| issue date = 08/18/2006
| issue date = 08/18/2006
| title = Errata for Diablo Canyon Power Plant - NRC Inspection Report 05000275-2005-005 and 05000323-2005-005
| title = Errata for Diablo Canyon Power Plant - NRC Inspection Report 05000275-2005-005 and 05000323-2005-005
| author name = Jones W B
| author name = Jones W
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Keenan J S
| addressee name = Keenan J
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:August 18, 2006 John S. Keenan, Senior Vice President of Generation and Chief Nuclear Officer Mail Code B32 Pacific Gas and Electric Company P.O. Box 770000 San Francisco, CA 94177-0001
 
==Dear Mr. Keenan:==
SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT - NRC INSPECTION REPORT 05000275/2005005 and 05000323/2005005 Please insert the enclosure to this letter as replacement for page 42 of NRC Inspection Report 05000275/2005005 and 05000323/2005005. A problem identification and resolution crosscutting aspect was incorrectly referenced in Section 4OA2.7 for Noncited Violation 05000275/2005-05-01, Failure to Adequately Assess and Manage Risk Associated with Startup Transformer 1-1 Maintenance. Section 1R14 of the report appropriately characterizes the cause of the finding as related to the crosscutting aspect of human performance in that maintenance personnel failed to follow procedures.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/
William B. Jones, Chief Project Branch B Division of Reactor Projects Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82
 
Pacific Gas and Electric Company -2-Enclosure:
Page 42 of NRC Inspection Report 05000275/2005005 and 05000323/2005005 cc w/enclosure:
Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors County Government Building 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.
 
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940
 
Pacific Gas and Electric Company -3-Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 Richard F. Locke, Esq.
 
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111
 
Pacific Gas and Electric Company -4-Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (TWJ)
Branch Chief, DRP/B (WBJ)
Senior Project Engineer, DRP/E (FLB2)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
DRS STA (DAP)
V. Dricks, PAO (VLD)
J. Lamb, OEDO RIV Coordinator (JGL1)
ROPreports DC Site Secretary (AWC1)
SUNSI Review Completed: _wbj__ ADAMS: : Yes G No Initials: __wbj____
: Publicly Available G Non-Publicly Available G Sensitive : Non-Sensitive R:\_REACTORS\_DC\2005\DC2005-05RP-TWJ Errata.wpd RIV:SRI:DRP/B C:DRP/B TWJackson;df WBJones T - WBJones /RA/
8/18/06  8/18/06 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
 
.7 PI&R Crosscutting Aspects Section 2OS1 identified a problem identification and resolution crosscutting aspect for the failure of radiation protection personnel to post a radiation area and the violation was similar to a violation previously identified in NRC Inspection Report 050000275; 323/2002004.
 
Section 4OA2.2 identified a problem identification and resolution crosscutting aspect for the failure of PG&E to adequately evaluate and implement timely corrective actions to ECCS check valve back-leakage.
 
4OA3 Event Follow-up (71153)
.1 (Closed) Licensee Event Report 05000323/2005001-00, TS 3.4.10 Not Met During Pressurizer Safety Valve Surveillance Testing Due to Random Lift Spread On January 27, 2005, during scheduled testing of Unit 2 pressurizer safety valves, PG&E identified two of three pressurizer safety valves outside the TS 3.4.10 lift setting of >2460 and <2510 psig.
 
In NRC Inspection Report 05000275; 323/2005003, an NRC-identified, Green NCV of 10 CFR Part 50, Criterion XVI, was identified for this issue. PG&E documented the problem in Nonconformance Report N0002197. No new information that would change the disposition of this issue was provided in this LER. This LER is closed.
 
4OA5 Other
.1 TI 2515/160 - Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors a. Inspection Scope The inspectors reviewed PG&Es actions regarding the inspection and repair associated with Alloy 82/182/600 material that may have been used in pressurizer penetration nozzles, steam space piping connections, heads, and shells. Specifically, the inspectors reviewed PG&Es response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors. PG&E documented in their response to the bulletin that no Alloy 82/182/600 material was used in the construction or welds of the Unit 1 pressurizer. PG&E did not commit to, or perform, any nondestruction examination methods for the Unit 1 pressurizer. PG&E did perform a boric acid walkdown of the pressurizer, and the inspectors performed an independent boric acid inspection of pressurizer.
 
The activities required in TI 2515/160 for Diablo Canyon Power Plant Unit 1 have been completed. This temporary instruction is closed for Unit 1.
 
