| title = 04/05/2006 - Public Meeting Notice for Three Mile Island (Amergen) and NRC Ref: Annual Assessment Performance CY2005
| title = Public Meeting Notice for Three Mile Island (Amergen) and NRC Ref: Annual Assessment Performance CY2005
| author name = Bellamy R R
| author name = Bellamy R
| author affiliation = NRC/RGN-I/DRP/PB7
| author affiliation = NRC/RGN-I/DRP/PB7
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000289
| docket = 05000289
| license number = DPR-050
| license number = DPR-050
| contact person = Bellamy R R  Rgn-I/DRP/Br7/610-337-5200
| contact person = Bellamy R  Rgn-I/DRP/Br7/610-337-5200
| document report number = MN 06-011
| document report number = MN 06-011
| package number = ML060680618
| package number = ML060680618
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:MN No. 06-011 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 21, 2006Licensee:AmerGen Energy Company, LLC Facility:Three Mile Island Nuclear Power Station, Unit 1 Docket No:50-289 Time and Date:April 5, 2006 at 7:00 p.m.
{{#Wiki_filter:MN No. 06-011 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 21, 2006 Licensee:               AmerGen Energy Company, LLC Facility:               Three Mile Island Nuclear Power Station, Unit 1 Docket No:             50-289 Time and Date:         April 5, 2006 at 7:00 p.m.
Location:Middletown Borough Hall 60 West Emaus Street
Location:               Middletown Borough Hall 60 West Emaus Street Middletown, PA 17057


Middletown, PA 17057Purpose:The NRC requested an Annual Assessment Meeting with AmerGen management to discuss NRC's assessment of the safety performance of
==Purpose:==
The NRC requested an Annual Assessment Meeting with AmerGen management to discuss NRCs assessment of the safety performance of the Three Mile Island Nuclear Power Station, Unit 1 for calendar year 2005. NRCs assessment is documented in a letter dated March 2, 2006.
Attendees:
NRC:          A. Blough, Director, Division of Reactor Safety, Region I R. Bellamy, Chief, Projects Branch 7, Region I D. Kern, Senior Resident Inspector, Three Mile Island R. Fuhrmeister, Senior Project Engineer J. Brand, Resident Inspector, Three Mile Island P. Milligan, Senior Advisor, Emergency Preparedness, NSIR Licensee:      R. West, Site Vice President - TMI Unit 1, AmerGen G. Chick, Plant Manager - TMI, Unit 1, AmerGen C. Smith, Regulatory Assurance Manager - TMI, Unit 1, AmerGen Public Participation:  This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRCs assessment letter can be found in ADAMS with an accession number of ML060620207.
This meeting notice with the enclosed meeting agenda can be located in ADAMS with an Accession Number of ML060750799. The NRC slides for the meeting can be accessed with the Accession Number ML060750803. ADAMS is accessible from the NRC web site at:
http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRCs Annual Assessment process and the safety performance of Three Mile Island Nuclear Power Station, Unit 1 can be found on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.


the Three Mile Island Nuclear Power Station, Unit 1 for calendar year
2 Meeting


2005. NRC's assessment is documented in a letter dated March 2, 2006.
==Contact:==
Attendees:NRC:A. Blough, Director, Division of Reactor Safety, Region I R. Bellamy, Chief, Projects Branch 7, Region I
Dr. Ronald Bellamy, Chief, Projects Branch 7 (610) 337-5200 E-mail: rrb1@nrc.gov
* Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 5, 2006, via telephone to the NRC meeting contact.
Approved by:     /RA/
Dr. Ronald R. Bellamy, Chief Projects Branch 7 Division of Reactor Projects Distribution:
Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)
D. Allard, PADEP Regional Administrator Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)


D. Kern, Senior Resident Inspector, Three Mile Island
Agenda NRCs Annual Assessment Meeting Three Mile Island Nuclear Power Station, Unit 1 April 5, 2006 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)
Discussion of Three Mile Island Performance . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)
AmerGens Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . .                        AmerGen (25 minutes)
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
NRC to address public questions                . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)


R. Fuhrmeister, Senior Project Engineer
4 Distribution w/encl: (VIA E-MAIL)
 
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
J. Brand, Resident Inspector, Three Mile Island
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
 
P. Milligan, Senior Advisor, Emergency Preparedness, NSIRLicensee:R. West, Site Vice President - TMI Unit 1, AmerGen G. Chick, Plant Manager - TMI, Unit 1, AmerGen
 
C. Smith, Regulatory Assurance Manager - TMI, Unit 1, AmerGenPublic Participation:This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the
 
