ML081830460: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 9, 2008  
{{#Wiki_filter:July 9, 2008 Mr. John T. Carlin Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
 
Mr. John T. Carlin Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC  
 
1503 Lake Road Ontario, NY 14519  


==SUBJECT:==
==SUBJECT:==
R. E. GINNA NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RE: BULLETIN 2007-01 "SECURITY OFFICER ATTENTIVENESS" (TAC NO. MD7603)  
R. E. GINNA NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RE: BULLETIN 2007-01 SECURITY OFFICER ATTENTIVENESS (TAC NO. MD7603)


==Dear Mr. Carlin:==
==Dear Mr. Carlin:==


By letter dated February 11, 2008, the R.E. Ginna Nuclear Power Plant, Inc. (the licensee) submitted the required written response to Nuclear Regulatory Commission (NRC)
By letter dated February 11, 2008, the R.E. Ginna Nuclear Power Plant, Inc. (the licensee) submitted the required written response to Nuclear Regulatory Commission (NRC)
Bulletin 2007-01 "Security Officer Attentiveness" for the R.E. Ginna Nuclear Power Plant. The response was submitted to the NRC in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) and 10 CFR 70.22(d).  
Bulletin 2007-01 Security Officer Attentiveness for the R.E. Ginna Nuclear Power Plant. The response was submitted to the NRC in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) and 10 CFR 70.22(d).
 
The NRC staff has reviewed your submittal and has determined that additional information is needed to complete the final staff assessment of the licensee response. Bulletin 2007-01 requested licensees to provide information regarding administrative and managerial programs and controls established to prevent, identify and correct security personnel inattentiveness, complicity, and failures to implement the behavioral observation program by individuals among licensee security personnel including security contractors and subcontractors. The staff will use the additional information received to inform the Commission and to determine if further regulatory action is warranted or if additional assessment of licensee program implementation is needed.
The NRC staff has reviewed your submittal and has determined that additional information is needed to complete the final staff assessment of the licensee response. Bulletin 2007-01 requested licensees to provide information regarding administrative and managerial programs and controls established to prevent, identify and correct security personnel inattentiveness, complicity, and failures to implement the behavioral observation program by individuals among licensee security personnel including security contra ctors and subcontractors. The staff will use the additional information received to inform the Commission and to determine if further regulatory action is warranted or if additional assessment of licensee program implementation is needed.  
The specific information requested is addressed in the enclosure to this letter. Responses are requested within 35 days of the issuance of this letter. Before submitting responses to the NRC, licensees must evaluate them for proprietary, sensitive, safeguards, or classified information and mark such information appropriately.
 
The specific information requested is addressed in the enclosure to this letter. Responses are requested within 35 days of the issuance of this letter.
Before submitting responses to the NRC, licensees must evaluate them for proprietary, sensitive, safeguards, or classified information and mark such information appropriately.  
 
If you have any questions, please contact me at 301-415-1364.
If you have any questions, please contact me at 301-415-1364.
Sincerely,       /RA/ Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
Sincerely,
 
                                                /RA/
Docket No. 50-244  
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244


==Enclosure:==
==Enclosure:==


Request for Additional Information  
Request for Additional Information cc w/encl: See next page


cc w/encl:  See next page July 9, 2008 Mr. John T. Carlin Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC  
July 9, 2008 Mr. John T. Carlin Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
 
1503 Lake Road Ontario, NY 14519  


==SUBJECT:==
==SUBJECT:==
R. E. GINNA NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RE: BULLETIN 2007-01 "SECURITY OFFICER ATTENTIVENESS" (TAC NO. MD7603)  
R. E. GINNA NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RE: BULLETIN 2007-01 SECURITY OFFICER ATTENTIVENESS (TAC NO. MD7603)


==Dear Mr. Carlin:==
==Dear Mr. Carlin:==


By letter dated February 11, 2008, the R.E. Ginna Nuclear Power Plant, Inc. (the licensee) submitted the required written response to Nuclear Regulatory Commission (NRC)
By letter dated February 11, 2008, the R.E. Ginna Nuclear Power Plant, Inc. (the licensee) submitted the required written response to Nuclear Regulatory Commission (NRC)
Bulletin 2007-01 "Security Officer Attentiveness" for the R.E. Ginna Nuclear Power Plant. The response was submitted to the NRC in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) and 10 CFR 70.22(d).  
Bulletin 2007-01 Security Officer Attentiveness for the R.E. Ginna Nuclear Power Plant. The response was submitted to the NRC in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) and 10 CFR 70.22(d).
 