-42-  Enclosure
}}
}}

Latest revision as of 15:53, 23 November 2019

Errata for Diablo Canyon Power Plant - NRC Inspection Report 05000275-2005-005 and 05000323-2005-005
ML062330155
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/18/2006
From: William Jones
NRC/RGN-IV/DRP/RPB-B
To: Keenan J
Pacific Gas & Electric Co
References
IR-05-005
Download: ML062330155 (5)


Text

August 18, 2006 John S. Keenan, Senior Vice President of Generation and Chief Nuclear Officer Mail Code B32 Pacific Gas and Electric Company P.O. Box 770000 San Francisco, CA 94177-0001

Dear Mr. Keenan:

SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT - NRC INSPECTION REPORT 05000275/2005005 and 05000323/2005005 Please insert the enclosure to this letter as replacement for page 42 of NRC Inspection Report 05000275/2005005 and 05000323/2005005. A problem identification and resolution crosscutting aspect was incorrectly referenced in Section 4OA2.7 for Noncited Violation 05000275/2005-05-01, Failure to Adequately Assess and Manage Risk Associated with Startup Transformer 1-1 Maintenance. Section 1R14 of the report appropriately characterizes the cause of the finding as related to the crosscutting aspect of human performance in that maintenance personnel failed to follow procedures.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

William B. Jones, Chief Project Branch B Division of Reactor Projects Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82

Pacific Gas and Electric Company -2-Enclosure:

Page 42 of NRC Inspection Report 05000275/2005005 and 05000323/2005005 cc w/enclosure:

Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors County Government Building 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940

Pacific Gas and Electric Company -3-Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Richard F. Locke, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111

Pacific Gas and Electric Company -4-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (TWJ)

Branch Chief, DRP/B (WBJ)

Senior Project Engineer, DRP/E (FLB2)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

DRS STA (DAP)

V. Dricks, PAO (VLD)

J. Lamb, OEDO RIV Coordinator (JGL1)

ROPreports DC Site Secretary (AWC1)

SUNSI Review Completed: _wbj__ ADAMS: : Yes G No Initials: __wbj____

Publicly Available G Non-Publicly Available G Sensitive : Non-Sensitive R:\_REACTORS\_DC\2005\DC2005-05RP-TWJ Errata.wpd RIV:SRI:DRP/B C:DRP/B TWJackson;df WBJones T - WBJones /RA/

8/18/06 8/18/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

.7 PI&R Crosscutting Aspects Section 2OS1 identified a problem identification and resolution crosscutting aspect for the failure of radiation protection personnel to post a radiation area and the violation was similar to a violation previously identified in NRC Inspection Report 050000275; 323/2002004.

Section 4OA2.2 identified a problem identification and resolution crosscutting aspect for the failure of PG&E to adequately evaluate and implement timely corrective actions to ECCS check valve back-leakage.

4OA3 Event Follow-up (71153)

.1 (Closed) Licensee Event Report 05000323/2005001-00, TS 3.4.10 Not Met During Pressurizer Safety Valve Surveillance Testing Due to Random Lift Spread On January 27, 2005, during scheduled testing of Unit 2 pressurizer safety valves, PG&E identified two of three pressurizer safety valves outside the TS 3.4.10 lift setting of >2460 and <2510 psig.

In NRC Inspection Report 05000275; 323/2005003, an NRC-identified, Green NCV of 10 CFR Part 50, Criterion XVI, was identified for this issue. PG&E documented the problem in Nonconformance Report N0002197. No new information that would change the disposition of this issue was provided in this LER. This LER is closed.

4OA5 Other

.1 TI 2515/160 - Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors a. Inspection Scope The inspectors reviewed PG&Es actions regarding the inspection and repair associated with Alloy 82/182/600 material that may have been used in pressurizer penetration nozzles, steam space piping connections, heads, and shells. Specifically, the inspectors reviewed PG&Es response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors. PG&E documented in their response to the bulletin that no Alloy 82/182/600 material was used in the construction or welds of the Unit 1 pressurizer. PG&E did not commit to, or perform, any nondestruction examination methods for the Unit 1 pressurizer. PG&E did perform a boric acid walkdown of the pressurizer, and the inspectors performed an independent boric acid inspection of pressurizer.

The activities required in TI 2515/160 for Diablo Canyon Power Plant Unit 1 have been completed. This temporary instruction is closed for Unit 1.

-42- Enclosure