ML18101A238: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)
{{#Wiki_filter:PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)
: b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary is greater than psig. The provisions of Specification 4.0.4 are not applicableX A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ----
: b. At least once per 92 days on a STAGGERED TEST BASIS by:
9409270338 940920 PDR ADDCK 05000272 P PDR SALEM -UNIT 1 , ' 3/4 7-6 Amendment No. 153
: 1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
* INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.
: 2. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary ste~Sl:lfl~l,*pressure is greater than     psig. The provisions of Specification 4.0.4 are not applicableX ;TNS6~~ A 1
* PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
: c. At least once per 18 months during shutdown by:
: b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J?
: 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.
1 Y pressure is greater than ?S.9-psig.
    ---- -----~------------"
The provisions Specification
9409270338 940920                         ,'
: 4. O. 4 are not applicable)<
PDR   ADDCK 05000272 P                 PDR SALEM - UNIT 1                       3/4 7-6                 Amendment No. 153
::I't-J s-t<. -r A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ,' SALEM -UNIT 2 3/4 7-6 Amendment No. 134 INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.}}
 
INSERT A
... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.
 
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
: b. At least once per 92 days on a STAGGERED TEST BASIS by:
: 1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
: 2. Verifyin~  that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J&#xa3;3;J? 1 Y pressure is greater than ?S.9-psig. The provisions           Specification
: 4. O. 4 are not applicable)< ::I't-J s- ~ t<. -r A
: c. At least once per 18 months during shutdown by:
: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
: 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.
SALEM - UNIT 2                         3/4 7-6                       Amendment No. 134
 
INSERT A
... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.}}

Latest revision as of 04:51, 3 February 2020

Proposed Tech Specs Re Auxiliary Feedwater Sys
ML18101A238
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/20/1994
From:
Public Service Enterprise Group
To:
Shared Package
ML18101A237 List:
References
NUDOCS 9409270338
Download: ML18101A238 (4)


Text

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)

b. At least once per 92 days on a STAGGERED TEST BASIS by:
1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary ste~Sl:lfl~l,*pressure is greater than psig. The provisions of Specification 4.0.4 are not applicableX ;TNS6~~ A 1
c. At least once per 18 months during shutdown by:
1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.

-----~------------"

9409270338 940920 ,'

PDR ADDCK 05000272 P PDR SALEM - UNIT 1 3/4 7-6 Amendment No. 153

INSERT A

... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b. At least once per 92 days on a STAGGERED TEST BASIS by:
1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifyin~ that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J? 1 Y pressure is greater than ?S.9-psig. The provisions Specification
4. O. 4 are not applicable)< ::I't-J s- ~ t<. -r A
c. At least once per 18 months during shutdown by:
1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.

SALEM - UNIT 2 3/4 7-6 Amendment No. 134

INSERT A

... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.