| {{#Wiki_filter:XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 1 AUDIT W ORKSHEET GALL R EPORT AMP PLANT: ______________________________ | | {{#Wiki_filter:AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________ |
| LRA AMP: __________________________ | | LRA AMP: __________________________ REVIEWER: ______________________ |
| R EVIEWER: ______________________
| | GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, DATE: __________________________ |
| GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD DATE: __________________________ | | IWC, and IWD Program Auditable GALL Criteria Documentation of Audit Finding Element Program A. Title 10 of the Code of Federal Regulations, 10 CFR 50.55a, Consistent with GALL AMP: Yes No Description imposes the inservice inspection (ISI) requirements of the Document(s) used to confirm Criteria: |
| Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. Title 10 of the Code of Federal Regulations, 10 CFR 50.55a, imposes the inservice inspection (ISI) requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section XI, for Class 1, 2, and 3 pressure-retaining components and their integral attachments in light-water cooled power plants. Inspection, repair, and replacement of these components are covered in Subsections IWB, IWC, and IWD, respectively, in the 2001 edition including the 2002 and 2003 Addenda. The program generally includes periodic visual, surface, and/or volumetric examination and leakage test of all Class 1, 2, and 3 pressure-retaining components and their integral attachments. The ASME Section XI inservice inspection program in accordance with Subsections IWB, IWC, or IWD has been shown to be generally effective in managing aging effects in Class 1, 2, or 3 components and their integral attachments in light-water cooled power plants. However, in certain cases, the ASME inservice inspection program is to be augmented to manage effects of aging for license renewal and is so identified in the GALL Report Consistent with GALL AMP: | | American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section XI, for Class 1, 2, and 3 pressure-retaining components and their integral attachments in light-water cooled power plants. Inspection, repair, and Comment: |
| Yes No Document(s) used to confirm Criteria: | | replacement of these components are covered in Subsections IWB, IWC, and IWD, respectively, in the 2001 edition including the 2002 and 2003 Addenda. The program generally includes periodic visual, surface, and/or volumetric examination and leakage test of all Class 1, 2, and 3 pressure-retaining components and their integral attachments. The ASME Section XI inservice inspection program in accordance with Subsections IWB, IWC, or IWD has been shown to be generally effective in managing aging effects in Class 1, 2, or 3 components and their integral attachments in light-water cooled power plants. |
| | However, in certain cases, the ASME inservice inspection program is to be augmented to manage effects of aging for license renewal and is so identified in the GALL Report |
| | : 1. Scope of A. The ASME Section XI program provides the requirements for Consistent with GALL AMP: Yes No Program ISI, repair, and replacement. The components within the scope Document(s) used to confirm Criteria: |
| | of the program are specified in Subsections IWB-1100, IWC-1100, and IWD-1100 for Class 1, 2, and 3 components, XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 1 |
|
| |
|
| Comment: 1. Scope of Program A. The ASME Section XI program provides the requirements for ISI, repair, and replacement. The components within the scope of the program are specified in Subsections IWB-1100, IWC-1100, and IWD-1100 for Class 1, 2, and 3 components, Consistent with GALL AMP:
| | Program Auditable GALL Criteria Documentation of Audit Finding Element respectively, and include all pressure-retaining components and their integral attachments in light-water cooled power plants. Comment The components described in Subsections IWB-1220, IWC-1220, and IWD-1220 are exempt from the examination requirements of Subsections IWB-2500, IWC-2500, and IWD-2500. |
| Yes No Document(s) used to confirm Criteria: | | : 2. Preventive A. Operation within the limits prescribed in the Technical Consistent with GALL AMP: Yes No Actions Specifications. Document(s) used to confirm Criteria: |
| | Comment: |
| | : 3. Parameters A. The ASME Section XI ISI program detects degradation of Consistent with GALL AMP: Yes No Monitored/ components by using the examination and inspection Document(s) used to confirm Criteria: |
| | Inspected requirements specified in ASME Section XI Tables IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, for Class 1, 2, or 3 components. |
| | Comment: |
| | : 4. Detection of A. The extent and schedule of the inspection and test Consistent with GALL AMP: Yes No Aging Effects techniques prescribed by the program are designed to maintain Document(s) used to confirm Criteria: |
| | structural integrity and ensure that aging effects will be discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking, loss of material due to corrosion, leakage of coolant and indications of Comment: |
| | degradation due to wear or stress relaxation, such as verification of clearances, settings, physical displacements, loose or missing parts, debris, wear, erosion, or loss of integrity at bolted or welded connections. Components are examined and tested as specified in Tables IWB-2500-1, IWC-2500-1, and IWD-2500-1, respectively, for Class 1, 2, and 3 components. |
