ML090220465

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Exelon Generation Co
ML090220465
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 01/22/2009
From: Conte R
Engineering Region 1 Branch 1
To:
PPL Corp
BELLAMY RR
References
MN 09-003
Download: ML090220465 (4)


Text

MN No.09-003 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING January 22, 2009 Licensee: Exelon Generation Company Facility: Three Mile Island Nuclear Station Unit 1 License: DPR-50 docketed at 50-289 Date and Time: February 5, 2009, 6:30 p.m.

Location: Sheraton Harrisburg Hershey Hotel 4650 Lindle Road Harrisburg, Pennsylvania 17111 (717) 564-5511

Purpose:

NRC staff will inform Exelon management of the results of the NRC team inspection covering the scoping and aging management portions of the Three Mile Island Nuclear Station Unit 1 application for a renewed license. Aging management programs manage the affects of aging on safety systems and certain other special systems within the scope of license renewal.

Attendees:

NRC: D. Roberts Deputy Division Director, DRS, Region I R. Conte Chief, Engineering Branch 1, DRS, Region I M. Modes Sr. Reactor Inspector/Team Leader, DRS, Region I Exelon: W. Noll Site Vice President M. Gallagher Vice President License Renewal Public Participation: The 6:30 p.m. management meeting is a Category 1 Meeting. The public is invited to observe this meeting. Per the attached agenda, following the business portion of the meeting, the public will have an opportunity to communicate with the NRC staff regarding the Three Mile Island Nuclear Station Unit 1 application for a renewed license, and the role of the NRC in ensuring safe plant operations. Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC no later than two business days prior to the meeting.

2 Information regarding the NRC's license renewal process and reactor oversight process can be found on the NRC's web site at:

http://www.nrc.gov/reactors/operating/licensing/renewal.html http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting

Contact:

Richard Conte, Chief, Engineering Branch 1 (610) 337-5183 E-mail: richard.conte@nrc.gov Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

/RA/

Approved by: ______________________

Richard Conte, Chief Engineering Branch 1 Division of Reactor Safety cc w/encl:

C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear W. Noll, Site Vice President, TMI Unit 1, Exelon Nuclear T. Dougherty, Plant Manager, TMI, Unit 1, Exelon Nuclear Manager, Regulatory Assurance, TMI, Unit 1, Exelon Nuclear Senior Vice President, Nuclear Services, Exelon Nuclear Senior Vice President, Mid-Atlantic Operations, Exelon Nuclear Senior Vice President, Operations Support, Exelon Nuclear Vice President, Licensing and Regulatory Affairs, Exelon Nuclear Director, Licensing, Exelon Nuclear Manager, Licensing, Exelon Nuclear J. Fewell, Esq., Associate General Counsel, Exelon Correspondence Control Desk, Exelon Nuclear Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA D. Allard, Director, PA DEP J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)

J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency

3 Agenda License Renewal Inspection Public Exit Meeting Three Mile Island Nuclear Station Unit 1 February 5, 2009 6:30 PM Introductions and Opening Remarks................................................... NRC (5 minutes)

Review of License Renewal Process .................................................. NRC (10 minutes)

Discussion of results of license renewal inspection............................. NRC (20 minutes)

Exelon Response and Remarks...........................................................Exelon (10 minutes)

NRC Closing Remarks ....................................................................... NRC (5 minutes)

Break (10 minutes)

NRC will remain to address public questions...................................... NRC/Public (60 minutes)

4 Distribution w/encl: (via e-mail)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

RIDSNRRADRO RIDSNRRDIRS RIDSNRRDIRSLPAB RIDSNRRDORL RIDSNRRDORlLpl1-1 RIDSNRRDORlLpl1-2 S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP D. Roberts, DRS R. Conte, DRS D. Kern, DRP S. Campbell, RI OEDO R. Nelson, NRR M. Kowal, NRR J. Kim, NRR B. Vaidya, NRR, PM J. Hughey, NRR D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO R. Bellamy, DRP P. Bamford, PM, NRR E. Miller, NRR, Backup S. Barber, DRP C. Newport, DRP R. Nelson, NRR H. Chernoff, NRR J. Brand, DRP C. LaRegina, DRP Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist PMNS RESOURCE Region I Docket Room (with concurrences)

SUNSI Review Complete: RC (Reviewer=s Initials)

ML090220465 DOCUMENT NAME: G:\DRS\Engineering Branch 1\Modes\TMI MeetingNotice&Agenda.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRP RI/DRS NAME MModes/RC for RBellamy/RRB RConte/RC DATE 01/22/09 01/22/09 01/22/09 OFFICIAL RECORD COPY