QUADRANT POWER TILT RATIO when one excore detector is inoperable, the movable incore detectors or incore thermocouple map are used to confirm that the normalized symmetric power distribution is consistent with the QUADRANT POWER TILT RATIO. The incore detector monitoring is done with a full incore flux map or two sets of four symmetric thimbles.
The two sets of four symmetric thimbles is a unique set of eight detector locations. These locations are C-8, E-5, E-ll, H-3, H-13, L-5, L-11, N-8.
3/4. 2. 5  ONB PARAMETERS The  limits  on the ONB-related parameters    assure  that  each of the  param-eters are maintained within the normal steady-state envelope of operation assumed in the transient and accident analyses.          The limits are consistent with the initial FSAR assumptions and have been analytically demonstrated ade-quate to maintain a minimum ONBR above the applicable design limits throughout each analyzed transient.        The indicated T      value of S7%$ 'F and the indicated avg          517~'F pressurizer pressure value of 288'sig correspond to analytical limits of
~4F 575'.2 act 2185 psig respectively, with allowance for measurement uncertainty.
                                            ~VS; 0On The  indicated  RCS  flow value of  ~%0      gpa corresponds to an analytical limit of    2%,500 gpa which is assumed to have a .          measurement uncertainty<.
The above measurement uncertainty estimates assume that these instrumen channel outputs are averaged to minimize the uncertainty.                        (<<ik<<tv<<t<<'<<I<<'he 12-hour periodic surveillance of these parameters through instrument readout is sufficient to ensure that the parameters are restored within their limits following load changes and other expected transient operation.
TURKEY POINT    - UNITS 3 4 4          B 3/4 2-8                  AMENDMENT NOSl37 AND 132
 
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 DNB Pa'rameters Limitin Condition  for 0 eration ATTACHMENT 2
 
Page  1 of 5 SAFETY ANALYSIS INTRODUCTION Pursuant to the requirements in    10 CFR 50.92, each application for  amendment  to an  operating license must be reviewed to determine  if  the modification involves a significant safety hazard. The proposed amendment, as defined in this report, has been reviewed and deemed not to involve a significant safety hazard based on the evaluation that follows.
This proposed amendment describes the following subjects:
Revision of Section 3/4.2.5, Power Distribution Limits, DNB Parameters,    reflecting revised indicated values; (a) RCS flow changing from >277,900 gpm to >275,000 gpm, (b) RCS Tavg changing from <576.6 F to <577.5 Fi (c) Pressurizer pressure changing from >2209 psig to
                >2205 psig.
These revisions are due to; (a) reduction of the uncertainties associated with the measurement of RCS flow, (b) the use of Eagle 21 digital process rack equipment for the treatment of Hot Leg and Cold Leg temperature, and (c) the replacement and respanning of the pressurizer pressure transmitters.
: 2. Revision of the Bases Section 3/4.2 5i Power.
Distribution Limits, DNB Parameters, to reflect the changes  noted in (l) above.
BACKGROUND In order to increase the operating margins associated with the DNB  limits, the changes to the Technical Specifications shown in  are being proposed by Florida Power and Light. The proposed revisions involve either; a)    reducing the uncertainties associated with the measurements of various parameters, b)    use of upgraded process instrumentation equipment, or c)    use  of upgraded transmitters.
 
Page 2  of 5 By  improving procedures and replacement of instrumentation, has been possible to provide additional operational margin to the it limits associated with the measurement and indication of RCS flow, Tavg and pressurizer pressure.
The  limits on  the DNB-related parameters  assure that each of the parameters  is maintained within the  normal steady-state envelope of operation assumed in the transient and accident analyses. The limits are consistent with the initial FSAR assumptions and have been demonstrated adequate to maintain the required minimum DNBR above the applicable design limits throughout each analyzed transient.
In conjunction with the RTD bypass elimination effort (which includes the use of digital process rack equipment for temperature related protection functions), and RPS/ESF Setpoint changes, Florida Power and Light Company is replacing the pressurizer pressure transmitters associated with the protection functions of Technical Specifications Section 2.2, Limiting Safety System Settings and Section 3/4.3.2, Engineered Safety Features Actuation System Instrumentation. With this equipment change, revision to the indicated limits on the DNB-related parameters is required. All of the limits have been recalculated with the use of the NRC approved Westinghouse Setpoint Methodology.
The methodology used    is the "square root of the sum of the squares" which has been used in other Westinghouse reports. This technique, or others of a similar nature, have been used in WCAP-10395,  Statistical Evaluation of  LOCA Heat Source Uncertainty, and    WCAP-8567, Improved Thermal Design Procedure.
WCAP-8567  is  approved by the NRC noting acceptability of statistical  techniques for the application requested. Also, various ANSI, American Nuclear Society, and Instrument Society of America standards approve the use of probabilistic and statistical techniques in determining safety-related setpoints (specifically ANSI/ANS Standard 58.4-1979, "Criteria for Technical Specifications for Nuclear Power Stations," and ISA Standard S67 04) 1987( Setpoints for Nuclear Safety-Related Instrumentation Used in Nuclear Power Plants" ) . The methodology used in this report is essentially the same as that used for V.
C. Summer in August, 1982; approved via NUREG-0717, Supplement No. 4, "Safety Evaluation Report related to the Operation of Virgil C. Summer Nuclear Station, Unit No. 1, " Docket No. 50-395, August 1982.
 
