| | title = Oyster Creek Nuclear Generating Station - Correction to RAI Reactor Water Clean-Up High Energy Line Break Detection and Isolation License Amendment Request | | | title = Correction to RAI Reactor Water Clean-Up High Energy Line Break Detection and Isolation License Amendment Request |
| | author name = Miller G E | | | author name = Miller G |
| | author affiliation = NRC/NRR/ADRO/DORL | | | author affiliation = NRC/NRR/ADRO/DORL |
| | addressee name = Crane C M | | | addressee name = Crane C |
| | addressee affiliation = AmerGen Energy Co, LLC | | | addressee affiliation = AmerGen Energy Co, LLC |
| | docket = 05000219 | | | docket = 05000219 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 20, 2006Mr. Christopher M. CranePresident and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 | | {{#Wiki_filter:March 20, 2006 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| OYSTER CREEK NUCLEAR GENERATING STATION - CORRECTION TOREQUEST FOR ADDITIONAL INFORMATION RE: REACTOR WATER CLEAN-UP HIGH ENERGY LINE BREAK DETECTION AND ISOLATION LICENSE AMENDMENT REQUEST (TAC NO. MC6046) | | OYSTER CREEK NUCLEAR GENERATING STATION - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RE: REACTOR WATER CLEAN-UP HIGH ENERGY LINE BREAK DETECTION AND ISOLATION LICENSE AMENDMENT REQUEST (TAC NO. MC6046) |
|
| |
|
| ==Dear Mr. Crane:== | | ==Dear Mr. Crane:== |
|
| |
|
| By letter dated February 2, 2005, AmerGen Energy Company, LLC submitted a licenseamendment request (LAR) for the Oyster Creek Nuclear Generating Station (Oyster Creek). The LAR requested to revise the Oyster Creek Technical Specifications to incorporate the isolation trip setting and the instrumentation surveillance requirements of the reactor watercleanup high energy line break detection and isolation equipment. By letter dated March 9, 2006, the Nuclear Regulatory Commission issued a request foradditional information regarding the aforementioned LAR. Subsequently, it was identified that the letter contained an error. Specifically, the date that the information was discussed withMr. David Robillard of your staff was March 9, 2006, not February 9, 2006 as written. Additionally, the subject line incorrectly referred to a different license amendment request. | | By letter dated February 2, 2005, AmerGen Energy Company, LLC submitted a license amendment request (LAR) for the Oyster Creek Nuclear Generating Station (Oyster Creek). |
| Instead, it should have been in reference to the reactor water clean-up high energy line break detection and isolation license amendment request. I apologize for any inconvenience this may have caused you. Sincerely,/RA/G. Edward Miller, Project M anagerPlant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-219: | | The LAR requested to revise the Oyster Creek Technical Specifications to incorporate the isolation trip setting and the instrumentation surveillance requirements of the reactor water cleanup high energy line break detection and isolation equipment. |
| cc: See next page Mr. Christopher M. CraneMarch 20, 2006President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 | | By letter dated March 9, 2006, the Nuclear Regulatory Commission issued a request for additional information regarding the aforementioned LAR. Subsequently, it was identified that the letter contained an error. Specifically, the date that the information was discussed with Mr. David Robillard of your staff was March 9, 2006, not February 9, 2006 as written. |
| | Additionally, the subject line incorrectly referred to a different license amendment request. |
| | Instead, it should have been in reference to the reactor water clean-up high energy line break detection and isolation license amendment request. I apologize for any inconvenience this may have caused you. |
| | Sincerely, |
| | /RA/ |
| | G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219: |
| | cc: See next page |
| | |
| | Mr. Christopher M. Crane March 20, 2006 President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| OYSTER CREEK NUCLEAR GENERATING STATION - CORRECTION TOREQUEST FOR ADDITIONAL INFORMATION RE: REACTOR WATER CLEAN-UP HIGH ENERGY LINE BREAK DETECTION AND ISOLATION LICENSE AMENDMENT REQUEST (TAC NO. MC6046) | | OYSTER CREEK NUCLEAR GENERATING STATION - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RE: REACTOR WATER CLEAN-UP HIGH ENERGY LINE BREAK DETECTION AND ISOLATION LICENSE AMENDMENT REQUEST (TAC NO. MC6046) |
|
| |
|
| ==Dear Mr. Crane:== | | ==Dear Mr. Crane:== |
|
| |
|
