{{#Wiki_filter:U.S. Nuclear Regulatory Commission Page 2 April 23, 2008
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Sodciy-Daisy, Tennessee 37384-2000 April 23, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of                                          )                      Docket No. 50-327 Tennessee Valley Authority (TVA)                          )
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 CYCLE 15 (U1C15) - 180-DAY -
STEAM GENERATOR (SG) INSPECTION REPORT In accordance with the requirements of SQN Unit 1 Technical Specification 6.8.4.k, Steam Generator Program and Technical Specification 6.9.1.16, Steam Generator Inspection report, TVA is submitting the 180-day report that includes the results of inservice inspections performed on Unit 1 SGs during the U1C15 refueling outage.
There are no commitments contained in this letter.
Please direct questions concerning this issue to me at (423) 843-7170 or Russell R. Thompson at (423) 843-6672.
Sincerely, James D. Smith Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Prinjec on recycled paper


cc (Enclosure):
U.S. Nuclear Regulatory Commission Page 2 April 23, 2008 cc (Enclosure):
Mr. Thomas H. Boyce, Senior Project Manager  
Mr. Thomas H. Boyce, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739


U.S. Nuclear Regulatory Commission
Tennessee Valley Authority Sequoyah Nuclear Plant Unit 1 Cycle 15 Refueling Outage October 2007 180 Day Steam Generator Inspection Report Prepared by:
Verified by:
Approved by:        />t*<< ^/^MMA                    ?>'>lzfL Zf/of


Mail Stop 08G-9a
SQN Unit 1 Cycle 15 180-Day Report In accordance with Technical Specification 6.8.4.k, Steam Generator Program and Technical Specification 6.9.1.16, Steam Generator Tube Inspection Report, this report documents the results of the Unit 1 Cycle 15 (U1C15) steam generator (SG) tube inservice inspection. The following list is the required scope of the 180-day report.
 
One White Flint North
 
11555 Rockville Pike
 
Rockville, Maryland 20852-2739
 
SQN Unit 1 Cycle 15 180-Day Report In accordance with Technical Specification 6.8.4.k, Steam Generator Program and Technical  
 
Specification 6.9.1.16, "Steam Generator Tube Inspection Report," this report documents the results of the Unit 1 Cycle 15 (U1C15) steam generator (SG) tube inservice inspection. The  
 
following list is the required scope of the 180-day report.
: 1. The scope of inspections performed on each SG.
: 1. The scope of inspections performed on each SG.
EDDY CURRENT EXAM TYPE (Exams) RSG 1 RSG 2 RSG 3 RSG 4 TotalFull Length Bobbin (.610 coil) 247724812479 24809917Full Length Bobbin (.590 coil) 424242 42168 Partial Length Bobbin (.570 coil HTE-VS3) 123122123 123491 Expansion Full Length Bobbin (.610 coil) 479286116 0881 Predetermined Diagnostic Plus Point 2329 135 Diagnostic/PID Plus Point 011 13
EDDY CURRENT EXAM TYPE (Exams)                   RSG 1   RSG 2     RSG 3   RSG 4     Total Full Length Bobbin (.610 coil)                     2477    2481      2479      2480    9917 Full Length Bobbin (.590 coil)                       42        42      42        42    168 Partial Length Bobbin (.570 coil HTE-VS3)           123      122      123        123    491 Expansion Full Length Bobbin (.610 coil)           479      286      116          0    881 Predetermined Diagnostic Plus Point                   2        3      29          1      35 Diagnostic/PID Plus Point                             0        1        1        1      3
______________________
_____    _____    _____    _____    _____
__________________ ____________Total Exams Completed 312329352790 264711495
______________________                               _        _        _        _      _
 
Total Exams Completed                             3123    2935      2790      2647    11495 Total Tubes Examined                               3121    2933      2775      2645    11474 In accordance with the U1C15 Degradation Assessment, expansion sample examinations were performed in SGs 1, 2, and 3. No expansion sample was required in SG 4.
Total Tubes Examined 312129332775 264511474 In accordance with the U1C15 Degradation Assessment, expansion sample examinations were performed in SGs 1, 2, and 3. No expansion sample was required in SG 4.
: 2. Active Degradation Mechanisms found.
: 2. Active Degradation Mechanisms found.  
INDICATIONS (Tubes)                       RSG 1       RSG 2       RSG 3       RSG 4         Total U-Bend Support Wear                         32            2          11            2        47
 
_____      _____        _____        _____      _____
INDICATIONS (Tubes) RSG 1 RSG 2 RSG 3 RSG 4 Total   U-Bend Support Wear 32211 247
______________________                           _          _            _            _          _
______________________
Total                                        32            2          11            2        47
__________________ ____________Total  32211 247
: 3. Nondestructive examination technique utilized for each degradation mechanism.
: 3. Nondestructive examination technique utilized for each degradation mechanism.  
 
