IR 05000416/2013302: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(12 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13336B037 | | number = ML13336B037 | ||
| issue date = 12/02/2013 | | issue date = 12/02/2013 | ||
| title = | | title = Er 05000416/13-302; 11/8/2013 - 11/21/2013; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS | | author affiliation = NRC/RGN-IV/DRS | ||
| addressee name = Mulligan K | | addressee name = Mulligan K | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000416 | | docket = 05000416 | ||
| license number = NPF-029 | | license number = NPF-029 | ||
| contact person = Apger G | | contact person = Apger G | ||
| document report number = 50-416/13-302 | | document report number = 50-416/13-302 | ||
| document type = Letter, License-Operator Examination Report | | document type = Letter, License-Operator Examination Report | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ember 2, 2013 | ||
==SUBJECT:== | |||
GRAND GULF NUCLEAR STATION - NRC EXAMINATION REPORT 05000416/2013302 | |||
SUBJECT: GRAND GULF NUCLEAR STATION - NRC EXAMINATION REPORT 05000416/2013302 | |||
==Dear Mr. Mulligan:== | ==Dear Mr. Mulligan:== | ||
On November 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Grand Gulf Nuclear Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 14, 2013, with Mr. J. Miller, and other members of your staff. A telephonic exit meeting was conducted on November 21, 2013 with Mr. S. Reeves, Operations Lead Exam Writer, who was provided the NRC licensing decisions. | On November 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Grand Gulf Nuclear Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 14, 2013, with Mr. J. Miller, and other members of your staff. A telephonic exit meeting was conducted on November 21, 2013 with Mr. S. Reeves, Operations Lead Exam Writer, who was provided the NRC licensing decisions. | ||
The examination included the evaluation of eight applicants for instant senior reactor operator licenses. The license examiners determined all of eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were two post examination comments submitted by your staff, the enclosure contains details of this report. No findings were identified during this examination. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | The examination included the evaluation of eight applicants for instant senior reactor operator licenses. The license examiners determined all of eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were two post examination comments submitted by your staff, the enclosure contains details of this report. | ||
No findings were identified during this examination. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely,/RA/ Vince G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-416 License: NPF-29 | Sincerely, | ||
/RA/ | |||
Vince G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-416 License: NPF-29 | |||
===Enclosure:=== | ===Enclosure:=== | ||
NRC Examination Report 05000416/2013302 | NRC Examination Report 05000416/2013302 w/Attachments: | ||
1. Supplemental Information 2. NRC Resolution to the Grand Gulf Nuclear Station Post Examination Comments | |||
REGION IV== | |||
Docket: 50-416 License: NPF-29 Report: 05000416/2013302 Licensee: Entergy Operations, Inc. | |||
Facility: Grand Gulf Nuclear Station Waterloo Road Location: | |||
Port Gibson, Mississippi 39150 Dates: November 8 to November 14, 2013 S. Garchow, Chief Examiner G. Callaway, Senior Training Instructor, Inspectors: | |||
G. Apger, Operations Engineer T. Buchanan, Operations Engineer Vince G. Gaddy, Chief Approved By: Operations Branch Division of Reactor Safety-1- Enclosure | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
ER 05000416/2013302; November 8 to November 21, 2013; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report. | ER 05000416/2013302; November 8 to November 21, 2013; Grand Gulf Nuclear Station; Initial | ||
Operator Licensing Examination Report. | |||
NRC examiners evaluated the competency of eight applicants for instant senior reactor operator licenses at Grand Gulf Nuclear Station. | |||
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on November 8, 2013. NRC examiners administered the operating tests on November 11 to November 14, 2013. | |||
The examiners determined that all eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | The examiners determined that all eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | ||
=== | ===NRC-Identified and Self-Revealing Findings=== | ||
None. | None. | ||
=== | ===Licensee-Identified Violations=== | ||
None. | None. | ||
Line 60: | Line 75: | ||
====a. Scope==== | ====a. Scope==== | ||
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject | NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 71: | Line 86: | ||
====b. Findings==== | ====b. Findings==== | ||
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination. | NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. | ||
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination. | |||
===.3 Operator Knowledge and Performance=== | ===.3 Operator Knowledge and Performance=== | ||
Line 81: | Line 98: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. All applicants passed the written examination and all parts of the operating tests. The final written examinations and post examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were two post examination comments as documented in the licensee submittal. | No findings were identified. | ||
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were two post examination comments as documented in the licensee submittal. | |||
