(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML18081A296 | | | number = ML18081A296 |
| | issue date = 03/22/2018 | | | issue date = 03/22/2018 |
| | title = 2018/03/22 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) | | | title = NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) |
| | author name = Wall S P | | | author name = Wall S |
| | author affiliation = NRC/NRR/DORL/LSPB | | | author affiliation = NRC/NRR/DORL/LSPB |
| | addressee name = Hazelhoff A C | | | addressee name = Hazelhoff A |
| | addressee affiliation = Entergy Nuclear Operations, Inc | | | addressee affiliation = Entergy Nuclear Operations, Inc |
| | docket = 05000255 | | | docket = 05000255 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1NRR-DMPSPEm Resource From:Wall, Scott Sent:Thursday, March 22, 2018 10:44 AM To:HAZELHOFF, AMY C; MIKSA, JAMES P; ERICKSON, JEFFREY S Cc:Rankin, Jennivine; Norris, Michael; Kinard, Richard | | {{#Wiki_filter:NRR-DMPSPEm Resource From: Wall, Scott Sent: Thursday, March 22, 2018 10:44 AM To: HAZELHOFF, AMY C; MIKSA, JAMES P; ERICKSON, JEFFREY S Cc: Rankin, Jennivine; Norris, Michael; Kinard, Richard |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Palisades - Final RAI Concerning Site Emergency Plan Chan ges (CAC MG0198; EPID L-2017-LLA-0305) | | Palisades - Final RAI Concerning Site Emergency Plan Changes (CAC MG0198; EPID L-2017-LLA-0305) |
| Attachments: | | Attachments: LTR - Final RAIs - EP Changes.pdf |
| LTR - Final RAIs - EP Changes.pdf Amy, Attached are requests for additional information (RAIs) concerning the August 31, 2017 (ADAMS Accession No. ML17248A389, Entergy Nuclear Operations, Inc. (ENO, the licensee) submittal regarding changes to the Palisades Nuclear Plant (Palisades) Emergency Response Organization (ERO) on-shift and augmented staffing, based on the certifications for permanent cessation of power operations and permanent removal of fuel from the reactor vessel to the NRC in accordance with §50.82(a)(1)(i) and (ii) to Title 10 of the Code of Federal Regulations (10 CFR). | | : Amy, Attached are requests for additional information (RAIs) concerning the August 31, 2017 (ADAMS Accession No. ML17248A389, Entergy Nuclear Operations, Inc. (ENO, the licensee) submittal regarding changes to the Palisades Nuclear Plant (Palisades) Emergency Response Organization (ERO) on-shift and augmented staffing, based on the certifications for permanent cessation of power operations and permanent removal of fuel from the reactor vessel to the NRC in accordance with §50.82(a)(1)(i) and (ii) to Title 10 of the Code of Federal Regulations (10 CFR). |
| As discussed by phone on March 22, 2018, ENO has agreed to a 30 day response to these RAIs. | | As discussed by phone on March 22, 2018, ENO has agreed to a 30 day response to these RAIs. |
| | : Regards, Scott P. Wall, LSS BB, BSP Senior Project Manager Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov 1 |
|
| |
|
| Regards, Scott P. Wall, LSS BB, BSP Senior Project Manager Special Projects and Process Branch
| | Hearing Identifier: NRR_DMPS Email Number: 253 Mail Envelope Properties (DM5PR09MB22331337630FC22AD95CC38292A90) |
| | |
| Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
| |
| | |
| 301.415.2855 Scott.Wall@nrc.gov
| |
| | |