Bobbin coil examinations were utilized for the detection of U-bend Support Wear.
Bobbin coil examinations were utilized for the detection of U-bend Support Wear.
: 4. Location, orientation (linear), and measured sizes (if available) of service induced indications.  
: 4. Location, orientation (linear), and measured sizes (if available) of service induced indications.
 
Refer to Table 1
Refer to Table 1  


SQN Unit 1 Cycle 15 180-Day Report
SQN Unit 1 Cycle 15 180-Day Report
: 5. Number of tubes plugged during the inspection outage for each active degradation mechanism.
: 5. Number of tubes plugged during the inspection outage for each active degradation mechanism.
PLUGGING STATUS RSG 1 RSG 2 RSG 3 RSG 4 TOTALPreviously Plugged Tubes   14665 31     Tubes Plugged by Damage Mechanism       U-Bend Support Wear 0000 0     Total Plugged Cycle 15         0 0       0       0       0     Total Tubes Plugged   14 6 6 5 31       Plugged Tube Percentage 0.28%0.12%0.12%0.10% 0.16%
PLUGGING STATUS                         RSG 1   RSG 2     RSG 3     RSG 4   TOTAL Previously Plugged Tubes                     14        6        6        5        31 Tubes Plugged by Damage Mechanism U-Bend Support Wear                         0        0        0        0        0 Total Plugged Cycle 15                       0         0         0         0         0 Total Tubes Plugged                         14       6         6         5       31 Plugged Tube Percentage                 0.28%   0.12%     0.12%     0.10%     0.16%
: 6. Total number and percentage of tubes plugged to date.  
: 6. Total number and percentage of tubes plugged to date.
 
Refer to the response to Number 5 above. The U-bend Support Wear indications were tapered along the tube axially.
Refer to the response to Number 5 above. The U-bend Support Wear indications  
 
were tapered along the tube axially.
: 7. The results of condition monitoring, including the results of tubes pulls and in-situ testing.
: 7. The results of condition monitoring, including the results of tubes pulls and in-situ testing.
No tube pulls or in-situ pressure tests were performed.  
No tube pulls or in-situ pressure tests were performed.
 
U-BEND SUPPORT WEAR Structural Integrity The SQN U1C15 degradation assessment predicted, based on past indications and growth rate data, that 25 tubes could be preventively plugged. A total of 51 indications in 47 tubes were detected. None exceeded the plugging limit of 40 percent. The U-bend Support Wear was assumed to have grown from 0 percent through wall over the last 2 fuel cycles. Using these growth rates, a repair limit of 30 percent was calculated which would ensure that a safety factor of 3 would be maintained (with a 95 percent probability) until the next planned inspection during the U1C18 refueling outage. Condition monitoring assumed the axial length of the U-bend Support Wear indication to be the width of the U-bend Support (i.e., 2 inches).
U-BEND SUPPORT WEAR Structural Integrity The SQN U1C15 degradation assessment predicted, based on past indications and growth rate data, that 25 tubes could be preventively plugged. A total of 51  
All indications were a fraction of this length. The limiting indications were 16 percent maximum depth. The limiting tubes were in SG1, Row 76, Col 100 at VS2-0.97, Row 85, Col 67 at VS4+0.91, and Row 87, Col 73 at VS2+1.28. The EPRI, Steam Generator Degradation Specific Management Flaw Handbook, Section 5.3.3, Axial Thinning with Limited Circumferential Extent, equations were utilized to calculate the burst pressure. The calculated 95th percentile lower limit burst pressure was 6958 psig (3P is 4114 psig). The largest amplitude U-bend Support Wear indication was 0.58 volts, and therefore did not exceed the in-situ pressure testing leakage screening criteria of 7.9 volts. All U-bend Support Wear indications met condition monitoring performance criteria. Zero indications exceeded the 40 percent plugging limit and zero indications exceeded the 30 percent repair limit.
 
indications in 47 tubes were detected. None exceeded the plugging limit of 40  
 
percent. The U-bend Support Wear was assumed to have grown from 0 percent  
 
through wall over the last 2 fuel cycles. Using these growth rates, a repair limit of 30  
 
percent was calculated which would ensure that a safety factor of 3 would be  
 
maintained (with a 95 percent probability) until the next planned inspection during the  
 
U1C18 refueling outage. Condition monitoring assumed the axial length of the U-
 
bend Support Wear indication to be the width of the U-bend Support (i.e., 2 inches).
 