| | The tables specify the extent and schedule of the inspection and examination methods for the components of the pressure-retaining boundaries. Alternative approved methods that meet the requirements of IWA-2240 are also specified in these tables. |
| | XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 2 |
|
| |
|
| XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 2 Program Element Auditable GALL Criteria Documentation of Audit Finding respectively, and include all pressure-retaining components and their integral attachments in light-water cooled power plants. The components described in Subsections IWB-1220, IWC-1220, and IWD-1220 are exempt from the examination requirements of Subsections IWB-2500, IWC-2500, and IWD-2500. Comment 2. Preventive Actions A. Operation within the limits prescribed in the Technical Specifications. Consistent with GALL AMP: | | Program Auditable GALL Criteria Documentation of Audit Finding Element See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. |
| Yes No Document(s) used to confirm Criteria: | | B. Class 1 Components, Table IWB-2500-1. Consistent with GALL AMP: Yes No Document(s) used to confirm Criteria: |
| | See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. |
| | Comment: |
| | C. Class 2 Components, Table IWC-2500-1. Consistent with GALL AMP: Yes No Document(s) used to confirm Criteria: |
| | See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. |
| | Comment: |
| | D. Class 3 Components, Table IWD-2500-1. Consistent with GALL AMP: Yes No Document(s) used to confirm Criteria: |
| | See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. |
| | Comment: |
| | XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 3 |
|
| |
|
| Comment: 3. Parameters Monitored/ Inspected A. The ASME Section XI ISI program detects degradation of components by using the examination and inspection requirements specified in ASME Section XI Tables IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, for Class 1, 2, or 3 components. Consistent with GALL AMP:
| | Program Auditable GALL Criteria Documentation of Audit Finding Element |
| Yes No Document(s) used to confirm Criteria: | | : 5. Monitoring A. For Class 1, 2, or 3 components, the inspection schedule of Consistent with GALL AMP: Yes No and Trending IWB-2400, IWC-2400, or IWD-2400, respectively, and the extent Document(s) used to confirm Criteria: |
| | | and frequency of IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, provides for timely detection of degradation. The sequence of component examinations established during the first inspection interval is repeated during each successive Comment: |
| Comment: 4. Detection of Aging Effects A. The extent and schedule of the inspection and test techniques prescribed by the program are designed to maintain structural integrity and ensure that aging effects will be discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking, loss of material due to corrosion, leakage of coolant and indications of degradation due to wear or stress relaxation, such as verification of clearances, settings, physical displacements, loose or missing parts, debris, wear, erosion, or loss of integrity at bolted or welded connections. Components are examined and tested as specified in Tables IWB-2500-1, IWC-2500-1, and IWD-2500-1, respectively, for Class 1, 2, and 3 components.
| | inspection interval, to the extent practical. |
| The tables specify the extent and schedule of the inspection and examination methods for the components of the pressure-retaining boundaries. Alternative approved methods that meet the requirements of IWA-2240 are also specified in these tables. Consistent with GALL AMP:
| | B. If flaw conditions or relevant conditions of degradation are Consistent with GALL AMP: Yes No evaluated in accordance with IWB-3100, IWC-3100, or IWD- Document(s) used to confirm Criteria: |
| Yes No Document(s) used to confirm Criteria:
| | 3100, and the component is qualified as acceptable for continued service, the areas containing such flaw indications and relevant conditions are reexamined during the next three inspection periods of IWB-2110 for Class 1 components, IWC- Comment: |
| | 2410 for Class 2 components, and IWD-2410 for Class 3 components. Examinations that reveal indications that exceed the acceptance standards described below are extended to include additional examinations in accordance with IWB-2430, IWC-2430, or IWD-2430 (1995 edition) for Class 1, 2, or, 3 components, respectively. |
| | : 6. Acceptance A. Any indication or relevant conditions of degradation detected Consistent with GALL AMP: Yes No Criteria are evaluated in accordance with IWB-3000, IWC-3000, or IWD- Document(s) used to confirm Criteria: |
| | 3000, for Class 1, 2, or 3 components, respectively. |
| | Examination results are evaluated in accordance with IWB-3100, IWC-3100, or IWD-3100 by comparing the results with the acceptance standards of IWB-3400 and IWB3500, or IWC-3400 Comment: |
| | and IWC-3500, or IWD3400 and IWD3500, respectively for Class 1 or Class 2 and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500, IWC-3500, or IWD3500, are evaluated by using the analytical procedures of IWB-3600, IWC-3600, or IWD-3600, respectively, for Class 1 or Class 2, and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500 or IWC-3500, are evaluated by using the analytical procedures of IWB-3600 or IWC-3600, respectively, for Class 1 or Class 2 and 3 XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 4 |
|
| |
|
| | Program Auditable GALL Criteria Documentation of Audit Finding Element components. Approved BWRVIP-14, BWRVIP-59, and BWRVIP-60 documents provide guidelines for evaluation of crack growth in stainless steels, nickel alloys, and low-alloy steels, respectively. |
