{{#Wiki_filter: | {{#Wiki_filter:Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Place RCS HPU Subloop In Service And Reset FCV Lockout Revision: NRC 2008 Task Number: N2-202001-01001 N2-202001-01023 Approvals: | ||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
Title: Place RCS HPU Subloop In Service And Reset FCV Lockout | NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | ||
Trainer/Evaluator: | |||
NA EXAMINATION SECURITY General Supervisor | Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: | ||
NO Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Comments: | |||
Evaluator Signature: Date: | |||
NMP2 JPM #S-1 1 October 2008 | |||
Recommended Start Location: | |||
Simulator Simulator Set-up: | Simulator Simulator Set-up: | ||
: 1. Reset to IC 181 Directions to Operators: | : 1. Reset to IC 181 Directions to Operators: | ||
Line 41: | Line 40: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
: 2. During Evaluated JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | : 3. During Training JPM: | ||
* Self-verification shall be demonstrated. | |||
* No other verification shall be demonstrated. | |||
==References:== | ==References:== | ||
: 1. N2-OP-29, Rev 12, Sect. E.1.0 2. NUREG K/A 202002 A4.02 Tools and Equipment: | : 1. N2-OP-29, Rev 12, Sect. E.1.0 | ||
: 1. None | : 2. NUREG K/A 202002 A4.02 Tools and Equipment: | ||
Hydraulic Power Unit | : 1. None Task Standard: | ||
Hydraulic Power Unit A has been placed in service with Subloop 2 is in LEAD operation. FCV A motion inhibit is reset and all P602 annunciators associated with FCV A are clear. | |||
NMP2 JPM #S-1 2 October 2008 | |||
Initial Conditions: | |||
: 1. The plant is operating at rated power. 2. Recirc FCV HPU | : 1. The plant is operating at rated power. | ||
°F and the HPU is ready to be placed in service. 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting. | : 2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour ago. | ||
Initiating cue: | : 3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service. | ||
: 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting. | |||
Initiating cue: | |||
Performance Steps Standard Grade | (Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0. | ||
: 2. Obtain a copy of the reference procedure | Performance Steps Standard Grade | ||
: 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | |||
CAUTION: IF a standby HPU Subloop remains pressurized (greater than 500 psig) when removed from service and is restarted without the other subloop in operation, this could cause RECIRC FCV motion. This should be avoided. | : 2. Obtain a copy of the reference procedure N2-OP-29 obtained. Precautions & Sat/Unsat and review/utilize the correct section. limitations reviewed & section E.1.0 referenced. | ||
* IF any of the following conditions exist, isolate 2RCS*SOV65A(B), | : 3. NOTE: Reviews Note and Caution Sat/Unsat The LOOP A(B) HYDR FLUID OUTSIDE ISOL valves may be closed, to reduce flow control valve from drifting closed during an HPU/Control System failure. They can be left closed until after their HPU is restored to operation. | ||
CAUTION: | |||
IF a standby HPU Subloop remains pressurized (greater than 500 psig) when removed from service and is restarted without the other subloop in operation, this could cause RECIRC FCV motion. This should be avoided. | |||
: 4. For the HPU being started, perform the Reviews Procedure Step Sat/Unsat following: | |||
* IF any of the following conditions exist, isolate 2RCS*SOV65A(B), | |||
NMP2 JPM #S-2 3 October 2008 | |||
Performance Steps Standard Grade 2RCS*SOV66A(B), 2RCS*SOV67A(B), | |||
2RCS*SOV68A(B), for the affected HPU by taking the LOOP A(B) HYDR FLUID OUTSIDE ISOL switch to CLOSE: | |||
o Unexpected pressure (greater than 400 psig) WHILE the subloop is in standby o Associated solenoid valve 2RCS-SOV106A(B) OR 2RCS-SOV107A(B) is known to be sticking partially open OR is NOT able to be over-ridden WHILE the solenoid coils are de-energized o It is known that EITHER OPERATE OR ISOLATE coil is burned out o FUSE BLOWN indicator is lit on the Modicon I/O module inside panel 2CEC-PNL634 at any of the following: | |||
Subloop A1 - MTBA-2, west panel, left column, 2nd from top (total of 8) | |||
Subloop A2 - MTBA-10, west panel, right column, 2nd from top (total of 8) | |||
Subloop B1 - MTBB-2, east panel, left column, 2nd from top (total of 8) | |||
Subloop B2 - MTBB-10, east panel, right column,2nd from top (total of 8) | |||
Cue: Valves were previously closed. None of these conditions currently exist | Cue: Valves were previously closed. None of these conditions currently exist | ||
: 5. IF the HPU has been idle for less than 2 | : 5. IF the HPU has been idle for less than 2 hours OR controls on the HPU have NOT been repositioned since the last shutdown, perform the following: | ||
NMP2 JPM #S-2 4 October 2008 | |||
NMP2 | |||
Performance Steps Standard Grade Cue/Note: Initial Conditions state that one hour has elapsed | |||
: a. Verify open 2RCS-V2011A(B) AND Dispatches operator to verify local Sat/Unsat V2011C(D), Return Filter Isolation. valve positions. | |||
Cue: 2RCS-V2011A and V2011C are open. | Cue: 2RCS-V2011A and V2011C are open. | ||
: b. Continue at Step E.1.14. | : b. Continue at Step E.1.14. Continues to step E.1.14 Sat/Unsat | ||
: 6. At 2CEC-PNL634 (South), Rack 1 for Verifies red indicating lights are NOT lit Sat/Unsat HPU A AND Rack 2 for HPU B, NEST 5, CARD 1, (R/C/L, labeled B35-K686A(B)) verify the red indicating lights for Channel 1 and 2 are NOT lit. | |||
Continues to step E.1.14 | |||
Sat/Unsat | |||
IF lit depress the reset pushbuttons. | IF lit depress the reset pushbuttons. | ||
Cue: Red indicating lights for Channel 1 and 2 are extinguished. | Cue: Red indicating lights for Channel 1 and 2 are extinguished. | ||
: 7. Momentarily depress BOTH READY Depresses BOTH READY pushbuttons Pass/Fail pushbuttons Verify the following: | |||
: 7. Momentarily depress BOTH READY | o READY light illuminates. Verifies lights and annunciator Sat/Unsat o MAINTENANCE light extinguishes. | ||
o READY light illuminates. | o Annunciator 602103(104), | ||
o MAINTENANCE light extinguishes. | RECIRC FCV A(B) BACKUP HYDR INOPERABLE clears. | ||
o Annunciator 602103(104), RECIRC FCV A(B) BACKUP HYDR INOPERABLE clears. | : 8. Unless isolated per Step E.1.1.1 verify At P602, opens valves using LOOP A Pass/Fail the following valves open: HYDR FLUID OUTSIDE ISOL switch. | ||
Observes green closed lights o 2RCS*SOV65A(B) extinguish and the red open lights are o 2RCS*SOV66A(B) lit for the four outside isolation valves. | |||
o 2RCS*SOV67A(B) o 2RCS*SOV68A(B) | |||
Note: Not isolated per E1.1.1 NMP2 JPM #S-2 5 October 2008 | |||
o 2RCS*SOV65A(B) o 2RCS*SOV66A(B) o 2RCS*SOV67A(B) o 2RCS*SOV68A(B) | |||
Note: | |||
Performance Steps Standard Grade | |||