t ct
 
Page 3  of 5 IMPACT OF THE PROPOSED TECHNICAL SPECIFICATION CHANGE ON THE FINAL SAFETY ANALYSIS REPORT A  review of the FSAR safety analyses was performed to assess the effects of the proposed Technical Specification changes and determine the need for re-analysis.      Based on the review performed, re-analysis is not required. The assumptions for the various analyses are noted in Table 1.
TABLE  1 Basis Parameter            ~Ta v      Pressure        RCS  Flow LOCA  analyses            574.2  'F    2235 psig    268,500 gpm Non-LOCA Analyses          579.2  'F    2185 psig    268,500 gpm Controller Uncertainty + 5.0      'F  + 50  psig    N/A Indication Uncertainty + 1.7      'F  + 20  psig    + 2.6  0  flow Current Tech Spec Limit 576.6    'F    2209 psig    277, 900 gpm Proposed Tech Spec Limit 577.5    'F    2205 psig    275,000 gpm An  evaluation of the events which could be potentially impacted by the proposed Technical    Specification changes was performed and is presented below.
Non-LOCA Sachet  Anal ses RCS  Flow The  current indication limit for RCS flow measurement uncertainty is  based on the  NRC mandated value of 3.5% based on Turkey Point Units 3 and 4 not providing a justification for a smaller value.
This is the standard approach used by the Staff for such circumstances and has been determined to be acceptable by the Staff. With the removal of the RTD bypass manifolds, Westinghouse has performed an uncertainty calculation to determine the RCS flow measurement uncertainty based on revised plant procedures, techniques and the modified plant configuration. This calculation is specific to Turkey Point Units 3 and 4 and reflects the instrumentation and techniques utilized at these plants. The RCS flow measurement uncertainty calculated is 2.6% flow (without venturi fouling). Use of this calculated measurement uncertainty maintains the assumption of the safety analyses with regards to RCS flow, i.e., verification that RCS flow is greater than or equal to the thermal design flow. Decreasing the reactor coolant system flow measurement uncertainty from 3.5% to 2.6% does not affect the non-LOCA safety analyses. This decrease in uncertainty allows the flow requirement of T.S. 3/4;2.4 to be reduced to 275,000 gpm from the current technical Specification value of 277,900 gpm, while
 
Page 4 of 5 maintaining the current analytical thermal design flow limit of 268,500 gpm. The analytical limit of 268,500 gpm is used in the safety analyses.
Since the proposed change does not affect the flow used in the safety analyses, the proposed change to the flow Technical Specification is consistent and acceptable with respect to the non-LOCA safety analyses.
TAVG The  revised indicated value of 577.5 F for Tavg did not require a  change in the analysis assumptions. The analytic value assumed in the non-LOCA  safety analyses remains 579.2 F for Tavg. The change from the  analytic value of 578.2 F for Tavg quoted on the current Technical Specification Bases to the current analytic value of 579.2 F was previously evaluated as part of the RPS/ESF Setpoints and RTD bypass elimination proposed license amendments which are currently under NRC review. The current indication limit for Tavg (576.6 'F) is based on the accuracy of the Rod Control system utilizing analog process equipment throughout the control channel instrumentation. With the removal of the RTD bypass manifolds, digital process equipment has been installed for temperature related protection functions. This digital equipment converts the RTD output to a digital signal which is processed for protection functions. The digital signal is then converted back to an analog signal for processing by the analog control system. The utilization of both analog and digital process equipment, along with increasing the number of Hot Leg RTDs utilized, results in an increase in the uncertainty (+/- 1.0
'F) of the Tavg Rod Control system. The increase in the control system uncertainty has been factored into the Safety Analysis as a revised initial condition. The Median Signal Selector has been utilized for the determination of the appropriate loop indicated Tavg for control system use. The Median Signal Selector satisfies the requirements of IEEE 279 with regards to control/protection system interaction. Thus, the conclusions of the various affected safety analyses are maintained.
Pressurizer Pressure The revised indicated value of 2205 psig for pressurizer pressure does not require a change in the analytical value. The analytic value assumed in the non-LOCA safety analyses remains 2185 psig.
This represents an uncertainty of +/- 50 psi on initial pressurizer pressure. The current indication limit for pressurizer pressure (2209 psig) is based on the accuracy of the Pressurizer Pressure Control System and the use of protection channel transmitters for indication in the control room. The input signal is currently generated by a Rosemount 1153GD9 transmitter with an instrument span of 800 psig. Turkey Point Units 3 and 4 are upgrading the protection channel transmitters
 
Page 5 of 5 to Rosemount 1154SH transmitters with an instrument span of 1000 psig. The control channel transmitters will remain as Rosemount 1153GD9 transmitters with a respanning of the instrument channel to 1000 psig. Both of these modifications result in a change to the indication limit. Uncertainty calculations have been performed for the modifications; the increased instrument span for the control channel results in an increased control system uncertainty. This increased uncertainty has been previously evaluated or assumed in the non-LOCA safety analyses as a revised initial condition, therefore, the conclusions of the various affected safety analyses remain valid.
LOCA  Safet  Anal ses The  effect of the proposed  changes on  the results of the following  LOCA related accident analyses  was considered:
: 1. Large Break LOCA                  FSAR Chapter 14.3.2
: 2. Small Break LOCA                  FSAR Chapter 14.3.2
: 3. Blowdown Reactor Vessel and Loop Forces                      FSAR Chapter 14.3.3
: 4. Post-LOCA Long-term Core Cooling Subcriticality            FSAR Chapter 14.3.2
: 5. Hot Leg Switchover to Prevent Potential Boron Precipitation    FSAR Chapter 6.2 The results of the evaluation indicate that no adverse effect on the FSAR results for any of the analyses given above is expected.
This conclusion is based upon the fact that only the uncertainties associated with each of the DNB Technical Specification related parameters: RCS Tavg, pressurizer pressure, and RCS flow, have changed while the initial conditions for the accident analyses remain unchanged.
While the uncertainties associated with the RCS average temperature have changed by +/- 1 'F from that "typically" assumed (+/- 4 'F) acceptable from the perspective of the LOCA related transients, any effect of the increased uncertainty is expected to be negligible. Furthermore, the uncertainty associated with the pressurizer pressure remains unchanged while the uncertainty associated with the RCS flow has been reduced from 3.5% to 2.6%. However, since the safety analyses basis thermal design flow remains unchanged at a value of 268,500 gpm, the results of the LOCA related accident analyses remain unchanged.
The  evaluations presented above demonstrate that the results and conclusions of the safety analyses used to license the current operation of Turkey Point Units 3 and 4 remain valid after consideration of the proposed changes to the DNB Parameters Technical Specification.
 