| By letter dated February 2, 2005, AmerGen Energy Company, LLC submitted a licenseamendment request (LAR) for the Oyster Creek Nuclear Generating Station (Oyster Creek). The LAR requested to revise the Oyster Creek Technical Specifications to incorporate the isolation trip setting and the instrumentation surveillance requirements of the reactor watercleanup high energy line break detection and isolation equipment. By letter dated March 9, 2006, the Nuclear Regulatory Commission issued a request foradditional information regarding the aforementioned LAR. Subsequently, it was identified that the letter contained an error. Specifically, the date that the information was discussed withMr. David Robillard of your staff was March 9, 2006, not February 9, 2006 as written. Additionally, the subject line incorrectly referred to a different license amendment request. | | By letter dated February 2, 2005, AmerGen Energy Company, LLC submitted a license amendment request (LAR) for the Oyster Creek Nuclear Generating Station (Oyster Creek). |
| Instead, it should have been in reference to the reactor water clean-up high energy line break detection and isolation license amendment request. I apologize for any inconvenience this may have caused you. Sincerely,/RA/G. Edward Miller, Project M anagerPlant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-219 cc: See next pageDISTRIBUTION:PUBLICRidsNrrDorlLplbRidsNrrPMGMillerRidsOgcMailCenterLPL1-2 R/FRidsNrrLACRaynorRidsAcrsAcnwMailCenterRYoung RidsNrrDssSbpbSMazumdarAccession Number: ML060690419OFFICENRR/LPL1-2/PMNRR/LPL1-2/LANRR/LPL1-2/BCNAMEGEMillerCRaynorDRobertsDATE3/20/063/16/063/20/06OFFICIAL RECORD COPY Oyster Creek Nuclear Generating StationSite Vice President - Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC | | The LAR requested to revise the Oyster Creek Technical Specifications to incorporate the isolation trip setting and the instrumentation surveillance requirements of the reactor water cleanup high energy line break detection and isolation equipment. |
| | | By letter dated March 9, 2006, the Nuclear Regulatory Commission issued a request for additional information regarding the aforementioned LAR. Subsequently, it was identified that the letter contained an error. Specifically, the date that the information was discussed with Mr. David Robillard of your staff was March 9, 2006, not February 9, 2006 as written. |
| P.O. Box 388 Forked River, NJ 08731Senior Vice President of Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348Kathryn M. Sutton, EsquireMorgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004Kent Tosch, ChiefNew Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Mayor of Lacey Township818 West Lacey Road Forked River, NJ 08731Senior Resident InspectorU.S. Nuclear Regulatory Commission
| | Additionally, the subject line incorrectly referred to a different license amendment request. |
| | | Instead, it should have been in reference to the reactor water clean-up high energy line break detection and isolation license amendment request. I apologize for any inconvenience this may have caused you. |
| P.O. Box 445 Forked River, NJ 08731Director - Licensing and Regulatory AffairsAmerGen Energy Company, LLC Correspondence Control
| | Sincerely, |
| | | /RA/ |
| P.O. Box 160 Kennett Square, PA 19348Manager Licensing - Oyster CreekExelon Generation Company, LLC Correspondence Control
| | G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219 cc: See next page DISTRIBUTION: |
| | | PUBLIC RidsNrrDorlLplb RidsNrrPMGMiller RidsOgcMailCenter LPL1-2 R/F RidsNrrLACRaynor RidsAcrsAcnwMailCenter RYoung RidsNrrDssSbpb SMazumdar Accession Number: ML060690419 OFFICE NRR/LPL1-2/PM NRR/LPL1-2/LA NRR/LPL1-2/BC NAME GEMiller CRaynor DRoberts DATE 3/20/06 3/16/06 3/20/06 OFFICIAL RECORD COPY |
| P.O. Box 160 Kennett Square, PA 19348Regulatory Assurance Manager Oyster Creek AmerGen Energy Company, LLC
| |
| | |
| P.O. Box 388 Forked River, NJ 08731Assistant General CounselAmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348Ron Bellamy, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Correspondence Control DeskAmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA 19348Oyster Creek Nuclear Generating StationPlant Manager AmerGen Energy Company, LLC
| |
|
| |
|