All indications were a fraction of this length. The limiting indications were 16 percent  
 
maximum depth. The limiting tubes were in SG1, Row 76, Col 100 at VS2-0.97, Row  
 
85, Col 67 at VS4+0.91, and Row 87, Col 73 at VS2+1.28. The EPRI, "Steam  
 
Generator Degradation Specific Management Flaw Handbook," Section 5.3.3, "Axial  
 
Thinning with Limited Circumferential Extent," equations were utilized to calculate the  
 
burst pressure. The calculated 95th percentile lower limit burst pressure was 6958  
 
psig (3P is 4114 psig).
The largest amplitude U-bend Support Wear indication was 0.58 volts, and therefore did not exceed the in-situ pressure testing leakage screening criteria of 7.9 volts. All U-bend Support Wear indications met condition  
 
monitoring performance criteria. Zero indications exceeded the 40 percent plugging  
 
limit and zero indications exceeded the 30 percent repair limit.
SQN Unit 1 Cycle 15 180-Day Report Leakage Integrity During the previous two fuel cycles, the Unit 1 operational primary to secondary leakage was below detection. The majority of the indications detected during U1C15
 
were less than 0.5 volts which in accordance with EPRI Steam Generator In-Situ
 
Pressure Test Guidelines Revision 2 (TR-1007904), dated August 2003, Section
 
B.3.4 is a quick screen for structural and leakage integrity, and therefore provides a
 
95 percent probability that none of the indications would leak should a postulated
 
main steam line break have occurred. The greatest through wall was 16 percent. 
 
The associated 95th percentile lower limit burst pressure was 6958 psig. The
 
equations utilized for burst pressure determine the ligament tearing pressure or the
 
pressure at which a partial through-wall indication goes through-wall (i.e., pop-
 
through). If an indication has a 95 percent probability of not going through wall at
 
6958 psig, then it should not go through wall at the Main Steam Line Break pressure
 
of 2405 psig. This provides additional confidence that no leakage would occur
 
should a postulated main steam line break occur.
: 8. The effective plugging percentage of all plugging in each SG.
 
Refer to the response to Number 5 above.  


SQN Unit 1 Cycle 15 180 Day Report Table 1 List of Indications 1 The indications below were characterized as U-bend Support Wear. They were detected by bobbin coil. The associated maximum depth and voltage are included. The  
SQN Unit 1 Cycle 15 180-Day Report Leakage Integrity During the previous two fuel cycles, the Unit 1 operational primary to secondary leakage was below detection. The majority of the indications detected during U1C15 were less than 0.5 volts which in accordance with EPRI Steam Generator In-Situ Pressure Test Guidelines Revision 2 (TR-1007904), dated August 2003, Section B.3.4 is a quick screen for structural and leakage integrity, and therefore provides a 95 percent probability that none of the indications would leak should a postulated main steam line break have occurred. The greatest through wall was 16 percent.
The associated 95th percentile lower limit burst pressure was 6958 psig. The equations utilized for burst pressure determine the ligament tearing pressure or the pressure at which a partial through-wall indication goes through-wall (i.e., pop-through). If an indication has a 95 percent probability of not going through wall at 6958 psig, then it should not go through wall at the Main Steam Line Break pressure of 2405 psig. This provides additional confidence that no leakage would occur should a postulated main steam line break occur.
: 8. The effective plugging percentage of all plugging in each SG.
Refer to the response to Number 5 above.