| | : 7. Corrective A. For Class 1, 2, and 3, respectively, repair is performed in Consistent with GALL AMP: Yes No Actions conformance with IWB-4000, IWC-4000, and IWD-4000, and Document(s) used to confirm Criteria: |
| | replacement according to IWB-7000, IWC-7000, and IWD-7000. |
| | Approved BWRVIP-44 and BWRVIP-45 documents, respectively, provide guidelines for weld repair of nickel alloys and for weldability of irradiated structural components. As Comment: |
| | discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions. |
| | : 8. A. Site quality assurance (QA) procedures, review and approval Consistent with GALL AMP: Yes No Confirmation processes, and administrative controls are implemented in Document(s) used to confirm Criteria: |
| | Process accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls. Comment: |
| | : 9. A. See Item 8, above. Consistent with GALL AMP: Yes No Administrative Document(s) used to confirm Criteria: |
| | Controls Comment: |
| | : 10. Operating A. Because the ASME Code is a consensus document that has Consistent with GALL AMP: Yes No Experience been widely used over a long period, it has been shown to be Document(s) used to confirm Criteria: |
| | generally effective in managing aging effects in Class 1, 2, and 3 components and their integral attachments in light-water cooled power plants (see Chapter I of the GALL Report, Vol. 2). |
| Comment: | | Comment: |
| XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 3 Program Element Auditable GALL Criteria Documentation of Audit Finding See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. " B. Class 1 Components, Table IWB-2500-1. | | XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 5 |
| See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
|
| |
|
| Comment: " C. Class 2 Components, Table IWC-2500-1.
| | Program Auditable GALL Criteria Documentation of Audit Finding Element See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. |
| See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. Consistent with GALL AMP: | | XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 6 |
| Yes No Document(s) used to confirm Criteria:
| |
| Comment: " D. Class 3 Components, Table IWD-2500-1.
| |
| See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information. Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
|
| |
|
| Comment:
| | EXCEPTIONS Item Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed Number (Identifier, Para.# and/or Page #) |
| XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 4 Program Element Auditable GALL Criteria Documentation of Audit Finding 5. Monitoring and Trending A. For Class 1, 2, or 3 components, the inspection schedule of IWB-2400, IWC-2400, or IWD-2400, respectively, and the extent and frequency of IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, provides for timely detection of degradation. The sequence of component examinations established during the first inspection interval is repeated during each successive inspection interval, to the extent practical. Consistent with GALL AMP:
| | 1. |
| Yes No Document(s) used to confirm Criteria:
| | 2. |
| Comment: " B. If flaw conditions or relevant conditions of degradation are evaluated in accordance with IWB-3100, IWC-3100, or IWD-3100, and the component is qualified as acceptable for continued service, the areas containing such flaw indications and relevant conditions are reexamined during the next three inspection periods of IWB-2110 for Class 1 components, IWC-2410 for Class 2 components, and IWD-2410 for Class 3 components. Examinations that reveal indications that exceed the acceptance standards described below are extended to include additional examinations in accordance with IWB-2430, IWC-2430, or IWD-2430 (1995 edition) for Class 1, 2, or, 3 components, respectively. Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
| Comment: 6. Acceptance Criteria A. Any indication or relevant conditions of degradation detected are evaluated in accordance with IWB-3000, IWC-3000, or IWD-3000, for Class 1, 2, or 3 components, respectively. Examination results are evaluated in accordance with IWB-3100, IWC-3100, or IWD-3100 by comparing the results with the acceptance standards of IWB-3400 and IWB3500, or IWC-3400 and IWC-3500, or IWD3400 and IWD3500, respectively for Class 1 or Class 2 and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500, IWC-3500, or IWD3500, are evaluated by using the analytical procedures of IWB-3600, IWC-3600, or IWD-3600, respectively, for Class 1 or Class 2, and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500 or IWC-3500, are evaluated by using the analytical procedures of IWB-3600 or IWC-3600, respectively, for Class 1 or Class 2 and 3 Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
| Comment:
| |
| XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 5 Program Element Auditable GALL Criteria Documentation of Audit Finding components. Approved BWRVIP-14, BWRVIP-59, and BWRVIP-60 documents provide guidelines for evaluation of crack growth in stainless steels, nickel alloys, and low-alloy steels, respectively. 7. Corrective Actions A. For Class 1, 2, and 3, respectively, repair is performed in conformance with IWB-4000, IWC-4000, and IWD-4000, and replacement according to IWB-7000, IWC-7000, and IWD-7000. Approved BWRVIP-44 and BWRVIP-45 documents, respectively, provide guidelines for weld repair of nickel alloys and for weldability of irradiated structural components. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions. Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
| Comment: 8.
| |
| Confirmation Process A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls. Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
|
| |
|
| Comment: 9.
| | ENHANCEMENTS Item Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number (Identifier, Para.# and/or Page #) |
| Administrative Controls A. See Item 8, above. Consistent with GALL AMP:
| | 1. |
| Yes No Document(s) used to confirm Criteria:
| | 2. |
| Comment: 10. Operating Experience A. Because the ASME Code is a consensus document that has been widely used over a long period, it has been shown to be generally effective in managing aging effects in Class 1, 2, and 3 components and their integral attachments in light-water cooled power plants (see Chapter I of the GALL Report, Vol. 2).
| |
| Consistent with GALL AMP:
| |
| Yes No Document(s) used to confirm Criteria:
| |
|
| |
|
| Comment:
| | DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number) Title Revision and/or Date 1. |
| XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 6 Program Element Auditable GALL Criteria Documentation of Audit Finding See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information.
| | 2. |
| XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 7 EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -
| | 3. |
| ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -
| | 4. |
| DOCUMENT REVIEWED D URING A UDIT Document Number Identifier (number) Title Revision and/or Date 1. 2. 3. 4. -.}} | | . |
| | XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 7}} |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E, BVY 06-076, 2006/08/10-Vermont Yankee - License Renewal Application, Amendment 8, BVY 06-079, 2006/08/22-Vermont Yankee License Renewal Application, Amendment 11, BVY 06-083, 2006/09/05-Vermont Yankee License Renewal Application, Amendment 12, BVY 06-095, E-mail: (PA-LR) Copy of SAMA Response, BVY 06-096, 2006/10/20-Vermont Yankee - License Renewal Application, Amendment No. 17, BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19, BVY 06-098, E-mail: (PA-LR) Copy of Vhs RAI Response, BVY 07-003, Email: (PA-LR) Vermont Yankee Nuclear Power Station License Renewal Commitment List, Rev. 5, BVY 07-009, License Renewal Application, Amendment 24, BVY 07-018, License Renewal Application, Amendment 26, BVY 07-034, License Renewal Application Annual Update, BVY 07-035, (PA-LR) Bvy 07-035 VY Lr SER Comments, BVY 07-047, License Renewal Application, Amendment 27, Submitted on January 25, 2006, BVY 07-058, License Renewal Application, Amendment 29, BVY 07-062, License Renewal Application, Amendment 30, BVY 07-066, License Renewal Application, Amendment 31, BVY 08-016, (PA-LR) Emailing Bvy 08-016 Final SER Review Comments, BVY 10-069, License Renewal Application Annual Update Information, ML060950195, ML060950215, ML060950218, ML060950220, ML060950224, ML060950235, ML060950250, ML060950258, ML060950262, ML060950269, ML060950271, ML060950277, ML060950279, ML060950284, ML060950290, ML060950301, ML060950311, ML060950323, ML060950328, ML060950331, ML060950347, ML060950351, ML060950356, ML060950364, ML060950370, ML060950372, ML060950375, ML060950540, ML060950549, ML060950559, ML060950567... further results
|
MONTHYEARML0629203681987-12-31031 December 1987 VY Annual Ecological Studies of the CT River Report 16-final.pdf Project stage: Other ML0629203651989-12-31031 December 1989 VY Annual Ecological Reports from the 1980's (1989) Project stage: Other ML0609503511998-02-28028 February 1998 GALL AMP: XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E2006-01-25025 January 2006 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E Project stage: Other ML0609506372006-03-22022 March 2006 GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506322006-03-22022 March 2006 GALL AMP: XI.M34, Buried Piping and Tanks Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506292006-03-22022 March 2006 GALL AMP: XI.M33, Selective Leaching of Materials (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506202006-03-22022 March 2006 GALL AMP: XI.M31, Reactor Vessel Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502792006-03-22022 March 2006 GALL AMP: XI.M3, Reactor Head Closure Studs (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505962006-03-22022 March 2006 GALL AMP: XI.M27, Fire Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505872006-03-22022 March 2006 GALL AMP: XI.M26, Fire Protection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505822006-03-22022 March 2006 GALL AMP: XI.M25, BWR Reactor Water Cleanup System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505792006-03-22022 March 2006 GALL AMP: XI.M24, Compressed Air Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505592006-03-22022 March 2006 GALL AMP: XI.M20, Open-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505402006-03-22022 March 2006 GALL AMP: XI.M18, Bolting Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503702006-03-22022 March 2006 GALL AMP: XI.M15, Neutron Noise Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502182006-03-22022 March 2006 GALL AMP: X.M1, Metal Fatigue of Reactor Coolant Pressure Boundary (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609501952006-03-22022 March 2006 GALL AMP: Plant-Specific (Audit Worksheet - GALL Report AMP) Project stage: Other ML0610001472006-03-22022 March 2006 GALL AMP: XI.S8, Protective