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 DNB Parameters  Limitin Condition  for 0 eration ATTACHMENT 3
 
Page 1 of 7 NO  SIGNIFICANT HAZARDS DETERMINATION The  standards used to arrive at    a determination that a request for  amendment  involves a no significant hazards consideration are included in the Commission s regulations, 10 CFR 50.92, which states that no significant hazards considerations are involved the operations of the facility in accordance with the proposed if amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated or (3) involve a significant reduction in the margin of safety. Each standard for each parameter is discussed on the following pages.
RCS FLOW Operation of the  facility in  accordance with the proposed amendment would  not involve  a  significant increase in the probability or  consequences  of  an  accident previously evaluated.
The current indication limit for RCS flow measurement uncertainty is based on the NRC mandated value of 3.5% based on Turkey Point Units 3 and 4 not providing a justification for a smaller value. This is the standard approach used by the Staff for such circumstances and has been determined to be acceptable by the Staff. With the removal of the RTD bypass manifolds, Westinghouse has performed an uncertainty calculation to determine the RCS flow measurement uncertainty based on revised plant procedures, techniques and the modified plant configuration. This calculation is specific to Turkey Point Units 3 and 4 and reflects the instrumentation and techniques utilized at these plants.
The RCS flow measurement uncertainty calculated is 2.6% flow (without venturi fouling) . Use of this calculated measurement uncertainty maintains the assumption of the safety analyses with regards to RCS flow, i.e., verification that RCS flow is greater than or equal to the thermal design flow. Since the RCS flow analysis assumption is not changed, the conclusions of the various affected safety analyses remain valid. Therefore, revision of the indication limit to reflect the modified procedures, techniques and plant configuration does not increase the probability or consequences of the affected accidents previously analyzed.
In summary, the revised indication limit continues to preserve the initial conditions of the plant safety analyses. Therefore, the results and conclusions of the
 
Page 2  of 7 analyses are consistent with those performed previously.
Therefore, the proposed change does not affect the probability or  consequences of accidents previously analyzed.
Operation of the  facility in accordance with the proposed amendment  would not create the possibility of a new or different kind of accident previously evaluated.
The revised RCS flow value (275,000 gpm) reflects the removal of the RTD bypass manifolds, which is currently under NRC review, and measurement of Hot Leg and Cold Leg temperatures in a precise manner. Since the value noted preserves the verification of the measured RCS flow greater than or equal to thermal design flow, no new or different kind of accidents from that previously evaluated are created.
In summary, the revision reflects changes in plant design currently under NRC review and previously approved calculational methods. No new or different accidents from those previously evaluated have been created as a result of these revisions.
Use of the modified specification would not involve a significant reduction in the margin of safety.
The indication limit for measured RCS flow (275,000 gpm) maintains the initial condition for flow assumed in the safety analyses, i.e., RCS flow in the plant is verified to be greater than or equal to thermal design flow (268,500 gpm) . The measurement uncertainty is calculated consistent with other plants using Westinghouse Setpoint Methodology.
Therefore, the margin to safety is not reduced for this parameter.
In summary, the proposed revision to the Turkey Point Units 3 and 4 Technical Specifications explicitly reflects plant modifications currently under NRC review, (e.g., RTD Bypass Elimination proposed license amendment) and previously approved Westinghouse uncertainty calculational methodology.
The revision maintains the margin of safety previously defined in the current Technical Specifications by use of the same calculational approach and by maintaining the safety analyses assumptions and conclusions. The revised value provides increased operational margin through improved accuracy in instrumentation and measurement techniques without reduction in the previously defined margin to safety.
 
Page 3 of 7 Operation of the  facility in  accordance with the proposed amendment  would not involve a  significant increase in the probability or  consequences  of an accident previously evaluated.
The current indication limit for Tavg (576.6 F) is based on the accuracy of the Rod Control System utilizing analog process equipment throughout the control channel instrumentation. With the removal of the RTD bypass manifolds, digital process equipment has been installed for temperature related protection functions. This digital equipment converts the RTD output to a digital signal which is processed for protection functions. The digital signal is then converted back to an analog signal for processing by the analog control system. The utilization of both analog and digital process equipment, along with increasing the number of Hot Leg RTDs utilized, results in a change in the uncertainty (+/- 1.0 F) of the Tavg Rod Control System.
The increase in the control system uncertainty has been previously factored into the safety analyses as a revised initial condition. The Median Signal Selector has been utilized for the determination of the appropriate loop indicated Tavg for control system use. The Median Signal Selector satisfies the requirements of IEEE 279 with regards to control/protection system interaction. Thus, the conclusions of the various affected safety analyses are maintained. Therefore, revision of the indication limit to reflect the modified plant configuration and process instrumentation does not increase the probability or consequences of the affected accidents previously analyzed.
In summary, the revised indication limit (577.5 F) continues to preserve the initial conditions of the plant safety analyses. Thus, the results and conclusions of the analyses are consistent with those performed previously.
Therefore, the proposed change does not affect the probability or consequences of accidents previously analyzed.
Operation of the facility in accordance with the proposed amendment would not create the possibility of a new of different kind of accident previously evaluated.
The proposed  revision maintains the assumptions made in the safety analyses performed to reflect the installation of the upgraded equipment and thus does not create the possibility of a new or different kind of accident.
 