| Hearing Identifier: NRR_DMPS Email Number: 253 Mail Envelope Properties (DM5PR09MB22331337630FC22AD95CC38292A90) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Palisades - Final RAI Concerning Site Emergency Plan Changes (CAC MG0198; EPID L-2017-LLA-0305) Sent Date: 3/22/2018 10:43:33 AM Received Date: 3/22/2018 10:43:00 AM From: Wall, Scott Created By: Scott.Wall@nrc.gov Recipients: "Rankin, Jennivine" <Jenn ivine.Rankin@nrc.gov> Tracking Status: None "Norris, Michael" <Michael.Norris@nrc.gov> Tracking Status: None "Kinard, Richard" <Richard.Kinard@nrc.gov> | | Palisades - Final RAI Concerning Site Emergency Plan Changes (CAC MG0198; EPID L-2017-LLA-0305) |
| Tracking Status: None "HAZELHOFF, AMY C" <ahazelh@entergy.com> Tracking Status: None "MIKSA, JAMES P" <jmiksa@entergy.com> Tracking Status: None "ERICKSON, JEFFREY S" <JERICKS@entergy.com> Tracking Status: None Post Office: DM5PR09MB2233.namprd09.prod.outlook.com | | Sent Date: 3/22/2018 10:43:33 AM Received Date: 3/22/2018 10:43:00 AM From: Wall, Scott Created By: Scott.Wall@nrc.gov Recipients: |
| | | "Rankin, Jennivine" <Jennivine.Rankin@nrc.gov> |
| Files Size Date & Time MESSAGE 936 3/22/2018 10:43:00 AM LTR - Final RAIs - EP Changes.pdf 134950 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | | Tracking Status: None "Norris, Michael" <Michael.Norris@nrc.gov> |
| DRAFT REQUEST FOR ADDITIONAL INFORMATION CHANGINGS TO SITE EMERGENCY PLAN ENTERGY NUCLEAR OPERATIONS, INC PALISADES NUCLEAR PLANT DOCKET NO. 50-255
| | Tracking Status: None "Kinard, Richard" <Richard.Kinard@nrc.gov> |
| | | Tracking Status: None "HAZELHOFF, AMY C" <ahazelh@entergy.com> |
| By letter dated August 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17248A389), Entergy Nuclear Operations, Inc. (ENO, the licensee), requested prior U.S. Nuclear Regulatory Commission (NRC) approval of an amendment to the Palisades Nuclear Plant (PNP) site emergency plan (SEP) in support of ENO's intent to permanently cease power operations at PNP no later than May 31, 2022. The proposed amendment to the PNP SEP would revise the PNP Emergency Response Organization (ERO) on-shift and augmented staffing, based on the certifications for permanent cessation of power operations and permanent removal of fuel from the reactor vessel to the NRC in accordance with §50.82(a)(1)(i) and (ii) to Title 10 of the Code of Federal Regulations (10 CFR).
| | Tracking Status: None "MIKSA, JAMES P" <jmiksa@entergy.com> |
| The NRC staff has reviewed the application and determined that additional information is needed for the staff to complete its review. RAI-PNP-1 Minimum staffing is explicitly addressed in the following sections of Attachment 1, "Description and Evaluation of the Proposed Changes," to ENO's August 31, 2017, letter: Section 3.2.2.1, "Technical Support Center" (page 24 of 35); Section 3.2.2.2, "Operations Support Center" (page 26 of 35), and Section 3.2.2.3, "Emergency Operations Facility" (page 27 of 35). In the letter, only minimum staffing positions at the Technical Support Center (TSC) are proposed to be eliminated, with no minimum staff proposed for elimination at the Operations Support Center (OSC) or Emergency Operations Facility (EOF). Section 3.2.2.4, "Joint Information Center" (page 29 of 35) is silent on the proposed outcome of minimum staff positions. However, in reviewing pages 7 - 8 of Attachment 6, "Emergency Response Organization Task Analysis," to ENO's August 31, 2017, letter all Joint Information Center (JIC) positions, whether to be retained or eliminated, are shown as being minimum staff. Please provide additional clarification regarding the intended minimum staffing positions at the JIC.
