| {{#Wiki_filter:MEn~erfy.Indian Point Energy Center Status Report January 29, 2007 Operational Status Unit 2 is operating at 100% and has been on-line for 6 days. Unit 3 is operating at 100% reactor power and has been on-line for Ff days.Groundwater Project Begins Dye Tracer Test The Groundwater Investigation program will be %inserting dye tracers (colored dyes) into selected areas near the fuel pools on Unit 2 and 1.The objective of this effort will be to intercept these dye tracers in various monitoring wells which have been installed around site in the last 12 months. By observing these dyes as they travel through the various groundwater pathways, the team can better understand the hydraulic connectivity of the groundwater on site. Also by timing how long it takes for the tracer dyes to travel to distant points, hydrologists can determine groundwater travel velocity, travel efficiency, and other groundwater characteristics. "Tea bag" showing mesh bag with activated charcoal granules The monitoring wells on site have had collection media installed at various depths in the wells.The primary collection media consists of two various designed collection devices. The first devise is a small nylon mesh bag about the size and shape of a pencil. The second type of collection bag is the size and shape of a large tea bag. Both these two tracer dye collection bags are filled with activated charcoal granules. | | {{#Wiki_filter:MEn~erfy |
| Because both bags have a permeable mesh screen, and have fine grained charcoal inside the bag, they are commonly referred to as dye tracer "tea bags".The tracer bags are held in place at various well depths by a string, so the bag can be removed for inspection and analysis. | | .Indian Point Energy Center Status Report January 29, 2007 Operational Status Unit 2 is operating at 100% and has been on-line for 6 days. Unit 3 is operating at 100% reactor power and has been on-line for Ff days. |
| There are many variables as to how fast, and how concentrated or diluted the dye tracers will move through the various rock fracture pathways. | | Groundwater Project Begins Dye Tracer Test The Groundwater Investigation program will be % |
| The tracer dyes will travel with relatively large volumes of groundwater as compared to small volume of dye. | | inserting dye tracers (colored dyes) into selected areas near the fuel pools on Unit 2 and 1. |
| The teabags will be removed and replaced periodically, and sent to a laboratory in Missouri that specializes in this testing analysis.The results of the dye tracer test will be added to the Groundwater Investigation process when the test period is concluded. | | The objective of this effort will be to intercept these dye tracers in various monitoring wells which have been installed around site in the last 12 months. By observing these dyes as they travel through the various groundwater pathways, the team can better understand the hydraulic connectivity of the groundwater on site. Also by timing how long it takes for the tracer dyes to travel to distant points, hydrologists can determine groundwater travel velocity, travel efficiency, and other groundwater characteristics. "Tea bag" showing mesh bag with activated charcoalgranules The monitoring wells on site have had collection media installed at various depths in the wells. |
| The test could last several months.Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. | | The primary collection media consists of two various designed collection devices. The first devise is a small nylon mesh bag about the size and shape of a pencil. The second type of collection bag is the size and shape of a large tea bag. Both these two tracer dye collection bags are filled with activated charcoal granules. Because both bags have a permeable mesh screen, and have fine grained charcoal inside the bag, they are commonly referred to as dye tracer "tea bags". |
| The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441. | | The tracer bags are held in place at various well depths by a string, so the bag can be removed for inspection and analysis. There are many variables as to how fast, and how concentrated or diluted the dye tracers will move through the various rock fracture pathways. The tracer dyes will travel with relatively large volumes of groundwater as compared to small volume of dye. |
| | |
| | The teabags will be removed and replaced periodically, and sent to a laboratory in Missouri that specializes in this testing analysis. |
| | The results of the dye tracer test will be added to the Groundwater Investigation process when the test period is concluded. The test could last several months. |
| | Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441. |
| If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.}} | | If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.}} |
|
---|
Category:Status Report
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ML18088B2462018-03-29029 March 2018 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2017, Per 10 CFR 50.82(a)(8)(vii) CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)2017-03-30030 March 2017 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii) NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-14-059, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2014-04-29029 April 2014 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc NL-14-031, Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-13-072, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2013-05-0202 May 2013 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-13-00011, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii)2013-03-29029 March 2013 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii) ML12137A1362012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A1052012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A0902012-05-29029 May 2012 Decommissioning Funding Status Report ML12122A0712012-05-14014 May 2012 Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ML1029403622010-11-12012 November 2010 October 2010 10 CFR 2.206 Monthly Status Report: Enclosures ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ML1100404362009-09-16016 September 2009 Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/16/2009 ML0830800812008-11-20020 November 2008 October 2008 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206- Enclosures ML0905708302008-11-0505 November 2008 Entergy Center Status Report NL-08-131, Siren Project Status Update2008-08-12012 August 2008 Siren Project Status Update NL-08-121, Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/082008-07-25025 July 2008 Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/08 ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report2008-05-0808 May 2008 J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report ML0729506172007-09-13013 September 2007 E-mail from K. Mcmullin, Entergy to J. Boska, NRR Et Al on IPEC Status Report, September 13, 2007 ML0729705242007-08-0707 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 7 2007 ML0729705222007-08-0606 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 6 2007 ML0729705042007-07-31031 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 31 2007 ML0729704422007-07-27027 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 27, 2007 ML0729704332007-07-26026 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 26 ML0729703852007-07-18018 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 18 2007 ML0729506092007-06-11011 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 11, 2007 ML0729506082007-06-0707 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 7, 2007 ML0729506032007-06-0505 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding Indian Point Energy Center Status Report, June 5, 2007 ML0729506002007-06-0101 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 1, 2007 ML0729505982007-05-31031 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 31, 2007 ML0729505922007-05-30030 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 30, 2007 ML0729505912007-05-29029 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 29, 2007 2024-09-18
[Table view] |
Text
MEn~erfy
.Indian Point Energy Center Status Report January 29, 2007 Operational Status Unit 2 is operating at 100% and has been on-line for 6 days. Unit 3 is operating at 100% reactor power and has been on-line for Ff days.
Groundwater Project Begins Dye Tracer Test The Groundwater Investigation program will be %
inserting dye tracers (colored dyes) into selected areas near the fuel pools on Unit 2 and 1.
The objective of this effort will be to intercept these dye tracers in various monitoring wells which have been installed around site in the last 12 months. By observing these dyes as they travel through the various groundwater pathways, the team can better understand the hydraulic connectivity of the groundwater on site. Also by timing how long it takes for the tracer dyes to travel to distant points, hydrologists can determine groundwater travel velocity, travel efficiency, and other groundwater characteristics. "Tea bag" showing mesh bag with activated charcoalgranules The monitoring wells on site have had collection media installed at various depths in the wells.
The primary collection media consists of two various designed collection devices. The first devise is a small nylon mesh bag about the size and shape of a pencil. The second type of collection bag is the size and shape of a large tea bag. Both these two tracer dye collection bags are filled with activated charcoal granules. Because both bags have a permeable mesh screen, and have fine grained charcoal inside the bag, they are commonly referred to as dye tracer "tea bags".
The tracer bags are held in place at various well depths by a string, so the bag can be removed for inspection and analysis. There are many variables as to how fast, and how concentrated or diluted the dye tracers will move through the various rock fracture pathways. The tracer dyes will travel with relatively large volumes of groundwater as compared to small volume of dye.
The teabags will be removed and replaced periodically, and sent to a laboratory in Missouri that specializes in this testing analysis.
The results of the dye tracer test will be added to the Groundwater Investigation process when the test period is concluded. The test could last several months.
Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.