ML19256B143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
{{#Wiki_filter:r
{{#Wiki_filter:r
                                                                                                                           ~
                                                                                                                           ~
          .
: i.                  .
: i.                  .
* r.RC FORM 3C6                                                                                                                          U S. NUCLE AR REGUL ATORY COMMISSION (7 77)
* r.RC FORM 3C6                                                                                                                          U S. NUCLE AR REGUL ATORY COMMISSION (7 77)
Line 29: Line 28:
o    e    teach entry. This occurrence sim_i_lar to 50-313/78-!4, 77-16, 77-11,'76,31,1 o    7      !76-19. Reported per T.S.6.12.3.l.b.                                                        There was no ha::ard to the health                                                  ;
o    e    teach entry. This occurrence sim_i_lar to 50-313/78-!4, 77-16, 77-11,'76,31,1 o    7      !76-19. Reported per T.S.6.12.3.l.b.                                                        There was no ha::ard to the health                                                  ;
o    s 1 and safety to t_he public.                                                                                                                                                          I
o    s 1 and safety to t_he public.                                                                                                                                                          I
       ?          8 9                                                                                                                                                                              Is 0 stif f u          causE            cAySE                                                        c g. .p-COCE
       ?          8 9                                                                                                                                                                              Is 0 stif f u          causE            cAySE                                                        c g. .p-COCE VALVE CODE          Sv0CUDE                    CCM**0NENT COLE                  FverODE            tb lo191                                  I s I n l@ [A_j@ !C_j @ l Z I z l z i Z l 2 l z j@ tz j@ @> 'CDE@
                                                                                                                                                        .
VALVE CODE          Sv0CUDE                    CCM**0NENT COLE                  FverODE            tb lo191                                  I s I n l@ [A_j@ !C_j @ l Z I z l z i Z l 2 l z j@ tz j@ @> 'CDE@
7          8                          9        10          11                12            13                            i.            59                ;g SECvf NTI AL                      OCcea H E rd t          mE Pen t                      REvlSION
7          8                          9        10          11                12            13                            i.            59                ;g SECvf NTI AL                      OCcea H E rd t          mE Pen t                      REvlSION
__Evf NT VE AR                              nEPORTrJO.                            CCCE                    TvPE                          N o.
__Evf NT VE AR                              nEPORTrJO.                            CCCE                    TvPE                          N o.
Line 42: Line 39:
au
au
[---J Ji          O.
[---J Ji          O.
3 A E        A T CN            ON PL ANT
3 A E        A T CN            ON PL ANT T                        .40uns 22        s akt$          rhn i    S L ts              t R          '8AN      ^'
* T                        .40uns 22        s akt$          rhn i    S L ts              t R          '8AN      ^'
[E_J@{Lt._J@
[E_J@{Lt._J@
33            34 12 3%
33            34 12 3%
Line 49: Line 45:
3a
3a
_[0l0l0l [ [N jg [NJ g hPPg lZ
_[0l0l0l [ [N jg [NJ g hPPg lZ
                                                                                             ;)                    4)    en              47                    43              44 9 l h "lEn9lg
                                                                                             ;)                    4)    en              47                    43              44 9 l h "lEn9lg CAUSE DESCRIPTION AND CQnnEC flVE ACTIONS i  o      iThe scheduling error was due to a responsibility change from one                                                                                                                ;
                                                                                                                                                                                                  ,,
CAUSE DESCRIPTION AND CQnnEC flVE ACTIONS i  o      iThe scheduling error was due to a responsibility change from one                                                                                                                ;
ii ii l1 supervisor to another.                                              The surveillance test was completed on 12/17/78                                                                    i lii21Ifor C4 and on 12/10/78 for C2                                                              per OP 1304.23 satis factorily.                                                                [.
ii ii l1 supervisor to another.                                              The surveillance test was completed on 12/17/78                                                                    i lii21Ifor C4 and on 12/10/78 for C2                                                              per OP 1304.23 satis factorily.                                                                [.
i!a 1                                                                                                                                                                                        l 1  4      I                                                                                                                                                                              l 7          8 9 STA S '                %,0WER                      QTwE R $7ATUS                  O SCO R                              DISCOVf HY DE FCniPTION l' s LEj@ ll 10 l Ol@l NA                                                                        l    W @l 4NA
i!a 1                                                                                                                                                                                        l 1  4      I                                                                                                                                                                              l 7          8 9 STA S '                %,0WER                      QTwE R $7ATUS                  O SCO R                              DISCOVf HY DE FCniPTION l' s LEj@ ll 10 l Ol@l NA                                                                        l    W @l 4NA AIT;vnv cCITENT                    "        '3                                u        3                                                                                    ,,
    '          '
AIT;vnv cCITENT                    "        '3                                u        3                                                                                    ,,
REtf ArEo or RnE AsE AucuNT o, ACTiv:Tv @                                  I                      toc,r,0sc,,,,,,3,@
REtf ArEo or RnE AsE AucuNT o, ACTiv:Tv @                                  I                      toc,r,0sc,,,,,,3,@
      '
         '    c L2,_] @ (Z._j@l NA l NA                                                                              l
         '    c
                ' '
L2,_] @ (Z._j@l NA
                                      '
l NA                                                                              l
                           ,E R sowEi E x,os0' Es
                           ,E R sowEi E x,os0' Es
                                                                                                   "            "                                                                              u
                                                                                                   "            "                                                                              u
                           ~u.o E R              mE          oE sCR ,1,0N @.
                           ~u.o E R              mE          oE sCR ,1,0N @.
        '
     ,        7]    I 0101 Ol@[z._J@i    '
     ,        7]    I 0101 Ol@[z._J@i    '
NA                                                                                                                                  l
NA                                                                                                                                  l
Line 72: Line 58:
NuveER                  ntsCR      ,Tio.@
NuveER                  ntsCR      ,Tio.@
7 i1-8 9 l0l'010l@lNA      it      12 l
7 i1-8 9 l0l'010l@lNA      it      12 l
LOS: GF CH DAMACE TO F ACI(8 TY TY&E          DE LCR,P TION Iill[E.j@l                                NA                                                                                                                                                    l
LOS: GF CH DAMACE TO F ACI(8 TY TY&E          DE LCR,P TION Iill[E.j@l                                NA                                                                                                                                                    l 2            o                                                                                                                                                              E0 Pv8LICITV DESCF'FTION b                                                                                                                            UY dEDNLY 2J e 2 W
    -
2            o                                                                                                                                                              E0 Pv8LICITV DESCF'FTION b                                                                                                                            UY dEDNLY 2J e 2 W
f;s;;E n@l m
f;s;;E n@l m
NA                                                                                                              ; ; ; ; ;;;;;;;
NA                                                                                                              ; ; ; ; ;;;;;;;
a . . .
a . . .
                                                                                                                                                                                                 ;j
                                                                                                                                                                                                 ;j N we a Pn m ata                  Chris N. Shively                                                        ,
                                                                                                                                                                                                ,,
501-968-2519 790124OtS9
N we a Pn m ata                  Chris N. Shively                                                        ,
501-968-2519
                                                                                    -
790124OtS9
                    .. . . . _                                                .