| P.O. Box 388 Forked River, NJ 08731}} | | Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek Director - Licensing and Regulatory Affairs Nuclear Generating Station AmerGen Energy Company, LLC AmerGen Energy Company, LLC Correspondence Control P.O. Box 388 P.O. Box 160 Forked River, NJ 08731 Kennett Square, PA 19348 Senior Vice President of Manager Licensing - Oyster Creek Operations Exelon Generation Company, LLC AmerGen Energy Company, LLC Correspondence Control 200 Exelon Way, KSA 3-N P.O. Box 160 Kennett Square, PA 19348 Kennett Square, PA 19348 Kathryn M. Sutton, Esquire Regulatory Assurance Manager Morgan, Lewis, & Bockius LLP Oyster Creek 1111 Pennsylvania Avenue, NW AmerGen Energy Company, LLC Washington, DC 20004 P.O. Box 388 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of Assistant General Counsel Environmental Protection AmerGen Energy Company, LLC Bureau of Nuclear Engineering 200 Exelon Way CN 415 Kennett Square, PA 19348 Trenton, NJ 08625 Ron Bellamy, Region I Vice President - Licensing and U.S. Nuclear Regulatory Commission Regulatory Affairs 475 Allendale Road AmerGen Energy Company, LLC King of Prussia, PA 19406-1415 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk AmerGen Energy Company, LLC Regional Administrator, Region I 200 Exelon Way, KSA 1--1 U.S. Nuclear Regulatory Commission Kennett Square, PA 19348 475 Allendale Road King of Prussia, PA 19406-1415 Oyster Creek Nuclear Generating Station Plant Manager Mayor of Lacey Township AmerGen Energy Company, LLC 818 West Lacey Road P.O. Box 388 Forked River, NJ 08731 Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARML0530502922005-10-18018 October 2005 Draft RAI on Proposed Amendment Re. Oyster Creek RWCU HELB Isolation Project stage: Draft RAI ML0602604072006-02-0101 February 2006 Oyster Creek Generating Station - Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call Project stage: Draft RAI ML0606704632006-03-0909 March 2006 Request for Additional Information Revision of Appendix B, Environmental Technical Specifications Project stage: RAI ML0606904192006-03-20020 March 2006 Correction to RAI Reactor Water Clean-Up High Energy Line Break Detection and Isolation License Amendment Request Project stage: RAI ML0623704752006-08-25025 August 2006 Technical Specifications - Deletion of Reporting Requirement in Facility Operating License Project stage: Other ML0620901592006-08-25025 August 2006 Issuance of Amendment Deletion of Reporting Requirement in Facility Operating License Project stage: Approval 2006-03-20
[Table View] |
|
---|
Category:Letter
MONTHYEARML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21099A0442021-04-0808 April 2021 Enclosure - Request for Additional Information Related to Request for Approval of Oyster Creek Nuclear Generating Station Independent Spent Fuel Storage Installation Only Emergency Plan Holtec Decommissioning International, LLC ML20335A3102020-11-30030 November 2020 RAI November 2020 Part 73 FOF Exemption Request ML20297A2382020-10-22022 October 2020 Fleet DQAP RAIs - Enclosure ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20134H8732020-05-12012 May 2020 E-mail - Request for Additional Information: Oyster Creek Request for Temporary Exemption from Part 73, Appendix B Requirements ML19263D2142019-09-20020 September 2019 Hdi PSDAR Environmental RAI Enclosure (002) ML19158A2772019-05-28028 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19025A1172019-01-24024 January 2019 NRR E-mail Capture - for Your Action - RAI for Oyster Creek EP Exemption (Change to Adiabatic Heat-Up Calculation) ML18256A0022018-09-12012 September 2018 NRR E-mail Capture - for Your Action: RAIs for Oyster Creek Post Shutdown Decommissioning Activities Report (PSDAR) ML18135A0732018-05-15015 May 2018 NRR E-mail Capture - RAIs - Oyster Creek - Request Approval of the Decommissioning Quality Assurance Program ML18068A6582018-03-0909 March 2018 NRR E-mail Capture - RAIs - Oyster Creek Defueled TS LAR ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML18024B0642018-01-24024 January 2018 NRR E-mail Capture - for Your Action - RAI for Oyster Creek Permanently Defueled EP and EAL Scheme LAR (CAC No. MG0160; EPID: L-2017-LLA-0307) ML18012A0782018-01-12012 January 2018 NRR E-mail Capture - for Your Review - Draft RAI for Oyster Creek Permanently Defueled EP and EAL Scheme LAR (CAC No. MG0160; EPID: L-2017-LLA-0307) ML18003A4122018-01-0303 January 2018 NRR E-mail Capture - for Your Action - RAI - Oyster Creek BWRVIP LAR (CAC No. MG0180; EPID No. L-LLA-2017-0304) ML17320A6372017-11-16016 November 2017 NRR E-mail Capture - Oyster Creek Nuclear Generating Station - Request for Additional Information Regarding License Amendment Request for Emergency Plan Exemption (CAC No. MG0153; EPID