Coating Monitoring and Maintenance Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001432006-03-22022 March 2006 GALL AMP: XI.S7, Rg 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001382006-03-22022 March 2006 GALL AMP: XI.S6, Structures Monitoring Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001342006-03-22022 March 2006 GALL AMP: XI.S5, Masonry Wall Progam (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001262006-03-22022 March 2006 GALL AMP: XI.S4, 10 CFR 50, Appendix J (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001012006-03-22022 March 2006 GALL AMP: XI.S2, ASME Section XI, Subsection Iwl (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000962006-03-22022 March 2006 GALL AMP: XI.S1, ASME Section XI, Subsection IWE (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503232006-03-22022 March 2006 GALL AMP: XI.M8, BWR Penetrations (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503112006-03-22022 March 2006 GALL AMP: XI.M7, BWR Stress Corrosion Cracking (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503012006-03-22022 March 2006 GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Project stage: Other ML0609503722006-03-22022 March 2006 GALL AMP: XI.M16, PWR Vessel Internals (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503752006-03-22022 March 2006 GALL AMP: XI.M17, Flow-Accelerated Corrosion (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505672006-03-22022 March 2006 GALL AMP: XI.M21, Closed-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505732006-03-22022 March 2006 GALL AMP: XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506102006-03-22022 March 2006 GALL AMP: XI.M29, Aboveground Steel Tanks (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506342006-03-22022 March 2006 GALL AMP: XI.M35, One-Time Inspection of ASME Code Class 1 Small Bore Piping (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000782006-03-22022 March 2006 GALL AMP: XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502152006-03-22022 March 2006 GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502202006-03-22022 March 2006 GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502242006-03-22022 March 2006 GALL AMP: XI.E1, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502352006-03-22022 March 2006 GALL AMP: XI.E2, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502692006-03-22022 March 2006 GALL AMP: XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet, GALL Report AMP) Project stage: Other 1998-02-28
[Table View] |
|
---|
Category:Report
MONTHYEARML21075A1772021-03-15015 March 2021 Response to Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request BVY 20-026, Defueled Safety Analysis Report, Revision 22020-09-23023 September 2020 Defueled Safety Analysis Report, Revision 2 BVY 19-020, 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 20192019-06-20020 June 2019 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 2019 ML19198A2522019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML15266A4302015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 24, Flow Diagram Instrument Air System. Sheet 2 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. ML15266A4452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 2 ML15266A4442015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 1 ML15266A4402015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 8 ML15266A4362015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 7 ML15266A4352015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 6 ML15266A4342015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 5 ML15266A4332015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 4 ML15266A4322015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 31, Flow Diagram Instrument Air System. Sheet 3 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 22015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 2 ML15266A4292015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 37, Flow Diagram Instrument Air System. Sheet 1 ML15266A4282015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 100, Flow Diagram Service Water System. Sheet 2 ML15266A4272015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 92, Flow Diagram Service Water System. Sheet 1 ML15266A4262015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191152, Rev. 14, General Arrangement Radwaste Building Section. ML15266A4252015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191151, Rev 19, General Arrangement Radwaste Building Plans. ML15266A4242015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191150, Rev. 20, General Arrangement Reactor Building Section. ML15266A4232015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191149, Rev. 27, General Arrangement Reactor Building Plans Sheet 2. ML15266A4222015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191148, Rev. 23, General Arrangement Reactor Building Plans Sheet 1. ML15266A2722015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report - List of Effective Pages BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 52015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 ML15266A2832015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, DSAR Drawing List BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. ML15266A2712015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, DSAR Changes