| | Tracking Status: None "ERICKSON, JEFFREY S" <JERICKS@entergy.com> |
| | Tracking Status: None Post Office: DM5PR09MB2233.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 936 3/22/2018 10:43:00 AM LTR - Final RAIs - EP Changes.pdf 134950 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received: |
|
| |
|
| RAI-PNP-2 Section 3.2.2.1, "Technical Support Center," (page 24 of 35) of Attachment 1 to the August 31, 2017 letter, ENO states, in part: | | DRAFT REQUEST FOR ADDITIONAL INFORMATION CHANGINGS TO SITE EMERGENCY PLAN ENTERGY NUCLEAR OPERATIONS, INC PALISADES NUCLEAR PLANT DOCKET NO. 50-255 By letter dated August 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17248A389), Entergy Nuclear Operations, Inc. (ENO, the licensee), |
| | requested prior U.S. Nuclear Regulatory Commission (NRC) approval of an amendment to the Palisades Nuclear Plant (PNP) site emergency plan (SEP) in support of ENOs intent to permanently cease power operations at PNP no later than May 31, 2022. The proposed amendment to the PNP SEP would revise the PNP Emergency Response Organization (ERO) on-shift and augmented staffing, based on the certifications for permanent cessation of power operations and permanent removal of fuel from the reactor vessel to the NRC in accordance with §50.82(a)(1)(i) and (ii) to Title 10 of the Code of Federal Regulations (10 CFR). |
| | The NRC staff has reviewed the application and determined that additional information is needed for the staff to complete its review. |
| | RAI-PNP-1 Minimum staffing is explicitly addressed in the following sections of Attachment 1, Description and Evaluation of the Proposed Changes, to ENOs August 31, 2017, letter: Section 3.2.2.1, Technical Support Center (page 24 of 35); Section 3.2.2.2, Operations Support Center (page 26 of 35), and Section 3.2.2.3, Emergency Operations Facility (page 27 of 35). In the letter, only minimum staffing positions at the Technical Support Center (TSC) are proposed to be eliminated, with no minimum staff proposed for elimination at the Operations Support Center (OSC) or Emergency Operations Facility (EOF). Section 3.2.2.4, Joint Information Center (page 29 of 35) is silent on the proposed outcome of minimum staff positions. However, in reviewing pages 7 - 8 of Attachment 6, Emergency Response Organization Task Analysis, to ENOs August 31, 2017, letter all Joint Information Center (JIC) positions, whether to be retained or eliminated, are shown as being minimum staff. Please provide additional clarification regarding the intended minimum staffing positions at the JIC. |
| | RAI-PNP-2 Section 3.2.2.1, Technical Support Center, (page 24 of 35) of Attachment 1 to the August 31, 2017 letter, ENO states, in part: |
| | TSC Engineers (Electrical, I&C, and Mechanical) - The primary duties of the TSC Engineer positions include responding to engineering requests from the Engineering Coordinator, evaluating the implementation of Severe Accident Management Guidelines, and assisting the OSC in preparing to send repair teams into the plant. These duties are either no longer necessary in a permanently shut down and defueled condition or will be performed by the Engineering Coordinator. The Engineering Coordinator is tasked with |
|
| |
|
| TSC Engineers (Electrical, I&C, and Mechanical) - The primary duties of the TSC Engineer positions include responding to engineering requests from the Engineering Coordinator, evaluating the implementation of Severe Accident Management Guidelines, and assisting the OSC in preparing to send repair teams into the plant. These duties are either no longer necessary in a permanently shut down and defueled condition or will be performed by the Engineering Coordinator. The Engineering Coordinator is tasked with performing an engineering assessment of plant conditions and/or actions needed to mitigate damage to the plant.
| | performing an engineering assessment of plant conditions and/or actions needed to mitigate damage to the plant. |
| With respect to responding to engineering requests from the Engineering Coordinator, this function will continue to be performed by augmenting qualified engineering resources. The Engineering Coordinator will continuously evaluate the need for engineering resources and coordinate with the EOF Technical Advisor to call in qualified engineering personnel. | | With respect to responding to engineering requests from the Engineering Coordinator, this function will continue to be performed by augmenting qualified engineering resources. The Engineering Coordinator will continuously evaluate the need for engineering resources and coordinate with the EOF Technical Advisor to call in qualified engineering personnel. |
| In addition to the change in status of the plant, the basis for the elimination of the TSC Engineers (Electrical, I&C, and Mechanical) should be that that Engineering Coordinator would be able to provide the needed initial engineering support in the TSC. Please clarify if the TSC Engineering Coordinator is qualified to perform "an engineering assessment of plant conditions and/or actions needed to mitigate damage to the plant," specifically in response to a fuel handling accident or an event resulting in damage to the spent fuel pool (SFP) integrity or the loss of SFP cooling or inventory.}} | | In addition to the change in status of the plant, the basis for the elimination of the TSC Engineers (Electrical, I&C, and Mechanical) should be that that Engineering Coordinator would be able to provide the needed initial engineering support in the TSC. Please clarify if the TSC Engineering Coordinator is qualified to perform an engineering assessment of plant conditions and/or actions needed to mitigate damage to the plant, specifically in response to a fuel handling accident or an event resulting in damage to the spent fuel pool (SFP) integrity or the loss of SFP cooling or inventory.}} |
