{{#Wiki_filter:REVISED PAGES -UNIT NO. 1 8609040083 860829 PDR ADOCK 05000272 P . PDR
{{#Wiki_filter:REVISED PAGES - UNIT NO. 1 8609040083 860829 ------~\
. ""-CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITON FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with: a. Both doors closed excep*t when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b. An overall air lock leakage rate of < 0.05 La at design pressure (47.0 psig). APPLICABILITY:
PDR ADOCK 05000272 P .           PDR
MODES 1, 2, 3 and 4 ACTION: With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours. SURVEILLANCE 4.6.1.3 Each conta*inment air lock shall be derronstrated OPERABLE:
 
: a. *By pressurizing the volume between the airlock door gaskets to > 10.0 psig and checking for an extrapolated**
CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITON FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:
seal leakage rate equal to or less than 0.01 La. 1. After each opening, except when used for Jlllltiple entries, then at least once per 72 hours. 2. After performing maintenance which could affect the airlock door gaskets sealing capability.
: a. Both doors closed excep*t when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and
: 3. Prior to establishing containment integrity, b. By CQnducting an overall air lock leakage test at design pressure (47.0 psig) and verifying the overall air leakage rate is within its limit: 1. At least once per six nnnths #. SALEM -UNIT 1 3/4 6-!j CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS SURVEILLANCE REQJIREMENTS (Continued)
: b. An overall air lock leakage rate of < 0.05 La at design pressure (47.0 psig).
: 2. Prior ta establishing containment integrity when that could affect the airlock sealing capab1l ity was performed and the maintenance affects components other than the door gaskets,*
APPLICABILITY:   MODES 1, 2, 3 and 4 ACTION:
and c. At least once per 6 llDnths by verifying that only one door in each air lack can be opened at a time.
With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
* Exemption ta Appendix 11 J 11 of 10 CFR 50. **The *measured leakage at the test pressure (10 psig) shall be rrultiplied by an extrapolation factor of 9.1 ta determine what the seal leakage flaw rate would be if tested at design pressure (47.0 psig). This seal leakage rate shall be less than or equal ta 0.01 La. . it The provisions of Specification 4.0.2 are not applicable.
SURVEILLANCE RE~IREMENTS 4.6.1.3 Each conta*inment air lock shall be derronstrated OPERABLE:
SALEM -UN IT 1 3/4 6-Sa REVISED PAGES -UNIT NO. 2
: a. *By pressurizing the volume between the airlock door gaskets to
! ** ... .,,JJitl CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS SURVEILLANCE REQ.JIREMENTS (Continued)  
                > 10.0 psig and checking for an extrapolated** seal leakage rate equal to or less than 0.01 La.
>"* ,:.. ... : . . . a. *By pressurizing the volume between the airlock door gaskets to > 10.0 psig and checking for an extrapolated**
: 1. After each opening, except when used for Jlllltiple entries, then at least once per 72 hours.
seal leakage rate equa 1 to or 1 es s than 0 .01 La. 1. After each opening, except when used for rrultiple entries, then at least once per 72 hours. 2. After performing maintenance which could affect the. airlock door gaskets. sealing capability.
: 2. After performing maintenance which could affect the airlock door gaskets sealing capability.
: 3. Prior to establishing containment integrity, b. By conducting an overall air lock le-akage test at design pressure (47.0 psig) and verifying the overall air leakage rate is within its limit: 1. At 1 east o nee per six l1'D  
: 3. Prior to establishing containment integrity,
#. 2. Prior to establishing containment integrity when maintenance that could affect the airlock sealing capability was performed and the maintenance affects components other than the door gaskets,*
: b. By CQnducting an overall air lock leakage test at design pressure (47.0 psig) and verifying the overall air leakage rate is within its limit:
and .. c. At least once per 6 ll'Dnths by verifying that only one door in each air lock can be opened at a ti me.
: 1. At least once per six nnnths   #.
* Exemption to Appendix 11 J 11 of 10 CFR 50. **The measured leakage at the test pressure (> 10 psig) shall be nultiplied by an extrapolation factor of 9.T to determine what the seal leakage flow rate would be if tested at design pressure (47.0 psig). This extrapolated .seal leakage rate shall be less. than or equal to 0 .01 La. II The provisions of Specification 4.0.2 are rot applicable.
SALEM - UNIT 1                       3/4 6-!j
SALEM -UNIT 2 3/4 6-S}}
 
CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS SURVEILLANCE REQJIREMENTS (Continued)
: 2. Prior ta establishing containment integrity when maint:n~nce  that could affect the airlock sealing capab1l ity was performed and the maintenance affects components other than the door gaskets,* and
: c. At least once per 6 llDnths by verifying that only one door in each air lack can be opened at a time.
* Exemption ta Appendix 11 J 11 of 10 CFR 50.
**The *measured leakage at the test pressure (10 psig) shall be rrultiplied by an extrapolation factor of 9.1 ta determine what the seal leakage flaw rate would be if tested at design pressure (47.0 psig). This ex~rapolated seal leakage rate shall be less than or equal ta 0.01 La.                       .
it The provisions of Specification 4.0.2 are not applicable.
SALEM - UN IT 1                       3/4 6-Sa
 