plugging limit at SQN Unit 1 is 40 percent through wall (TW).   
SQN Unit 1 Cycle 15 180 Day Report Table 1 List of Indications The indications below were characterized as U-bend Support Wear. They were detected by bobbin coil. The associated maximum depth and voltage are included. The plugging limit at SQN Unit 1 is 40 percent through wall (TW).
SG  ROW    COL  LOCATION    %TW    VOLTS  CHARACTERIZATION    RESOLUTION In service <30% Repair 1    68      76  VS2-.26        7      0.21  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    75      73  VS3+.80        9      0.28  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    78      78  VS2+.91        8      0.23  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    83      77  VS2+.91      10      0.32  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    87      73  VS2+1.28      16      0.58  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    87      73  VS3+1.00      15      0.51  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    87      75  VS2+1.14      13      0.4  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    87      81  VS4-1.11      15      0.53  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    88      70  VS4-1.11      13      0.39  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    90      70  VS4-1.00      13      0.37  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    92      70  VS2-.91        9      0.24  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    92      70  VS4+1.00      15      0.45  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    95      77  VS4-1.11      9      0.27  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    96      76  VS3+1.28      11      0.35  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    55    115  VS3-.91      15      0.47  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    61      85  VS2-1.09      8      0.21  U-BEND SUPPORT WEAR Limit In service <30% Repair 3    67      87  VS3-.92        6      0.19  U-BEND SUPPORT WEAR Limit In service <30% Repair 3    76      90  VS2+.86        9      0.26  U-BEND SUPPORT WEAR Limit In service <30% Repair 4    68      64  VS3-.83      10      0.37  U-BEND SUPPORT WEAR Limit In service <30% Repair 4    97      55  VS4-.83        8      0.29  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    69      59  VS3+.77      10      0.31  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    70      66  VS4-1.03      15      0.53  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    74      48  VS3-.88        6      0.17  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    83      45  VS4-.91        6      0.15  U-BEND SUPPORT WEAR Limit In service <30% Repair 2    20      80  VS3-.06      14      0.45  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    83      49  VS2+.77        7      0.2    U-BEND SUPPORT WEAR Limit In service <30% Repair 1    84      64  VS4+1.03      11      0.31   U-BEND SUPPORT WEAR Limit In service <30% Repair 1    85      65  VS4+.80      11      0.33  U-BEND SUPPORT WEAR Limit In service <30% Repair 1    85      67  VS4+.91      16      0.54  U-BEND SUPPORT WEAR Limit 1    88      52  VS4-.91        8      0.22  U-BEND SUPPORT WEAR In service <30% Repair 1