                                                  .
  -
                                                        ..
.A.      .
.A.      .
                                      .
                                .
1*    Reportable Occurrence Report No. 50-313/78-31
1*    Reportable Occurrence Report No. 50-313/78-31
,
: 2. Report Date: 01-15-79                  3. Occurrence Date: 12-14-78 4      Facility: Arkansas Nuclear One - Unit 1 Russellville, AR 72801                                      .
: 2. Report Date: 01-15-79                  3. Occurrence Date: 12-14-78 4      Facility: Arkansas Nuclear One - Unit 1 Russellville, AR 72801                                      .
: 5. Identification of Occurrence:
: 5. Identification of Occurrence:
The failure to perform a Barrel Test on the Emergency Escape hatch and Personnel hatch within the specified time limits.
The failure to perform a Barrel Test on the Emergency Escape hatch and Personnel hatch within the specified time limits.
                                                                                          .
                                                                                    .
: 6. Conditions Prior to Occurrence:
: 6. Conditions Prior to Occurrence:
Steady-State Power          X Reactor Power            MWth Ib t . Standby                              Net Output                MWe Cold Shutdown                                Percent' of Full Power 100 %
Steady-State Power          X Reactor Power            MWth Ib t . Standby                              Net Output                MWe Cold Shutdown                                Percent' of Full Power 100 %
Line 105: Line 76:
: 7. Description of Occurrence:
: 7. Description of Occurrence:
A review indicated that the Barrel Test on the Emergency Escape hatch and Personnel hatch had not been performed within 6 months + 255.since the last such test as required by Technical Specification 4.4.1.2.5 Under Technical Specification 1.3 the hatches were not sealed and Reactor Building Integrity as defined by Technical Specification 1.7 was not maintained as required by Technical Specification 3.6.1.
A review indicated that the Barrel Test on the Emergency Escape hatch and Personnel hatch had not been performed within 6 months + 255.since the last such test as required by Technical Specification 4.4.1.2.5 Under Technical Specification 1.3 the hatches were not sealed and Reactor Building Integrity as defined by Technical Specification 1.7 was not maintained as required by Technical Specification 3.6.1.
                                                                          .


