December 30, 2013
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000416/2013404
Dear Mr. Mulligan:
On November 21, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Grand Gulf Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 21, 2013, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
One NRC identified finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) was identified during this inspection.
The deficiency was promptly corrected or compensated for and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the area. The finding was determined to involve a violation of NRC requirements. However, the NRC is treating the violation as a non-cited violation (NCV)
consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at the Grand Gulf Nuclear Station.
One cross-cutting aspect was assigned to a finding in the area associated with Work Control, Work Coordination, because due to the varying security components that were inoperable, the staff was forced to implement both manual actions and compensatory measures in order to maintain regulatory compliance H.3(b)(4)].
If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Grand Gulf Nuclear Station.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire, Chief
Plant Support Branch-1
Division of Reactor Safety
Docket No.: 50-416 License No.: NPF-29
Nonpublic Enclosure:
NRC Inspection Report 05000416/2013404 w/Attachment: Supplemental Information cc w/o enclosure:
Electronic Distribution for Grand Gulf Nuclear Station
ML13364A362 Cover Letter Only Non Sensitive JRL Publicly Available JRL SUNSI Review MLC Sensitive Non-Publicly Available Cover Letter w/enclosure Non Sensitive Publicly Available MD 3.4 Non-Public A.3 JRL Sensitive Periodic Review Required JRL Non-Publicly Available JRL SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBC C:PSB1 JRLarsen MBrooks MHaire DAllen MHaire
/RA/
/RA/
/RA/
/RA/
/RA/
12/19/13 12/19/13 12/19/13 12/19/13 12/30/13