: 9. NOTE: Step 1.17 does not apply if I&C Reads Note Sat/Unsat is to use the Standby Unit (SBU) at 2CEC-PNL634 to reduce % SERVO ERROR to zero or have verified that the signal to the servo valve is approximately zero. | |||
Cue: If asked, I&C will NOT be using SBU to reduce % SERVO ERROR. | Cue: If asked, I&C will NOT be using SBU to reduce % SERVO ERROR. | ||
Using 2RCS-HC1603A(B), RECIRC At P602, Reduces % SERVO ERROR Pass/Fail LOOP A(B) FLOW CONTROL at to ZERO using Loop A controller 2CEC*PNL602, reduce % SERVO ERROR to zero. | |||
Using 2RCS-HC1603A(B), RECIRC LOOP A(B) FLOW CONTROL at | |||
NOTE: Failure to zero the % SERVO ERROR will result in an unplanned reactivity transient, as the FCV opens. | NOTE: Failure to zero the % SERVO ERROR will result in an unplanned reactivity transient, as the FCV opens. | ||
: 10. Decide which subloop is to control the Depresses PUMP/FAN MTR RUN Pass/Fail actuator AND depress its PUMP/FAN pushbutton for HPU A, Subloop 2 MTR RUN pushbutton. | |||
Verify the following: Verifies indications Sat/Unsat | |||
: 10. Decide which subloop is to control the | |||
Verify the following: | |||
* PUMP/FAN MTR STOP light extinguishes. | * PUMP/FAN MTR STOP light extinguishes. | ||
* PUMP/FAN MTR RUN light illuminates. | * PUMP/FAN MTR RUN light illuminates. | ||
Line 115: | Line 110: | ||
* PRESSURIZED light illuminates OR 2RCS-PI1001A(B)-1(2) locally indicates 1850-1950 psi. | * PRESSURIZED light illuminates OR 2RCS-PI1001A(B)-1(2) locally indicates 1850-1950 psi. | ||
* Annunciator 602101(102), RECIRC FCV A(B) HYDRAULICS INOPERABLE clears. | * Annunciator 602101(102), RECIRC FCV A(B) HYDRAULICS INOPERABLE clears. | ||
: 11. At 2CEC*PNL602, verify: | |||
NMP2 JPM #S-2 6 October 2008 | |||
Performance Steps Standard Grade | |||
* Annunciator 602111(112), RECIRC Verifies annunciators clear, with the Sat/Unsat FCV A(B) HYDRAULICS MAINT exception of 602105 REQD cleared. | |||
* Annunciator 602111(112), RECIRC FCV A(B) HYDRAULICS MAINT | |||
* Annunciator 602103(104), RECIRC FCV A(B) BACK UP HYDR INOPERABLE cleared. | * Annunciator 602103(104), RECIRC FCV A(B) BACK UP HYDR INOPERABLE cleared. | ||
* Annunciator 602127(128), DRYWELL HIGH PRESSURE SWITCH A(B) TEST POSITION cleared. | * Annunciator 602127(128), | ||
* Annunciator 602133(134), DRYWELL HIGH PRESSURE SYSTEM A(B) INTERLOCK cleared. | DRYWELL HIGH PRESSURE SWITCH A(B) TEST POSITION cleared. | ||
* Annunciator 602133(134), | |||
DRYWELL HIGH PRESSURE SYSTEM A(B) INTERLOCK cleared. | |||
* Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT, in alarm condition. | * Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT, in alarm condition. | ||
: 12. Depress the applicable FCV MOTION Depresses FCV MOTION INHIBIT Pass/Fail INHIBIT RESET pushbutton at RESET pushbutton 2CEC*PNL602: | |||
Verify the following: | Verify the following: Verifies light illuminated and Sat/Unsat annunciator clear | ||
* LEAD subloop OPERATIONAL light illuminated | * LEAD subloop OPERATIONAL light illuminated | ||
* Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT extinguishes. | * Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT extinguishes. | ||
: 13. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Hydraulic Power Unit A Subloop 2 is in operation and FCV A motion inhibit is reset with all annunciators associated with FCV A cleared. | |||
RECORD STOP TIME NMP2 JPM #S-2 7 October 2008 | |||
Initial Conditions: | |||
: 1. The plant is operating at rated power. | |||
: 2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour ago. | |||
: 3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service. | |||
: 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting. | |||
Initiating cue: | |||
(Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0. | |||
NMP2 JPM #S-2 8 October 2008 | |||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shifting Feedwater Pumps at Power65% power when 2 pumps are in service Revision: | |||
NRC 2008 Task Number: N2-259001-01004 Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | |||
Trainer/Evaluator: | |||
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: | |||
YES Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
NRC 2008 | Comments: | ||
NMP2 JPM #S-2 9 October 2008 | |||
NA EXAMINATION SECURITY General Supervisor | |||
NA EXAMINATION SECURITY Configuration Control | |||
Performer: | |||
Evaluator Signature: Date: | |||
NMP2 JPM #S-2 10 October 2008 | |||
Recommended Start Location: | |||
Simulator Simulator Set-up: | Simulator Simulator Set-up: | ||
: 2. Reset to IC ????-182 3. 65% Power with malfunction FW10C preset. | : 2. Reset to IC ????-182 | ||
: 3. 65% Power with malfunction FW10C preset. | |||
Directions to Operators: | Directions to Operators: | ||
Read Before Every JPM Performance: | Read Before Every JPM Performance: | ||
Line 173: | Line 163: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
* Self-verification shall be demonstrated. 3. During Training JPM: | : 2. During Evaluated JPM: | ||
* Self-verification shall be demonstrated. | |||
: 3. During Training JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | * No other verification shall be demonstrated. | ||
==References:== | ==References:== | ||
: 3. N2-OP-3, Rev 21, Sect. F.13.0 4. NUREG K/A 259001 A4.02 | : 3. N2-OP-3, Rev 21, Sect. F.13.0 | ||
: 1. None | : 4. NUREG K/A 259001 A4.02 3.7 Tools and Equipment: | ||
NMP2 | : 1. None Task Standard: | ||
NMP2 JPM #S-2 11 October 2008 | |||
C Feedwater Pump is in service and level is under control in the normal band via MANUAL controller operation. A Feedwater Pump is secured with LV10A in manual and closed. | |||
NMP2 JPM #S-2 12 October 2008 | |||
Initiating cue: | Initial Conditions: | ||
: 5. The plant is operating at 65% power. | |||
: 6. C Feedwater Pump C is ready to be placed in service. | |||
: 7. Pre-start checks are complete. | |||
Initiating cue: | |||
(Operators name), Place C Feedwater Pump in service, and rRemove A Feedwater Pump A from service and place Feedwater Pump C in service, IAW N, per N2-OP-3, Section F.13.0. | |||
Performance Steps Standard Grade | |||
: 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | |||
: 2. Obtain a copy of the reference procedure N2-OP-3 obtained. Precautions & Sat/Unsat and review/utilize the correct section. limitations reviewed & section F.13.0 referenced. | |||
: 3. NOTES: Reads notes. Obtains Key 18 Sat/Unsat | |||
: 1. All actions in this Subsection are performed at 2CEC*PNL851 and PNL603 unless otherwise noted. | |||
: 2. Shifting Feedwater Pumps will be performed at approximately 65% power by securing one pump and starting the standby. | |||
: 3. IF re-starting 2FWS-P1A (B,C) from operating temperatures (D.4.0), Electrical Maintenance should perform an inspection of windings at first opportunity. | |||
: 4. Feedwater minimum flow setpoint will be lowered to 4 Kgpm for all three Feedwater Pumps and then restored to 8 Kgpm after pump swap(s) are complete. | |||
: 5. Fourth Point Heater Drain Pumps may remain pumping forward during this evolution if NMP2 2008 JPM #S-3 13 October 2008 | |||
Performance Steps Standard Grade | Performance Steps Standard Grade feedwater heater level controllers are stable at 65% | ||
power, with the permission of the Shift Manager. | |||
: 6. Steps 13.1 AND 13.2 may be performed simultaneously. | |||
: 7. The following step requires key | |||
power, with the permission of | # 18 from the SM key locker. | ||
: 7. The following step requires key | |||
CAUTION Throughout this section if a plant casualty occurs such that Feedwater Pumps will remain on minimum flow for greater than 15 minutes, Reactor Power should be immediately reduced below 55% AND Feedwater Pump minimum flow should be returned to 8 Kgpm on all three Feedwater Pumps. | CAUTION Throughout this section if a plant casualty occurs such that Feedwater Pumps will remain on minimum flow for greater than 15 minutes, Reactor Power should be immediately reduced below 55% AND Feedwater Pump minimum flow should be returned to 8 Kgpm on all three Feedwater Pumps. | ||
: 4. Adjust ALL three Feedwater Pump | : 4. Adjust ALL three Feedwater Pump Dispatches operator to Aadjust s Pass/Fail minimum flow valve setpoints as setpoints of all 3 minimum flow valves. Sat/Unsat follows: | ||
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68A, RX FD WTR P1A RECIRC controller, to 4 Kgpm. | |||
At 2CEC-PNL827, verify in auto AND | At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68B, RX FD WTR P1B RECIRC controller, to 4 Kgpm. | ||
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68B, | At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68C, RX FD WTR P1C RECIRC controller, to 4 Kgpm. | ||
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68C, | CUE: Min flow valve setpoints for all three feedwater pumps are set at 4 Kgpm. | ||
: 5. Perform pre-start checks locally for the Reviews step Sat/Unsat associated Feedwater pump to be started ONLY per step F.13.2.1 through F.13.2.7. | |||
NOTE: Pre-Start checks are complete NMP2 2008 JPM #S-3 14 October 2008 | |||
NOTE: Pre-Start checks are complete | |||
DURING this evolution, verify that the | Performance Steps Standard Grade | ||
: 6. Using N2-OP-101D, verify Reactor Reviews step and determines power is Sat/Unsat power has been reduced 65%. at 65% | |||
NOTE: Power is at 65%. Rated MWth is 3467 and 65% power is 2253 MWth. | |||
: 7. Secure one of the two operating Feedwater Pumps 2FWS-P1A (B,C) as follows: | |||
Depress Manual (M) pushbutton on Depresses M pushbutton on 2FWS- Pass/Fail 2FWS-LV10A (B,C) controller. LV10A controller 2FWS-HIC1010A and yellow M light is lit. | |||
DURING this evolution, verify that the Verifies remaining LCV maintains level Sat/Unsat remaining level control valve 2FWS- on an on-going basis during evolution. | |||
LV10B (C,A) maintains desired water level. | |||
: 8. Slowly close 2FWS-LV10A (B,C) to the Locates Using 2FWS-HIC1010A slow Pass/Fail 2 to 4% valve position by using the slow detent close PBpushbutton and , | |||
CLOSE detent pushbutton on 2FWS- depresses until about 2-4% shown. | |||
LV10A (B,C) controller. | |||
: 9. Close 2FWS-LV10A (B,C) to the 0% Using 2FWS-HIC1010A fast detent Pass/Fail valve position by depressing the fast close pushbutton, Locates fast close CLOSE detent pushbutton on 2FWS- PB and depresses until 0% shown. | |||
LV10A (B,C) controller. | |||
: 10. Secure 2FWS-P1A (B,C), REACTOR Places FW Pump A in green flagged Pass/Fail FW PMP 1A (B,C), by placing its control position switch to Normal-After-STOP (Green flagged). | |||
: 11. Verify 2FWL-P2A (B,C), AUX LUBE Determines Aux Lube Oil Pump starts Sat/Unsat OIL PMP 2A (B,C), auto starts. by observing AUX LUBE OIL PMP 2A red light ON. | |||
: 12. Confirm 2FWR-FV2A (B,C), REACTOR Determines valve closes by observing Sat/Unsat FD P1A (B,C) RECIRC VLV, closes REACTOR FD P1A RECIRC VLV immediately. POSN meter indication goes to 0% | |||
VALVE POSITION. | |||
NMP2 2008 JPM #S-3 15 October 2008 | |||
Performance Steps Standard Grade | |||
: 13. At 2FWS-P1A (B,C), place the Auxiliary Dispatches operator to Pplaces Aux Pass/Fail Lube Oil Pump control switch 2FWL- Lube Oil Pump control switch to Sat/Unsat LCS752 (753, 754) to START AND START, determines pump remains verify 2FWL-P2A (B,C) remains running running. | |||
BOOTH OPERATOR: Activate remote to start aux oil pump. | BOOTH OPERATOR: Activate remote to start aux oil pump. | ||
: 14. IF 2FWS-P1A (B,C) is being placed in Dispatches operator to Oopen s Pass/Fail standby, open 2FWS-V25A (B,C) FD warmup line isolation. Sat/Unsat WTR PUMP 1A (B,C) WRMUP LN ISOLATION. | |||
CUE: If directed, report 2FWS-V25A is open. | CUE: If directed, report 2FWS-V25A is open. | ||
: 15. NOTE: The following step requires key Determines step is N/A | |||
# 18 from the SM key locker. | |||
IF the plant will remain at 65 % power for more than a shift, adjust ALL | IF the plant will remain at 65 % power for more than a shift, adjust ALL Feedwater Pump minimum flow valve setpoints as follows: | ||
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, | At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 8 k gpm. | ||
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, | At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 8 k gpm. | ||
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, | At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 8 k gpm. | ||
CUE: The Unit plant will remain at 65% | CUE: The Unit plant will remain at 65% | ||
power for LESS than a shift. | power for LESS than a shift. | ||
: 16. NOTE: The following step will be Determines Step is N/A performed prior to starting the standby feed pump. | |||
NMP2 2008 JPM #S-3 16 October 2008 | |||
NOTE: Min flow valve setpoints are at 4 Kgpm from previous steps. | Performance Steps Standard Grade Perform Feedwater Pump Warmup for the pump being started per subsection F.14.0. | ||
: 17. Adjust ALL three Feedwater Pump | CUE: Another Operator has performed the warmup NOTE: Min flow valve setpoints are at 4 Kgpm from previous steps. | ||
At 2CEC-PNL827, verify in auto AND | : 17. Adjust ALL three Feedwater Pump Adjusts all 3 controllers Pass/Fail minimum flow valve setpoints as Sat/Unsat follows: | ||
At 2CEC-PNL827, verify in auto AND | At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 4 k gpm. | ||
At 2CEC-PNL827, verify in auto AND | At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 4 k gpm. | ||
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 4 k gpm. | |||
: 18. Start the stand by Feedwater Pump Pass/Fail 2FWS-P1A (B,C) as follows: | |||
Verify open 2FWS-MOV47A (B,C), Verifies Discharge Block Valve is open Sat/Unsat REACTOR FW PMP 1A (B,C) DISCH by observing REACTOR FW PMP 1C BLOCK VLV. DISCH BLOCK VLV FWS-MOV47C red light is ON and green light is OFF. | |||
: 19. IF applicable, verify open 2FWS-V103A Determines valve is openstep is NA, Sat/Unsat (B), FEEDWATER PUMP 1A (B) LOW since Feedwater Pump C is being FLOW LINE ISOL. started. | |||