ML15266A2732015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, UFSAR to DSAR Conversion Matrix ML15267A6092015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 3 BVY 15-046, Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf.2015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf. ML15267A6612015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. ML15267A6592015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191592, Control Room Building Fl Plan El 248.50 & Fdn Plan-R, Sheet 1 ML15267A6562015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. ML15267A6542015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. ML15267A6512015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191463, Circulating Water System Discharge Structure Reinf, Sheet 2 ML15267A6492015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 ML15267A6472015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191453, Circulating Water System Intake Structure-M, Sheet 3 ML15267A6452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191452, Circulating Water System Intake Structure-V, Sheet 2 ML15267A6412015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191451, Circulating Water System Intake Structure-M, Sheet 1 ML15267A6112015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 ML15267A6102015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 120/240V Vital AC and Instrument AC One Line Diagram, Sheet 4 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 ML15267A6082015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 2 ML15267A6072015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 ML15267A6062015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 2 ML15267A6052015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 30, 480V Aux. One Line Diagram Swgr BUS-9, MCC-9A, 9C. Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. 2021-03-15
[Table view] Category:Miscellaneous
MONTHYEARML21075A1772021-03-15015 March 2021 Response to Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request BVY 19-020, 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 20192019-06-20020 June 2019 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 2019 ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum BVY 15-049, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask BVY 15-018, Transmittal of Biennial 10 CFR 50.59 Report2015-03-0202 March 2015 Transmittal of Biennial 10 CFR 50.59 Report BVY 14-085, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2014-12-19019 December 2014 Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) BVY 14-011, Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ...2014-02-25025 February 2014 Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ... BVY 13-090, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2013-10-0202 October 2013 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask BVY 12-081, Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-21021 November 2012 Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML12160A3732012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daichii Nuclear Plant Accident TAC No. ME8747) ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants BVY 07-079, Update of Aging Management Program Audit Q&A Database2007-11-14014 November 2007 Update of Aging Management Program Audit Q&A Database BVY 07-004, Emergency Response Data System (ERDS) Data Point Library Update2007-06-21021 June 2007 Emergency Response Data System (ERDS) Data Point Library Update ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 L-87-005, Various CRS 08/09/2005 to 02/08/20072007-02-0808 February 2007 Various CRS 08/09/2005 to 02/08/2007 ML0706703802007-02-0101 February 2007 NDE Reports 07-001 Thru 07-008 ML0701705912007-01-0909 January 2007 VYNPS - SEIS Web Reference - Us Census Glossary ML0701701982006-12-15015 December 2006 VYNPS - SEIS Web Reference - Connecticut River Migratory Fish Counts 1967-2005 ML0629204232006-10-0303 October 2006 (E-Mail) Cooling Tower Report for VY ML0629203422006-09-18018 September 2006 (E-Mail) Air Emissions Inventory Report for 2005 and MSDS for Nalco H-550 ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 20062006-08-29029 August 2006 Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 BVY 06-068, Cycle 25 Startup Test Report Following Power Ascension and Testing2006-08-0101 August 2006 Cycle 25 Startup Test Report Following Power Ascension and Testing CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee ML0618803852006-05-22022 May 2006 Windham Regional Plan Draft, May 22, 2006 ML0704404852006-05-12012 May 2006 AMRM-16, Revision 0, Aging Management Review of the Instrument Air System. ML0704404832006-05-12012 May 2006 AMRM-15, Revision 0, Aging Management Review of the Fuel Oil System. ML0704404782006-05-12012 May 2006 AMRM-15, Aging Management Review of the Fuel Oil System ML0704404742006-05-12012 May 2006 AMRM-12, Aging Management Review of the Reactor Building Closed Cooling Water System ML0704404862006-05-11011 May 2006 AMRM-30, Rev. 01, Aging Management Review of Ns Systems Affecting Safety Systems BVY 06-033, Cycle 24 10 CFR 50.59 Report2006-04-24024 April 2006 Cycle 24 10 CFR 50.59 Report BVY 06-031, Revision 1 to Steam Dryer Monitoring Plan2006-03-26026 March 2006 Revision 1 to Steam Dryer Monitoring Plan ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) ML0609502712006-03-22022 March 