The NRC staff has reviewed your submittal and has determined that additional information is needed to complete the final staff assessment of the licensee response. Bulletin 2007-01 requested licensees to provide information regarding administrative and managerial programs and controls established to prevent, identify and correct security personnel inattentiveness, complicity, and failures to implement the behavioral observation program by individuals among licensee security personnel including security contractors and subcontractors. The staff will use the additional information received to inform the Commission and to determine if further regulatory action is warranted or if additional assessment of licensee program implementation is needed.
The NRC staff has reviewed your submittal and has determined that additional information is needed to complete the final staff assessment of the licensee response. Bulletin 2007-01 requested licensees to provide information regarding administrative and managerial programs and controls established to prevent, identify and correct security personnel inattentiveness, complicity, and failures to implement the behavioral observation program by individuals among licensee security personnel including security contra ctors and subcontractors. The staff will use the additional information received to inform the Commission and to determine if further regulatory action is warranted or if additional assessment of licensee program implementation is needed.  
The specific information requested is addressed in the enclosure to this letter. Responses are requested within 35 days of the issuance of this letter. Before submitting responses to the NRC, licensees must evaluate them for proprietary, sensitive, safeguards, or classified information and mark such information appropriately.
 
The specific information requested is addressed in the enclosure to this letter. Responses are requested within 35 days of the issuance of this letter.
Before submitting responses to the NRC, licensees must evaluate them for proprietary, sensitive, safeguards, or classified information and mark such information appropriately.  
 
If you have any questions, please contact me at 301-415-1364.
If you have any questions, please contact me at 301-415-1364.
Sincerely,       /RA/ Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244  
Sincerely,
                                                /RA/
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244


==Enclosure:==
==Enclosure:==


Request for Additional Information cc w/encl: See next page DISTRIBUTION:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC   LPLI-1 r/f RidsNrrDorlLpi-1 RidsNrrLASLittle LRegner, NRR MBanic, NRR/DPR FPeduzzi, NSIR RCorreia, NSIR RidsNrrPMDPickett RidsOgcMailCenter RidsAcrsAcnwMailCenter GDentel, R1  
PUBLIC                 LPLI-1 r/f             RidsNrrDorlLpi-1       RidsNrrLASLittle LRegner, NRR           MBanic, NRR/DPR         FPeduzzi, NSIR         RCorreia, NSIR RidsNrrPMDPickett       RidsOgcMailCenter       RidsAcrsAcnwMailCenter GDentel, R1 ADAMS Accession Number: ML08 OFFICE     LPL/PM           LPL/LA         LPL/BC NAME       DPickett         SLittle       MKowal DATE       07/ 9 / 08       07/ 8 / 08     07/9/ 08 OFFICIAL RECORD COPY
 
ADAMS Accession Number: ML08 OFFICE LPL/PM   LPL/LA LPL/BC NAME DPickett SLittle MKowal DATE 07/ 9 / 08 07/ 8 / 08 07/9/ 08 OFFICIAL RECORD COPY
 
R.E. Ginna Nuclear Power Plant
 
cc:
 
Mr. Michael J. Wallace, Vice-Chairman Constellation Energy 100 Constellation Way, Suite 1800P Baltimore, MD 21202
 
Mr. Henry B. Barron, President, CEO &
Chief Nuclear Officer Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C Baltimore, MD  21202
 
Kenneth Kolaczyk, Sr. Resident Inspector R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission


1503 Lake Road Ontario, NY  14519
R.E. Ginna Nuclear Power Plant cc:
 
Mr. Michael J. Wallace, Vice-Chairman    Mr. Charles Donaldson, Esquire Constellation Energy                     Assistant Attorney General 100 Constellation Way, Suite 1800P      New York Department of Law Baltimore, MD 21202                      120 Broadway New York, NY 10271 Mr. Henry B. Barron, President, CEO &
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA  19406
Chief Nuclear Officer                    Mr. George Bastedo, Director Constellation Energy Nuclear Group, LLC  Wayne County Emergency Management 100 Constellation Way, Suite 200C        Office Baltimore, MD 21202                      Wayne County Emergency Operations Center Kenneth Kolaczyk, Sr. Resident Inspector 7336 Route 31 R.E. Ginna Nuclear Power Plant          Lyons, NY 14489 U.S. Nuclear Regulatory Commission 1503 Lake Road                          Ms. Mary Louise Meisenzahl Ontario, NY 14519                        Administrator, Monroe County Office of Emergency Preparedness Regional Administrator, Region I        1190 Scottsville Road, Suite 200 U.S. Nuclear Regulatory Commission      Rochester, NY 14624 475 Allendale Road King of Prussia, PA 19406                Mr. Paul Eddy New York State Department of Mr. John P. Spath                        Public Service New York State Energy, Research,        3 Empire State Plaza, 10th Floor and Development Authority              Albany, NY 12223 17 Columbia Circle Albany, NY 12203-6399                    Mr. David F. Wilson Director, Licensing Mr. Paul Tonko                          R.E. Ginna Nuclear Power Plant President and CEO                        1503 Lake Road New York State Energy, Research, and    Ontario, NY 14519 Development Authority 17 Columbia Circle                      Mr. Gary L. Detter Albany, NY 12203-6399                    Manager - Nuclear Safety and Security Constellation Energy Nuclear Group, LLC Mr. Carey W. Fleming, Esquire            100 Constellation Way, Suite 200C Senior Counsel - Nuclear Generation      Baltimore, MD 21202 Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 1700P Baltimore, MD 21202
 
Mr. John P. Spath New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY  12203-6399
 
Mr. Paul Tonko President and CEO New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY  12203-6399
 
Mr. Carey W. Fleming, Esquire Senior Counsel - Nuclear Generation Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 1700P Baltimore, MD 21202
 
Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271  
 
Mr. George Bastedo, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489  
 
Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 1190 Scottsville Road, Suite 200 Rochester, NY 14624  
 
Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223  
 
Mr. David F. Wilson Director, Licensing R.E. Ginna Nuclear Power Plant  
 
1503 Lake Road Ontario, NY 14519  
 
Mr. Gary L. Detter Manager - Nuclear Safety and Security Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C Baltimore, MD 21202  
 
REQUEST FOR ADDITIONAL INFORMATION REVIEW OF BULLETIN RESPONSES SUBMITTED IN RESPONSE TO NRC BULLETIN 2007-01 R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244
 
In responding to each of the following questions, the licensee should provide information that addresses measures that are currently in place, and any additional planned actions with expected completion dates:


REQUEST FOR ADDITIONAL INFORMATION REVIEW OF BULLETIN RESPONSES SUBMITTED IN RESPONSE TO NRC BULLETIN 2007-01 R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 In responding to each of the following questions, the licensee should provide information that addresses measures that are currently in place, and any additional planned actions with expected completion dates:
The NRC staff reviewed your response to Question 1a and requests the following additional information:
The NRC staff reviewed your response to Question 1a and requests the following additional information:
: 1. Describe the process for security post rotations including the rotation process for isolated positions.  
: 1. Describe the process for security post rotations including the rotation process for isolated positions.
 
Include the following information in your response:
Include the following information in your response:  
 
A description of the security post rotation process including, but not limited to: (1) a discussion of the types of posts a typical security officer would rotate through during a normal shift; (2) a discussion on whether the type of activity (i.e. roving or foot patrol or stationary in a Bullet Resisting Enclosure [BRE]) performed at each individual post is taken into consideration when a security officer moves from post-to-post throughout the shift; and, (3) the length of time at each post. When responding, particular emphasis should be placed on whether the licensee takes into consideration the activities associated with each post assignment when formulating their post rotation schedules for each shift (i.e., rotating from foot patrol to BRE to Vital Area patrol or rotating from BRE to ready room to BRE, etc.).
A description of the security post rotation process including, but not limited to: (1) a discussion of the types of posts a typical security officer would rotate through during a normal shift; (2) a discussion on whether the type of activity (i.e. roving or foot patrol or stationary in a Bullet Resisting Enclosure [BRE]) performed at each individual post is taken into consideration when a security officer moves from post-to-post throughout the shift; and, (3) the length of time at each post. When responding, particular emphasis should be placed on whether the licensee takes into consideration the activities associated with each post assignment when formulating their post rotation schedules for each shift (i.e., rotating from foot patrol to BRE to Vital Area patrol or rotating from BRE to ready room to BRE, etc.).
The NRC staff reviewed your response to Question 1b. and requests the following additional information:
The NRC staff reviewed your response to Question 1b. and requests the following additional information:
: 2. Describe any licensee processes or programs that are in place to identify problems in climate controlled security areas. What methods are used to track, inspect, and ensure timely repairs are completed?
: 2. Describe any licensee processes or programs that are in place to identify problems in climate controlled security areas. What methods are used to track, inspect, and ensure timely repairs are completed?
Include the following information in your response:  
Include the following information in your response:
A description of how the security areas are maintained including, but not limited to: (1) a discussion of the maintenance and/or preventive maintenance process and programs in place for these security areas including an overview and brief discussion on routine inspection schedules by maintenance personnel; (2) a discussion on the process a security officer can follow to report concerns with the up-keep and maintenance of his or her post; and, (3) a


