MN 08-036, Notice of Closed Meeting to Exelon Generation Company for SCWE Survey Review
| ML083110593 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane |
| Issue date: | 11/07/2008 |
| From: | Paul Krohn Reactor Projects Region 1 Branch 4 |
| To: | |
| KROHN P, RI/DRP/PB4/610-337-5120 | |
| References | |
| MN 08-036 | |
| Download: ML083110593 (3) | |
Text
MN No.08-036 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING November 7, 2008 Licensee:
Exelon Generation Company, LLC Facilities &
Peach Bottom Atomic Power Station, Units 2 and 3; 50-277; 50-278 Docket Nos.:
Braidwood Station, Units 1 and 3; 50-456; 50-457 Byron Station, Units 1 and 2; 50-454; 50-455 Clinton Power Station, Unit 1; 50-461 Dresden Nuclear Power Station, Units 2 and 3; 50-237; 50-249 LaSalle County Station, Units 1 and 2; 50-373; 50-374 Limerick Generating Station, Units 1 and 2; 50-352; 50-353 Oyster Creek Nuclear Generating Station; 50-219 Quad Cities Nuclear Power Station, Units 1 and 2; 50-254; 50-265 Three Mile Island Nuclear Station, Unit 1; 50-289 Date/ Time:
November 17, 2008 at 1:00 p.m.
Location:
Exelon Generation 300 Exelon Way Kennett Square, PA 19348
Purpose:
The NRC requested a meeting with Exelon to review the results of security organization safety conscious work environment (SCWE) surveys at Exelon Nuclear operating reactors. This meeting was originally discussed in a NRC Confirmatory Action Letter (ML072920283) to Exelon as a result of Peach Bottom inattentive security officer events that were discovered in September 2007.
This meeting will be closed to public participation due to discussions involving site-specific, security-related SCWE survey results and corrective actions. Some corrective actions have not yet been completed and are ongoing.
Attendees:
NRC:
D. Roberts, Deputy Director, Division of Reactor Safety (DRS), Region I S. West, Director, DRS, Region III J. Trapp, Branch Chief, DRS Plant Support Branch 1, Region I E. Duncan, Branch Chief, DRS, Region III P. Krohn, Branch Chief, Division of Reactor Projects Branch 4, Region I Licensee:
C. Kelley, Senior Director, Nuclear Security D. Hieggelke, Director, Nuclear Oversight Audit & Programs P. Cowan, Director, Mid-Atlantic Licensing D. Benyak, Director, Mid-West Licensing
2 Meeting
Contact:
Paul G. Krohn, Chief, Projects Branch 4, Region I 610-337-5120 E-mail: pgk1@nrc.gov This meeting notice can be located in ADAMS with Accession Number ML083110593 ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.
Previous regulatory actions regarding the Peach Bottom inattentive security officer events can be located in ADAMS with Accession Numbers ML072920283 (Confirmatory Action Letter);
ML073090061 (Augmented Inspection Team); ML073320344 (Reactor Oversight Process Deviation Memorandum); ML073550590 (Augmented Inspection Team Follow-up);
ML080440012 (Final Significance Determination); and ML082410183 (Closure of Confirmatory Action Letter). The NRCs annual assessment letter regarding Peach Bottom performance during 2007 can be found in ADAMS with Accession Number ML080630190. Information relative to the NRCs Annual Assessment process and the safety performance of the Exelon facilities listed in this meeting notice can be found on the NRCs web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Attendance by NRC personnel at this meeting should be made known by COB on November 13, 2008 Approved By: ___/RA/___________
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects
ML083110593 DOCUMENT NAME: G:\\DRP\\BRANCH4\\Assessment (EOC, MC)\\ROP 7 EOC\\2007 AAM Meeting Notices and Summaries\\Peach Bottom\\NRC Meeting Notice Regarding Exelon Sec Org SCWE Survey Results 11_17_08 Rev1.doc SUNSI Review Complete: PGK (Reviewers Initials)
After declaring this document An Official Agency Record it will not be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRS NAME PKrohn/PGK JTrapp/JMT DATE 11/07/08 11/07/08