NMP2 2008 JPM #S-3 17 October 2008 | |||
Performance Steps Standard Grade | |||
: 20. IF required, start the standby Determines three Condensate Pumps Sat/Unsat Condensate pump by placing 2CNM- running. | |||
P1A (B,C) control switch in Normal-After-START (Red-flagged). | |||
Note: NOT required, since all Condensate Pumps are running. | |||
: 21. Verify sufficient Condensate Iron Determines sufficient Condensate Iron Sat/Unsat Prefilters are in service to support the Prefilters are in service maximum expected Condensate System flow rate. Refer to N2-OP-5A, Attachment 1. | |||
CUE: If asked, Ssufficient Iron Prefilters are in service | |||
: 22. NOTE: Nine Condensate Dispatches operator to determine at Sat/Unsat Demineralizers in service is the least eight demineralizers are in preferred lineup in the next step. service. | |||
Verify at least eight Condensate Demineralizers are in service in accordance with N2-OP-5. | |||
CUE: 8Nine demineralizers are in service | |||
: 23. IF all three Heater Drain pumps are Determines step is N/A because heater Sat/Unsat NOT pumping forward, start the drain pumps are pumping forward. | |||
standby Condensate Booster pump as follows: | |||
Using 2CNM-PI39A (B,C), locally confirm condensate booster pump suction pressure is > 150 psig. | |||
Start 2CNM-P2A (B,C), CONDENSATE BOOSTER PMP 2A (B,C), by placing the control switch to Normal-After-START (Red-flagged). | |||
At 2CNM-P2A (B,C), place the Auxiliary Lube Oil Pump control switch 2CNO-LCS706 (707, 708) to AUTO AND verify 2CNO-P2A (B,C) stops. | |||
NMP2 2008 JPM #S-3 18 October 2008 | |||
Performance Steps Standard Grade CUE: Heater Drain Pumps are pumping forward | |||
: 24. For the Feedwater pump to be started, Determines that controller 2FWS-HIC- Pass/Fail verify the level controllers are in Manual 1010C is in manual by observing Sat/Unsat (M) AND valve positions are at 0% yellow M light is lit and % VALVE open. POSITION metervalve position i indicates 0. | |||
: 25. CAUTION Reviews Caution Sat/Unsat The next two steps shall be performed concurrently. | |||
IF feedwater pump suction pressure drops to 220 psig, start the third Condensate Booster pump if NOT already operating. | |||
: 26. NOTE: IF 2FWS-P1C is selected to NOTE: Since 2FWS-P1B is to be left start, the preferable power supply is running, the preferable power supply from 2NPS-SWG003 if 2FWS-P1A will for 2FWS-P1C is 2NPS-SWG001. | |||
be left running, or 2NPS-SWG001 if 2FWS-P1B is to be left running. | |||
Start 2FWS-P1A (B,C) REACTOR FD Rotates control switch REACTOR FW Pass/Fail P1A (B,C), by placing the control switch PMP 1C FROM BUS 001 FWS-P1C to to Normal-After-Start (red flagged). red flagged position. | |||
: 27. Confirm 2FWR-FV2A (B,C), REACTOR Determines valve starts to Sat/Unsat FD P1A (B,C) RECIRC VLV, starts to openDetermines valve starts to open open. by observing REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION. | |||
: 28. WHEN 2FWR-FV2A (B,C) is 15% When REACTOR FD P1C RECIRC Sat/Unsat open, confirm 2FWS-P1A (B,C) starts. VLV POSN meter indication goes past 15% VALVE POSITION, observe pump start by observing red light and ammeter FWS-P1C BUS 001 CURRENT indication.Verifies valve position and pump start NMP2 2008 JPM #S-3 19 October 2008 | |||
: 24. For the Feedwater pump to be started, | |||
IF feedwater pump suction pressure | |||
Start 2FWS-P1A (B,C) REACTOR FD P1A (B,C), by placing the control switch | |||
: 27. Confirm 2FWR-FV2A (B,C), REACTOR | |||
Performance Steps Standard Grade | |||
: 29. Using 2CNM-FI68A (B,C), RX FD WTR Determines flow on 2CNM-FI68C, RX Sat/Unsat P1A (B,C) FLOW meter, confirm FD WTR P1C FLOW meter is about 2FWS-P1A (B,C) flow is approximately 4000 gpm 4000 gpm. | |||
: 30. NOTES: Reviews notes | |||
: 1. The following two steps are performed locally at the associated Feedwater pump just started. | |||
: 2. The feedwater pump may be loaded as 2FWS-V25A (B,C) is shut. | |||
Place the Auxiliary Lube Oil Pump Places Aux Lube Oil Pump Control Pass/Fail control switch 2FWL-LCS752 (753, Switch in AUTO and verifies pump Sat/Unsat 754) to AUTO AND verify 2FWL-P2A stops (B,C) stops. | |||
: 31. Close 2FWS-V25A (B,C), FD WTR Dispatches operator to Ccloses Pass/Fail PUMP 1A (B,C) WRMUP LN warmup line isolation. Sat/Unsat ISOLATION. | |||
CUE: If asked, report 2FWS-V25C is closed. | CUE: If asked, report 2FWS-V25C is closed. | ||
NOTES: Reviews Notes and Caution Sat/Unsat | |||
: 2. Once the LV10 valve circuitry | : 1. When opening 2FWS-LV10A (B,C) from a fully shut position, the initial 2 seconds of valve open signal serve only to wake up the control circuit computer with no additional action. | ||
Pressing the valve open push button for an additional 10 seconds in manual slow detent (2% position per second) serves to take the control circuit from the minus (-) 20% position to the 0% position PRIOR to any actual valve position indicator movement taking place. | |||
: 2. Once the LV10 valve circuitry reaches the 0% position, the first 1.5% to 2% of the valve stroke, as indicated by the position indicator, is used to release the seating force held NMP2 2008 JPM #S-3 20 October 2008 | |||
CAUTION | Performance Steps Standard Grade by the compression of the SB spring. | ||
Therefore, the valve stem will not be lifted to establish flow until approximately 2% valve indication is reached. Reactor water level should be closely monitored during this evolution. | |||
: 32. Throttle open 2FWS-LV10A (B,C), | CAUTION The fast detent position (20% position per second) should NOT be used to take the control circuit from the minus (- | ||
-) 20% to 0% position as the LV10 will likely open beyond the desired position as the valve can only physically open at 6% per second, and will continue to open once the operator releases the open pushbutton if the demand signal is beyond the 0% position until valve position catches up to the circuit controller demand. | |||
: 32. Throttle open 2FWS-LV10A (B,C), Throttles LCV by depressing the OPEN Pass/Fail Feedwater Pump 1A (B,C) Level pushbuttonOPEN detent pushbutton Control Valve, by using the OPEN for controller 2FWS-HIC-1010C and detent pushbutton on 2FWS-LV10A observes % VALVE POSITION meter. | |||
(B,C) controller. | |||
Booth Operator: | : 33. Verify 2FWS-LV10B (C,A) closes Determines valve is closing by Sat/Unsat gradually as 2FWS-LV10A (B,C) observing % VALVE POSITION meter slowly opens. for 2FWS-LV10B. | ||
: 34. Continue to slowly open 2FWS-LV10A Adjusts position using 2FWS-HIC- Pass/Fail (B,C) UNTIL the input signal (vertical) 1010C until vertical and horizontal AND output signal (horizontal) read the signals are equal. | |||
same on 2FWS-LV10A (B,C) controller. | |||
: 35. Place 2FWS-LV10A (B,C) in Auto by Depresses 2FWS-HIC-1010C AUTO Pass/Fail momentarily depressing the pushbutton and observe green AUTO Auto (A) pushbutton on 2FWS-LV10A light is lit. | |||