SG ROW COL LOCATION %TW VOLTS CHARACTERIZATION RESOLUTION 1 68 76 VS2-.26 7 0.21 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 75 73 VS3+.80 9 0.28 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 78 78 VS2+.91 8 0.23 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 83 77 VS2+.91 10 0.32 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 87 73 VS2+1.28 16 0.58 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 87 73 VS3+1.00 15 0.51 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 87 75 VS2+1.14 13 0.4 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 87 81 VS4-1.11 15 0.53 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 88 70 VS4-1.11 13 0.39 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 90 70 VS4-1.00 13 0.37 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 92 70 VS2-.91 9 0.24 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 92 70 VS4+1.00 15 0.45 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 95 77 VS4-1.11 9 0.27 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 96 76 VS3+1.28 11 0.35 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 55 115 VS3-.91 15 0.47 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 61 85 VS2-1.09 8 0.21 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 67 87 VS3-.92 6 0.19 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 76 90 VS2+.86 9 0.26 U-BEND SUPPORT WEAR In service <30% Repair Limit 4 68 64 VS3-.83 10 0.37 U-BEND SUPPORT WEAR In service <30% Repair Limit 4 97 55 VS4-.83 8 0.29 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 69 59 VS3+.77 10 0.31 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 70 66 VS4-1.03 15 0.53 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 74 48 VS3-.88 6 0.17 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 83 45 VS4-.91 6 0.15 U-BEND SUPPORT WEAR In service <30% Repair Limit 2 20 80 VS3-.06 14 0.45 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 83 49 VS2+.77 7 0.2 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 84 64 VS4+1.03 11 0.31 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 85 65 VS4+.80 11 0.33 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 85 67 VS4+.91 16 0.54 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 88 52 VS4-.91 8 0.22 U-BEND SUPPORT WEAR In service <30% Repair SQN Unit 1 Cycle 15 180 Day Report Table 1 List of Indications SG ROW COL LOCATION %TW VOLTS CHARACTERIZATION RESOLUTION Limit 1 92 52 VS3+.83 6 0.17 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 92 68 VS4+.62 14 0.41 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 93 65 VS2+.85 9 0.25 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 95 63 VS3-.63 13 0.42 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 95 63 VS4-1.14 11 0.33 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 98 66 VS3+.82 8 0.24 U-BEND SUPPORT WEAR In service <30% Repair Limit 2 92 42 VS2-.74 8 0.23 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 62 112 VS3+.77 13 0.41 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 66 110 VS3+.80 11 0.34 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 76 100 VS2-.97 16 0.56 U-BEND SUPPORT WEAR In service <30% Repair Limit 1 92 88 VS4-.85 11 0.33 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 73 75 VS3+.74 7 0.23 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 79 79 VS2-.86 7 0.23 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 79 79 VS3+.86 8 0.27 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 80 72 VS4-.83 9 0.31 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 85 69 VS4+.83 10 0.35 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 87 63 VS2+1.07 9 0.28 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 87 65 VS3+.95 12 0.4 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 89 71 VS4+1.01 8 0.26 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 97 71 VS3+.74 8 0.26 U-BEND SUPPORT WEAR In service <30% Repair Limit 3 98 56 VS4-1.06 12 0.39 U-BEND SUPPORT WEAR In service <30% Repair Limit}}
SQN Unit 1 Cycle 15 180 Day Report Table 1 List of Indications SG ROW COL LOCATION %TW     VOLTS   CHARACTERIZATION   RESOLUTION Limit In service <30% Repair 1 92 52 VS3+.83   6       0.17   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 92 68 VS4+.62   14     0.41   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 93 65 VS2+.85   9       0.25   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 95 63 VS3-.63   13     0.42   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 95 63 VS4-1.14 11     0.33   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 98 66 VS3+.82   8       0.24   U-BEND SUPPORT WEAR Limit In service <30% Repair 2 92 42 VS2-.74   8     0.23   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 62 112 VS3+.77   13     0.41   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 66 110 VS3+.80   11     0.34   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 76 100 VS2-.97   16     0.56   U-BEND SUPPORT WEAR Limit In service <30% Repair 1 92 88 VS4-.85   11     0.33   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 73 75 VS3+.74   7       0.23   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 79 79 VS2-.86   7     0.23   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 79 79 VS3+.86   8       0.27   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 80 72 VS4-.83   9     0.31   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 85 69 VS4+.83   10     0.35   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 87 63 VS2+1.07   9     0.28   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 87 65 VS3+.95   12       0.4   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 89 71 VS4+1.01   8     0.26   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 97 71 VS3+.74   8       0.26   U-BEND SUPPORT WEAR Limit In service <30% Repair 3 98 56 VS4-1.06 12     0.39   U-BEND SUPPORT WEAR Limit}}

Revision as of 18:01, 14 November 2019

Cycle 15 (U1C15) - 180-Day - Steam Generator (SG) Inspection Report
ML081290185
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/23/2008
From: James Smith
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML081290185 (8)


Text

Tennessee Valley Authority, Post Office Box 2000, Sodciy-Daisy, Tennessee 37384-2000 April 23, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-327 Tennessee Valley Authority (TVA) )

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 CYCLE 15 (U1C15) - 180-DAY -

STEAM GENERATOR (SG) INSPECTION REPORT In accordance with the requirements of SQN Unit 1 Technical Specification 6.8.4.k, Steam Generator Program and Technical Specification 6.9.1.16, Steam Generator Inspection report, TVA is submitting the 180-day report that includes the results of inservice inspections performed on Unit 1 SGs during the U1C15 refueling outage.

There are no commitments contained in this letter.

Please direct questions concerning this issue to me at (423) 843-7170 or Russell R. Thompson at (423) 843-6672.

Sincerely, James D. Smith Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Prinjec on recycled paper

U.S. Nuclear Regulatory Commission Page 2 April 23, 2008 cc (Enclosure):

Mr. Thomas H. Boyce, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739

Tennessee Valley Authority Sequoyah Nuclear Plant Unit 1 Cycle 15 Refueling Outage October 2007 180 Day Steam Generator Inspection Report Prepared by:

Verified by:

Approved by: />t*<< ^/^MMA  ?>'>lzfL Zf/of

SQN Unit 1 Cycle 15 180-Day Report In accordance with Technical Specification 6.8.4.k, Steam Generator Program and Technical Specification 6.9.1.16, Steam Generator Tube Inspection Report, this report documents the results of the Unit 1 Cycle 15 (U1C15) steam generator (SG) tube inservice inspection. The following list is the required scope of the 180-day report.