|
---|
Category:E-Mail
MONTHYEARML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) Primary and Secondary Liability Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22227A0082022-08-12012 August 2022 Acceptance Review: Exemption Request from 10CFR50.47(b), 10 CFR 50.47(c)(2), and 10 CFR Part 50, Appendix E, Section IV ML22227A0092022-08-12012 August 2022 Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme (L-2022-LLA-0099) ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22159A2672022-06-0202 June 2022 Answers to Your Questions on Palisades ML22159A2652022-05-0303 May 2022 Questions Asked at Palisades Plant Performance Public Meeting April 26, 2022 ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML22208A1052021-11-16016 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A5152021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A2982021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML21209A9802021-07-28028 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Rescission of Interim Compensatory Measure from Order EA-02-026 ML21189A2462021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML21189A0432021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Permanently Defueled Technical Specifications ML21054A1822021-02-23023 February 2021 NRR E-mail Capture - Regarding Public Comment on Palisades Request for Relief RR 5-8 ML21028A4092021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application ML21007A3752021-01-0707 January 2021 NRR E-mail Capture - Regarding Public Comment on Palisades Nuclear Plant License Transfer (Sierra Club Nuclear Free Michigan) ML21054A1812021-01-0606 January 2021 NRR E-mail Capture - (External_Sender) Regarding Public Comment on Palisades Request for Relief RR 5-8 ML20275A3432020-10-0101 October 2020 Verbal Authorization for Proposed Alternative (RR 5-8) Reactor Vessel Closure Head Penetration Repairs ML20272A0112020-09-26026 September 2020 Request for Additional Information - Palisades Relief Request RR 5-8 (Proposed Alternative) for Reactor Pressure Vessel Head Penetration Repairs ML20262G9622020-09-17017 September 2020 Acknowledgement to Mr. Muhich e-mail, Dated September 15, 2020 (e-mail) ML20241A1802020-08-27027 August 2020 NRR E-mail Capture - Palisades Nuclear Plant- Upcoming Steam Generator Tube Inservice Inspection ML20162A4522020-04-0808 April 2020 Lake Mich Level Correspondence with Ipotter ML19344C7162019-08-25025 August 2019 Response from NEIMA Local Community Advisory Board Questionnaire 08-25-2019 C Ferry ML19344C8072019-08-16016 August 2019 Scanned Response 09-29-2019 I Potter ML19226A2932019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Re License Amendment Request to Adopt TSTF-425, Revision 3 for the Palisades Nuclear Plant ML19226A2922019-08-0505 August 2019 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Adopt TSTF-425 ML19122A4852019-04-29029 April 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications ML19095A6572019-04-0505 April 2019 NRR E-mail Capture - Acceptance for Review of Application to Revise the Palisades Nuclear Plant License Renewed Facility Operation License Regarding Full Compliance Implementation Date for the Fire Protection Program ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML19059A0292019-02-27027 February 2019 NRR E-mail Capture - Acceptance Review Results for License Amendment Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules, for Entergy Fleet ML19009A5392019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML19009A5382018-12-12012 December 2018 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML18337A1382018-11-30030 November 2018 NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 ML18337A1352018-11-30030 November 2018 NRR E-mail Capture - Acceptance for Review of Application to Revise the Palisades Nuclear Plant License Renewed Facility Operation License Regarding Changes to the Fire Protection Plan ML18337A1402018-11-29029 November 2018 NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18184A2402018-07-0303 July 2018 NRR E-mail Capture - Acceptance for Review of Application to Revise Technical Specification Surveillance Requirement 3.3.5.2a for the Diesel Generator Undervoltage Start ML18101A1132018-04-11011 April 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML18081A2962018-03-22022 March 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) ML18059A8202018-02-28028 February 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML17355A0092017-12-20020 December 2017 NRR E-mail Capture - Palisades Nuclear Plant: Acceptance Review for Relief Request No. RR 5-6 - Alternative to the Reexamination Frequency for a Relevant Condition ML17345A0142017-12-0808 December 2017 NRR E-mail Capture - Acceptance Review Results Entergy Request No. EN-17-RR-1 ML17338B1242017-11-30030 November 2017 NRR E-mail Capture - (External_Sender) Palisades Nuclear Plant Flood Hazard Reevaluation Report FHRR Staff Assessment Input ML17335A1042017-11-30030 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - RAI Regarding Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (CAC MG0021; EPID L-2017-LLA-0266) ML17317A0042017-11-0909 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance Review for License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Transition License Condition 2024-02-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23055A1542023-02-24024 February 2023 Attachment: Request for Additional Information on the Palisades PSDAR