Page  4 of 7 The  revised indicated Tavg value (577.5 'F) reflects the inclusion of a digital to analog process instrumentation interface. The additional instrument uncertainties present as a result of this interface have been determined and incorporated into the safety analyses assumptions.      The conclusions of these analyses remain unchanged.
Control/protection interaction has been addressed by the utilization of the Median Signal Selector for selection of the appropriate Tavg channel for control. Use of the Median Signal Selector assures selection of the appropriate Tavg channel even after a single Tavg channel failure and precludes the need for action by the protection system.
This satisfies the requirements of IEEE 279. Based on this design feature and the continued validation of the safety analyses conclusions, no new or different kind of accidents from those previously evaluated are created.
In summary, the revision reflects changes in plant design currently under NRC review and previously approved calculational methodology. No new or different kind of accidents from those previously evaluated have been created as a result of these revisions.
: 3. Use of the modified specification would not involve a significant reduction in the margin of safety.
The  indication limit for Tavg is based on the accuracy of the  Rod Control System and the indication uncertainty in the control room. This limit maintains the initial condition for Tavg assumed in the safety analyses (579.2 F) . The revised Rod Control System accuracy and the revised indication uncertainty have been evaluated and the conclusions of the affected safety analyses remain unchanged. Therefore, the margin to safety is not reduced for this parameter.
In summary, the proposed revision to the Turkey Point Units 3  and 4 Technical Specifications explicitly reflects plant modifications currently under NRC review (i.e., RTD Bypass Elimination proposed license amendment), and previously approved uncertainty calculational methodology. The revision maintains the margin to safety previously defined in the current Technical Specifications by use of the same calculational approach and by maintaining the safety Analyses assumptions and conclusions. The revised value provides increased operational margin through improved accuracy in instrumentation and measurement techniques without reduction in the previously defined margin to safety.
 
Page 5 of  7 Pressurizer Pressure Operation of the  facility in  accordance with the proposed amendment would  not involve  a  significant increase in the probability or  consequences  of  an accident, previously evaluated.
The current indication limit for pressurizer pressure (2209 psig) is based on the accuracy of the Pressurizer Pressure Control System and use of protection channel transmitters for indication in the control room. The input signal is currently generated by a Rosemount 1153GD9 transmitter with an instrument span of 800 psig.      Turkey Point Units 3 and 4 are upgrading the protection channel transmitters to Rosemount 1154SH transmitters with an instrument span of 1000 psig. The control channel transmitters will remain as Rosemount 1153GD9 transmitters with a respanning of the instrument channel to 1000 psig. Both of these modifications result in a change to the indication limit.
Uncertainty calculations have been performed for the modifications; the increased instrument span for the control channel results in an increased control system uncertainty.
This increased uncertainty has been previously factored into the safety analyses as a revised initial condition. The conclusions of the various affected safety analyses are maintained. Utilization of the revised indication uncertainty, reflecting the use of the Rosemount 1154SH transmitters, preserves this initial condition assumption.
The Rosemount 1154SH transmitters are similar in design to the 1153GD9, thus no significant increase in the probability of an accident previously evaluated has been determined.
Since the conclusions of the safety analyses are maintained, no increase in the consequences of an accident previously evaluated has been determined.
In summary, the revised indication limit (2205 psig) continues to preserve the initial conditions of the plant safety analyses. Therefore, the results and conclusions of the analyses are consistent with those performed previously.
Thus, the proposed change does not affect the probability or consequences of accidents previously analyzed.
Operation of the  facility in  accordance with the proposed amendment would  not create the  possibility of a  new or different kind of accident, previously evaluated.
 
Page  6 of 7 The proposed  revision maintains the assumptions made in the safety and transient analyses performed to reflect the installation of the upgraded equipment and thus does not create the possibility of a new or different kind of accident. The revised indicated pressurizer Pressure value (2205 psig) reflects the transmitter replacement and respanning of the protection channels, used for control room indication, and the respanning of the control channel. The additional instrument uncertainties presented as a result of the channel respanning have been determined and previously incorporated into the initial condition assumptions of the safety analyses. The conclusions for these analyses remain unchanged. Control/protection interaction has been addressed by separation of the control and protection channels, i.e., no shared components, which addresses the requirements of IEEE 279. The design of the protection system replacement transmitters is similar to the present transmitters, thus no new or different kind of accidents from that previously evaluated are created.
In summary, the revision reflects changes in plant design currently under NRC review and previously approved calculational methods. No new or different accidents from those previously evaluated have been created as a result of these revisions.
Vse of the modified specification would not involve a significant reduction in the margin of safety.
The proposed changes maintain a margin of safety consistent with that used to determine the original indicated values for the parameters noted, i.e., the same  calculational methodology was used for both limits.
The indication limit for pressurizer pressure (2205 psig)    is based on the accuracy of the Pressurizer Pressure Control System and the indication uncertainty in the control room.
This  limit maintains  the initial condition for pressure assumed  in the safety analyses (2185 psig) . The revised control system accuracy and the revised indication uncertainty have been previously evaluated and the conclusions of the affected safety analyses remain unchanged. Therefore, the margin to safety is not reduced for this parameter.
In  summary, the proposed revision to the Turkey Point Units 3  and 4 Technical Specifications explicitly reflects previously approved uncertainty calculational methodology.
The revision maintains the margin of safety previously defined in the current Technical Specifications by using the same calculational approach and maintaining the safety
 
Page 7 of 7 analyses assumptions and conclusions.      The revised value provides increased operational margin through improved accuracy in instrumentation and measurement techniques without reduction in the previously defined margin of safety.
Based on the above,    it amendment request does not, has been determined  that the proposed (1)  involve  a significant increase in the probability or consequences  of  an  accident previously evaluated, (2)  create the probability of a new or different kind of accident from any accident previously evaluated, or (3)  involve a significant reduction in the margin of safety; and therefore, does not involve    any  significant safety hazards consideration.}}

Latest revision as of 23:29, 3 February 2020

Proposed Tech Spec 3/4.2.5 Re Power Distribution Limits,Dnb Parameters
ML17345A796
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/03/1991
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345A795 List:
References
NUDOCS 9104150044
Download: ML17345A796 (19)


Text

POWER DISTRIBUTION LIMITS 3/4.2.5 ONB PARAMETERS LIMITING CONDITION FOR OPERATION 3.2.5 The following DNB-related parameters shall be maintained within the following limits:

a. Reactor Coolant System g yy.~ F' T

< 5~7~

b. Pressurizer Pressure ~2 psig", and u~>5 ps'
c. Reactor Coolant System Flow 0O gpm a7H~ gpss APPLICABILITY: MODE 1.