L-2017-LLE-0020) ML17319A9422017-11-15015 November 2017 NRR E-mail Capture - Oyster Creek Nuclear Generating Station - Request for Additional Information Regarding License Amendment Request for Emergency Plan Exemption (CAC No. MG0153; EPID L-2017-LLE-0020) ML17208A7472017-09-14014 September 2017 Request for Additional Information, License Amendment Request to Revise the Site Emergency Plan for On-Shift and Emergency Response Organization Staffing for Permanently Defueled Condition ML17136A3852017-05-12012 May 2017 NRR E-mail Capture - (External_Sender) Oyster Creek Response to NRC Flood MSA Audit Review Questions ML17038A5152017-02-0303 February 2017 NRR E-mail Capture - (External_Sender) Oyster Creek Nuclear Generating Station Response to Environmental Questions Regarding the Mitigating Strategies Final Integrated Plan and SPF Instrumentation Compliance Letter ML16244A3112016-10-0707 October 2016 Request for Additional Information Regarding License Amendment Request for Technical Specifications Section 6.0, Administrative Controls for Permanently Defueled Condition ML16125A2452016-05-16016 May 2016 Request for Additional Information Regarding Request for Approval of a Certified Fuel Handler Training and Retraining Program ML16060A1722016-03-0707 March 2016 Request for Additional Information Regarding Preliminary Decommissioning Cost Estimate and Spent Fuel Management Program ML16056A0012016-02-24024 February 2016 NRR E-mail Capture - Request for Additional Information - Oyster Creek Security Plan - Revision 14 ML17144A3702015-05-0606 May 2015 NRC Email J. Hughey( NRC) to Dave Distel (Exelon)- Request for Additional Information Regarding Request for Extension to Comply with NRC Order EA-13-109, Dated May 6, 2015 ML15005A0692015-01-0606 January 2015 Request for Additional Information Regarding the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief ML14246A5182014-09-17017 September 2014 Request for Additional Information Regarding the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief ML14252A7032014-09-17017 September 2014 Request for Additional Information Regarding Preliminary Decommissioning Cost Estimate and Annual Decommissioning Funding Status Reports ML14247A5862014-09-16016 September 2014 Request for Additional Information Regarding License Amendment Request to Revise Snubber Surveillance Requirements (Tac No. MF4124) ML14114A5632014-09-10010 September 2014 Request for Additional Information Regarding License Amendment Request Related to Reactor Building Vital Area Access Control ML14220A0272014-08-27027 August 2014 Request for Additional Information Regarding Request for Extension to Comply with NRC Order EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML14083A1602014-03-31031 March 2014 Request for Additional Information Regarding Bulletin 2012-01, Design Vulnerability in Electric Power System ML13351A3142013-12-20020 December 2013 Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. ML13268A0312013-11-0808 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13227A3042013-08-28028 August 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12032A1872012-02-21021 February 2012 Request for Additional Information Related to the Response to License Renewal Commitment No. 10 Regarding Thermal Aging Irradiation Embrittlement of Cast Austenitic Stainless Steel ML12025A2542012-01-23023 January 2012 Request for Additional Information - License Renewal Commitment Regarding Thermal Aging and Neutron Irradiation Embrittlement of CASS Materials ML1200603242012-01-19019 January 2012 Fleet, RAI, Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-789 (N-789) ML1131200572011-11-22022 November 2011 Fleet - Bulletin 2011 01, Mitigating Strategies Request for Additional Information Regarding 60-Day Response ML1123604472011-08-24024 August 2011 E-mail, Miller to Loomis, Oyster Creek Flaw Evaluation Draft RAI Questions ML1120910012011-07-22022 July 2011 Generation Station - Licensed Operator Request for Additional Information ML1116805642011-07-0707 July 2011 Fleet, Request for Additional Information, 2011 Report on Status of Decommissioning Funding for Reactors 2021-04-08
[Table view] |
Text
March 20, 2006 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RE: REACTOR WATER CLEAN-UP HIGH ENERGY LINE BREAK DETECTION AND ISOLATION LICENSE AMENDMENT REQUEST (TAC NO. MC6046)
Dear Mr. Crane:
By letter dated February 2, 2005, AmerGen Energy Company, LLC submitted a license amendment request (LAR) for the Oyster Creek Nuclear Generating Station (Oyster Creek).
