|
|
(2 intermediate revisions by the same user not shown) |
Line 5: |
Line 5: |
| | author name = Desai B | | | author name = Desai B |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Robinson R K | | | addressee name = Robinson R |
| | addressee affiliation = Duke Energy Carolinas, LLC | | | addressee affiliation = Duke Energy Carolinas, LLC |
| | docket = 05000269, 05000270, 05000287 | | | docket = 05000269, 05000270, 05000287 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:/RA/ | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 18, 2019 |
| | |
| | ==SUBJECT:== |
| | OCONEE NUCLEAR STATION - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000269/2019411, 05000270/2019411, AND 05000287/2019411 |
| | |
| | ==Dear Mr. Robinson:== |
| | On February 28, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Oconee Nuclear Station, Units 1, 2, and 3, and discussed the results of this inspection with Mr. E. Burchfield, and other members of your staff. The results of this inspection are documented in the enclosed report. |
| | |
| | No NRC-Identified or self-revealing findings were identified during the inspection. |
| | |
| | This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| | |
| | Sincerely, |
| | /RA/ |
| | Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-269, 50-270 and 50-287 License Nos: DPR-38, DPR-47 and DPR-55 |
| | |
| | ===Enclosure:=== |
| | NRC IR 05000269/2019411, 270/2019411 and 287/2019411 |
| | |
| | ==Inspection Report== |
| | Docket Nos: 05000269, 05000270, and 05000287 License Nos: DPR-38, DPR-47, and DPR-55 Report Nos: 05000269/2019411, 05000270/2019411, and 05000287/2019411 Enterprise Identifier: I-2019-411-0000 Licensee: Duke Energy Carolinas, LLC Facility: Oconee Nuclear Station, Units 1, 2, and 3 Location: Seneca, SC Dates: February 25 - 28, 2019 Inspectors: Ivan Hall, Physical Security Inspector Jared Justice, Physical Security Inspector Approved by: Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Enclosure |
| | |
| | =SUMMARY= |
| | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Oconee Nuclear Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. |
| | |
| | Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. |
| | |
| | List of Findings and Violations No findings were identified. |
| | |
| | =INSPECTION SCOPE= |
| | |
| | Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. |
| | |
| | ==SAFEGUARDS== |
| | |
| | ==71130.01 - Access Authorization== |
| | {{IP sample|IP=IP 71130.01|count=1}} |
| | |
| | The inspectors evaluated the access authorization program. The following elements were evaluated from this IP dated January 1, 2019. |
| | |
| | Tier I: All requirements Tier II: All requirements Tier III: All requirements |
| | |
| | ==71130.02 - Access Control== |
| | {{IP sample|IP=IP 71130.02|count=1}} |
| | |
| | The inspectors evaluated the security access control program. The following elements were evaluated from this IP dated January 1, 2019. |
| | |
| | Tier I: All requirements Tier II: 8 Requirements 02.06 (a), (c), (d), 02.07 (a), 02.08 (a), (g), (h), |
| | : (i) Tier III: 1 Requirement 02.09 (a) |
| | |
| | ==71130.06 - Protection of Safeguards Information== |
| | {{IP sample|IP=IP 71130.06|count=1}} |
| | |
| | The inspectors evaluated the safeguards information protection program. The following elements were evaluated from this IP dated January 1, 2019. |
| | |
| | Tier I: All requirements Tier II: All requirements Tier III: All requirements |
| | |
| | ==71130.08 - Fitness for Duty== |
| | {{IP sample|IP=IP 71130.08|count=1}} |
| | |
| | The inspectors evaluated the fitness for duty program. The following elements were evaluated from this IP dated January 1, 2019. |
| | |
| | Tier I: All requirements Tier II: All requirements Tier III: All requirements |
| | |
| | ==OTHER ACTIVITIES - BASELINE== |
| | |
| | ===71151 - Performance Indicator Verification === |
| | {{IP sample|IP=IP 71151|count=1}} |
| | The inspectors verified licensee performance indicators submittals listed below for the period from January 1, 2018, through January 31, 2019. |
| | : (1) Protected Area Security Equipment Performance Index |
| | |
| | ==EXIT MEETINGS AND DEBRIEFS== |
| | On February 28, 2019, the inspectors presented the Baseline Security Inspection results to Mr. |
| | |
| | E. Burchfield and other members of the licensee staff. |
| | |
| | LIST OF |
| | |
| | =DOCUMENTS REVIEWED= |
| | |
| | PROCEDURES |
| | AD-PI-ALL-0700, Consolidated Data Entry - INFO - WANO Performance Indicators, Rev. 1 |