REVISED PAGES - UNIT NO. 2
                                                                                >"* ,:.. ... : . . . ~ ~-*
! ** ... .,,JJitl CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS SURVEILLANCE REQ.JIREMENTS (Continued)
: a. *By pressurizing the volume between the airlock door gaskets to
                              > 10.0 psig and checking for an extrapolated** seal leakage rate equa 1 to or 1es s than 0 .01 La.
: 1. After each opening, except when used for rrultiple entries, then at least once per 72 hours.
: 2. After performing maintenance which could affect the.
airlock door gaskets. sealing capability.
: 3. Prior to establishing containment integrity,
: b. By conducting an overall air lock le-akage test at design pressure (47.0 psig) and verifying the overall air leakage rate is within its limit:
: 1. At 1east o nee per six l1'D nth~ #.
: 2. Prior to establishing containment integrity when maintenance that could affect the airlock sealing capability was performed and the maintenance affects components other than the door gaskets,* and
                        .. c. At least once per 6 ll'Dnths by verifying that only one door in each air lock can be opened at a ti me.
* Exemption to Appendix 11 J 11 of 10 CFR 50.
                    **The measured leakage at the test pressure (> 10 psig) shall be nultiplied by an extrapolation factor of 9.T to determine what the seal leakage flow rate would be if tested at design pressure (47.0 psig). This extrapolated .seal leakage rate shall be less. than or equal to 0 .01 La.
II The provisions of Specification 4.0.2 are rot applicable.
SALEM - UNIT 2                             3/4 6-S}}

Latest revision as of 08:06, 3 February 2020

Proposed Tech Spec Changes,Incorporating Exemption Granted from 10CFR50,App J,III.D.2(b)(ii) Re Full Pressure Air Lock Leakage Tests
ML18092B263
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/29/1986
From:
Public Service Enterprise Group
To:
Shared Package
ML18092B262 List:
References
LCR-85-10, NUDOCS 8609040083
Download: ML18092B263 (5)


Text

REVISED PAGES - UNIT NO. 1 8609040083 860829 ------~\

PDR ADOCK 05000272 P . PDR

CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITON FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

a. Both doors closed excep*t when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and
b. An overall air lock leakage rate of < 0.05 La at design pressure (47.0 psig).

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE~IREMENTS 4.6.1.3 Each conta*inment air lock shall be derronstrated OPERABLE:

a. *By pressurizing the volume between the airlock door gaskets to

> 10.0 psig and checking for an extrapolated** seal leakage rate equal to or less than 0.01 La.

1. After each opening, except when used for Jlllltiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
2. After performing maintenance which could affect the airlock door gaskets sealing capability.
3. Prior to establishing containment integrity,
b. By CQnducting an overall air lock leakage test at design pressure (47.0 psig) and verifying the overall air leakage rate is within its limit:
1. At least once per six nnnths #.

SALEM - UNIT 1 3/4 6-!j

CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS SURVEILLANCE REQJIREMENTS (Continued)

2. Prior ta establishing containment integrity when maint:n~nce that could affect the airlock sealing capab1l ity was performed and the maintenance affects components other than the door gaskets,* and
c. At least once per 6 llDnths by verifying that only one door in each air lack can be opened at a time.
    • The *measured leakage at the test pressure (10 psig) shall be rrultiplied by an extrapolation factor of 9.1 ta determine what the seal leakage flaw rate would be if tested at design pressure (47.0 psig). This ex~rapolated seal leakage rate shall be less than or equal ta 0.01 La. .

it The provisions of Specification 4.0.2 are not applicable.

SALEM - UN IT 1 3/4 6-Sa

REVISED PAGES - UNIT NO. 2

>"* ,:.. ... : . . . ~ ~-*

! ** ... .,,JJitl CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS SURVEILLANCE REQ.JIREMENTS (Continued)

a. *By pressurizing the volume between the airlock door gaskets to

> 10.0 psig and checking for an extrapolated** seal leakage rate equa 1 to or 1es s than 0 .01 La.

1. After each opening, except when used for rrultiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
2. After performing maintenance which could affect the.

airlock door gaskets. sealing capability.

3. Prior to establishing containment integrity,
b. By conducting an overall air lock le-akage test at design pressure (47.0 psig) and verifying the overall air leakage rate is within its limit:
1. At 1east o nee per six l1'D nth~ #.
2. Prior to establishing containment integrity when maintenance that could affect the airlock sealing capability was performed and the maintenance affects components other than the door gaskets,* and

.. c. At least once per 6 ll'Dnths by verifying that only one door in each air lock can be opened at a ti me.

    • The measured leakage at the test pressure (> 10 psig) shall be nultiplied by an extrapolation factor of 9.T to determine what the seal leakage flow rate would be if tested at design pressure (47.0 psig). This extrapolated .seal leakage rate shall be less. than or equal to 0 .01 La.

II The provisions of Specification 4.0.2 are rot applicable.

SALEM - UNIT 2 3/4 6-S