MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000415/20223012022-12-19019 December 2022 NRC Examination Report 05000415/2022301 IR 05000416/20223012022-09-30030 September 2022 NRC Initial Operator Licensing Examination Approval 05000416/2022301 IR 05000416/20213012021-12-14014 December 2021 NRC Examination Report 05000416/2021301 IR 05000416/20203022020-12-0404 December 2020 Exam Report 05000416/2020302 IR 05000416/20203012020-03-31031 March 2020 NRC Initial Operator Licensing Examination Report 05000416/2020301 ML18060A1782018-03-0101 March 2018 NRC Examination Report 05000416/2017302 IR 05000416/20173012017-06-21021 June 2017 NRC Examination Report 05000416/2017301 IR 05000416/20153012016-01-28028 January 2016 Er 05000416/2015301; 10/26/2015 - 01/19/2016; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report IR 05000416/20143012014-11-13013 November 2014 Er 05000416/2014301; 10/17/2014 to 11/03/2014; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report IR 05000416/20133022013-12-0202 December 2013 Er 05000416/13-302; 11/8/2013 - 11/21/2013; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report IR 05000416/20133012013-05-30030 May 2013 Er 05000416/13-301, 05/15-16/2013; Grand Gulf Nuclear Station, NRC Examination Report IR 05000416/20123012013-03-28028 March 2013 Er 05000416-12-301; December 10, 2012 - February 27, 2013; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report ML13030A4902013-01-30030 January 2013 Notification of NRC Initial Operator Licensing Examination 05000416/2014301 IR 05000416/20113012012-01-18018 January 2012 Er 05000416-11-301, on December 5 to December 12, 2011, Grand Gulf Nuclear Station, Initial Operator Licensing Examination Report IR 05000416/20103012010-07-16016 July 2010 IR 05000416-10-301, on 06/25/10 - 07/08/10 for Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report IR 05000416/20093012009-03-12012 March 2009 Er 05000416-09-301; March 3-10, 2009; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report ML0907210952009-03-12012 March 2009 Er 05000416-09-301; March 3-10, 2009; Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report IR 05000416/20083012008-04-16016 April 2008 Er 05000416/08-301 on 03/31/08 - 04/04/08 for Grand Gulf, Initial Operator Licensing Examination Report IR 05000416/20073012007-06-29029 June 2007 Er 05000416-07-301; 5/21-24,2007; Grand Gulf Nuclear Station; Initial Operator Licensing Examinations ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000416/20023012002-09-24024 September 2002 Er 05000416-02-301; on August 26-30, 2002; Grand Gulf Nuclear Station; Initial Operator Licensing Examination 2022-09-30
[Table view] |
Text
ember 2, 2013
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC EXAMINATION REPORT 05000416/2013302
Dear Mr. Mulligan:
On November 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Grand Gulf Nuclear Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 14, 2013, with Mr. J. Miller, and other members of your staff. A telephonic exit meeting was conducted on November 21, 2013 with Mr. S. Reeves, Operations Lead Exam Writer, who was provided the NRC licensing decisions.
The examination included the evaluation of eight applicants for instant senior reactor operator licenses. The license examiners determined all of eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were two post examination comments submitted by your staff, the enclosure contains details of this report.
No findings were identified during this examination.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vince G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-416 License: NPF-29
Enclosure:
NRC Examination Report 05000416/2013302 w/Attachments:
1. Supplemental Information 2. NRC Resolution to the Grand Gulf Nuclear Station Post Examination Comments
REGION IV==
Docket: 50-416 License: NPF-29 Report: 05000416/2013302 Licensee: Entergy Operations, Inc.
Facility: Grand Gulf Nuclear Station Waterloo Road Location:
Port Gibson, Mississippi 39150 Dates: November 8 to November 14, 2013 S. Garchow, Chief Examiner G. Callaway, Senior Training Instructor, Inspectors:
G. Apger, Operations Engineer T. Buchanan, Operations Engineer Vince G. Gaddy, Chief Approved By: Operations Branch Division of Reactor Safety-1- Enclosure
SUMMARY OF FINDINGS
ER 05000416/2013302; November 8 to November 21, 2013; Grand Gulf Nuclear Station; Initial
Operator Licensing Examination Report.
NRC examiners evaluated the competency of eight applicants for instant senior reactor operator licenses at Grand Gulf Nuclear Station.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on November 8, 2013. NRC examiners administered the operating tests on November 11 to November 14, 2013.
The examiners determined that all eight applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On November 8, 2013, the licensee proctored the administration of the written examinations to all eight applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on November 18, 2013.
The NRC examination team administered the various portions of the operating tests to all applicants on November 11 to November 14, 2013.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were two post examination comments as documented in the licensee submittal.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to Messrs. Jay Miller, General Manager Plant Operations, Jeff Gerard, Operations Manager, Jerry Giles, Training Manager, and other members of the staff on November 14, 2013. A telephonic exit was conducted on November 21, 2013 between Mr. Steve Garchow, Chief Examiner, and Mr. Steve Reeves, Operations Exam Writer. The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- M. Rasch, Superintendent Operations Training
- S. Reeves, Operations Exam Writer
- K. Grillis, Operations Exam Writer
- M. Pait, Operations Instructor
NRC Personnel
Richard Smith, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED