ML062970196: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML062970196
| number = ML062970196
| issue date = 10/25/2006
| issue date = 10/25/2006
| title = 11/06/2006 Notice of Forthcoming Meeting with PPL Susquehanna, LLC (PPL) to Conduct a Working Level-Discussion Re Steam Dryer Analytical Updates and Revisions Made to the Extended Power Uprate Application for Susquehanna Units 1 & 2
| title = Notice of Forthcoming Meeting with PPL Susquehanna, LLC (PPL) to Conduct a Working Level-Discussion Re Steam Dryer Analytical Updates and Revisions Made to the Extended Power Uprate Application for Susquehanna Units 1 & 2
| author name = Guzman R
| author name = Guzman R
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1

Latest revision as of 17:04, 7 December 2019

Notice of Forthcoming Meeting with PPL Susquehanna, LLC (PPL) to Conduct a Working Level-Discussion Re Steam Dryer Analytical Updates and Revisions Made to the Extended Power Uprate Application for Susquehanna Units 1 & 2
ML062970196
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/25/2006
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To: Richard Laufer
NRC/NRR/ADRO/DORL/LPLI-1
Guzman R, NRR/DORL, 415-1030
References
Download: ML062970196 (5)


Text

October 25, 2006 MEMORANDUM TO: Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing FROM: Richard V. Guzman, Project Manager /RA/

Plant Licensing Branch I-1 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH PPL SUSQUEHANNA, LLC (PPL),

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DATE & TIME: Monday, November 6, 2006 10:00 a.m. - 12:30 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-8-B-4 Rockville, Maryland PURPOSE: To conduct a working level-discussion related to the steam dryer analytical updates and revisions made to the extended power uprate application for Susquehanna Steam Electric Station, Units 1 and 2.

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting (see Agenda) and will have one or more opportunities to communicate with the NRC after the business portion but before the meeting is adjourned.

MEETING CONTACTS: Rich Guzman, NRR Tim Colburn, NRR 301-415-1030 301-415-1402 rvg@nrc.gov tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

PARTICIPANTS: Participants consist of members of the Office of Nuclear Reactor Regulation (NRR) Division of Operating Reactor Licensing (DORL),

Division of Policy and Rulemaking (DPR), Division of Engineering (DE),

and PPL Susquehanna.

NRC John Lubinski, NRR, DORL Deputy Director Rich Guzman, NRR, Project Manager Kamal Manoly, NRR, DE Branch Chief, Engineering Mechanics Branch Thomas Scarbrough, NRR Technical Reviewer Andrew DuBouchet, NRR Technical Reviewer Thomas Alexion, NRR, DPR, Project Manager Quynh Nguyen, NRR, DPR, Project Manager James Tatum, NRR Technical Reviewer PPL George Jones, Vice President Special Projects John Bartos, EPU Engineering Lead Mike Crowthers, EPU Licensing Lead Mike Gorski, EPU Kevin Browning, EPU Nuclear Steam Supply System/Emergency Core Cooling Containment Spray Systems Terry Cribbe, EPU Licensing Rick Pistolas, EPU Balance of Plant Lead Docket Nos. 50-387 and 50-388

Enclosure:

Meeting Agenda

R. Laufer PARTICIPANTS: Participants consist of members of the Office of Nuclear Reactor Regulation (NRR) Division of Operating Reactor Licensing (DORL),

Division of Policy and Rulemaking (DPR), Division of Engineering (DE),

and PPL Susquehanna.

NRC John Lubinski, NRR, DORL Deputy Director Rich Guzman, NRR, Project Manager Kamal Manoly, NRR, DE Branch Chief, Engineering Mechanics Branch Thomas Scarbrough, NRR Technical Reviewer Andrew DuBouchet, NRR Technical Reviewer Thomas Alexion, NRR, DPR, Project Manager Quynh Nguyen, NRR, DPR, Project Manager James Tatum, NRR Technical Reviewer PPL George Jones, Vice President Special Projects John Bartos, EPU Engineering Lead Mike Crowthers, EPU Licensing Lead Mike Gorski, EPU Kevin Browning, EPU Nuclear Steam Supply System/Emergency Core Cooling Containment Spray Systems Terry Cribbe, EPU Licensing Rick Pistolas, EPU Balance of Plant Lead Docket Nos. 50-387 and 50-388

Enclosure:

Meeting Agenda DISTRIBUTION:

PUBLIC LPLI-1 R/F RidsNrrLaSlittle RidsNrrDorlLpl1-1 RidsNrrPmRGuzman RidsNrrDorl RidsNrrDorlCHolden RidsAcrsAcnwMailCenter RidsOpaMail RidsOgcMailCenter RidsNrrPmTColburn RidsNrrDeEema ABlamey JTrapp JTatum TScarbrough ADuBouchet JLubinski RidsNrrPmTAlexion RidsNrrPmQNguyen PMNS RidsRgn1MailCenter RidsOpaMail OTabatabai Receptionist ACCESSION NO. ML062970196 *Concurrence by email OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman SLIttle RLaufer DATE 10/24/06 10/24/06 10/25/06 OFFICIAL RECORD COPY

PPL SUSQUEHANNA, LLC U.S. NUCLEAR REGULATORY COMMISSION NOVEMBER 6, 2006 EXTENDED POWER UPRATE PLANNING MEETING AGENDA INTRODUCTIONS 10:00 a.m. - 10:05 a.m.

OBJECTIVES 10:05 a.m. - 10:10 a.m.

INITIAL STAFF COMMENTS 10:10 a.m. - 10:15 a.m.

REVIEW CHANGES TO PPL SUSQUEHANNA, LLC 10:15 a.m. - 10:30 a.m.

APPLICATION REVIEW STEAM DRYER ANALYSIS AND RESULTS 10:30 a.m. - 11:20 a.m.

BREAK 11:20 a.m. - 11:30 a.m.

REVIEW BALANCE OF PLANT CHANGES 11:30 a.m. - 11:50 a.m.

NRC REVIEW SCHEDULE 11:50 a.m. - 12:10 p.m COMMENTS FROM PUBLIC 12:10 pm. - 12:20 p.m.

CONCLUSIONS AND CLOSING REMARKS 12:20 p.m. - 12:30 p.m.

Enclosure

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Mr. Britt T. McKinney Bryan A. Snapp, Esq Sr. Vice President Assoc. General Counsel and Chief Nuclear Officer PPL Services Corporation PPL Susquehanna, LLC Two North Ninth Street, GENTW3 769 Salem Blvd., NUCSB3 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Supervisor - Document Control Services Robert A. Saccone PPL Susquehanna, LLC Vice President - Nuclear Operations Two North Ninth Street, GENPL4 PPL Susquehanna, LLC Allentown, PA 18101-1179 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Richard W. Osborne Allegheny Electric Cooperative, Inc.

Terry L. Harpster 212 Locust Street General Manager - Plant Support P.O. Box 1266 PPL Susquehanna, LLC Harrisburg, PA 17108-1266 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Director, Bureau of Radiation Protection Pennsylvania Department of Rocco R. Sgarro Environmental Protection Manager - Nuclear Regulatory Affairs Rachel Carson State Office Building PPL Susquehanna, LLC P.O. Box 8469 Two North Ninth Street, GENPL4 Harrisburg, PA 17105-8469 Allentown, PA 18101-1179 Senior Resident Inspector Walter E. Morrissey U.S. Nuclear Regulatory Commission Supervising Engineer P.O. Box 35, NUCSA4 Nuclear Regulatory Affairs Berwick, PA 18603-0035 PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Regional Administrator, Region 1 Berwick, PA 18603-0467 U.S. Nuclear Regulatory Commission 475 Allendale Road Michael H. Crowthers King of Prussia, PA 19406 Supervising Engineer Nuclear Regulatory Affairs Board of Supervisors PPL Susquehanna, LLC Salem Township Two North Ninth Street, GENPL4 P.O. Box 405 Allentown, PA 18101-1179 Berwick, PA 18603-0035 Steven M. Cook Dr. Judith Johnsrud Manager - Quality Assurance National Energy Committee PPL Susquehanna, LLC Sierra Club 769 Salem Blvd., NUCSB2 443 Orlando Avenue Berwick, PA 18603-0467 State College, PA 16803 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467