ACTION:

With any of the above parameters exceeding its limit, restore the parameter to within'ts limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5X of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.2.5. 1 Each of the parameters shown above shall be verified to be within its limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4. 2. 5.2 The RCS flow rate indicators shall be subjected to a CHANNEL CALIBRATION at least once per 18 months.

4.2.5.3 The RCS flow rate shall be demonstrated by measurement once per 18 months.

"Limit not applicable during either a THERMAL POWER ramp in excess of 5X of RATED THERMAL POWER per minute or a THERMAL POWER step in excess of 10K of RATED THERMAL POWER.

,T~+<EY POINT - UNITS 3 4 4 3/4 2-16 AMENDMENT NOS.131 AND 132

. 9i04i50044 910403 PDR ADOCK 05000250 P PDR

rj I POWER DISTRIBUTION LIMITS BASES 3/4.2.4 UADRANT POWER TILT RATIO The QUADRANT POWER TILT RATIO limit assures that the radial power dis-tribution satisfies the design values used in the power capability analysis.

Radial power distribution measurements are made during STARTUP testing and periodically during power operation.

The limit of 1.02, at which corrective action is required, provides DNB and linear heat generation rate protection with x-y plane power tilts. A limit of 1.02 was selected to provide an allowance for the uncertainty asso-ciated with the indicated power tilt.

The 2-hour time allowance for operation with a tilt condition greater than 1.02 but less than 1.09 is provided to allow identification and correc-tion of a dropped or misaligned control rod. In the event such action action does not correct the tilt, the margin for uncertainty on F (Z) is reinstated by reducing the maximum allowed power by 3X for each percent of of 1.

tilt in excess For purposes of monitoring QUADRANT POWER TILT RATIO when one excore detector is inoperable, the movable incore detectors or incore thermocouple map are used to confirm that the normalized symmetric power distribution is consistent with the QUADRANT POWER TILT RATIO. The incore detector monitoring is done with a full incore flux map or two sets of four symmetric thimbles.

The two sets of four symmetric thimbles is a unique set of eight detector locations. These locations are C-8, E-5, E-ll, H-3, H-13, L-5, L-11, N-8.

3/4. 2. 5 ONB PARAMETERS The limits on the ONB-related parameters assure that each of the param-eters are maintained within the normal steady-state envelope of operation assumed in the transient and accident analyses. The limits are consistent with the initial FSAR assumptions and have been analytically demonstrated ade-quate to maintain a minimum ONBR above the applicable design limits throughout each analyzed transient. The indicated T value of S7%$ 'F and the indicated avg 517~'F pressurizer pressure value of 288'sig correspond to analytical limits of

~4F 575'.2 act 2185 psig respectively, with allowance for measurement uncertainty.

~VS; 0On The indicated RCS flow value of ~%0 gpa corresponds to an analytical limit of 2%,500 gpa which is assumed to have a . measurement uncertainty<.

The above measurement uncertainty estimates assume that these instrumen channel outputs are averaged to minimize the uncertainty. (<<ik<<tv<<t<<'<<I<<'he 12-hour periodic surveillance of these parameters through instrument readout is sufficient to ensure that the parameters are restored within their limits following load changes and other expected transient operation.

TURKEY POINT - UNITS 3 4 4 B 3/4 2-8 AMENDMENT NOSl37 AND 132

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 DNB Pa'rameters Limitin Condition for 0 eration ATTACHMENT 2

Page 1 of 5 SAFETY ANALYSIS INTRODUCTION Pursuant to the requirements in 10 CFR 50.92, each application for amendment to an operating license must be reviewed to determine if the modification involves a significant safety hazard. The proposed amendment, as defined in this report, has been reviewed and deemed not to involve a significant safety hazard based on the evaluation that follows.

This proposed amendment describes the following subjects:

Revision of Section 3/4.2.5, Power Distribution Limits, DNB Parameters, reflecting revised indicated values; (a) RCS flow changing from >277,900 gpm to >275,000 gpm, (b) RCS Tavg changing from <576.6 F to <577.5 Fi (c) Pressurizer pressure changing from >2209 psig to

>2205 psig.

These revisions are due to; (a) reduction of the uncertainties associated with the measurement of RCS flow, (b) the use of Eagle 21 digital process rack equipment for the treatment of Hot Leg and Cold Leg temperature, and (c) the replacement and respanning of the pressurizer pressure transmitters.

2. Revision of the Bases Section 3/4.2 5i Power.

Distribution Limits, DNB Parameters, to reflect the changes noted in (l) above.

BACKGROUND In order to increase the operating margins associated with the DNB limits, the changes to the Technical Specifications shown in are being proposed by Florida Power and Light. The proposed revisions involve either; a) reducing the uncertainties associated with the measurements of various parameters, b) use of upgraded process instrumentation equipment, or c) use of upgraded transmitters.

Page 2 of 5 By improving procedures and replacement of instrumentation, has been possible to provide additional operational margin to the it limits associated with the measurement and indication of RCS flow, Tavg and pressurizer pressure.

The limits on the DNB-related parameters assure that each of the parameters is maintained within the normal steady-state envelope of operation assumed in the transient and accident analyses. The limits are consistent with the initial FSAR assumptions and have been demonstrated adequate to maintain the required minimum DNBR above the applicable design limits throughout each analyzed transient.

In conjunction with the RTD bypass elimination effort (which includes the use of digital process rack equipment for temperature related protection functions), and RPS/ESF Setpoint changes, Florida Power and Light Company is replacing the pressurizer pressure transmitters associated with the protection functions of Technical Specifications Section 2.2, Limiting Safety System Settings and Section 3/4.3.2, Engineered Safety Features Actuation System Instrumentation. With this equipment change, revision to the indicated limits on the DNB-related parameters is required. All of the limits have been recalculated with the use of the NRC approved Westinghouse Setpoint Methodology.