A description of how the security areas are maintained including, but not limited to: (1) a discussion of the maintenance and/or preventive maintenance process and programs in place for these security areas including an overview and brief discussion on routine inspection schedules by maintenance personnel; (2) a discussion on the process a security officer can follow to report concerns with the up-keep and maintenance of his or her post; and, (3) a discussion on the timeliness of repairs and any follow-up actions taken by the licensee to ensure the repairs are completed and resolved adequately.
discussion on the timeliness of repairs and any follow-up actions taken by the licensee to ensure the repairs are completed and resolved adequately.
The NRC staff reviewed your response to Question 1 and requests the following additional information:
The NRC staff reviewed your response to Question 1 and requests the following additional information:
: 3. Are security personnel provided opportunities to participate in any personnel surveys regarding the work environment? If so, what is the frequency of the surveys, the average participation rate of security personnel as compared to the general site average, and the process for providing feedback and addressing the results from the survey?
: 3. Are security personnel provided opportunities to participate in any personnel surveys regarding the work environment? If so, what is the frequency of the surveys, the average participation rate of security personnel as compared to the general site average, and the process for providing feedback and addressing the results from the survey?
: 4. How is the licensee's policy regarding site employee attentiveness and/or inattentiveness communicated to personnel, both licensee and contractor, and at what frequency?
: 4. How is the licensees policy regarding site employee attentiveness and/or inattentiveness communicated to personnel, both licensee and contractor, and at what frequency?
 
The NRC staff reviewed your response to Question 2 and requests the following additional information:
The NRC staff reviewed your response to Question 2 and requests the following additional information:
: 5. Describe the process for employees to file reports through the site corrective action program (CAP). Can employees file CAP reports without prior supervisory/management review or approval?  
: 5. Describe the process for employees to file reports through the site corrective action program (CAP). Can employees file CAP reports without prior supervisory/management review or approval?
 
Include the following information in your response:
Include the following information in your response:  
 
Describe the process for employees to file reports through the CAP. Discuss the supervisor/management review and/or approval process including, but not limited to: (1) does a supervisor/manager have the authority to reject a report before entering it into the corrective action program without additional management review and approval; and, (2) does a supervisor/manager have the authority to modify the report before such report has been entered into the CAP.
Describe the process for employees to file reports through the CAP. Discuss the supervisor/management review and/or approval process including, but not limited to: (1) does a supervisor/manager have the authority to reject a report before entering it into the corrective action program without additional management review and approval; and, (2) does a supervisor/manager have the authority to modify the report before such report has been entered into the CAP.
: 6. Can the employees view the status and disposition of reports directly, or must this information be requested? If yes, please describe the process.
: 6. Can the employees view the status and disposition of reports directly, or must this information be requested? If yes, please describe the process.
The NRC staff reviewed your response to Question 4 and requests the following additional information:
The NRC staff reviewed your response to Question 4 and requests the following additional information:
: 7. Are formal assessments of the security program conducted by organizations/individuals that do not have direct responsibility for the security program? If so, provide information on the process, including, but not limited to, the organizations and levels of management involved, the frequency of such activities, and any tracking of how findings are resolved.
: 7. Are formal assessments of the security program conducted by organizations/individuals that do not have direct responsibility for the security program? If so, provide information on the process, including, but not limited to, the organizations and levels of management involved, the frequency of such activities, and any tracking of how findings are resolved.
: 8. How are self-assessment findings and relevant operating experience information communicated to the security force? Describe those processes including, but not limited to, information such as the criteria by which such information is identified, the frequency of such communications, the responsible department(s) or position(s) for such communications, and the recipients of such communications.  
: 8. How are self-assessment findings and relevant operating experience information communicated to the security force? Describe those processes including, but not limited to, information such as the criteria by which such information is identified, the frequency of such communications, the responsible department(s) or position(s) for such communications, and the recipients of such communications.
 
