ML111400039

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Exelon Generation Company, LLC to Discuss the Nrc'S Assessment of Safety Performance at Three Mile Island, Unit 1 for 2010
ML111400039
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/20/2011
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
bellamy, rr
References
MN 11-020
Download: ML111400039 (3)


Text

MN No.11-020 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 20,2Q11 Licensee: Exelon Generation Company, LLC Facilities: Three Mile lsland Power Station, Unit 1 Docket No(s). 50-289 Time and Date: June 7, 2011,6:30 - 8:00 pm Location: Sheraton Harrisburg Hersheyl Hotel 4650 Lindle Rd.

Harrisburg, PA 17111

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessrhent of safety performance at Three Mile fsland Power Station Unit 1 for 2010, as described in the annual assessment letter dated MarcFr 4,2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operationg.

NRC Attendees: W. Dean, RegionalAdministr{tor, Region I R. Bellamy, Chief, Projects Brlanch 6, Region I D. Kern, Senior Resident lnspector, Three Mile lsland S. Barber, Senior Projects Engineer, Project Branch 6, Region I J. Heinly, Resident lnspector, Three Mile lsland Public Participation: This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC statf following the presentation.

Meeting

Contact:

Ronald R. Bellamy, Chief, rojects Branch 6 61 0-337-5200 Email: Ronald. bella.my@nrc.tilov The NRC's annual assessment letter regarding Three Mile lsland Unit 1 performance during from the NRC Web Site at -rm/ad Additional information relative to the NRC's annual dssessment process and the safety performance of the Three Mile lsland Power Station can be found on the NRC's website at.

htto://www. nrc. gov/N RR/OVERSI GHT/ASSESS/indPx. html.

The NRC's Policy Statement, "Enhancing Public Palticipation in NRC Meetings," effective May 28, 20A2, applies to this meeting. The policy statement may be found on the NRC website, http:// vvww.nrc.govlreadinq-rm/doc-collectionsicom4nission/policv/67fr36920.htm1, and contains information regarding visitors and security.

2 The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participf,te in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations oh requests for reasonable accommodation will be made on a case-by-case basis. Persons requriring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by June 5,2011 via telephone to the NRC meeting contact.

Meetings are sometimes cancelled or rescheduled ab a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC wdbsite under Public Meetings.

Approved:

R. Bellamy, Ph.D., Chief Division of Reactor Projects cc: Distribution via ListServ

2 The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons reqiriring assistance to attend the meeting shall make their requests known to the NRC meeting confact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by June 5,2011 via telephone to the NRC meeting contact.

Meetings are sometimes cancelled or rescheduled {s a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC wbbsite under Public Meetings.

Approved by: /RA/

Ronald R. Bellamy, Ph.D., Chief Project$ Branch 6 Division of Reactor Projects cc: Distribution via ListServ Distribution w/encl: (VlA E-MAIL)

Executive Director for Operations, OEDO (RTDSEDOMATLCENTER RESOURCE)

Deputy Executive Direclor for Reactor Programs,OEDO (RIDSEDOMAILCENTER RESOURCE)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nucelar Reactor Regulation, NRR (RIDSNRROD)

Director, Division of Inspection and Regional Support, NRFyDIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Direc{orate l-1 (PD1-2), NRR (RIDSNRRDORILpI 1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RTDSOGCMATLCENTER)

W. Dean, RA r/. Heinly, DRP, Rl D. Lew, DRA C. LaRegina, DRP D. Roberts. DRP N. Sheehan. PAO J. Clifford, DRP D. Screnci. PAO C. Miller, DRS R. Bakley, ORA P. Wilson, DRS N. McNamara, SLO S. Bush-Goddard, Rl, OEDO D. Tifft. sLo R. Bellamy, DRP G. Matakas, ORA S. Barber, DRP K. Heater. DRP C. Newport, DRP V. Lewis, Rl RecePtionist A. Dugandzic, DRP RidsNrrPMThreeMilelsland Resource T. Ziev, DRP ROPReportsResource D. Kern. DRP, SRI SUNSI REVIEW COMPLETE: GN (Reviewer's Initials) ML111400039 DOC NAME: G:\DRP\BRANCH6\ROP ASSESSMENT FbLDERS\ROP 11\THREE MILE ISLAND\

END-OF-CYCLE\TMI AA MEETING NOTICE ROP 11 Revl.DOCX After declaring this document'An OfficialAgency Rebord'it wlll be released to the Public.

'E' = Copy with attachmenvenclosure 'N' = No mpy 05t 18 t11