NRC after the business portion, but before the meeting is adjourned.
NRC's assessment letter can be found in ADAMS with an accession number of ML060620207.
This meeting notice with the enclosed meeting agenda can be located in ADAMS with an
 
Accession Number of ML060750799. The NRC slides for the meeting can be accessed with the
 
Accession Number ML060750803. ADAMS is accessible from the NRC web site at:
 
http://www.nrc.gov/reading-rm/adams.html
.Additional information relative to the NRC's Annual Assessment process and the safety performance of Three Mile Island Nuclear Power Station, Unit 1 can be found on the NRC web
 
site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
2Meeting Contact:Dr. Ronald Bellamy, Chief, Projects Branch 7 (610) 337-5200
 
E-mail:  rrb1@nrc.gov*Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than two business days prior
 
to the meeting. Attendance by NRC personnel at this meeting should be made known
 
by April 5, 2006, via telephone to the NRC meeting contact.
Approved by:     
/RA/
Dr. Ronald R. Bellamy, Chief Projects Branch 7
 
Division of Reactor Projects Distribution
: Chief Operating Officer, AmerGen
 
Site Vice President - TMI Unit 1, AmerGen
 
Plant Manager - TMI, Unit 1, AmerGen
 
Regulatory Assurance Manager - TMI, Unit 1, AmerGen
 
Senior Vice President - Nuclear Services, AmerGen
 
Vice President - Mid-Atlantic Operations, AmerGen
 
Vice President - Operations Support, AmerGen
 
Vice President - Licensing and Regulatory Affairs, AmerGen
 
Director Licensing - AmerGen
 
Manager Licensing - TMI, AmerGen
 
Vice President - General Counsel and Secretary, AmerGen
 
T. O'Neill, Associate General Counsel, Exelon Generation Company
 
J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear
 
Correspondence Control Desk -  AmerGen
 
Chairman, Board of County Commissioners of Dauphin County
 
Chairman, Board of Supervisors of Londonderry Township
 
R. Janati, Director, Bureau of Radiation Protection, State of PA
 
J. Johnsrud, National Energy Committee
 
E. Epstein, TMI-Alert (TMIA)
 
D. Allard, PADEP
 
Regional Administrator Secretary, RI 
 
DRM Division Secretary, RI
 
Region I Receptionist
 
Region I Docket Room (with concurrences)
Agenda NRC's Annual Assessment Meeting Three Mile Island Nuclear Power Station, Unit 1 April 5, 2006Introduction 
....................................................
NRC (3 minutes)Review of Reactor Oversight Process................................
NRC (5 minutes)National Summary of Plant Performance
..............................
NRC (7 minutes)Discussion of Three Mile Island Performance
.........................
NRC (15 minutes)AmerGen's Response and Remarks........................... AmerGen (25 minutes)Closing Remarks................................................
NRC (5 minutes)Short Break.........................................................(5 minutes)
NRC to address public questions
................
NRC/Members of the Public (as needed) 4 Distribution w/encl: (VIA E-MAIL)
Executive Director for Operat ions, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reacto r Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
 
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)
Associate Director, Office of Operating Reactor Oversight and  
 
Licensing, NRR/ADRO (RIDSNRRADRO)
 
Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)
Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)
Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
 
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP A. Blough, Director, DRS M. Gamberoni, DRS R. Bellamy, DRP - Branch 7 Chief R. Fuhrmeister, DRP - SPE D. Kern, DRP - Senior Resident Inspector J. Brand, DRP - Resident Inspector P. Sauder, DRP - Resident OA B. Sosa, RI OEDO F. Saba, Project Manager, NRR G. Wunder, NRR D. Roberts, NRR J. Boska, NRR K. Farrar, Regional Counsel D. Screnci, Senior PAO N. Sheehan, Field PAO R. Bores, SLO J. Wray, SLO G. Matakas, ORA, Secretary PMNS ADAMS Accession Number ML060750799 Document Name: C:\MyFiles\Copies\TMI 2006 AA Meeting Notice 4-5-06.wpd SISP Review Complete:___AAR_____ (Reviewers Initials)
S. Collins, RA
After declaring this document An Official Agency Record it will be released to the Public.
 