The LAR requested to revise the Oyster Creek Technical Specifications to incorporate the isolation trip setting and the instrumentation surveillance requirements of the reactor water cleanup high energy line break detection and isolation equipment.
By letter dated March 9, 2006, the Nuclear Regulatory Commission issued a request for additional information regarding the aforementioned LAR. Subsequently, it was identified that the letter contained an error. Specifically, the date that the information was discussed with Mr. David Robillard of your staff was March 9, 2006, not February 9, 2006 as written.
Additionally, the subject line incorrectly referred to a different license amendment request.
Instead, it should have been in reference to the reactor water clean-up high energy line break detection and isolation license amendment request. I apologize for any inconvenience this may have caused you.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219:
cc: See next page
Mr. Christopher M. Crane March 20, 2006 President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RE: REACTOR WATER CLEAN-UP HIGH ENERGY LINE BREAK DETECTION AND ISOLATION LICENSE AMENDMENT REQUEST (TAC NO. MC6046)
Dear Mr. Crane:
By letter dated February 2, 2005, AmerGen Energy Company, LLC submitted a license amendment request (LAR) for the Oyster Creek Nuclear Generating Station (Oyster Creek).
The LAR requested to revise the Oyster Creek Technical Specifications to incorporate the isolation trip setting and the instrumentation surveillance requirements of the reactor water cleanup high energy line break detection and isolation equipment.
By letter dated March 9, 2006, the Nuclear Regulatory Commission issued a request for additional information regarding the aforementioned LAR. Subsequently, it was identified that the letter contained an error. Specifically, the date that the information was discussed with Mr. David Robillard of your staff was March 9, 2006, not February 9, 2006 as written.
Additionally, the subject line incorrectly referred to a different license amendment request.
Instead, it should have been in reference to the reactor water clean-up high energy line break detection and isolation license amendment request. I apologize for any inconvenience this may have caused you.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlLplb RidsNrrPMGMiller RidsOgcMailCenter LPL1-2 R/F RidsNrrLACRaynor RidsAcrsAcnwMailCenter RYoung RidsNrrDssSbpb SMazumdar Accession Number: ML060690419 OFFICE NRR/LPL1-2/PM NRR/LPL1-2/LA NRR/LPL1-2/BC NAME GEMiller CRaynor DRoberts DATE 3/20/06 3/16/06 3/20/06 OFFICIAL RECORD COPY
Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek Director - Licensing and Regulatory Affairs Nuclear Generating Station AmerGen Energy Company, LLC AmerGen Energy Company, LLC Correspondence Control P.O. Box 388 P.O. Box 160 Forked River, NJ 08731 Kennett Square, PA 19348 Senior Vice President of Manager Licensing - Oyster Creek Operations Exelon Generation Company, LLC AmerGen Energy Company, LLC Correspondence Control 200 Exelon Way, KSA 3-N P.O. Box 160 Kennett Square, PA 19348 Kennett Square, PA 19348 Kathryn M. Sutton, Esquire Regulatory Assurance Manager Morgan, Lewis, & Bockius LLP Oyster Creek 1111 Pennsylvania Avenue, NW AmerGen Energy Company, LLC Washington, DC 20004 P.O. Box 388 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of Assistant General Counsel Environmental Protection AmerGen Energy Company, LLC Bureau of Nuclear Engineering 200 Exelon Way CN 415 Kennett Square, PA 19348 Trenton, NJ 08625 Ron Bellamy, Region I Vice President - Licensing and U.S. Nuclear Regulatory Commission Regulatory Affairs 475 Allendale Road AmerGen Energy Company, LLC King of Prussia, PA 19406-1415 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk AmerGen Energy Company, LLC Regional Administrator, Region I 200 Exelon Way, KSA 1--1 U.S. Nuclear Regulatory Commission Kennett Square, PA 19348 475 Allendale Road King of Prussia, PA 19406-1415 Oyster Creek Nuclear Generating Station Plant Manager Mayor of Lacey Township AmerGen Energy Company, LLC 818 West Lacey Road P.O. Box 388 Forked River, NJ 08731 Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731