                                                *
  -,
                                                      .
sh  . s                                                .
sh  . s                                                .
                                    -
                            .
Reportable Occurrence Report h'o. 50-313/h8-31 9
Reportable Occurrence Report h'o. 50-313/h8-31 9
: 8. Designation of Apparent Cause of Occurrence:
: 8. Designation of Apparent Cause of Occurrence:
Line 119: Line 84:
Including Environmental Installation /
Including Environmental Installation /
Construction                          Coraponent Failure (See Failure Data)
Construction                          Coraponent Failure (See Failure Data)
Operater
Operater Other (specify)                                                        .
                                                                                          '
Other (specify)                                                        .
Administrative Failure
Administrative Failure
                                                                              -
                              .
: 9. Analysis of Occurrence:
: 9. Analysis of Occurrence:
                          .
The personnel Hatch. Seals are routinely tested every 3rd day and
The personnel Hatch. Seals are routinely tested every 3rd day and
           'after each entry while maintaining containment integrity.      The Escape Hatch Seals are tested after each entry. Subsequent successful Barrel Testing indicated acceptable operability, therefore, there was no hazard to the health and safety of the public.
           'after each entry while maintaining containment integrity.      The Escape Hatch Seals are tested after each entry. Subsequent successful Barrel Testing indicated acceptable operability, therefore, there was no hazard to the health and safety of the public.
                                                                      .


                                                    .
      -
                                                          ..
        .
    ,
J    -      .                                              .
J    -      .                                              .
                                        -
                                  .
rleportabic Occurrence Report No. 50-313/7B-31 t                                                            *
rleportabic Occurrence Report No. 50-313/7B-31 t                                                            *
: 10. Corrective Action:
: 10. Corrective Action:
Surveillance test'ng was successfully completed on 12/17/78 and 12/18/78
Surveillance test'ng was successfully completed on 12/17/78 and 12/18/78 for C4 and C2 respectively.
* for C4 and C2 respectively.
    .
                                                                                        .
                                                                                  .
: 11. Failure Data:                                                    -
: 11. Failure Data:                                                    -
                                    .
-              This occurrence is similar to 50-313/78-14 and 50-313/77-16, 77-11 O
-              This occurrence is similar to 50-313/78-14 and 50-313/77-16, 77-11
4}}
                                .
O 4}}

Latest revision as of 23:32, 1 February 2020

LER 78-031/03T-0:on 781214,barrel Test on Emergency Escape Hatch C4 & Personnel Hatch C2 Not Performed as Scheduled. Caused by Scheduling Error Due to Responsibility Change from One Supervisor to Another
ML19256B143
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/15/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19256B141 List:
References
FOIA-80-150 LER-78-031-03T, LER-78-31-3T, NUDOCS 7901240159
Download: ML19256B143 (4)


Text

r

~

i. .
  • r.RC FORM 3C6 U S. NUCLE AR REGUL ATORY COMMISSION (7 77)

LICENSEE EVENT" REPORT. EXHIBIT A CONTROL EILOCK: ] l l l l l l IPLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6 lo l i8 l9I A IR 7 l AE CODE LICE,NsE l N I O I I l@Dl010 l LICEME le -1010 l Ol0 l 0 l- l010 l@l4 NvYnM 25  ;% Lace l1 ut il1getl1 40 l1 57 lOLI CA1 tal@

CON'T Lo.L1J 8

sTn% Lt_.j@lo l 510101013 l1 13 )@! 112 l1 l41718 l@l 011 l115l 719 l@

7 60 6: COCIL E T P.UMB E R f.3 C) EVENT DATE 14 Its RE POHT OATE 40 EVENT DESCRIPTION AND PROBADLE CONSEQUENCES 10 o12 iReview revealed that the Barrel rest on the Emergency Escape Hatch, i ic13j lC4, 6 Personnel Hatch, C 2, was not performed as scheduled. The Personnel; oIA IHatch seals are routinelv tested every 3rd day 6 after each entry while I o s Imaintaining containment integrity. The Escape Hatch seals are tested after; ,

o e teach entry. This occurrence sim_i_lar to 50-313/78-!4, 77-16, 77-11,'76,31,1 o 7 !76-19. Reported per T.S.6.12.3.l.b. There was no ha::ard to the health  ;

o s 1 and safety to t_he public. I

? 8 9 Is 0 stif f u causE cAySE c g. .p-COCE VALVE CODE Sv0CUDE CCM**0NENT COLE FverODE tb lo191 I s I n l@ [A_j@ !C_j @ l Z I z l z i Z l 2 l z j@ tz j@ @> 'CDE@

7 8 9 10 11 12 13 i. 59 ;g SECvf NTI AL OCcea H E rd t mE Pen t REvlSION

__Evf NT VE AR nEPORTrJO. CCCE TvPE N o.

@ ,"LE R 'RO j'.2,1

_2i 17 18 I 2:

l-- .]

n l0 u

13 l1 aJ M, 2

10131 a s O

au

[---J Ji O.