| | AD-SY-ALL-0110, Protection of Information Related to Nuclear Security, Rev. 4 |
| | AD-SY-ALL-0301, Nuclear Worker Unescorted Access Authorization Program, Rev. 4 |
| | AD-SY-ALL-0310, Access Authorization Processing, Rev. 3 |
| | AD-SY-ALL-0320, Personnel Access Data System, Rev. 2 |
| | AD-SY-ALL-0340, Access Authorization Training and Qualification Program, Rev. 1 |
| | AD-SY-ALL-0370, Access Processing of Foreign Nationals, Rev. 0 |
| | AD-SY-ALL-0401, Fitness for Duty Program, Rev. 2 |
| | AD-SY-ALL-0405, Fitness for Duty Violations, Rev. 0 |
| | AD-SY-ALL-0410, Fitness for Duty Drug and Alcohol Collections, Rev. 2 |
| | AD-SY-ALL-0415, Fitness for Duty Blind Performance Testing Procedure, Rev. 2 |
| | AD-SY-ALL-0420, Fitness for Duty Unscheduled Callout, Rev. 1 |
| | AD-SY-ALL-0440, Fitness for Duty Training and Qualification Program, Rev. 1 |
| | AD-SY-ALL-0451, Behavior Observation Program, Rev. 3 |
| | AD-SY-ALL-0460, Managing Fatigue and Work Hour Limits, Rev. 2 |
| | PY-SY-ALL-0004, Duke Energy Nuclear Generation Fitness for Duty Policy, Rev. 1 |
| | SD-8.0, Search and Protected Area Ingress Process, Rev. 24 |
| | SP/O/1305/O, VBS Access Control and Search Equipment, Rev. 23 |
| | SP/E/1201/O, Security Locks & Keys, Rev.14 |
| | Various Behavior Observation Program Training Documents |
| | Various Nuclear Oversight and Self-Screener Audits |
| | CONDITION REPORTS |
| | 2175920 02196102 02202947 02230310 |
| | 224401 02241415 02243638 02248706 |
| | 2112971 02111059 02241177 02253744 |
| | 255084 02256571 02256573 02254966 |
| | 254968 02255238 02241177 02230310 |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000269/20234012023-04-14014 April 2023 Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 IR 05000269/20224012022-08-26026 August 2022 Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 IR 05000270/20220022022-07-29029 July 2022 Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 IR 05000269/20220102022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 IR 05000269/20224032022-05-0404 May 2022 Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 IR 05000269/20220012022-05-0404 May 2022 Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 IR 05000269/20224042022-04-27027 April 2022 Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) IR 05000269/20220122022-02-24024 February 2022 Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 IR 05000269/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 IR 05000269/20210042022-02-14014 February 2022 Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation IR 05000269/20210032021-10-28028 October 2021 Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 IR 05000269/20210102021-09-17017 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 IR 05000269/20210052021-08-26026 August 2021 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) IR 07200004/20210012021-08-26026 August 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 IR 05000269/20210022021-08-0404 August 2021 Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 IR 05000269/20210112021-06-0202 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 IR 05000269/20210012021-04-23023 April 2021 Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 IR 05000269/20214012021-04-22022 April 2021 Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 IR 05000269/20200042021-02-22022 February 2021 Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004 ML21036A0012021-02-0404 February 2021 Integrated Inspection Report 05000269/2020004 and 05000270/2020004 and 05000287/2020004 IR 05000269/20200102021-01-22022 January 2021 NRC Design Bases Assurance Inspection (Team) Report 05000269/2020010 and 05000270/2020010 and 05000287/2020010 and Notice of Violation IR 05000269/20204012020-11-13013 November 2020 Security Baseline Inspection Report 05000269/2020401 and 05000270/2020401 and 05000287/2020401 IR 05000269/20200032020-11-0404 November 2020 Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002 2024-09-23
[Table view] Category:Letter
MONTHYEARML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 2024-09-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 18, 2019
SUBJECT:
OCONEE NUCLEAR STATION - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000269/2019411, 05000270/2019411, AND 05000287/2019411
Dear Mr. Robinson:
On February 28, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Oconee Nuclear Station, Units 1, 2, and 3, and discussed the results of this inspection with Mr. E. Burchfield, and other members of your staff. The results of this inspection are documented in the enclosed report.
