| title = Y020060097 - Ltr to Glen Mills Fm Christopher Grimes Re.: San Onofre Nuclear Generating Station Units 2 and 3, 10 CFR 50.75(f)(1) Decommissioning Funding Report
| title = Y020060097 - Ltr to Glen Mills Fm Christopher Grimes Re.: San Onofre Nuclear Generating Station Units 2 and 3, 10 CFR 50.75(f)(1) Decommissioning Funding Report
| author name = Grimes C I
| author name = Grimes C
| author affiliation = NRC/NRR/ADRA/DPR
| author affiliation = NRC/NRR/ADRA/DPR
| addressee name = Mills G R
| addressee name = Mills G
| addressee affiliation = - No Known Affiliation
| addressee affiliation = - No Known Affiliation
| docket = 05000206, 05000361, 05000362
| docket = 05000206, 05000361, 05000362
| license number = DPR-013, NPF-010, NPF-015
| license number = DPR-013, NPF-010, NPF-015
| contact person = Dusaniwskji M A,NRR/DRIP/RGEB,415-1260
| contact person = Dusaniwskji M,NRR/DRIP/RGEB,415-1260
| case reference number = Y020060097
| case reference number = Y020060097
| document type = Letter
| document type = Letter
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:6/2/06Mr. Glen R. MillsP. O. Box 3393 Mission Viejo, California 92690
{{#Wiki_filter:6/2/06 Mr. Glen R. Mills P. O. Box 3393 Mission Viejo, California 92690


==Dear Mr. Mills:==
==Dear Mr. Mills:==
I am responding to your April 26, 2006, letter to the Nuclear Regulatory Commission (NRC), whichexpressed your concerns about the Decommissioning Funding Report for San Onofre Nuclear Generating Station, Units 2 & 3, ADAMS Document Number ML060590262.ADAMS Document Number ML060590262, is a correspondence from Southern California Edison(SCE), dated February 23, 2006, in connection to their request to seek NRC consent to transferthe City of Anaheim's 3.16% undivided ownership interest in San Onofre Nuclear GeneratingStation, Units 2 & 3, to SCE. SCE's transfer request is currently under review. However, among the  required regulations governing transfer requests of ownership interests in nuclear production facilities, SCE has provi ded to the NRC the status of their decommissioning funding.The NRC has determined that the requirements to provide reasonable assurance ofdecommissioning funding are necessary to ensure the adequate protection of public health and safety. The regulation, 10 CFR 50.33(k), requires that an application for an operating license fora nuclear production facility contain information to demonstrate how reasonable assurance will beprovided that funds will be available to decommission the facility.A preliminary review indicates that SCE and the other owners of San Onofre Nuclear GeneratingStation, Units 2 & 3, have accumulated decommissioning funds in excess of the minimumdecommissioning funds required pursuant to NRC Regulations 10 CFR 50.75(c). The minimumdecommissioning funds so required, are for the eventual decommissioning and decontamination activities required by the NRC. In this case, SCE and the other owners of San Onofre Nuclear Generating Station, Units 2 & 3,have accumulated decommissioning funds in excess of their own site-specific estimate, which appears to include decommissioning activities beyond those required by the NRC. As a practicalmatter, when the units will permanently terminate operations, mandatory NRC decommissioningand decontamination activities will need to be conducted first, leaving the site radiologically-freeto NRC standards before the site will be released for restricted or unrestricted use.
G. Mills-2-I trust that your expressed concerns have been answered. However, if you wish any furtherclarifications about this matter, please feel free to contact Mr. Michael Dusaniwskyj, an NRC staffEconomist, dealing with Decommissioning Funding Assurance for nuclear production and utilizationfacilities. Mr. Dusaniwskyj can be reached at 301-415-1260.Sincerely,/RA/Christopher I. Grimes, DirectorDivision of Policy and Rulemaking Office of Nuclear Reactor Regulation 