(B,C) controller. | |||
Booth Operator: Insert MMalfunction (or preset) FW10C is preset and when AUTO NMP2 2008 JPM #S-3 21 October 2008 | |||
Observe and report 2FWS-LV10C is opening unexpectedly. | Performance Steps Standard Grade pushbutton is depressed, the malfunction becomes effective causing LV10C to go full open. | ||
RECORD STOP TIME | As FWS-LV10C opens due to failure, FW flow Observe and report 2FWS-LV10C is Sat/Unsat and RPV water level will rise. Annunciator opening unexpectedly. | ||
603139 REACTOR WATER LEVEL HIGH/LOW alarms. | |||
: 36. Auto controller fails requiring manual Recognizes controller failure and takes Pass/Fail control returns 2FWS-HIC-1010C to manual control using controller pushbutton IAW per N2-SOP-6 and stabilize RPV level to avoid Level 3 and Level 8 protective functions. | |||
: 37. Report status to CRS Status reported Sat/Unsat TERMINATING CUE: JPM is complete when level is being controlled manually in the normal band (between the low and high water level alarm setpoints). | |||
RECORD STOP TIME NMP2 2008 JPM #S-3 22 October 2008 | |||
Initial Conditions: | |||
: 1. The plant is operating at 65% power. 2. | : 1. The plant is operating at 65% power. | ||
: 2. C Feedwater Pump is ready to be placed in service. | |||
: 3. Pre-start checks are complete. | |||
Initiating cue: | |||
(Operators name), Remove Feedwater Pump A from service and place Feedwater Pump C in service, per N2-OP-3, Section F.13.0Place C Feedwater Pump in service, and remove A Feedwater Pump from service, IAW N2-OP-3, Section 13.0 NMP2 2008 JPM #S-3 23 October 2008 | |||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate RCIC and Respond To Overspeed Trip (Alternate) Revision: NRC 2008 Task Number: N2-217000-01048 Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | |||
NA EXAMINATION SECURITY General Supervisor | |||
NA EXAMINATION SECURITY Configuration Control | |||
Performer: | |||
Trainer/Evaluator: | Trainer/Evaluator: | ||
Evaluation Method: | Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: YES Start Time: Stop Time: Completion Time: | ||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Expected Completion Time: 15 minutes | Comments: | ||
Evaluator Signature: Date: | |||
Start Time: | NMP2 2008 JPM #S-3 24 October 2008 | ||
JPM Overall Rating: | |||
NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Recommended Start Location: | |||
Simulator Simulator Set-up: | Simulator Simulator Set-up: | ||
: 1. Reset to IC 183 Post Scram 2. Set remote RC01, RCIC Mech OS Trip to actuate when zarctum1 (RCIC speed) > 0.5 (3000 rpm) | : 1. Reset to IC 183 Post Scram | ||
Read Before Every JPM Performance: | : 2. Set remote RC01, RCIC Mech OS Trip to actuate when zarctum1 (RCIC speed) > 0.5 (3000 rpm) | ||
Directions to Operators: | |||
Read Before Every JPM Performance: | |||
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | ||
Read Before Each Evaluated JPM Performance: | Read Before Each Evaluated JPM Performance: | ||
Line 341: | Line 342: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
: 2. During Evaluated JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | : 3. During Training JPM: | ||
* Self-verification shall be demonstrated. | |||
* No other verification shall be demonstrated. | |||
==References:== | ==References:== | ||
: 1. N2-OP-35 2. N2-ARP-01 601305 | : 1. N2-OP-35 | ||
: 2. N2-ARP-01 601305 | |||
: 3. NUREG K/A 217000 A4.02 Tools and Equipment: | : 3. NUREG K/A 217000 A4.02 Tools and Equipment: | ||
: 1. None Task Standard: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602. | : 1. None Task Standard: | ||
RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602. | |||
NMP2 2008 JPM #S-3 25 October 2008 | |||
Initial Conditions: | |||
Initiating cue: | : 1. The plant has experienced a reactor scram and loss of feedwater. | ||
: 2. Obtain a copy of the reference | : 2. N2-EOP-RPV is being implemented. | ||
: 3. ARM and DEPRESS RCIC MANUAL | Initiating cue: | ||
(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches. | |||
Performance Steps Standard Grade | |||
: 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | |||
ICS*MOV116 Cooling Water MOV opens. Red light ON. Green light OFF. ICS*MOV120 Steam opens. Red light ON. Green light OFF. | : 2. Obtain a copy of the reference N2-EOP-HC-2 Attachment 5, Sat/Unsat procedure and review/utilize the correct Automatic RCIC Injection is section. obtained/referenced. | ||
ICS*MOV126 opens. Red light ON. Green light OFF. | : 3. ARM and DEPRESS RCIC MANUAL ARM and DEPRESS RCIC Pass/Fail INITIATION pushbutton. MANUAL INITIATION pushbutton. | ||
: 4. Verify system startup GLAND SEAL SYSTEM AIR Sat/Unsat COMPRESSOR starts. Red light ON. Green light OFF. | |||
ICS*MOV116 Cooling Water MOV Sat/Unsat opens. Red light ON. Green light OFF. | |||
When 2ICS*MOV120 Steam Admission Valve opens, turbine speed and pump discharge ICS*MOV120 Steam opens. Red Sat/Unsat pressure rise. light ON. Green light OFF. | |||
: 5. Observes RCIC Turbine trip Cue: | When turbine speed exceeds 3000 RPM, ICS*MOV126 opens. Red light ON. Sat/Unsat 2ICS*MOV150 Trip Throttle Valve closes due Green light OFF. | ||
to unexpected overspeed trip. | |||
: 5. Observes RCIC Turbine trip Observes Annunciators 601305 lit. Sat/Unsat Observes TURBINE TRIPPED Sat/Unsat Cue: When informed of RCIC Turbine amber postage stamp lit. | |||
trip, instruct candidate to Reset the RCIC Turbine from P601 and reestablish Recognizes RCIC Turbine tripped Sat/Unsat injection to the RPV Reports RCIC Turbine Tripped to Sat/Unsat SM NMP2 2008 JPM #S-3 26 October 2008 | |||
Performance Steps Standard Grade Cue: If directed to investigate, report Dispatches operator to RCIC Room Sat/Unsat overspeed trip mechanism is tripped. to investigate. | |||
: 6. Reset ICS*MOV150 at P601 per N2-OP-35 H.1.0, RCIC Turbine Reset. | |||
: 7. Verify cause is understood and Verify cause is understood and Sat/Unsat corrected. corrected. | |||
: 7. Verify cause is understood and corrected. | : 8. Places ICS*MOV150 switch to CLOSED Places ICS*MOV150 switch to Pass/Fail until BOTH valve positions indicate CLOSED until BOTH valve valve is closed positions indicate valve is closed.(P601) | ||
: 8. Places ICS*MOV150 switch to CLOSED until BOTH valve positions indicate valve is closed | Observes ICS*MOV150 Green Sat/Unsat light ON (P601 Apron) | ||
: 9. Verify turbine speed is less than 3500 RPM. | Observes ICS*MOV150 Red Sat/Unsat light OFF (P601 Apron) | ||
: 10. IF RCIC turbine tripped on overspeed OR was locally tripped. Locally reset trip mechanism. BOOTH OPERATOR: REMOTE RC01 to RESET. | Observes Trip/Throttle valve Sat/Unsat Green light ON (P601 verical) | ||
Observes Trip/Throttle valve Sat/Unsat Red light OFF (P601 vertical) | |||
: 9. Verify turbine speed is less than 3500 Verify turbine speed is less than Sat/Unsat RPM. 3500 RPM. | |||