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP                              RI/DRP NAME          ARosebrook/AAR RBellamy/RRB DATE          03/16/06                      03/21/06 OFFICIAL RECORD COPY}}
M. Dapas, DRA
 
B. Holian, DRP
 
D. Lew, DRP
 
A. Blough, Director, DRS
 
M. Gamberoni, DRS
 
R. Bellamy, DRP - Branch 7 Chief
 
R. Fuhrmeister, DRP - SPE
 
D. Kern, DRP - Senior Resident Inspector  
 
J. Brand, DRP - Resident Inspector
 
P. Sauder, DRP - Resident OA
 
B. Sosa, RI OEDO  
 
F. Saba, Project Manager, NRR
 
G. Wunder, NRR
 
D. Roberts, NRR
 
J. Boska, NRR
 
K. Farrar, Regional Counsel
 
D. Screnci, Senior PAO
 
N. Sheehan, Field PAO
 
R. Bores, SLO
 
J. Wray, SLO G. Matakas, ORA, Secretary
 
PMNS ADAMS Accession Number ML060750799 Document Name: C:\MyFiles\Copies\TMI 2006 AA Meeting Notice 4-5-06.wpdSISP Review Complete:___AAR_____ (Reviewer's Initials)
After declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copyOFFICERI/DRPRI/DRP     NAMEARosebrook/AARRBellamy/RRBDATE03/16/0603/21/06 OFFICIAL RECORD COPY}}

Latest revision as of 21:12, 7 December 2019

Public Meeting Notice for Three Mile Island (Amergen) and NRC Ref: Annual Assessment Performance CY2005
ML060750799
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/21/2006
From: Bellamy R
NRC/RGN-I/DRP/PB7
To:
Bellamy R Rgn-I/DRP/Br7/610-337-5200
Shared Package
ML060680618 List:
References
MN 06-011
Download: ML060750799 (4)


Text

MN No.06-011 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 21, 2006 Licensee: AmerGen Energy Company, LLC Facility: Three Mile Island Nuclear Power Station, Unit 1 Docket No: 50-289 Time and Date: April 5, 2006 at 7:00 p.m.

Location: Middletown Borough Hall 60 West Emaus Street Middletown, PA 17057

Purpose:

The NRC requested an Annual Assessment Meeting with AmerGen management to discuss NRCs assessment of the safety performance of the Three Mile Island Nuclear Power Station, Unit 1 for calendar year 2005. NRCs assessment is documented in a letter dated March 2, 2006.

Attendees:

NRC: A. Blough, Director, Division of Reactor Safety, Region I R. Bellamy, Chief, Projects Branch 7, Region I D. Kern, Senior Resident Inspector, Three Mile Island R. Fuhrmeister, Senior Project Engineer J. Brand, Resident Inspector, Three Mile Island P. Milligan, Senior Advisor, Emergency Preparedness, NSIR Licensee: R. West, Site Vice President - TMI Unit 1, AmerGen G. Chick, Plant Manager - TMI, Unit 1, AmerGen C. Smith, Regulatory Assurance Manager - TMI, Unit 1, AmerGen Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter can be found in ADAMS with an accession number of ML060620207.

This meeting notice with the enclosed meeting agenda can be located in ADAMS with an Accession Number of ML060750799. The NRC slides for the meeting can be accessed with the Accession Number ML060750803. ADAMS is accessible from the NRC web site at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and the safety performance of Three Mile Island Nuclear Power Station, Unit 1 can be found on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 Meeting

Contact:

Dr. Ronald Bellamy, Chief, Projects Branch 7 (610) 337-5200 E-mail: rrb1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 5, 2006, via telephone to the NRC meeting contact.

Approved by: /RA/

Dr. Ronald R. Bellamy, Chief Projects Branch 7 Division of Reactor Projects Distribution:

Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)

D. Allard, PADEP Regional Administrator Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

Agenda NRCs Annual Assessment Meeting Three Mile Island Nuclear Power Station, Unit 1 April 5, 2006 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Three Mile Island Performance . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

AmerGens Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . AmerGen (25 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

4 Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP A. Blough, Director, DRS M. Gamberoni, DRS R. Bellamy, DRP - Branch 7 Chief R. Fuhrmeister, DRP - SPE D. Kern, DRP - Senior Resident Inspector J. Brand, DRP - Resident Inspector P. Sauder, DRP - Resident OA B. Sosa, RI OEDO F. Saba, Project Manager, NRR G. Wunder, NRR D. Roberts, NRR J. Boska, NRR K. Farrar, Regional Counsel D. Screnci, Senior PAO N. Sheehan, Field PAO R. Bores, SLO J. Wray, SLO G. Matakas, ORA, Secretary PMNS ADAMS Accession Number ML060750799 Document Name: C:\MyFiles\Copies\TMI 2006 AA Meeting Notice 4-5-06.wpd SISP Review Complete:___AAR_____ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 03/16/06 03/21/06 OFFICIAL RECORD COPY