The methodology used is the "square root of the sum of the squares" which has been used in other Westinghouse reports. This technique, or others of a similar nature, have been used in WCAP-10395, Statistical Evaluation of LOCA Heat Source Uncertainty, and WCAP-8567, Improved Thermal Design Procedure.

WCAP-8567 is approved by the NRC noting acceptability of statistical techniques for the application requested. Also, various ANSI, American Nuclear Society, and Instrument Society of America standards approve the use of probabilistic and statistical techniques in determining safety-related setpoints (specifically ANSI/ANS Standard 58.4-1979, "Criteria for Technical Specifications for Nuclear Power Stations," and ISA Standard S67 04) 1987( Setpoints for Nuclear Safety-Related Instrumentation Used in Nuclear Power Plants" ) . The methodology used in this report is essentially the same as that used for V.

C. Summer in August, 1982; approved via NUREG-0717, Supplement No. 4, "Safety Evaluation Report related to the Operation of Virgil C. Summer Nuclear Station, Unit No. 1, " Docket No. 50-395, August 1982.

t ct

Page 3 of 5 IMPACT OF THE PROPOSED TECHNICAL SPECIFICATION CHANGE ON THE FINAL SAFETY ANALYSIS REPORT A review of the FSAR safety analyses was performed to assess the effects of the proposed Technical Specification changes and determine the need for re-analysis. Based on the review performed, re-analysis is not required. The assumptions for the various analyses are noted in Table 1.

TABLE 1 Basis Parameter ~Ta v Pressure RCS Flow LOCA analyses 574.2 'F 2235 psig 268,500 gpm Non-LOCA Analyses 579.2 'F 2185 psig 268,500 gpm Controller Uncertainty + 5.0 'F + 50 psig N/A Indication Uncertainty + 1.7 'F + 20 psig + 2.6 0 flow Current Tech Spec Limit 576.6 'F 2209 psig 277, 900 gpm Proposed Tech Spec Limit 577.5 'F 2205 psig 275,000 gpm An evaluation of the events which could be potentially impacted by the proposed Technical Specification changes was performed and is presented below.

Non-LOCA Sachet Anal ses RCS Flow The current indication limit for RCS flow measurement uncertainty is based on the NRC mandated value of 3.5% based on Turkey Point Units 3 and 4 not providing a justification for a smaller value.

This is the standard approach used by the Staff for such circumstances and has been determined to be acceptable by the Staff. With the removal of the RTD bypass manifolds, Westinghouse has performed an uncertainty calculation to determine the RCS flow measurement uncertainty based on revised plant procedures, techniques and the modified plant configuration. This calculation is specific to Turkey Point Units 3 and 4 and reflects the instrumentation and techniques utilized at these plants. The RCS flow measurement uncertainty calculated is 2.6% flow (without venturi fouling). Use of this calculated measurement uncertainty maintains the assumption of the safety analyses with regards to RCS flow, i.e., verification that RCS flow is greater than or equal to the thermal design flow. Decreasing the reactor coolant system flow measurement uncertainty from 3.5% to 2.6% does not affect the non-LOCA safety analyses. This decrease in uncertainty allows the flow requirement of T.S. 3/4;2.4 to be reduced to 275,000 gpm from the current technical Specification value of 277,900 gpm, while

Page 4 of 5 maintaining the current analytical thermal design flow limit of 268,500 gpm. The analytical limit of 268,500 gpm is used in the safety analyses.

Since the proposed change does not affect the flow used in the safety analyses, the proposed change to the flow Technical Specification is consistent and acceptable with respect to the non-LOCA safety analyses.

TAVG The revised indicated value of 577.5 F for Tavg did not require a change in the analysis assumptions. The analytic value assumed in the non-LOCA safety analyses remains 579.2 F for Tavg. The change from the analytic value of 578.2 F for Tavg quoted on the current Technical Specification Bases to the current analytic value of 579.2 F was previously evaluated as part of the RPS/ESF Setpoints and RTD bypass elimination proposed license amendments which are currently under NRC review. The current indication limit for Tavg (576.6 'F) is based on the accuracy of the Rod Control system utilizing analog process equipment throughout the control channel instrumentation. With the removal of the RTD bypass manifolds, digital process equipment has been installed for temperature related protection functions. This digital equipment converts the RTD output to a digital signal which is processed for protection functions. The digital signal is then converted back to an analog signal for processing by the analog control system. The utilization of both analog and digital process equipment, along with increasing the number of Hot Leg RTDs utilized, results in an increase in the uncertainty (+/- 1.0

'F) of the Tavg Rod Control system. The increase in the control system uncertainty has been factored into the Safety Analysis as a revised initial condition. The Median Signal Selector has been utilized for the determination of the appropriate loop indicated Tavg for control system use. The Median Signal Selector satisfies the requirements of IEEE 279 with regards to control/protection system interaction. Thus, the conclusions of the various affected safety analyses are maintained.

Pressurizer Pressure The revised indicated value of 2205 psig for pressurizer pressure does not require a change in the analytical value. The analytic value assumed in the non-LOCA safety analyses remains 2185 psig.

This represents an uncertainty of +/- 50 psi on initial pressurizer pressure. The current indication limit for pressurizer pressure (2209 psig) is based on the accuracy of the Pressurizer Pressure Control System and the use of protection channel transmitters for indication in the control room. The input signal is currently generated by a Rosemount 1153GD9 transmitter with an instrument span of 800 psig. Turkey Point Units 3 and 4 are upgrading the protection channel transmitters

Page 5 of 5 to Rosemount 1154SH transmitters with an instrument span of 1000 psig. The control channel transmitters will remain as Rosemount 1153GD9 transmitters with a respanning of the instrument channel to 1000 psig. Both of these modifications result in a change to the indication limit. Uncertainty calculations have been performed for the modifications; the increased instrument span for the control channel results in an increased control system uncertainty. This increased uncertainty has been previously evaluated or assumed in the non-LOCA safety analyses as a revised initial condition, therefore, the conclusions of the various affected safety analyses remain valid.