ML22292A2582022-10-31031 October 2022 PDEP-EAL Amendment RAI ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 ML21028A4092021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application ML20272A0112020-09-26026 September 2020 Request for Additional Information - Palisades Relief Request RR 5-8 (Proposed Alternative) for Reactor Pressure Vessel Head Penetration Repairs ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 ML19226A2932019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Re License Amendment Request to Adopt TSTF-425, Revision 3 for the Palisades Nuclear Plant ML19226A2922019-08-0505 August 2019 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Adopt TSTF-425 ML19122A4852019-04-29029 April 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications ML19009A5392019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML19009A5382018-12-12012 December 2018 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML18337A1382018-11-30030 November 2018 NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 ML18337A1402018-11-29029 November 2018 NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18309A1342018-11-0808 November 2018 Supplemental Information Needed for Acceptance or Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-425, Revision 3 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18081A2962018-03-22022 March 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) ML18059A8202018-02-28028 February 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML17335A1042017-11-30030 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - RAI Regarding Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (CAC MG0021; EPID L-2017-LLA-0266) ML17118A3342017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/2017 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part B Items (Exf) ML17118A3312017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/17 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part a Items ML17072A2752017-03-10010 March 2017 NRR E-mail Capture - Palisades Nuclear Plant - Final Request for Additional Information Regarding Relief Request No. RR 4-25 ML16238A0302016-08-29029 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Control Rod Drive Exercise Surveillance ML16130A0762016-05-11011 May 2016 Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternative Repair Criterion on the Steam Generator Tubes ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15258A2432015-09-0101 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - Palisades Nuclear Plant ML15149A2462015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15072A2542015-03-19019 March 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company ML15022A1382015-01-22022 January 2015 E-Mail - Palisades Request for Information ML15016A1842015-01-20020 January 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a ML15012A3052015-01-15015 January 2015 Request for Additional Information Regarding the License Amendment Request for an Equivalent Margin Analysis Completed in Accordance with 10 CFR 50, Appendix G ML14318A4002014-12-17017 December 2014 Vermont Yankee Nuclear and Big Rock Point - Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company (Tac Nos. MF3218 - MF3221) ML14157A3642014-06-0505 June 2014 CDBI Request for Information ML13353A0422013-12-16016 December 2013 NRR E-mail Capture - Request for Additional Information - Palisades - Proposed Revision to Palisades Site Emergency Plan (SEP) Emergency Response Organization (ERO) MF2321 ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13051A7772013-02-19019 February 2013 Request for Additional Information, 2012 SG Inspection Report ML12314A4222012-11-0808 November 2012 ME8074 - Request for Additional Information Regarding Replacement of Spent Fuel Pool Region I Storage Racks ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs ML12206A4042012-07-24024 July 2012 Request for Additional Information (Revised) - Palisades - SFP Rerack LAR - ME8074 ML12206A3322012-07-19019 July 2012 E-mail Combined Request for Additional Information for Several Branches of NRR for the Submittal on Palisades re-sack LAR ML12121A7032012-04-27027 April 2012 Relief Request - Proposed Alternative - Use of Alternate ASME Code Case N-770-1 Baseline Examination - ME8492 ML1209604492012-04-0505 April 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Request for Additional Information, Revise Quality Assurance Program Manual and Staff Qualification Technical Specificat ML12068A3882012-04-0202 April 2012 Request for Additional Information Regarding License Renewal Commitment to Submit Alloy 600 Program ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic 2023-02-24
[Table view] |
Text
NRR-DMPSPEm Resource From: Wall, Scott Sent: Thursday, March 22, 2018 10:44 AM To: HAZELHOFF, AMY C; MIKSA, JAMES P; ERICKSON, JEFFREY S Cc: Rankin, Jennivine; Norris, Michael; Kinard, Richard
Subject:
Palisades - Final RAI Concerning Site Emergency Plan Changes (CAC MG0198; EPID L-2017-LLA-0305)
Attachments: LTR - Final RAIs - EP Changes.pdf
- Amy, Attached are requests for additional information (RAIs) concerning the August 31, 2017 (ADAMS Accession No. ML17248A389, Entergy Nuclear Operations, Inc. (ENO, the licensee) submittal regarding changes to the Palisades Nuclear Plant (Palisades) Emergency Response Organization (ERO) on-shift and augmented staffing, based on the certifications for permanent cessation of power operations and permanent removal of fuel from the reactor vessel to the NRC in accordance with §50.82(a)(1)(i) and (ii) to Title 10 of the Code of Federal Regulations (10 CFR).
As discussed by phone on March 22, 2018, ENO has agreed to a 30 day response to these RAIs.