1. The scope of inspections performed on each SG.

EDDY CURRENT EXAM TYPE (Exams) RSG 1 RSG 2 RSG 3 RSG 4 Total Full Length Bobbin (.610 coil) 2477 2481 2479 2480 9917 Full Length Bobbin (.590 coil) 42 42 42 42 168 Partial Length Bobbin (.570 coil HTE-VS3) 123 122 123 123 491 Expansion Full Length Bobbin (.610 coil) 479 286 116 0 881 Predetermined Diagnostic Plus Point 2 3 29 1 35 Diagnostic/PID Plus Point 0 1 1 1 3

_____ _____ _____ _____ _____

______________________ _ _ _ _ _

Total Exams Completed 3123 2935 2790 2647 11495 Total Tubes Examined 3121 2933 2775 2645 11474 In accordance with the U1C15 Degradation Assessment, expansion sample examinations were performed in SGs 1, 2, and 3. No expansion sample was required in SG 4.

2. Active Degradation Mechanisms found.

INDICATIONS (Tubes) RSG 1 RSG 2 RSG 3 RSG 4 Total U-Bend Support Wear 32 2 11 2 47

_____ _____ _____ _____ _____

______________________ _ _ _ _ _

Total 32 2 11 2 47

3. Nondestructive examination technique utilized for each degradation mechanism.

Bobbin coil examinations were utilized for the detection of U-bend Support Wear.

4. Location, orientation (linear), and measured sizes (if available) of service induced indications.

Refer to Table 1

SQN Unit 1 Cycle 15 180-Day Report

5. Number of tubes plugged during the inspection outage for each active degradation mechanism.

PLUGGING STATUS RSG 1 RSG 2 RSG 3 RSG 4 TOTAL Previously Plugged Tubes 14 6 6 5 31 Tubes Plugged by Damage Mechanism U-Bend Support Wear 0 0 0 0 0 Total Plugged Cycle 15 0 0 0 0 0 Total Tubes Plugged 14 6 6 5 31 Plugged Tube Percentage 0.28% 0.12% 0.12% 0.10% 0.16%

6. Total number and percentage of tubes plugged to date.

Refer to the response to Number 5 above. The U-bend Support Wear indications were tapered along the tube axially.

7. The results of condition monitoring, including the results of tubes pulls and in-situ testing.

No tube pulls or in-situ pressure tests were performed.

U-BEND SUPPORT WEAR Structural Integrity The SQN U1C15 degradation assessment predicted, based on past indications and growth rate data, that 25 tubes could be preventively plugged. A total of 51 indications in 47 tubes were detected. None exceeded the plugging limit of 40 percent. The U-bend Support Wear was assumed to have grown from 0 percent through wall over the last 2 fuel cycles. Using these growth rates, a repair limit of 30 percent was calculated which would ensure that a safety factor of 3 would be maintained (with a 95 percent probability) until the next planned inspection during the U1C18 refueling outage. Condition monitoring assumed the axial length of the U-bend Support Wear indication to be the width of the U-bend Support (i.e., 2 inches).

All indications were a fraction of this length. The limiting indications were 16 percent maximum depth. The limiting tubes were in SG1, Row 76, Col 100 at VS2-0.97, Row 85, Col 67 at VS4+0.91, and Row 87, Col 73 at VS2+1.28. The EPRI, Steam Generator Degradation Specific Management Flaw Handbook, Section 5.3.3, Axial Thinning with Limited Circumferential Extent, equations were utilized to calculate the burst pressure. The calculated 95th percentile lower limit burst pressure was 6958 psig (3P is 4114 psig). The largest amplitude U-bend Support Wear indication was 0.58 volts, and therefore did not exceed the in-situ pressure testing leakage screening criteria of 7.9 volts. All U-bend Support Wear indications met condition monitoring performance criteria. Zero indications exceeded the 40 percent plugging limit and zero indications exceeded the 30 percent repair limit.

SQN Unit 1 Cycle 15 180-Day Report Leakage Integrity During the previous two fuel cycles, the Unit 1 operational primary to secondary leakage was below detection. The majority of the indications detected during U1C15 were less than 0.5 volts which in accordance with EPRI Steam Generator In-Situ Pressure Test Guidelines Revision 2 (TR-1007904), dated August 2003, Section B.3.4 is a quick screen for structural and leakage integrity, and therefore provides a 95 percent probability that none of the indications would leak should a postulated main steam line break have occurred. The greatest through wall was 16 percent.