2006 GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections Iwb, Iwc, and Iwd (Audit Worksheet, GALL Report AMP) ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) ML0609502152006-03-22022 March 2006 GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP) ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) ML0609502202006-03-22022 March 2006 GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP) ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) ML0609502582006-03-22022 March 2006 GALL AMP: XI.E4, Metal Enclosed Bus (Audit Worksheet GALL Report AMP) ML0609502622006-03-22022 March 2006 GALL AMP: XI.E5, Fuse Holder (Audit Worksheet GALL Report AMP) ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) ML0610000902006-03-22022 March 2006 GALL AMP: XI.M39, Lubricating Oil Analysis Program (Audit Worksheet GALL Report AMP) ML0609503312006-03-22022 March 2006 GALL AMP: XI.M10, Boric Acid Corrosion (Audit Worksheet GALL Report AMP) 2021-03-15
[Table view] |
Text
AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________
LRA AMP: __________________________ REVIEWER: ______________________
GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, DATE: __________________________
IWC, and IWD Program Auditable GALL Criteria Documentation of Audit Finding Element Program A. Title 10 of the Code of Federal Regulations, 10 CFR 50.55a, Consistent with GALL AMP: Yes No Description imposes the inservice inspection (ISI) requirements of the Document(s) used to confirm Criteria:
American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for Class 1, 2, and 3 pressure-retaining components and their integral attachments in light-water cooled power plants. Inspection, repair, and Comment:
replacement of these components are covered in Subsections IWB, IWC, and IWD, respectively, in the 2001 edition including the 2002 and 2003 Addenda. The program generally includes periodic visual, surface, and/or volumetric examination and leakage test of all Class 1, 2, and 3 pressure-retaining components and their integral attachments. The ASME Section XI inservice inspection program in accordance with Subsections IWB, IWC, or IWD has been shown to be generally effective in managing aging effects in Class 1, 2, or 3 components and their integral attachments in light-water cooled power plants.
However, in certain cases, the ASME inservice inspection program is to be augmented to manage effects of aging for license renewal and is so identified in the GALL Report
- 1. Scope of A. The ASME Section XI program provides the requirements for Consistent with GALL AMP: Yes No Program ISI, repair, and replacement. The components within the scope Document(s) used to confirm Criteria:
of the program are specified in Subsections IWB-1100, IWC-1100, and IWD-1100 for Class 1, 2, and 3 components, XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 1
Program Auditable GALL Criteria Documentation of Audit Finding Element respectively, and include all pressure-retaining components and their integral attachments in light-water cooled power plants. Comment The components described in Subsections IWB-1220, IWC-1220, and IWD-1220 are exempt from the examination requirements of Subsections IWB-2500, IWC-2500, and IWD-2500.
- 2. Preventive A. Operation within the limits prescribed in the Technical Consistent with GALL AMP: Yes No Actions Specifications. Document(s) used to confirm Criteria:
Comment:
- 3. Parameters A. The ASME Section XI ISI program detects degradation of Consistent with GALL AMP: Yes No Monitored/ components by using the examination and inspection Document(s) used to confirm Criteria:
Inspected requirements specified in ASME Section XI Tables IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, for Class 1, 2, or 3 components.
Comment:
- 4. Detection of A. The extent and schedule of the inspection and test Consistent with GALL AMP: Yes No Aging Effects techniques prescribed by the program are designed to maintain Document(s) used to confirm Criteria:
structural integrity and ensure that aging effects will be discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking, loss of material due to corrosion, leakage of coolant and indications of Comment:
degradation due to wear or stress relaxation, such as verification of clearances, settings, physical displacements, loose or missing parts, debris, wear, erosion, or loss of integrity at bolted or welded connections. Components are examined and tested as specified in Tables IWB-2500-1, IWC-2500-1, and IWD-2500-1, respectively, for Class 1, 2, and 3 components.
The tables specify the extent and schedule of the inspection and examination methods for the components of the pressure-retaining boundaries. Alternative approved methods that meet the requirements of IWA-2240 are also specified in these tables.
XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 2
Program Auditable GALL Criteria Documentation of Audit Finding Element See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information.
B. Class 1 Components, Table IWB-2500-1. Consistent with GALL AMP: Yes No Document(s) used to confirm Criteria:
See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information.
Comment:
C. Class 2 Components, Table IWC-2500-1. Consistent with GALL AMP: Yes No Document(s) used to confirm Criteria:
See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information.