- Regards, Scott P. Wall, LSS BB, BSP Senior Project Manager Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov 1
Hearing Identifier: NRR_DMPS Email Number: 253 Mail Envelope Properties (DM5PR09MB22331337630FC22AD95CC38292A90)
Subject:
Palisades - Final RAI Concerning Site Emergency Plan Changes (CAC MG0198; EPID L-2017-LLA-0305)
Sent Date: 3/22/2018 10:43:33 AM Received Date: 3/22/2018 10:43:00 AM From: Wall, Scott Created By: Scott.Wall@nrc.gov Recipients:
"Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>
Tracking Status: None "Norris, Michael" <Michael.Norris@nrc.gov>
Tracking Status: None "Kinard, Richard" <Richard.Kinard@nrc.gov>
Tracking Status: None "HAZELHOFF, AMY C" <ahazelh@entergy.com>
Tracking Status: None "MIKSA, JAMES P" <jmiksa@entergy.com>
Tracking Status: None "ERICKSON, JEFFREY S" <JERICKS@entergy.com>
Tracking Status: None Post Office: DM5PR09MB2233.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 936 3/22/2018 10:43:00 AM LTR - Final RAIs - EP Changes.pdf 134950 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
DRAFT REQUEST FOR ADDITIONAL INFORMATION CHANGINGS TO SITE EMERGENCY PLAN ENTERGY NUCLEAR OPERATIONS, INC PALISADES NUCLEAR PLANT DOCKET NO. 50-255 By letter dated August 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17248A389), Entergy Nuclear Operations, Inc. (ENO, the licensee),
requested prior U.S. Nuclear Regulatory Commission (NRC) approval of an amendment to the Palisades Nuclear Plant (PNP) site emergency plan (SEP) in support of ENOs intent to permanently cease power operations at PNP no later than May 31, 2022. The proposed amendment to the PNP SEP would revise the PNP Emergency Response Organization (ERO) on-shift and augmented staffing, based on the certifications for permanent cessation of power operations and permanent removal of fuel from the reactor vessel to the NRC in accordance with §50.82(a)(1)(i) and (ii) to Title 10 of the Code of Federal Regulations (10 CFR).
The NRC staff has reviewed the application and determined that additional information is needed for the staff to complete its review.
RAI-PNP-1 Minimum staffing is explicitly addressed in the following sections of Attachment 1, Description and Evaluation of the Proposed Changes, to ENOs August 31, 2017, letter: Section 3.2.2.1, Technical Support Center (page 24 of 35); Section 3.2.2.2, Operations Support Center (page 26 of 35), and Section 3.2.2.3, Emergency Operations Facility (page 27 of 35). In the letter, only minimum staffing positions at the Technical Support Center (TSC) are proposed to be eliminated, with no minimum staff proposed for elimination at the Operations Support Center (OSC) or Emergency Operations Facility (EOF). Section 3.2.2.4, Joint Information Center (page 29 of 35) is silent on the proposed outcome of minimum staff positions. However, in reviewing pages 7 - 8 of Attachment 6, Emergency Response Organization Task Analysis, to ENOs August 31, 2017, letter all Joint Information Center (JIC) positions, whether to be retained or eliminated, are shown as being minimum staff. Please provide additional clarification regarding the intended minimum staffing positions at the JIC.
RAI-PNP-2 Section 3.2.2.1, Technical Support Center, (page 24 of 35) of Attachment 1 to the August 31, 2017 letter, ENO states, in part:
TSC Engineers (Electrical, I&C, and Mechanical) - The primary duties of the TSC Engineer positions include responding to engineering requests from the Engineering Coordinator, evaluating the implementation of Severe Accident Management Guidelines, and assisting the OSC in preparing to send repair teams into the plant. These duties are either no longer necessary in a permanently shut down and defueled condition or will be performed by the Engineering Coordinator. The Engineering Coordinator is tasked with
performing an engineering assessment of plant conditions and/or actions needed to mitigate damage to the plant.
With respect to responding to engineering requests from the Engineering Coordinator, this function will continue to be performed by augmenting qualified engineering resources. The Engineering Coordinator will continuously evaluate the need for engineering resources and coordinate with the EOF Technical Advisor to call in qualified engineering personnel.
In addition to the change in status of the plant, the basis for the elimination of the TSC Engineers (Electrical, I&C, and Mechanical) should be that that Engineering Coordinator would be able to provide the needed initial engineering support in the TSC. Please clarify if the TSC Engineering Coordinator is qualified to perform an engineering assessment of plant conditions and/or actions needed to mitigate damage to the plant, specifically in response to a fuel handling accident or an event resulting in damage to the spent fuel pool (SFP) integrity or the loss of SFP cooling or inventory.