ML080080477

From kanterella
Jump to navigation Jump to search
Notice of Non-Public Meeting with Exelon to Discuss Plans to Transition Wackenhut Security Workforce to a Proprietary In-House Workforce
ML080080477
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 01/08/2008
From: Eric Duncan
Plant Support Branch II
To:
References
Download: ML080080477 (2)


Text

January 8, 2008 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS NOT OPEN TO PUBLIC ATTENDANCE Name of Licensee: Exelon Generation Company, LLC Name of Facilities/Docket Nos: Region III Braidwood 456; 50-457 Quad Cities 254; 50-265 LaSalle 373; 50-374 Clinton 461 Dresden 237; 50-249 Byron 454, 50-455 Region I Peach Bottom 277; 50-278 Three Mile Island 289 Oyster Creek 219 Limerick 352; 50-353 Date and Time of Meeting: Friday, January 11, 2008 at 10:30 CST Location of Meeting: U.S. NRC Region III 2443 Warrenville Road, Suite 210 Lisle, Illinois, 60532 Video Conference Location: Headquarters Operations Center Region I Purpose of Meeting: To discuss Exelon=s plans to transition the Wackenhut security workforce to a proprietary in-house workforce.

Category: This meeting will be closed to the public because the staff has determined that the information is security-sensitive in nature.

NRC Attendees: R. Correia, Deputy Director for Security Oversight, NSIR S. West, Director, DRS, Region III A. Boland, Deputy Director, DRS, Region III F. Peduzzi, Team Leader, NSIR M. Gamberoni, Director, DRS, Region I D. Roberts, Deputy Director, DRS, Region I J. Trapp, Plant Support Branch Chief, Region I E. Duncan, Plant Support Branch Chief, Region III Licensee Attendees: G. Kaegi, Exelon J. Achterberg, Exelon D. Evans, Exelon D. Benyak, Exelon M. Carney, Exelon

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9757 by COB Thursday, January 10, 2007.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC=s meeting coordinator.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: _______/RA/______________

Eric Duncan Chief, Plant Support Branch Division of Reactor Safety Distribution:

D. Jackson, (DEJ1), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR R. Correia, Deputy Director for Security Oversight, NSIR F. Peduzzi, Team Leader, NSIR M. Gamberoni, Director, DRS, Region I D. Roberts, Deputy Director, DRS, Region I J. Trapp, Plant Support Branch Chief, Region I C. Pederson (CDP1), Director, Division of Reactor Projects, RIII G. Shear (GLS), Deputy Director, Division of Reactor Projects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII E. Duncan (ERD), Branch Chief, Plant Support, Division of Reactor Safety, RIII DRP Branch Chiefs (MAR, KXR, RAS)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII RIII Public Affairs (VTM, PSC1)

T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP