| number = ML080780025
| number = ML080780025
| issue date = 03/14/2008
| issue date = 03/14/2008
| title = 04/03/2008 - Notice of Meeting with Entergy Nuclear Northeast to Discuss Safety Performance of the James A. FitzPatrick Nuclear Power Plant Annual Assessment for Cy 2007
| title = Notice of Meeting with Entergy Nuclear Northeast to Discuss Safety Performance of the James A. FitzPatrick Nuclear Power Plant Annual Assessment for Cy 2007
| author name = Cobey E
| author name = Cobey E
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:March 14, 2008 MN No. 08-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING  
{{#Wiki_filter:March 14, 2008 MN No. 08-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee:              Entergy Nuclear Northeast Facility:              James A. FitzPatrick Nuclear Power Plant Docket No.            50-333 Date and Time:        April 3, 2008, from 2:00 p.m. to 3:30 p.m.
Location:              Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069


Licensee: Entergy Nuclear Northeast Facility:   James A. FitzPatrick Nuclear Power Plant Docket No. 50-333
==Purpose:==
The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of the James A. FitzPatrick Nuclear Power Plant for calendar year 2007.
The NRCs assessment is documented in a letter dated March 3, 2008.
Attendees*:
NRC:                  E. Cobey, Chief, Projects Branch 2, Region I G. Hunegs, Senior Resident Inspector S. Rutenkroger, Resident Inspector Entergy:              P. Dietrich, Site Vice President K. Mulligan, General Manager of Plant Operations S. Bono, Director of Engineering B. Finn, Director of Nuclear Safety Assurance Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, but before the meeting is adjourned.
The NRCs Annual Assessment Letter - James A. FitzPatrick Nuclear Power Plant, can be located in ADAMS (Accession Number ML080630118). ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.


Date and Time:  April 3, 2008, from 2:00 p.m. to 3:30 p.m.
2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of James A. FitzPatrick Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Location:  Joint News Center    Oswego County Airport    County Route 176 Fulton, NY 13069 Purpose: The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRC's assessment of the safety performance of the James A. FitzPatrick Nuclear Power Plant for calendar year 2007.
Meeting
The NRC's assessment is documented in a letter dated March 3, 2008. Attendees*:


NRC:   E. Cobey, Chief, Projects Branch 2, Region I    G. Hunegs, Senior Resident Inspector    S. Rutenkroger, Resident Inspector Entergy:  P. Dietrich, Site Vice President K. Mulligan, General Manager of Plant Operations    S. Bono, Director of Engineering    B. Finn, Director of Nuclear Safety Assurance Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, but before the meeting is adjourned.
==Contact:==
The NRC's Annual Assessment Letter - James A. FitzPatrick Nuclear Power Plant, can be located in ADAMS (Accession Number ML080630118). ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.
Eugene W. Cobey, Chief, Projects Branch 2 610-337-5171 E-mail: ewc@nrc.gov
2Additional information relative to the NRC's Annual Assessment Process and the safety performance of James A. FitzPatrick Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting Contact: Eugene W. Cobey, Chief, Projects Branch 2   610-337-5171 E-mail: ewc@nrc.gov
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 26, 2008, via telephone to the NRC meeting contact.
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 26, 2008, via telephone to the NRC meeting contact.
Approved by: /RA by Blake D. Welling For/
Approved by: /RA by Blake D. Welling For/
Eugene W. Cobey, Chief       Projects Branch 2       Division of Reactor Projects  
Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects


3 Agenda NRC's Annual Assessment Meeting James A. FitzPatrick Nuclear Power Plant April 3, 2008 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
3 Agenda NRCs Annual Assessment Meeting James A. FitzPatrick Nuclear Power Plant April 3, 2008 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . NRC (10 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . NRC (10 minutes)
Discussion of James A. FitzPatrick Nuclear Station Performance . . . . NRC (10 minutes)
Discussion of James A. FitzPatrick Nuclear Station Performance . . . . NRC (10 minutes)
Entergy's Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (25 minutes)  
Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (25 minutes)
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
NRC to address public questions . . . . . . . . . . . .NRC/Members of the Public (as needed)


3 Agenda NRCs Annual Assessment Meeting James A. FitzPatrick Nuclear Power Plant April 3, 2008 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . NRC (10 minutes)
Discussion of James A. FitzPatrick Nuclear Station Performance . . . . NRC (10 minutes)
Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (25 minutes)
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . . (5 minutes)
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
NRC to address public questions . . . . . . . . . . . .NRC/Members of the Public (as needed) 3Agenda  NRC's Annual Assessment Meeting James A. FitzPatrick Nuclear Power Plant April 3, 2008 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes) Review of Reactor Oversight Process . . . . . . . . .  . . . . . . . . . . . . . . . . NRC (10 minutes)
NRC to address public questions . . . . . . . . . . . .NRC/Members of the Public (as needed)
Discussion of James A. FitzPatrick Nuclear Station Performance . . . . NRC (10 minutes) Entergy's Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (25 minutes) Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
D. Jackson, DRP Distribution w/encl: (VIA E-MAIL)                                                                 B. Welling, DRP Executive Director for Operations, OEDO                                                           T. Wingfield, DRP (RIDSEDOMAILCENTER RESOURCES)                                                                     G. West, RI OEDO (Acting)
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes) NRC to address public questions . . . . . . . . . . . .NRC/Members of the Public (as needed)
Deputy Executive Director for Reactor Programs,                                                   M. Kowal, NRR OEDO (RIDSEDOMAILCENTER RESOURCES)                                                               J. Boska, PM NRR Director, Office of Nuclear Reactor Regulation, NRR                                               J. Hughey, NRR (RIDSNRROD)                                                                                       G. Hunegs, DRP, Senior Resident Inspector Deputy Director, Office of Nuclear Reactor Regulation,                                            S. Rutenkroger, DRP, Resident Inspector NRR/ADPR (RIDSNRROD)                                                                              K. Kolek, Resident OA RIDSNRRADRO                                                                                      D. Roberts, DRS RIDSNRRDIRS                                                                                      M. Gamberoni, DRS RIDSNRRDIRSLPAB                                                                                  D. Screnci, PAO RIDSNRRDORL                                                                                      N. Sheehan, PAO RIDSNRRDORlLpl1-1                                                                                N. McNamara, SLO RIDSNRRDORlLpl1-2                                                                                M. McLaughlin, SLO Asst. General Counsel Materials Litigation and                                                    Region I Docket Room (w/concurrences)
 
Enforcement, OGC (RIDSOGCMAILCENTER)                                                              Regional Administrator Secretary, RI S. Collins, RA                                                                                    Deputy Regional Administrator Secretary, RI M. Dapas, DRA                                                                                    DRP Division Secretary, RI D. Lew, DRP                                                                                      DRS Division Secretary, RI J. Clifford, DRP                                                                                  DNMS Division Secretary, RI G. West, RI OEDO                                                                                  DRM Division Secretary, RI J. Lubinski, NRR                                                                                  Region I Receptionist E. Cobey, DRP DOCUMENT NAME: T:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\Fitz\Fitzpatrick Meeting Notice.doc SUNSI Review Complete:                     SCM                       (Reviewers Initials)
Distribution w/encl: (VIA E-MAIL) Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES) Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)
After declaring this document An Official Agency Record it will be released to the Public.
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD) RIDSNRRADRO RIDSNRRDIRS RIDSNRRDIRSLPAB RIDSNRRDORL RIDSNRRDORlLpl1-1 RIDSNRRDORlLpl1-2 Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER) S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP G. West, RI OEDO J. Lubinski, NRR E. Cobey, DRP D. Jackson, DRP B. Welling, DRP T. Wingfield, DRP G. West, RI OEDO (Acting) M. Kowal, NRR J. Boska, PM NRR J. Hughey, NRR G. Hunegs, DRP, Senior Resident Inspector S. Rutenkroger, DRP, Resident Inspector K. Kolek, Resident OA D. Roberts, DRS M. Gamberoni, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Region I Docket Room (w/concurrences)
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy                                                                                                 ML080780025 OFFICE                         RI/DRP                                     RI/DRP                               RI/PAO NAME                           SMcCarver/SCM                               ECobey/BDW For/ DScrenci/DPS DATE                           03/11/08                                   03/14/08                             03/14/08 OFFICIAL RECORD COPY}}
Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: T:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\Fitz\Fitzpatrick Meeting Notice.doc SUNSI Review Complete:       SCM                 (Reviewer's Initials) After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copy                                                                                               ML080780025 OFFICE RI/DRP   RI/DRP   RI/PAO   NAME SMcCarver/SCM ECobey/BDW For/
DScrenci/DPS  
 
DATE 03/11/08 03/14/08 03/14/08 OFFICIAL RECORD COPY}}

Latest revision as of 08:44, 7 December 2019

Notice of Meeting with Entergy Nuclear Northeast to Discuss Safety Performance of the James A. FitzPatrick Nuclear Power Plant Annual Assessment for Cy 2007
ML080780025
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/14/2008
From: Cobey E
Reactor Projects Branch 2
To:
Cobey, Eugene W. RI/DRP/PB2/610-337-5171
References
MN 08-010
Download: ML080780025 (4)


Text

March 14, 2008 MN No.08-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee: Entergy Nuclear Northeast Facility: James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Date and Time: April 3, 2008, from 2:00 p.m. to 3:30 p.m.

Location: Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of the James A. FitzPatrick Nuclear Power Plant for calendar year 2007.

The NRCs assessment is documented in a letter dated March 3, 2008.

Attendees*:

NRC: E. Cobey, Chief, Projects Branch 2, Region I G. Hunegs, Senior Resident Inspector S. Rutenkroger, Resident Inspector Entergy: P. Dietrich, Site Vice President K. Mulligan, General Manager of Plant Operations S. Bono, Director of Engineering B. Finn, Director of Nuclear Safety Assurance Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, but before the meeting is adjourned.

The NRCs Annual Assessment Letter - James A. FitzPatrick Nuclear Power Plant, can be located in ADAMS (Accession Number ML080630118). ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of James A. FitzPatrick Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Eugene W. Cobey, Chief, Projects Branch 2 610-337-5171 E-mail: ewc@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 26, 2008, via telephone to the NRC meeting contact.

Approved by: /RA by Blake D. Welling For/

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects

3 Agenda NRCs Annual Assessment Meeting James A. FitzPatrick Nuclear Power Plant April 3, 2008 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . NRC (10 minutes)

Discussion of James A. FitzPatrick Nuclear Station Performance . . . . NRC (10 minutes)

Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (25 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . .NRC/Members of the Public (as needed)

3 Agenda NRCs Annual Assessment Meeting James A. FitzPatrick Nuclear Power Plant April 3, 2008 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . NRC (10 minutes)

Discussion of James A. FitzPatrick Nuclear Station Performance . . . . NRC (10 minutes)

Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (25 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . .NRC/Members of the Public (as needed)

D. Jackson, DRP Distribution w/encl: (VIA E-MAIL) B. Welling, DRP Executive Director for Operations, OEDO T. Wingfield, DRP (RIDSEDOMAILCENTER RESOURCES) G. West, RI OEDO (Acting)

Deputy Executive Director for Reactor Programs, M. Kowal, NRR OEDO (RIDSEDOMAILCENTER RESOURCES) J. Boska, PM NRR Director, Office of Nuclear Reactor Regulation, NRR J. Hughey, NRR (RIDSNRROD) G. Hunegs, DRP, Senior Resident Inspector Deputy Director, Office of Nuclear Reactor Regulation, S. Rutenkroger, DRP, Resident Inspector NRR/ADPR (RIDSNRROD) K. Kolek, Resident OA RIDSNRRADRO D. Roberts, DRS RIDSNRRDIRS M. Gamberoni, DRS RIDSNRRDIRSLPAB D. Screnci, PAO RIDSNRRDORL N. Sheehan, PAO RIDSNRRDORlLpl1-1 N. McNamara, SLO RIDSNRRDORlLpl1-2 M. McLaughlin, SLO Asst. General Counsel Materials Litigation and Region I Docket Room (w/concurrences)

Enforcement, OGC (RIDSOGCMAILCENTER) Regional Administrator Secretary, RI S. Collins, RA Deputy Regional Administrator Secretary, RI M. Dapas, DRA DRP Division Secretary, RI D. Lew, DRP DRS Division Secretary, RI J. Clifford, DRP DNMS Division Secretary, RI G. West, RI OEDO DRM Division Secretary, RI J. Lubinski, NRR Region I Receptionist E. Cobey, DRP DOCUMENT NAME: T:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\Fitz\Fitzpatrick Meeting Notice.doc SUNSI Review Complete: SCM (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ML080780025 OFFICE RI/DRP RI/DRP RI/PAO NAME SMcCarver/SCM ECobey/BDW For/ DScrenci/DPS DATE 03/11/08 03/14/08 03/14/08 OFFICIAL RECORD COPY