===.4 Simulation Facility Performance=== | ===.4 Simulation Facility Performance=== | ||
====a. Scope==== | ====a. Scope==== | ||
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 97: | Line 116: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Meetings, Including Exit== | ==4OA6 Meetings, Including Exit== | ||
The chief examiner presented the preliminary examination results to Messrs. Jay Miller, General Manager Plant Operations, Jeff Gerard, Operations Manager, Jerry Giles, Training Manager, and other members of the staff on November 14, 2013. A telephonic exit was conducted on November 21, 2013 between Mr. Steve Garchow, Chief Examiner, and Mr. Steve Reeves, Operations Exam Writer. The licensee did not identify any information or materials used during the examination as proprietary. | The chief examiner presented the preliminary examination results to Messrs. Jay Miller, General Manager Plant Operations, Jeff Gerard, Operations Manager, Jerry Giles, Training Manager, and other members of the staff on November 14, 2013. A telephonic exit was conducted on November 21, 2013 between Mr. Steve Garchow, Chief Examiner, and Mr. Steve Reeves, Operations Exam Writer. The licensee did not identify any information or materials used during the examination as proprietary. | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
Line 109: | Line 127: | ||
===Licensee Personnel=== | ===Licensee Personnel=== | ||
: [[contact::M. Rasch]], Superintendent Operations Training | : [[contact::M. Rasch]], Superintendent Operations Training | ||
: [[contact::S. Reeves]], Operations Exam Writer | : [[contact::S. Reeves]], Operations Exam Writer | ||
: [[contact::K. Grillis]], Operations Exam Writer | : [[contact::K. Grillis]], Operations Exam Writer | ||
: [[contact::M. Pait]], Operations Instructor | : [[contact::M. Pait]], Operations Instructor | ||
===NRC Personnel=== | ===NRC Personnel=== | ||
Richard Smith, Senior Resident Inspector | |||
==ADAMS DOCUMENTS REFERENCED== | ==ADAMS DOCUMENTS REFERENCED== | ||
}} | }} |
Latest revision as of 12:45, 20 December 2019
ML13336B037 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 12/02/2013 |
From: | Vincent Gaddy Division of Reactor Safety IV |
To: | Kevin Mulligan Entergy Operations |
Apger G | |
References | |
50-416/13-302 | |
Download: ML13336B037 (9) | |
Text
ember 2, 2013
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC EXAMINATION REPORT 05000416/2013302
Dear Mr. Mulligan:
On November 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Grand Gulf Nuclear Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 14, 2013, with Mr. J. Miller, and other members of your staff. A telephonic exit meeting was conducted on November 21, 2013 with Mr. S. Reeves, Operations Lead Exam Writer, who was provided the NRC licensing decisions.
The examination included the evaluation of eight applicants for instant senior reactor operator licenses. The license examiners determined all of eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were two post examination comments submitted by your staff, the enclosure contains details of this report.
No findings were identified during this examination.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vince G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-416 License: NPF-29
Enclosure:
NRC Examination Report 05000416/2013302 w/Attachments:
1. Supplemental Information 2. NRC Resolution to the Grand Gulf Nuclear Station Post Examination Comments
REGION IV==
Docket: 50-416 License: NPF-29 Report: 05000416/2013302 Licensee: Entergy Operations, Inc.
Facility: Grand Gulf Nuclear Station Waterloo Road Location:
Port Gibson, Mississippi 39150 Dates: November 8 to November 14, 2013 S. Garchow, Chief Examiner G. Callaway, Senior Training Instructor, Inspectors:
G. Apger, Operations Engineer T. Buchanan, Operations Engineer Vince G. Gaddy, Chief Approved By: Operations Branch Division of Reactor Safety-1- Enclosure
SUMMARY OF FINDINGS
ER 05000416/2013302; November 8 to November 21, 2013; Grand Gulf Nuclear Station; Initial
Operator Licensing Examination Report.
NRC examiners evaluated the competency of eight applicants for instant senior reactor operator licenses at Grand Gulf Nuclear Station.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on November 8, 2013. NRC examiners administered the operating tests on November 11 to November 14, 2013.
The examiners determined that all eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On November 8, 2013, the licensee proctored the administration of the written examinations to all eight applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on November 18, 2013.
The NRC examination team administered the various portions of the operating tests to all applicants on November 11 to November 14, 2013.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were two post examination comments as documented in the licensee submittal.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to Messrs. Jay Miller, General Manager Plant Operations, Jeff Gerard, Operations Manager, Jerry Giles, Training Manager, and other members of the staff on November 14, 2013. A telephonic exit was conducted on November 21, 2013 between Mr. Steve Garchow, Chief Examiner, and Mr. Steve Reeves, Operations Exam Writer. The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- M. Rasch, Superintendent Operations Training
- S. Reeves, Operations Exam Writer
- K. Grillis, Operations Exam Writer
- M. Pait, Operations Instructor
NRC Personnel
Richard Smith, Senior Resident Inspector