: 10. IF RCIC turbine tripped on overspeed Directs operator to locally reset the Sat/Unsat OR was locally tripped. Locally reset trip overspeed trip mechanism. | |||
mechanism. | |||
BOOTH OPERATOR: REMOTE RC01 to RESET. | |||
CUE: Report trip mechanism is reset. | CUE: Report trip mechanism is reset. | ||
: 11. IF an initiation signal is sealed in, perform the following: | : 11. IF an initiation signal is sealed in, perform the following: | ||
: a. Throttle open ICS*MOV150 Places ICS*MOV150 switch to OPEN (P601) | : a. Throttle open ICS*MOV150 Places ICS*MOV150 switch to Pass/Fail OPEN (P601) | ||
NMP2 2008 JPM #S-3 27 October 2008 | |||
Performance Steps Standard Grade Observes ICS*MOV150 Green Sat/Unsat light OFF (P601 Apron) | |||
Observes ICS*MOV150 Red light ON (P601 Apron) | Observes ICS*MOV150 Red Sat/Unsat light ON (P601 Apron) | ||
Observes Trip/Throttle valve Green light OFF (P601 verical) | Observes Trip/Throttle valve Sat/Unsat Green light OFF (P601 verical) | ||
Observes Trip/Throttle valve Red light ON (P601 vertical) Sat/Unsat | Observes Trip/Throttle valve Sat/Unsat Red light ON (P601 vertical) | ||
: b. At 2ICS*MOV150, verify proper Directs operator to verify proper Sat/Unsat latching of the latch lever and trip latching. | |||
hook. | |||
CUE: Report trip mechanism is properly latched. | |||
: c. Verify RCIC restarts Observe turbine speed and pump Sat/Unsat discharge pressure are rising. | |||
: 12. Establish RPV Injection Places ICS*MOV126 switch to Pass/Fail OPEN (P601) | |||
When RCIC flow is > 220 gpm, Sat/Unsat observe ICS*MOV143 Min Flow closes. | |||
When RCIC discharge pressure > Sat/Unsat reactor pressure, ICS*MOV156 and 157 Injection Check Valves open. | |||
RCIC Injection controlled at 600 gpm. Sat/Unsat | |||
: 13. Report completion. Report RCIC injecting. Sat/Unsat TERMINATING CUE: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602. | |||
RECORD STOP TIME NMP2 2008 JPM #S-3 28 October 2008 | |||
Initial Conditions: | |||
: 1. The plant has experienced a reactor scram and loss of feedwater. | |||
: 2. N2-EOP-RPV is being implemented. | |||
Initiating cue: | |||
(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches. | |||
NMP2 JPM #S-4 29 October 2008 | |||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shift RBCLCW and TBCLCW Pumps Revision: NRC 2008 Task Number: N2-SOP-14-01001 Approvals: | |||
: | NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | ||
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | |||
Trainer/Evaluator: | |||
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: | |||
YES Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Comments: | |||
NMP2 JPM #S-4 30 October 2008 | |||
Evaluator Signature: Date: | |||
NMP2 JPM #S-4 31 October 2008 | |||
Recommended Start Location: | |||
Simulator Simulator Set-up: | Simulator Simulator Set-up: | ||
: 4. Reset to IC 184 5. Remote CW-27 103. | : 4. Reset to IC 184 | ||
: 5. Remote CW-27 103.9oF, triggered from stopping CCS-P1A Directions to Operators: | |||
Read Before Every JPM Performance: | Read Before Every JPM Performance: | ||
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | ||
Line 444: | Line 437: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
: 2. During Evaluated JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | : 3. During Training JPM: | ||
* Self-verification shall be demonstrated. | |||
* No other verification shall be demonstrated. | |||
==References:== | ==References:== | ||
: 5. N2-OP-13, Rev 07 6. N2-OP-14, Rev 05 7. ARP 601244 | : 5. N2-OP-13, Rev 07 | ||
: 6. N2-OP-14, Rev 05 | |||
: 7. ARP 601244 | |||
: 8. NUREG K/A 400000 A4.01 Tools and Equipment: | : 8. NUREG K/A 400000 A4.01 Tools and Equipment: | ||
: 1. None NMP2 | : 1. None NMP2 JPM #S-4 32 October 2008 | ||
Task Standard: | |||
RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually. | RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually. | ||
NMP2 | NMP2 JPM #S-4 33 October 2008 | ||
Initial Conditions: | |||
: 8. The plant is operating at full power. | : 8. The plant is operating at full power. | ||
Initiating cue: | Initiating cue: | ||
(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation. | |||
Performance Steps Standard Grade | |||
Performance Steps Standard Grade | : 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | ||
: 2. Obtain a copy of the reference procedure | : 2. Obtain a copy of the reference procedure N2-OP-13 & N2-OP-14 obtained. Sat/Unsat and review/utilize the correct section. Precautions & limitations reviewed | ||
: 3. For the Main CCP pump to be started, Ensures checked by local operator Sat/Unsat verify the pump casing is free of air as follows: | |||
Uncap AND throttle open 2CCP-V195 (V196, V197), P1A (B,C) VENT. WHEN a steady stream of water is observed, close AND recap 2CCP-V195 (V196, V197). CUE: | Uncap AND throttle open 2CCP-V195 (V196, V197), P1A (B,C) VENT. WHEN a steady stream of water is observed, close AND recap 2CCP-V195 (V196, V197). | ||
CUE: Checked by local operator | |||
Note: | : 4. For the Main CCP pump to be started, Places control switch in red flagged Pass/Fail at panel 2CEC*P601, start 2CCP-P1A position (B,C), PMP 1A (B,C), by placing control switch in Normal-After-START (red flagged). | ||
Ensures checked by local operator Sat/Unsat | Note: The applicant will check board indications for amps and discharge pressure | ||
: 5. Confirm normal operating indications in Ensures checked by local operator Sat/Unsat accordance with Subsection F.1.0. | |||
NMP2 JPM #S-5 34 October 2008 | |||
Performance Steps Standard Grade CUE: Local indications are normal | |||
: 6. At 2CEC*PNL601, secure 2CCP-P1A Places control switch in green flagged Pass/Fail (B,C), PMP 1A (B,C), by placing control position switch in Normal-After-STOP. (Green flagged) | |||
: 7. IF required, place 2CCP-P1A (B,C) May request required status Sat/Unsat control switch in PULL TO LOCK. | |||
: 8. Confirm normal operating indications in Ensures local checks are made Sat/Unsat accordance with Subsection F.1.0. | |||
CUE: Another operator will check local indications Examiner Note: The applicant will now refer to N2-OP-14 for TBCLCW operations NOTES: | |||
: 1. CCS system flow of greater than 8000 gpm requires more than one heat exchanger in service. | |||
: 2. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified. | |||
: 9. IF time permits, perform the following: Dispatched operator or determines Sat/Unsat task has been performed Dispatch an Operator to the pump to perform prestart inspection AND observe pump during start. | |||
For the pump to be started, close 2CCS-V303A(B,C), TBCLC PUMP 1A(B,C) STOP CHECK. | |||
CUE: Pre-start checks complete; the stop-check valve is CLOSED NMP2 JPM #S-5 35 October 2008 | |||
Performance Steps Standard Grade | |||
: 10. Start 2CCS-P1A(B,C), PMP 1A(B,C), by Places control switch in red flagged Pass/Fail placing the control switch to Normal- position After-START (red flagged). | |||