The associated 95th percentile lower limit burst pressure was 6958 psig. The equations utilized for burst pressure determine the ligament tearing pressure or the pressure at which a partial through-wall indication goes through-wall (i.e., pop-through). If an indication has a 95 percent probability of not going through wall at 6958 psig, then it should not go through wall at the Main Steam Line Break pressure of 2405 psig. This provides additional confidence that no leakage would occur should a postulated main steam line break occur.

8. The effective plugging percentage of all plugging in each SG.

Refer to the response to Number 5 above.

SQN Unit 1 Cycle 15 180 Day Report Table 1 List of Indications The indications below were characterized as U-bend Support Wear. They were detected by bobbin coil. The associated maximum depth and voltage are included. The plugging limit at SQN Unit 1 is 40 percent through wall (TW).

SG ROW COL LOCATION %TW VOLTS CHARACTERIZATION RESOLUTION In service <30% Repair 1 68 76 VS2-.26 7 0.21 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 75 73 VS3+.80 9 0.28 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 78 78 VS2+.91 8 0.23 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 83 77 VS2+.91 10 0.32 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 87 73 VS2+1.28 16 0.58 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 87 73 VS3+1.00 15 0.51 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 87 75 VS2+1.14 13 0.4 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 87 81 VS4-1.11 15 0.53 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 88 70 VS4-1.11 13 0.39 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 90 70 VS4-1.00 13 0.37 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 92 70 VS2-.91 9 0.24 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 92 70 VS4+1.00 15 0.45 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 95 77 VS4-1.11 9 0.27 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 96 76 VS3+1.28 11 0.35 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 55 115 VS3-.91 15 0.47 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 61 85 VS2-1.09 8 0.21 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 67 87 VS3-.92 6 0.19 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 76 90 VS2+.86 9 0.26 U-BEND SUPPORT WEAR Limit In service <30% Repair 4 68 64 VS3-.83 10 0.37 U-BEND SUPPORT WEAR Limit In service <30% Repair 4 97 55 VS4-.83 8 0.29 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 69 59 VS3+.77 10 0.31 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 70 66 VS4-1.03 15 0.53 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 74 48 VS3-.88 6 0.17 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 83 45 VS4-.91 6 0.15 U-BEND SUPPORT WEAR Limit In service <30% Repair 2 20 80 VS3-.06 14 0.45 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 83 49 VS2+.77 7 0.2 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 84 64 VS4+1.03 11 0.31 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 85 65 VS4+.80 11 0.33 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 85 67 VS4+.91 16 0.54 U-BEND SUPPORT WEAR Limit 1 88 52 VS4-.91 8 0.22 U-BEND SUPPORT WEAR In service <30% Repair 1

SQN Unit 1 Cycle 15 180 Day Report Table 1 List of Indications SG ROW COL LOCATION %TW VOLTS CHARACTERIZATION RESOLUTION Limit In service <30% Repair 1 92 52 VS3+.83 6 0.17 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 92 68 VS4+.62 14 0.41 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 93 65 VS2+.85 9 0.25 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 95 63 VS3-.63 13 0.42 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 95 63 VS4-1.14 11 0.33 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 98 66 VS3+.82 8 0.24 U-BEND SUPPORT WEAR Limit In service <30% Repair 2 92 42 VS2-.74 8 0.23 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 62 112 VS3+.77 13 0.41 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 66 110 VS3+.80 11 0.34 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 76 100 VS2-.97 16 0.56 U-BEND SUPPORT WEAR Limit In service <30% Repair 1 92 88 VS4-.85 11 0.33 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 73 75 VS3+.74 7 0.23 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 79 79 VS2-.86 7 0.23 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 79 79 VS3+.86 8 0.27 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 80 72 VS4-.83 9 0.31 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 85 69 VS4+.83 10 0.35 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 87 63 VS2+1.07 9 0.28 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 87 65 VS3+.95 12 0.4 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 89 71 VS4+1.01 8 0.26 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 97 71 VS3+.74 8 0.26 U-BEND SUPPORT WEAR Limit In service <30% Repair 3 98 56 VS4-1.06 12 0.39 U-BEND SUPPORT WEAR Limit