Text
.'ACCELERATED DIS UTION DEMONS TION SYSTEM
/
~ '
~
R I
D REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
,ACCESSION NBR:9104150042 DOC.DATE: 91/04/03 NOTARIZED: YES
=
DOCKET' FACIL:50-250 Turkey Point Plan't,'Unit.3, Florida Power and Light C 05000250
'0-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.
Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amends to Licenses DPR-31
& DPR-41,changing I
Tech Spec 3/4.2.5, "Power Distribution Limits,DNB Parameters" to provide addi operational margin to limits associated w/RCS flow 6 RCS average temp.
S DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR g ENCLf SIZE:
TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R
'INTERNAL: NRR/DET/ECMB 9H NRR/DOEA/OTSB1 1 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC/LF RE
-BE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB NSIC COPIES LTTR ENCL 1
1 1
1 1-"
1 1
1 1
1 1
0 1
1 1
1 A
D D
i' l
D S
NOTE TO ALL"RIDS" RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 16
~
~
g'
~
A A
'I I
4 f
P.O. Box14000, Juno Beach, FL 33408-0420 APR 08 19St L-91-86 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Proposed License Amendment DNB Parameters Limitin Condition for 0 eration In accordance with 10 CFR 50.90, Florida Power
& Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to modify the Turkey Point Units 3 and 4 Technical Specification 3/4.2.5, Power Distribution Limits, DNB Parameters, Limiting Condition for Operation and the Bases Section 3/4.2.5, Power Distzibution Limits, DNB Parameters.
The proposed amendment provides additional operational mazgin associ-ated with the DNB parameters by changing the indicated values of the operating parameters as follows:
1.
Flow from >277,900 gpm to
>275,000
- gpm, t
2.
RCS average temperature from <576.6 'F to <577.5 'F, 3.
Pressurizer pressure from >2209 psig to >2205 psig.
The proposed amendment also revises the Bases Section 3/4.2.5, Power Distribution Limits, DNB Parameters, to reflect the changes listed above.
Additional operational margin to the limits associated with the measurement and indication of RCS flow, RCS average temperature, and pressurizer pressure may be provided by the improvement of procedures, replacement of instrumentation, and recalculation of the limits with the use of the NRC approved Westinghouse Setpoint Methodology.
FPL has determined that the proposed amendment does not involve a significant hazard pursuant to 10 CFR 50.92.
The proposed revised Technical Specification change is.shown in Attachment 1.
A descrip-tion of the amendment request and the supporting safety analysis which forms the basis for a no significant hazards determination is provided in Attachment 2.
Attachment 3 provides the no significant hazards determination in support of the proposed amendment.
9104i50042 9i0403 PDR ADQCK 05000250 P
)
~ m n an FPL Group company
<'-'UU20
t 2,
In accordance with 10 CFR 50. 91 (b)
(1),
a copy of this proposed license amendment is being forwarded to the State Designee for the State of Florida.
The proposed amendment has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the FPL Company Nuclear Review Board.
Should there be any questions on this request, please contact us.
Very truly yours, W.
H. Bo lke Vice President Nuclear Engineering and Licensing WHB/OIH Attachments CC:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Mr. Jacob Daniel Nash, Florida Department of Health and Rehabilitative Services
STATE OF FLORIDA COUNTY OF DADE
)
)
ss
~
)
W.
H. Bohlke being first duly sworn, deposes and says:
That he is Vice President Nuclear En ineerin and Licensin of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
W.
H. Bohlke Subscribed and sworn to before me this day of 1 991
~
Ij c
Notar Y Public, State af Florbfa Ng Commission Expires Jag. )6, ]g93 eo"ded rhrv troy fain IAswonce IP yg>r
'~Vs'ARY PUBLICr in and for the County of
- Dade, State of Florida I
V My'ommission expires
'i, r.
l~h p
)
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 DNB Parameters Limitin Condition for 0 eration ATTACHMENT 1
'