: | : 11. Slowly open 2CCS-V303A(B,C). Directs local operator to open valve Sat/Unsat CUE: Valve has been opened | ||
: 12. Confirm normal operating indications in Ensures checked by local operator Sat/Unsat accordance with Subsection F.1.0. | |||
: | CUE: Local indications are normal | ||
: 13. NOTES: Checks indications Sat/Unsat | |||
: | : 1. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified. | ||
: 2. CCS Pump runout is 8,500 gpm. If system flow is greater than 8,000 gpm for one pump operations or 16,000 gpm for two pump operations, then starting an additional pump increases the probability of damaging tube vibrations in the CCS heat exchangers. | |||
Three CCS pump operation shall be avoided unless shifting of pumps is required. | |||
Confirm the CCS pump is NOT required for CCS System flow as follows: | |||
Computer Point CCSFA01 Number of Running Pumps 1,000 - 8,200 GPM 1 8,200 - 16,400 GPM 2 | |||
: 14. NOTE: 2CCS-V303A (B,C) is located at Directs a local operator to close valve Sat/Unsat 2CCS-P1A (B,C) on TB Elev 250 Southwest. | |||
Close 2CCS-V303A (B,C), TBCLC PUMP 1A (B,C) STOP CHECK. | |||
Cue: Valve is closed NMP2 JPM #S-5 36 October 2008 | |||
Report status. Sat/Unsat TERMINATING CUE: | Performance Steps Standard Grade | ||
RECORD STOP TIME | : 15. Secure 2CCS-P1A (B,C), PMP 1A Places control switch in green flagged Pass/Fail (B,C), by placing the control switch in position Normal-After-STOP. (Green flagged) | ||
Booth Operator: Malfunction to fail temperature controller REMOTE CW-27 103.9oF when CCS-P1A is stopped. | |||
: 16. IF required, place 2CCS-P1A (B,C) May request required status of control Sat/Unsat control switch in PULL TO LOCK. switch | |||
: 17. Confirm normal operating indications for Ensures checked by local operator Sat/Unsat the running CCS Pump(s) in accordance with Subsection F.1.0. | |||
Examiner Note: Applicant will respond to annunciator 601244 and Computer Point CCSTC04 for TBCLCW HX DISCH TEMP | |||
: 18. Determines temp controller is failed and Determines ARP 601244 actions apply Sat/Unsat refers to ARP 601244 | |||
: 19. Places 2CCS-TIK104 in M Manual Places controller TBCLC HEAT Pass/Fail EXCHANGER TEMP CONTROLLER 2CCS-TIK104 in M Manual by depressing M button. | |||
: 20. Manually controls temperature Adjusts temperature downward to Pass/Fail approximately 85°F (80 to 95), | |||
indicated on TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104 | |||
: 21. Report status to CRS Report status. Sat/Unsat TERMINATING CUE: RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually. | |||
RECORD STOP TIME NMP2 JPM #S-5 37 October 2008 | |||
Initial Conditions: | |||
: 1. The plant is operating at full power. | : 1. The plant is operating at full power. | ||
Initiating cue: | Initiating cue: | ||
(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation. | |||
NMP2 JPM #S-5 38 October 2008 | |||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Depressurize the RPV to the Main Condenser Revision: NRC 2008 Task Number: | |||
Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | |||
Trainer/Evaluator: | |||
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: | |||
YES Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Comments: | |||
NMP2 JPM #S-5 39 October 2008 | |||
Evaluator Signature: Date: | |||
NMP2 JPM #S-5 40 October 2008 | |||
Recommended Start Location: | |||
Simulator Simulator Set-up: | Simulator Simulator Set-up: | ||
: 6. Reset to IC 185 7. Malfunction MS-13 | : 6. Reset to IC 185 | ||
: 7. Malfunction MS-13 MSIV Isolation Failure Directions to Operators: | |||
Directions to Operators: | |||
Read Before Every JPM Performance: | Read Before Every JPM Performance: | ||
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | ||
Line 532: | Line 540: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
* Self-verification shall be demonstrated. 3. During Training JPM: | : 2. During Evaluated JPM: | ||
* Self-verification shall be demonstrated. | |||
: 3. During Training JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | * No other verification shall be demonstrated. | ||
==References:== | ==References:== | ||
: 9. EOP-6 Attachment 18 10. NUREG K/A 239001 A4.09 Tools and Equipment: | : 9. EOP-6 Attachment 18 | ||
: 1. None | : 10. NUREG K/A 239001 A4.09 Tools and Equipment: | ||
NMP2 | : 1. None Task Standard: | ||
NMP2 JPM #S-5 41 October 2008 | |||
RPV is depressurizing to Main Condenser using Bypass Valves or Drain valves NMP2 JPM #S-5 42 October 2008 | |||
LOCA | Initial Conditions: | ||
Determines LOCA is present. | : 9. A LOCA has occurred and an RPV Blowdown was required | ||
Using key, places switch in OVERRIDE | : 10. Only 5 SRVs could be opened | ||
: 11. EOP-6, Attachment 18 is in progress. | |||
Initiating cue: | |||
(Operators name), Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser Performance Steps Standard Grade | |||
: 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | |||
: 2. Obtain a copy of the reference procedure EOP-6, Attachment 18 obtained. Sat/Unsat and review/utilize the correct section. | |||
: 3. IF a LOCA signal is present OR Determines LOCA is present. Sat/Unsat expected, using PA235 key, place the following LOCA override switches to OVERRIDE: (2CEC*PNL851) | |||
LOCA OVERRIDE VLV IAS*SOV166 Using key, places switch in Sat/Unsat OVERRIDE LOCA OVERRIDE VLV IAS*SOV184 Using key, places switch in Sat/Unsat OVERRIDE Annunciators 601517 and 601519 alarms when switches are placed in OVERRIDE. | |||
: 4. Verify open the following valves (2CEC*PNL851) | |||
IAS*SOV166, PRIMARY CNTMT Open IAS*SON166 and observe red Sat/Unsat OUTBD ISOL VLV TO SRV light ON and green light OFF. | |||
IAS*SOV184, PRIMARY CNTMT INBD Open IAS*SON184 and observe red Sat/Unsat ISOL VLV TO SRV light ON and green light OFF. | |||
NMP2 2008 ML083230120.doc 43 October 2008 | |||
Performance Steps Standard Grade | |||
: 5. Record differential pressure across the Determines differential pressure is Sat/Unsat MSIVs using C33-R605 on within 150 psid. | |||
2CEC*PNL603 AND one or more of the following Trip Units: | |||
B22-N676A, STM LINE PRESS LO (2CEC*PNL609) | |||
B22-N676C, STM LINE PRESS LO (2CEC*PNL609) | |||
B22-N676B, STM LINE PRESS LO (2CEC*PNL611) | |||
B22-N676D, STM LINE PRESS LO (2CEC*PNL611) | |||
B22-N676A, STM LINE PRESS LO | |||
B22-N676C, STM LINE PRESS LO | |||
B22-N676B, STM LINE PRESS LO | |||
B22-N676D, STM LINE PRESS LO | |||
Note: PNL609 trip units are not within the scope of simulation. | Note: PNL609 trip units are not within the scope of simulation. | ||
CUE: Differential Pressure is <150 psid | CUE: Differential Pressure is <150 psid | ||
N/A, a pair of MSIVs will be opened per | : 6. IF differential pressure across the Determines step is N/A, based on Sat/Unsat MSIVs is > 150 psid, open at least one differential pressure. | ||
pair of MSIVs by performing N2-OP-1, Section H.4.0 AND THEN continue at Step 3.1.7 N/A, differential pressure across the MSIVs is < 150 psid | |||