LOCA Safet Anal ses The effect of the proposed changes on the results of the following LOCA related accident analyses was considered:

1. Large Break LOCA FSAR Chapter 14.3.2
2. Small Break LOCA FSAR Chapter 14.3.2
3. Blowdown Reactor Vessel and Loop Forces FSAR Chapter 14.3.3
4. Post-LOCA Long-term Core Cooling Subcriticality FSAR Chapter 14.3.2
5. Hot Leg Switchover to Prevent Potential Boron Precipitation FSAR Chapter 6.2 The results of the evaluation indicate that no adverse effect on the FSAR results for any of the analyses given above is expected.

This conclusion is based upon the fact that only the uncertainties associated with each of the DNB Technical Specification related parameters: RCS Tavg, pressurizer pressure, and RCS flow, have changed while the initial conditions for the accident analyses remain unchanged.

While the uncertainties associated with the RCS average temperature have changed by +/- 1 'F from that "typically" assumed (+/- 4 'F) acceptable from the perspective of the LOCA related transients, any effect of the increased uncertainty is expected to be negligible. Furthermore, the uncertainty associated with the pressurizer pressure remains unchanged while the uncertainty associated with the RCS flow has been reduced from 3.5% to 2.6%. However, since the safety analyses basis thermal design flow remains unchanged at a value of 268,500 gpm, the results of the LOCA related accident analyses remain unchanged.

The evaluations presented above demonstrate that the results and conclusions of the safety analyses used to license the current operation of Turkey Point Units 3 and 4 remain valid after consideration of the proposed changes to the DNB Parameters Technical Specification.

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 DNB Parameters Limitin Condition for 0 eration ATTACHMENT 3

Page 1 of 7 NO SIGNIFICANT HAZARDS DETERMINATION The standards used to arrive at a determination that a request for amendment involves a no significant hazards consideration are included in the Commission s regulations, 10 CFR 50.92, which states that no significant hazards considerations are involved the operations of the facility in accordance with the proposed if amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated or (3) involve a significant reduction in the margin of safety. Each standard for each parameter is discussed on the following pages.

RCS FLOW Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.

The current indication limit for RCS flow measurement uncertainty is based on the NRC mandated value of 3.5% based on Turkey Point Units 3 and 4 not providing a justification for a smaller value. This is the standard approach used by the Staff for such circumstances and has been determined to be acceptable by the Staff. With the removal of the RTD bypass manifolds, Westinghouse has performed an uncertainty calculation to determine the RCS flow measurement uncertainty based on revised plant procedures, techniques and the modified plant configuration. This calculation is specific to Turkey Point Units 3 and 4 and reflects the instrumentation and techniques utilized at these plants.

The RCS flow measurement uncertainty calculated is 2.6% flow (without venturi fouling) . Use of this calculated measurement uncertainty maintains the assumption of the safety analyses with regards to RCS flow, i.e., verification that RCS flow is greater than or equal to the thermal design flow. Since the RCS flow analysis assumption is not changed, the conclusions of the various affected safety analyses remain valid. Therefore, revision of the indication limit to reflect the modified procedures, techniques and plant configuration does not increase the probability or consequences of the affected accidents previously analyzed.

In summary, the revised indication limit continues to preserve the initial conditions of the plant safety analyses. Therefore, the results and conclusions of the

Page 2 of 7 analyses are consistent with those performed previously.

Therefore, the proposed change does not affect the probability or consequences of accidents previously analyzed.

Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident previously evaluated.

The revised RCS flow value (275,000 gpm) reflects the removal of the RTD bypass manifolds, which is currently under NRC review, and measurement of Hot Leg and Cold Leg temperatures in a precise manner. Since the value noted preserves the verification of the measured RCS flow greater than or equal to thermal design flow, no new or different kind of accidents from that previously evaluated are created.

In summary, the revision reflects changes in plant design currently under NRC review and previously approved calculational methods. No new or different accidents from those previously evaluated have been created as a result of these revisions.

Use of the modified specification would not involve a significant reduction in the margin of safety.

The indication limit for measured RCS flow (275,000 gpm) maintains the initial condition for flow assumed in the safety analyses, i.e., RCS flow in the plant is verified to be greater than or equal to thermal design flow (268,500 gpm) . The measurement uncertainty is calculated consistent with other plants using Westinghouse Setpoint Methodology.

Therefore, the margin to safety is not reduced for this parameter.

In summary, the proposed revision to the Turkey Point Units 3 and 4 Technical Specifications explicitly reflects plant modifications currently under NRC review, (e.g., RTD Bypass Elimination proposed license amendment) and previously approved Westinghouse uncertainty calculational methodology.

The revision maintains the margin of safety previously defined in the current Technical Specifications by use of the same calculational approach and by maintaining the safety analyses assumptions and conclusions. The revised value provides increased operational margin through improved accuracy in instrumentation and measurement techniques without reduction in the previously defined margin to safety.

Page 3 of 7 Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.

The current indication limit for Tavg (576.6 F) is based on the accuracy of the Rod Control System utilizing analog process equipment throughout the control channel instrumentation. With the removal of the RTD bypass manifolds, digital process equipment has been installed for temperature related protection functions. This digital equipment converts the RTD output to a digital signal which is processed for protection functions. The digital signal is then converted back to an analog signal for processing by the analog control system. The utilization of both analog and digital process equipment, along with increasing the number of Hot Leg RTDs utilized, results in a change in the uncertainty (+/- 1.0 F) of the Tavg Rod Control System.

The increase in the control system uncertainty has been previously factored into the safety analyses as a revised initial condition. The Median Signal Selector has been utilized for the determination of the appropriate loop indicated Tavg for control system use. The Median Signal Selector satisfies the requirements of IEEE 279 with regards to control/protection system interaction. Thus, the conclusions of the various affected safety analyses are maintained. Therefore, revision of the indication limit to reflect the modified plant configuration and process instrumentation does not increase the probability or consequences of the affected accidents previously analyzed.