3 A E A T CN ON PL ANT T .40uns 22 s akt$ rhn i S L ts t R '8AN ^'

[E_J@{Lt._J@

33 34 12 3%

l@ Lz_j@

3a

_[0l0l0l [ [N jg [NJ g hPPg lZ

) 4) en 47 43 44 9 l h "lEn9lg CAUSE DESCRIPTION AND CQnnEC flVE ACTIONS i o iThe scheduling error was due to a responsibility change from one  ;

ii ii l1 supervisor to another. The surveillance test was completed on 12/17/78 i lii21Ifor C4 and on 12/10/78 for C2 per OP 1304.23 satis factorily. [.

i!a 1 l 1 4 I l 7 8 9 STA S '  %,0WER QTwE R $7ATUS O SCO R DISCOVf HY DE FCniPTION l' s LEj@ ll 10 l Ol@l NA l W @l 4NA AIT;vnv cCITENT " '3 u 3 ,,

REtf ArEo or RnE AsE AucuNT o, ACTiv:Tv @ I toc,r,0sc,,,,,,3,@

' c L2,_] @ (Z._j@l NA l NA l

,E R sowEi E x,os0' Es

" " u

~u.o E R mE oE sCR ,1,0N @.

, 7] I 0101 Ol@[z._J@i '

NA l

' ' ' ,E RsoN,.E't imuR Es " so -

NuveER ntsCR ,Tio.@

7 i1-8 9 l0l'010l@lNA it 12 l

LOS: GF CH DAMACE TO F ACI(8 TY TY&E DE LCR,P TION Iill[E.j@l NA l 2 o E0 Pv8LICITV DESCF'FTION b UY dEDNLY 2J e 2 W

f;s;;E n@l m

NA  ; ; ; ; ;;;;;;;

a . . .

j N we a Pn m ata Chris N. Shively ,

501-968-2519 790124OtS9

.A. .

1* Reportable Occurrence Report No. 50-313/78-31

2. Report Date: 01-15-79 3. Occurrence Date: 12-14-78 4 Facility: Arkansas Nuclear One - Unit 1 Russellville, AR 72801 .
5. Identification of Occurrence:

The failure to perform a Barrel Test on the Emergency Escape hatch and Personnel hatch within the specified time limits.

6. Conditions Prior to Occurrence:

Steady-State Power X Reactor Power MWth Ib t . Standby Net Output MWe Cold Shutdown Percent' of Full Power 100 %

Refueling Shutdown Load Changes During Routine Power Operation Routine Startup .

Operation Routine Shutdown Operation Other (specify)

7. Description of Occurrence:

A review indicated that the Barrel Test on the Emergency Escape hatch and Personnel hatch had not been performed within 6 months + 255.since the last such test as required by Technical Specification 4.4.1.2.5 Under Technical Specification 1.3 the hatches were not sealed and Reactor Building Integrity as defined by Technical Specification 1.7 was not maintained as required by Technical Specification 3.6.1.

sh . s .

Reportable Occurrence Report h'o. 50-313/h8-31 9

8. Designation of Apparent Cause of Occurrence:

Design Prccedure .

bbnufacture Unusual Service Condition ~~

Including Environmental Installation /

Construction Coraponent Failure (See Failure Data)

Operater Other (specify) .

Administrative Failure

9. Analysis of Occurrence:

The personnel Hatch. Seals are routinely tested every 3rd day and

'after each entry while maintaining containment integrity. The Escape Hatch Seals are tested after each entry. Subsequent successful Barrel Testing indicated acceptable operability, therefore, there was no hazard to the health and safety of the public.

J - . .

rleportabic Occurrence Report No. 50-313/7B-31 t *

10. Corrective Action:

Surveillance test'ng was successfully completed on 12/17/78 and 12/18/78 for C4 and C2 respectively.

11. Failure Data: -

- This occurrence is similar to 50-313/78-14 and 50-313/77-16, 77-11 O

4