ML061520151PACKAGE ACCESSION NUMBER : ML061520167 OFFICE:PFPB:DPRPFPB:DPRDPR:DNAME:MDusaniwskyjBWetzelCGrimesDATE: 06/01/06 06/01/06   06/02/06}}
I am responding to your April 26, 2006, letter to the Nuclear Regulatory Commission (NRC), which expressed your concerns about the Decommissioning Funding Report for San Onofre Nuclear Generating Station, Units 2 & 3, ADAMS Document Number ML060590262.
ADAMS Document Number ML060590262, is a correspondence from Southern California Edison (SCE), dated February 23, 2006, in connection to their request to seek NRC consent to transfer the City of Anaheims 3.16% undivided ownership interest in San Onofre Nuclear Generating Station, Units 2 & 3, to SCE. SCEs transfer request is currently under review. However, among the required regulations governing transfer requests of ownership interests in nuclear production facilities, SCE has provided to the NRC the status of their decommissioning funding.
The NRC has determined that the requirements to provide reasonable assurance of decommissioning funding are necessary to ensure the adequate protection of public health and safety. The regulation, 10 CFR 50.33(k), requires that an application for an operating license for a nuclear production facility contain information to demonstrate how reasonable assurance will be provided that funds will be available to decommission the facility.
A preliminary review indicates that SCE and the other owners of San Onofre Nuclear Generating Station, Units 2 & 3, have accumulated decommissioning funds in excess of the minimum decommissioning funds required pursuant to NRC Regulations 10 CFR 50.75(c). The minimum decommissioning funds so required, are for the eventual decommissioning and decontamination activities required by the NRC.
In this case, SCE and the other owners of San Onofre Nuclear Generating Station, Units 2 & 3, have accumulated decommissioning funds in excess of their own site-specific estimate, which appears to include decommissioning activities beyond those required by the NRC. As a practical matter, when the units will permanently terminate operations, mandatory NRC decommissioning and decontamination activities will need to be conducted first, leaving the site radiologically-free to NRC standards before the site will be released for restricted or unrestricted use.
 
G. Mills                                          I trust that your expressed concerns have been answered. However, if you wish any further clarifications about this matter, please feel free to contact Mr. Michael Dusaniwskyj, an NRC staff Economist, dealing with Decommissioning Funding Assurance for nuclear production and utilization facilities. Mr. Dusaniwskyj can be reached at 301-415-1260.
Sincerely,
                                                        /RA/
Christopher I. Grimes, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
 
ML061520151 PACKAGE ACCESSION NUMBER : ML061520167 OFFICE:     PFPB:DPR              PFPB:DPR                    DPR:D NAME:       MDusaniwskyj          BWetzel                      CGrimes DATE:         06/01/06             06/01/06                     06/02/06}}

Latest revision as of 18:57, 23 November 2019

Y020060097 - Ltr to Glen Mills Fm Christopher Grimes Re.: San Onofre Nuclear Generating Station Units 2 and 3, 10 CFR 50.75(f)(1) Decommissioning Funding Report
ML061520151
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/02/2006
From: Charemagne Grimes
NRC/NRR/ADRA/DPR
To: Mills G
- No Known Affiliation
Dusaniwskji M,NRR/DRIP/RGEB,415-1260
References
Y020060097
Download: ML061520151 (3)


Text

6/2/06 Mr. Glen R. Mills P. O. Box 3393 Mission Viejo, California 92690

Dear Mr. Mills:

I am responding to your April 26, 2006, letter to the Nuclear Regulatory Commission (NRC), which expressed your concerns about the Decommissioning Funding Report for San Onofre Nuclear Generating Station, Units 2 & 3, ADAMS Document Number ML060590262.

ADAMS Document Number ML060590262, is a correspondence from Southern California Edison (SCE), dated February 23, 2006, in connection to their request to seek NRC consent to transfer the City of Anaheims 3.16% undivided ownership interest in San Onofre Nuclear Generating Station, Units 2 & 3, to SCE. SCEs transfer request is currently under review. However, among the required regulations governing transfer requests of ownership interests in nuclear production facilities, SCE has provided to the NRC the status of their decommissioning funding.

The NRC has determined that the requirements to provide reasonable assurance of decommissioning funding are necessary to ensure the adequate protection of public health and safety. The regulation, 10 CFR 50.33(k), requires that an application for an operating license for a nuclear production facility contain information to demonstrate how reasonable assurance will be provided that funds will be available to decommission the facility.

A preliminary review indicates that SCE and the other owners of San Onofre Nuclear Generating Station, Units 2 & 3, have accumulated decommissioning funds in excess of the minimum decommissioning funds required pursuant to NRC Regulations 10 CFR 50.75(c). The minimum decommissioning funds so required, are for the eventual decommissioning and decontamination activities required by the NRC.

In this case, SCE and the other owners of San Onofre Nuclear Generating Station, Units 2 & 3, have accumulated decommissioning funds in excess of their own site-specific estimate, which appears to include decommissioning activities beyond those required by the NRC. As a practical matter, when the units will permanently terminate operations, mandatory NRC decommissioning and decontamination activities will need to be conducted first, leaving the site radiologically-free to NRC standards before the site will be released for restricted or unrestricted use.

G. Mills I trust that your expressed concerns have been answered. However, if you wish any further clarifications about this matter, please feel free to contact Mr. Michael Dusaniwskyj, an NRC staff Economist, dealing with Decommissioning Funding Assurance for nuclear production and utilization facilities. Mr. Dusaniwskyj can be reached at 301-415-1260.

Sincerely,

/RA/

Christopher I. Grimes, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

ML061520151 PACKAGE ACCESSION NUMBER : ML061520167 OFFICE: PFPB:DPR PFPB:DPR DPR:D NAME: MDusaniwskyj BWetzel CGrimes DATE: 06/01/06 06/01/06 06/02/06