Include the following information in your response: 
 
Describe the process including, but not limited to: (1) formal or informal communication methods;
 
(2) procedures that ensure availability of the policy to staff; and, (3) trai ning opportunities for staff to read and understand the policy. 


Include the following information in your response:
Describe the process including, but not limited to: (1) formal or informal communication methods; (2) procedures that ensure availability of the policy to staff; and, (3) training opportunities for staff to read and understand the policy.
The NRC staff reviewed your response to Question 5 and requests the following additional information:
The NRC staff reviewed your response to Question 5 and requests the following additional information:
: 9. How do you assess the effectiveness of your oversight of contractors and subcontractors?  
: 9. How do you assess the effectiveness of your oversight of contractors and subcontractors?
 
Include the following information in your response:
Include the following information in your response:  
Describe the licensees program for oversight of contractors and subcontractors including, but not limited to: (1) a brief overview and description of licensees procedures that describe the oversight process; (2) include a detailed list (bulleted is preferred) of assigned duties for the licensee supervisor(s) or manager(s) responsible for overseeing contractors and subcontractors at the site; (3) include a detailed list (bulleted is preferred) of the assigned duties for the contractor and subcontractor supervisor(s) or manager(s) responsible for overseeing the contractor and subcontractor staff at the site; and, (4) a brief discussion of the corporate (management) involvement with the oversight of contractors and subcontractors at the site.}}
 
Describe the licensees' program for oversight of contractors and subcontractors including, but not limited to: (1) a brief overview and description of licensee's procedures that describe the oversight process; (2) include a detailed list (bulleted is preferred) of assigned duties for the licensee supervisor(s) or manager(s) responsible for overseeing contractors and subcontractors at the site; (3) include a detailed list (bulleted is preferred) of the assigned duties for the contractor and subcontractor supervisor(s) or manager(s) responsible for overseeing the contractor and subcontractor staff at the site; and, (4) a brief discussion of the corporate (management) involvement with the oversight of contractors and subcontractors at the site.}}

Latest revision as of 16:18, 14 November 2019

R. E. Ginna Nuclear Power Plant-Request for Additional Information Bulletin 2007-01 Security Officer Attentiveness.
ML081830460
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/09/2008
From: Pickett D
NRC/NRR/ADRO/DORL/LPLI-1
To: John Carlin
Ginna
tsw1
References
TAC MD7603
Download: ML081830460 (6)


Text

July 9, 2008 Mr. John T. Carlin Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RE: BULLETIN 2007-01 SECURITY OFFICER ATTENTIVENESS (TAC NO. MD7603)

Dear Mr. Carlin:

By letter dated February 11, 2008, the R.E. Ginna Nuclear Power Plant, Inc. (the licensee) submitted the required written response to Nuclear Regulatory Commission (NRC)

Bulletin 2007-01 Security Officer Attentiveness for the R.E. Ginna Nuclear Power Plant. The response was submitted to the NRC in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) and 10 CFR 70.22(d).

The NRC staff has reviewed your submittal and has determined that additional information is needed to complete the final staff assessment of the licensee response. Bulletin 2007-01 requested licensees to provide information regarding administrative and managerial programs and controls established to prevent, identify and correct security personnel inattentiveness, complicity, and failures to implement the behavioral observation program by individuals among licensee security personnel including security contractors and subcontractors. The staff will use the additional information received to inform the Commission and to determine if further regulatory action is warranted or if additional assessment of licensee program implementation is needed.

The specific information requested is addressed in the enclosure to this letter. Responses are requested within 35 days of the issuance of this letter. Before submitting responses to the NRC, licensees must evaluate them for proprietary, sensitive, safeguards, or classified information and mark such information appropriately.