Comment:
D. Class 3 Components, Table IWD-2500-1. Consistent with GALL AMP: Yes No Document(s) used to confirm Criteria:
See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information.
Comment:
XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 3
Program Auditable GALL Criteria Documentation of Audit Finding Element
- 5. Monitoring A. For Class 1, 2, or 3 components, the inspection schedule of Consistent with GALL AMP: Yes No and Trending IWB-2400, IWC-2400, or IWD-2400, respectively, and the extent Document(s) used to confirm Criteria:
and frequency of IWB-2500-1, IWC-2500-1, or IWD-2500-1, respectively, provides for timely detection of degradation. The sequence of component examinations established during the first inspection interval is repeated during each successive Comment:
inspection interval, to the extent practical.
B. If flaw conditions or relevant conditions of degradation are Consistent with GALL AMP: Yes No evaluated in accordance with IWB-3100, IWC-3100, or IWD- Document(s) used to confirm Criteria:
3100, and the component is qualified as acceptable for continued service, the areas containing such flaw indications and relevant conditions are reexamined during the next three inspection periods of IWB-2110 for Class 1 components, IWC- Comment:
2410 for Class 2 components, and IWD-2410 for Class 3 components. Examinations that reveal indications that exceed the acceptance standards described below are extended to include additional examinations in accordance with IWB-2430, IWC-2430, or IWD-2430 (1995 edition) for Class 1, 2, or, 3 components, respectively.
- 6. Acceptance A. Any indication or relevant conditions of degradation detected Consistent with GALL AMP: Yes No Criteria are evaluated in accordance with IWB-3000, IWC-3000, or IWD- Document(s) used to confirm Criteria:
3000, for Class 1, 2, or 3 components, respectively.
Examination results are evaluated in accordance with IWB-3100, IWC-3100, or IWD-3100 by comparing the results with the acceptance standards of IWB-3400 and IWB3500, or IWC-3400 Comment:
and IWC-3500, or IWD3400 and IWD3500, respectively for Class 1 or Class 2 and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500, IWC-3500, or IWD3500, are evaluated by using the analytical procedures of IWB-3600, IWC-3600, or IWD-3600, respectively, for Class 1 or Class 2, and 3 components. Flaws that exceed the size of allowable flaws, as defined in IWB-3500 or IWC-3500, are evaluated by using the analytical procedures of IWB-3600 or IWC-3600, respectively, for Class 1 or Class 2 and 3 XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 4
Program Auditable GALL Criteria Documentation of Audit Finding Element components. Approved BWRVIP-14, BWRVIP-59, and BWRVIP-60 documents provide guidelines for evaluation of crack growth in stainless steels, nickel alloys, and low-alloy steels, respectively.
- 7. Corrective A. For Class 1, 2, and 3, respectively, repair is performed in Consistent with GALL AMP: Yes No Actions conformance with IWB-4000, IWC-4000, and IWD-4000, and Document(s) used to confirm Criteria:
replacement according to IWB-7000, IWC-7000, and IWD-7000.
Approved BWRVIP-44 and BWRVIP-45 documents, respectively, provide guidelines for weld repair of nickel alloys and for weldability of irradiated structural components. As Comment:
discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.
- 8. A. Site quality assurance (QA) procedures, review and approval Consistent with GALL AMP: Yes No Confirmation processes, and administrative controls are implemented in Document(s) used to confirm Criteria:
Process accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls. Comment:
- 9. A. See Item 8, above. Consistent with GALL AMP: Yes No Administrative Document(s) used to confirm Criteria:
Controls Comment:
- 10. Operating A. Because the ASME Code is a consensus document that has Consistent with GALL AMP: Yes No Experience been widely used over a long period, it has been shown to be Document(s) used to confirm Criteria:
generally effective in managing aging effects in Class 1, 2, and 3 components and their integral attachments in light-water cooled power plants (see Chapter I of the GALL Report, Vol. 2).
Comment:
XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 5
Program Auditable GALL Criteria Documentation of Audit Finding Element See the GALL Report, AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD, for more information.
XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 6
EXCEPTIONS Item Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed Number (Identifier, Para.# and/or Page #)
1.
2.
ENHANCEMENTS Item Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number (Identifier, Para.# and/or Page #)
1.
2.
DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number) Title Revision and/or Date 1.
2.
3.
4.
.
XI.M1 ASME Section XI Inservice Inspection, Subsections IWD, IWC, And IWD 7