In summary, the revised indication limit (577.5 F) continues to preserve the initial conditions of the plant safety analyses. Thus, the results and conclusions of the analyses are consistent with those performed previously.

Therefore, the proposed change does not affect the probability or consequences of accidents previously analyzed.

Operation of the facility in accordance with the proposed amendment would not create the possibility of a new of different kind of accident previously evaluated.

The proposed revision maintains the assumptions made in the safety analyses performed to reflect the installation of the upgraded equipment and thus does not create the possibility of a new or different kind of accident.

Page 4 of 7 The revised indicated Tavg value (577.5 'F) reflects the inclusion of a digital to analog process instrumentation interface. The additional instrument uncertainties present as a result of this interface have been determined and incorporated into the safety analyses assumptions. The conclusions of these analyses remain unchanged.

Control/protection interaction has been addressed by the utilization of the Median Signal Selector for selection of the appropriate Tavg channel for control. Use of the Median Signal Selector assures selection of the appropriate Tavg channel even after a single Tavg channel failure and precludes the need for action by the protection system.

This satisfies the requirements of IEEE 279. Based on this design feature and the continued validation of the safety analyses conclusions, no new or different kind of accidents from those previously evaluated are created.

In summary, the revision reflects changes in plant design currently under NRC review and previously approved calculational methodology. No new or different kind of accidents from those previously evaluated have been created as a result of these revisions.

3. Use of the modified specification would not involve a significant reduction in the margin of safety.

The indication limit for Tavg is based on the accuracy of the Rod Control System and the indication uncertainty in the control room. This limit maintains the initial condition for Tavg assumed in the safety analyses (579.2 F) . The revised Rod Control System accuracy and the revised indication uncertainty have been evaluated and the conclusions of the affected safety analyses remain unchanged. Therefore, the margin to safety is not reduced for this parameter.

In summary, the proposed revision to the Turkey Point Units 3 and 4 Technical Specifications explicitly reflects plant modifications currently under NRC review (i.e., RTD Bypass Elimination proposed license amendment), and previously approved uncertainty calculational methodology. The revision maintains the margin to safety previously defined in the current Technical Specifications by use of the same calculational approach and by maintaining the safety Analyses assumptions and conclusions. The revised value provides increased operational margin through improved accuracy in instrumentation and measurement techniques without reduction in the previously defined margin to safety.

Page 5 of 7 Pressurizer Pressure Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident, previously evaluated.

The current indication limit for pressurizer pressure (2209 psig) is based on the accuracy of the Pressurizer Pressure Control System and use of protection channel transmitters for indication in the control room. The input signal is currently generated by a Rosemount 1153GD9 transmitter with an instrument span of 800 psig. Turkey Point Units 3 and 4 are upgrading the protection channel transmitters to Rosemount 1154SH transmitters with an instrument span of 1000 psig. The control channel transmitters will remain as Rosemount 1153GD9 transmitters with a respanning of the instrument channel to 1000 psig. Both of these modifications result in a change to the indication limit.

Uncertainty calculations have been performed for the modifications; the increased instrument span for the control channel results in an increased control system uncertainty.

This increased uncertainty has been previously factored into the safety analyses as a revised initial condition. The conclusions of the various affected safety analyses are maintained. Utilization of the revised indication uncertainty, reflecting the use of the Rosemount 1154SH transmitters, preserves this initial condition assumption.

The Rosemount 1154SH transmitters are similar in design to the 1153GD9, thus no significant increase in the probability of an accident previously evaluated has been determined.

Since the conclusions of the safety analyses are maintained, no increase in the consequences of an accident previously evaluated has been determined.

In summary, the revised indication limit (2205 psig) continues to preserve the initial conditions of the plant safety analyses. Therefore, the results and conclusions of the analyses are consistent with those performed previously.

Thus, the proposed change does not affect the probability or consequences of accidents previously analyzed.

Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident, previously evaluated.

Page 6 of 7 The proposed revision maintains the assumptions made in the safety and transient analyses performed to reflect the installation of the upgraded equipment and thus does not create the possibility of a new or different kind of accident. The revised indicated pressurizer Pressure value (2205 psig) reflects the transmitter replacement and respanning of the protection channels, used for control room indication, and the respanning of the control channel. The additional instrument uncertainties presented as a result of the channel respanning have been determined and previously incorporated into the initial condition assumptions of the safety analyses. The conclusions for these analyses remain unchanged. Control/protection interaction has been addressed by separation of the control and protection channels, i.e., no shared components, which addresses the requirements of IEEE 279. The design of the protection system replacement transmitters is similar to the present transmitters, thus no new or different kind of accidents from that previously evaluated are created.

In summary, the revision reflects changes in plant design currently under NRC review and previously approved calculational methods. No new or different accidents from those previously evaluated have been created as a result of these revisions.

Vse of the modified specification would not involve a significant reduction in the margin of safety.

The proposed changes maintain a margin of safety consistent with that used to determine the original indicated values for the parameters noted, i.e., the same calculational methodology was used for both limits.

The indication limit for pressurizer pressure (2205 psig) is based on the accuracy of the Pressurizer Pressure Control System and the indication uncertainty in the control room.

This limit maintains the initial condition for pressure assumed in the safety analyses (2185 psig) . The revised control system accuracy and the revised indication uncertainty have been previously evaluated and the conclusions of the affected safety analyses remain unchanged. Therefore, the margin to safety is not reduced for this parameter.

In summary, the proposed revision to the Turkey Point Units 3 and 4 Technical Specifications explicitly reflects previously approved uncertainty calculational methodology.

The revision maintains the margin of safety previously defined in the current Technical Specifications by using the same calculational approach and maintaining the safety

Page 7 of 7 analyses assumptions and conclusions. The revised value provides increased operational margin through improved accuracy in instrumentation and measurement techniques without reduction in the previously defined margin of safety.

Based on the above, it amendment request does not, has been determined that the proposed (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the probability of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in the margin of safety; and therefore, does not involve any significant safety hazards consideration.