If you have any questions, please contact me at 301-415-1364.

Sincerely,

/RA/

Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244

Enclosure:

Request for Additional Information cc w/encl: See next page

July 9, 2008 Mr. John T. Carlin Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RE: BULLETIN 2007-01 SECURITY OFFICER ATTENTIVENESS (TAC NO. MD7603)

Dear Mr. Carlin:

By letter dated February 11, 2008, the R.E. Ginna Nuclear Power Plant, Inc. (the licensee) submitted the required written response to Nuclear Regulatory Commission (NRC)

Bulletin 2007-01 Security Officer Attentiveness for the R.E. Ginna Nuclear Power Plant. The response was submitted to the NRC in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) and 10 CFR 70.22(d).

The NRC staff has reviewed your submittal and has determined that additional information is needed to complete the final staff assessment of the licensee response. Bulletin 2007-01 requested licensees to provide information regarding administrative and managerial programs and controls established to prevent, identify and correct security personnel inattentiveness, complicity, and failures to implement the behavioral observation program by individuals among licensee security personnel including security contractors and subcontractors. The staff will use the additional information received to inform the Commission and to determine if further regulatory action is warranted or if additional assessment of licensee program implementation is needed.

The specific information requested is addressed in the enclosure to this letter. Responses are requested within 35 days of the issuance of this letter. Before submitting responses to the NRC, licensees must evaluate them for proprietary, sensitive, safeguards, or classified information and mark such information appropriately.

If you have any questions, please contact me at 301-415-1364.

Sincerely,

/RA/

Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLI-1 r/f RidsNrrDorlLpi-1 RidsNrrLASLittle LRegner, NRR MBanic, NRR/DPR FPeduzzi, NSIR RCorreia, NSIR RidsNrrPMDPickett RidsOgcMailCenter RidsAcrsAcnwMailCenter GDentel, R1 ADAMS Accession Number: ML08 OFFICE LPL/PM LPL/LA LPL/BC NAME DPickett SLittle MKowal DATE 07/ 9 / 08 07/ 8 / 08 07/9/ 08 OFFICIAL RECORD COPY

R.E. Ginna Nuclear Power Plant cc:

Mr. Michael J. Wallace, Vice-Chairman Mr. Charles Donaldson, Esquire Constellation Energy Assistant Attorney General 100 Constellation Way, Suite 1800P New York Department of Law Baltimore, MD 21202 120 Broadway New York, NY 10271 Mr. Henry B. Barron, President, CEO &

Chief Nuclear Officer Mr. George Bastedo, Director Constellation Energy Nuclear Group, LLC Wayne County Emergency Management 100 Constellation Way, Suite 200C Office Baltimore, MD 21202 Wayne County Emergency Operations Center Kenneth Kolaczyk, Sr. Resident Inspector 7336 Route 31 R.E. Ginna Nuclear Power Plant Lyons, NY 14489 U.S. Nuclear Regulatory Commission 1503 Lake Road Ms. Mary Louise Meisenzahl Ontario, NY 14519 Administrator, Monroe County Office of Emergency Preparedness Regional Administrator, Region I 1190 Scottsville Road, Suite 200 U.S. Nuclear Regulatory Commission Rochester, NY 14624 475 Allendale Road King of Prussia, PA 19406 Mr. Paul Eddy New York State Department of Mr. John P. Spath Public Service New York State Energy, Research, 3 Empire State Plaza, 10th Floor and Development Authority Albany, NY 12223 17 Columbia Circle Albany, NY 12203-6399 Mr. David F. Wilson Director, Licensing Mr. Paul Tonko R.E. Ginna Nuclear Power Plant President and CEO 1503 Lake Road New York State Energy, Research, and Ontario, NY 14519 Development Authority 17 Columbia Circle Mr. Gary L. Detter Albany, NY 12203-6399 Manager - Nuclear Safety and Security Constellation Energy Nuclear Group, LLC Mr. Carey W. Fleming, Esquire 100 Constellation Way, Suite 200C Senior Counsel - Nuclear Generation Baltimore, MD 21202 Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 1700P Baltimore, MD 21202