No NRC-Identified or self-revealing findings were identified during the inspection.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-269, 50-270 and 50-287 License Nos: DPR-38, DPR-47 and DPR-55
Enclosure:
NRC IR 05000269/2019411, 270/2019411 and 287/2019411
Inspection Report
Docket Nos: 05000269, 05000270, and 05000287 License Nos: DPR-38, DPR-47, and DPR-55 Report Nos: 05000269/2019411, 05000270/2019411, and 05000287/2019411 Enterprise Identifier: I-2019-411-0000 Licensee: Duke Energy Carolinas, LLC Facility: Oconee Nuclear Station, Units 1, 2, and 3 Location: Seneca, SC Dates: February 25 - 28, 2019 Inspectors: Ivan Hall, Physical Security Inspector Jared Justice, Physical Security Inspector Approved by: Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Oconee Nuclear Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations No findings were identified.
INSPECTION SCOPE
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
Main article: IP 71130.01
The inspectors evaluated the access authorization program. The following elements were evaluated from this IP dated January 1, 2019.
Tier I: All requirements Tier II: All requirements Tier III: All requirements
71130.02 - Access Control
Main article: IP 71130.02
The inspectors evaluated the security access control program. The following elements were evaluated from this IP dated January 1, 2019.
Tier I: All requirements Tier II: 8 Requirements 02.06 (a), (c), (d), 02.07 (a), 02.08 (a), (g), (h),
- (i) Tier III: 1 Requirement 02.09 (a)
71130.06 - Protection of Safeguards Information
Main article: IP 71130.06
The inspectors evaluated the safeguards information protection program. The following elements were evaluated from this IP dated January 1, 2019.
Tier I: All requirements Tier II: All requirements Tier III: All requirements
71130.08 - Fitness for Duty
Main article: IP 71130.08
The inspectors evaluated the fitness for duty program. The following elements were evaluated from this IP dated January 1, 2019.
Tier I: All requirements Tier II: All requirements Tier III: All requirements
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below for the period from January 1, 2018, through January 31, 2019.
- (1) Protected Area Security Equipment Performance Index
EXIT MEETINGS AND DEBRIEFS
On February 28, 2019, the inspectors presented the Baseline Security Inspection results to Mr.
E. Burchfield and other members of the licensee staff.
LIST OF
DOCUMENTS REVIEWED
PROCEDURES
AD-PI-ALL-0700, Consolidated Data Entry - INFO - WANO Performance Indicators, Rev. 1
AD-SY-ALL-0110, Protection of Information Related to Nuclear Security, Rev. 4
AD-SY-ALL-0301, Nuclear Worker Unescorted Access Authorization Program, Rev. 4
AD-SY-ALL-0310, Access Authorization Processing, Rev. 3
AD-SY-ALL-0320, Personnel Access Data System, Rev. 2
AD-SY-ALL-0340, Access Authorization Training and Qualification Program, Rev. 1
AD-SY-ALL-0370, Access Processing of Foreign Nationals, Rev. 0
AD-SY-ALL-0401, Fitness for Duty Program, Rev. 2
AD-SY-ALL-0405, Fitness for Duty Violations, Rev. 0
AD-SY-ALL-0410, Fitness for Duty Drug and Alcohol Collections, Rev. 2
AD-SY-ALL-0415, Fitness for Duty Blind Performance Testing Procedure, Rev. 2
AD-SY-ALL-0420, Fitness for Duty Unscheduled Callout, Rev. 1
AD-SY-ALL-0440, Fitness for Duty Training and Qualification Program, Rev. 1
AD-SY-ALL-0451, Behavior Observation Program, Rev. 3
AD-SY-ALL-0460, Managing Fatigue and Work Hour Limits, Rev. 2
PY-SY-ALL-0004, Duke Energy Nuclear Generation Fitness for Duty Policy, Rev. 1
SD-8.0, Search and Protected Area Ingress Process, Rev. 24
SP/O/1305/O, VBS Access Control and Search Equipment, Rev. 23
SP/E/1201/O, Security Locks & Keys, Rev.14
Various Behavior Observation Program Training Documents
Various Nuclear Oversight and Self-Screener Audits
CONDITION REPORTS
2175920 02196102 02202947 02230310
224401 02241415 02243638 02248706
2112971 02111059 02241177 02253744
255084 02256571 02256573 02254966
254968 02255238 02241177 02230310