REQUEST FOR ADDITIONAL INFORMATION REVIEW OF BULLETIN RESPONSES SUBMITTED IN RESPONSE TO NRC BULLETIN 2007-01 R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 In responding to each of the following questions, the licensee should provide information that addresses measures that are currently in place, and any additional planned actions with expected completion dates:

The NRC staff reviewed your response to Question 1a and requests the following additional information:

1. Describe the process for security post rotations including the rotation process for isolated positions.

Include the following information in your response:

A description of the security post rotation process including, but not limited to: (1) a discussion of the types of posts a typical security officer would rotate through during a normal shift; (2) a discussion on whether the type of activity (i.e. roving or foot patrol or stationary in a Bullet Resisting Enclosure [BRE]) performed at each individual post is taken into consideration when a security officer moves from post-to-post throughout the shift; and, (3) the length of time at each post. When responding, particular emphasis should be placed on whether the licensee takes into consideration the activities associated with each post assignment when formulating their post rotation schedules for each shift (i.e., rotating from foot patrol to BRE to Vital Area patrol or rotating from BRE to ready room to BRE, etc.).

The NRC staff reviewed your response to Question 1b. and requests the following additional information:

2. Describe any licensee processes or programs that are in place to identify problems in climate controlled security areas. What methods are used to track, inspect, and ensure timely repairs are completed?

Include the following information in your response:

A description of how the security areas are maintained including, but not limited to: (1) a discussion of the maintenance and/or preventive maintenance process and programs in place for these security areas including an overview and brief discussion on routine inspection schedules by maintenance personnel; (2) a discussion on the process a security officer can follow to report concerns with the up-keep and maintenance of his or her post; and, (3) a

discussion on the timeliness of repairs and any follow-up actions taken by the licensee to ensure the repairs are completed and resolved adequately.

The NRC staff reviewed your response to Question 1 and requests the following additional information:

3. Are security personnel provided opportunities to participate in any personnel surveys regarding the work environment? If so, what is the frequency of the surveys, the average participation rate of security personnel as compared to the general site average, and the process for providing feedback and addressing the results from the survey?
4. How is the licensees policy regarding site employee attentiveness and/or inattentiveness communicated to personnel, both licensee and contractor, and at what frequency?

The NRC staff reviewed your response to Question 2 and requests the following additional information:

5. Describe the process for employees to file reports through the site corrective action program (CAP). Can employees file CAP reports without prior supervisory/management review or approval?

Include the following information in your response:

Describe the process for employees to file reports through the CAP. Discuss the supervisor/management review and/or approval process including, but not limited to: (1) does a supervisor/manager have the authority to reject a report before entering it into the corrective action program without additional management review and approval; and, (2) does a supervisor/manager have the authority to modify the report before such report has been entered into the CAP.

6. Can the employees view the status and disposition of reports directly, or must this information be requested? If yes, please describe the process.

The NRC staff reviewed your response to Question 4 and requests the following additional information:

7. Are formal assessments of the security program conducted by organizations/individuals that do not have direct responsibility for the security program? If so, provide information on the process, including, but not limited to, the organizations and levels of management involved, the frequency of such activities, and any tracking of how findings are resolved.
8. How are self-assessment findings and relevant operating experience information communicated to the security force? Describe those processes including, but not limited to, information such as the criteria by which such information is identified, the frequency of such communications, the responsible department(s) or position(s) for such communications, and the recipients of such communications.

Include the following information in your response:

Describe the process including, but not limited to: (1) formal or informal communication methods; (2) procedures that ensure availability of the policy to staff; and, (3) training opportunities for staff to read and understand the policy.

The NRC staff reviewed your response to Question 5 and requests the following additional information:

9. How do you assess the effectiveness of your oversight of contractors and subcontractors?

Include the following information in your response:

Describe the licensees program for oversight of contractors and subcontractors including, but not limited to: (1) a brief overview and description of licensees procedures that describe the oversight process; (2) include a detailed list (bulleted is preferred) of assigned duties for the licensee supervisor(s) or manager(s) responsible for overseeing contractors and subcontractors at the site; (3) include a detailed list (bulleted is preferred) of the assigned duties for the contractor and subcontractor supervisor(s) or manager(s) responsible for overseeing the contractor and subcontractor staff at the site; and, (4) a brief discussion of the corporate (management) involvement with the oversight of contractors and subcontractors at the site.