Verify MSIV isolation signals reset by | : 7. IF differential pressure across the MSIVs is < 150 psid, open at least one pair of MSIVs as follows: | ||
N/A, a pair of MSIVs will be opened per N2-OP-1, Section H.4.0 Verify MSIV isolation signals reset by performing the following: | |||
Place control switches for the following to CLOSE: | (2CEC*PNL602) | ||
Place control switches for the following Places all eight MSIV control switches Sat\Unsat to CLOSE: in CLOSE | |||
* MSS*AOV6A, MSIV | * MSS*AOV6A, MSIV | ||
* MSS*AOV6B, MSIV | * MSS*AOV6B, MSIV NMP2 2008 ML083230120.doc 44 October 2008 | ||
Performance Steps Standard Grade | |||
* MSS*AOV6C, MSIV | * MSS*AOV6C, MSIV | ||
* MSS*AOV6D, MSIV | * MSS*AOV6D, MSIV | ||
Line 583: | Line 594: | ||
* MSS*AOV7B, MSIV | * MSS*AOV7B, MSIV | ||
* MSS*AOV7C, MSIV | * MSS*AOV7C, MSIV | ||
* MSS*AOV7D, MSIV | * MSS*AOV7D, MSIV Booth Operator: Insert malfunction MS-13 when MSIVs are closed | ||
: 8. Depress pushbutton B22H-S33, INBD | : 8. Depress pushbutton B22H-S33, INBD Depresses pushbutton Sat\Unsat ISOL LOGIC RESET | ||
: 9. Depress pushbutton B22H-S32, | : 9. Depress pushbutton B22H-S32, Depresses pushbutton Sat\Unsat OUTBD ISOL LOGIC RESET | ||
: 10. Open one pair of MSIVs as follows: Places control switches for one pair of Sat/Unsat (2CEC*PNL602) MSIVs to AUTO. MSIVs will not open Place the control switch for ANY outboard MSIV to AUTO Place the control switch for the corresponding inboard MSIV to AUTO. | |||
Place the control switch for ANY | Examiner Note: Applicant must continue in procedure because MSIVs will not open | ||
: 11. IF a pair of MSIVs can NOT be opened, align steam line drains to depressurize the RPV as follows: | |||
Examiner Note: | N/A, a pair of MSIVs are open Verify open MSS*MOV207, INSIDE Opens MSS*MOV207 and observe red Pass/Fail MSIVS UPSTREAM DRAIN VLV. light ON and green light OFF. | ||
: 11. IF a pair of MSIVs can NOT be opened, | (2CEC-PNL824) | ||
N/A, a pair of MSIVs are open | Verify open MSS*MOV111, MAIN STM LINE DRAIN ISOL VLV. Opens MSS*MOV111 and observe red Pass/Fail (2CEC*PNL602) light ON and green light OFF. | ||
NMP2 2008 ML083230120.doc 45 October 2008 | |||
Verify open MSS*MOV207, INSIDE | |||
Verify open MSS*MOV111, MAIN STM | |||
Performance Steps Standard Grade | |||
: 12. NOTE: A CAT 60 key may be required for entry to 2EHS*MCC102. | |||
Place 2EHS*MCC102-7A, Directs operator to locally close Sat/Unsat 2MSS*MOV112 MAIN STEAM LINE 2EHS*MCC102-7A AND place alarm DRAIN OUTBD to ON (Aux Bay-North circuit to enable. | |||
El 240) | |||
BOOTH OPERATOR: Enter Remote MS05B, 2MSS*MOV112 APP R CKT BKR, CLOSE CUE: Report the breaker is closed and alarm circuit is enabled. | |||
Place 2EHS*MCC102-7A, ALARM CIRCUIT control switch to ENABLE Verify open 2MSS*MOV112 Open 2MSS*MOV112 and observe red Pass/Fail (2CEC*PNL602) light ON and green light OFF. | |||
Verify open MSS-MOV187, MAIN STM Pass/Fail LINE PRESS EQL/WARMING Open 2MSS-MOV187 and observe red (2CEC*PNL602) light ON and green light OFF. | |||
: 13. Using BYPASS VALVE OPENING Depresses and holds to attempt to Pass/Fail/ | |||
JACK SELECTOR, depress AND hold open bypasses NA the INCREASE pushbutton UNTIL bypass valves are full open (2CEC*PNL851) | |||
N/A, Turbine Bypass Valves will NOT open | |||
: 14. IF Bypass Valves are unavailable, verify Performs if bypass valves would not Pass/Fail/ | |||
open as many of the following open NA steam line drains as possible to depressurize the RPV to the condenser: | |||
N/A, Turbine Bypass Valves are available Open Turbine Stop Valve Drains (2CEC-PNL824): | |||
MSS-MOV21A, TURBINE STOP VLV MSV3 DRAIN VLV NMP2 2008 ML083230120.doc 46 October 2008 | |||
Performance Steps Standard Grade MSS-MOV21B, TURBINE STOP VLV MSV4 DRAIN VLV MSS-MOV21C, TURBINE STOP VLV MSV1 DRAIN VLV MSS-MOV21D, TURBINE STOP VLV MSV2 DRAIN VLV Examiner Note: Step only performed if bypass valves could not be opened. | |||
Degrading vacuum may have caused closure | |||
: 15. Open MSS-MOV147, TURBINE Performs if bypass valves did not open Pass/Fail/ | |||
CONTROL VLVS DRAIN VLV NA (2CEC-PNL824) | |||
: 16. Open Main Steam Line Drains (2CEC- Performs if bypass valves did not open Pass/Fail/ | |||
PNL824): NA MSS-AOV191, MAIN STM LINE HEADER DRAIN VLV MSS-AOV194, MAIN STM LINE HEADER DRAIN VLV MSS-AOV203, MAIN STM LINE HEADER DRAIN VLV MSS-AOV205, MAIN STM LINE HEADER DRAIN VLV MSS-AOV209, MAIN STM LINE HEADER DRAIN VLV MSS-AOV87A MSL A LOW POINT DRAIN VALVE MSS-AOV87B MSL B LOW POINT DRAIN VALVE MSS-AOV87C MSL C LOW POINT DRAIN VALVE MSS-AOV87D MSL D LOW POINT DRAIN VALVE NMP2 2008 ML083230120.doc 47 October 2008 | |||
Performance Steps Standard Grade MSS-AOV88A MSL DRAIN HEADER ISOL VALVE MSS-A0V88B MSL DRAIN HEADER ISOL VALVE | |||
: 17. Open MSL Drain Orifice Bypass (2CEC- Performs if bypass valves did not open Pass/Fail/ | |||
PNL824): NA MSS-AOV85A, MAIN STM LINE DRAIN VLV MSS-AOV85B, MAIN STM LINE DRAIN VLV MSS-AOV85C, MAIN STM LINE DRAIN VLV MSS-AOV85D, MAIN STM LINE DRAIN VLV TERMINATING CUE: RPV is depressurizing to Main Condenser via Bypass valves or Drain valves RECORD STOP TIME NMP2 2008 ML083230120.doc 48 October 2008 | |||
MSS-A0V88B MSL DRAIN HEADER | |||
: 17. Open MSL Drain Orifice Bypass (2CEC-PNL824): | |||
MSS-AOV85A, MAIN STM LINE DRAIN | |||
NMP2 2008 ML083230120.doc | |||
Initial Conditions: | |||
: 12. A LOCA has occurred and an RPV Blowdown was required | |||
: 13. Only 5 SRVs could be opened | |||
: 14. N2-EOP-6, Attachment 18 is in progress. | |||
Initiating cue: | Initiating cue: | ||
Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser | Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser NMP2 2008 ML083230120.doc 49 October 2008 | ||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Energize Reserve Station Transformer 1B and NPS-SWG003. Revision: NRC 2008 Task Number: N2-262000-01002, N2-SOP-03-01001 Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
Approvals: | NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | ||
NA EXAMINATION SECURITY General Supervisor | Trainer/Evaluator: | ||
NA EXAMINATION SECURITY Configuration Control | Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time: | ||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Comments: | |||
Evaluator Signature: Date: | |||
NMP2 2008 ML083230120.doc 50 October 2008 | |||
Recommended Start Location: | |||
Simulator Simulator Set-up: | Simulator Simulator Set-up: | ||
Reset to IC 186 Directions to Operators: | Reset to IC 186 Directions to Operators: | ||
Line 680: | Line 658: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
: 2. During Evaluated JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | : 3. During Training JPM: | ||
* Self-verification shall be demonstrated. | |||
* No other verification shall be demonstrated. | |||
==References:== | ==References:== | ||
Line 689: | Line 669: | ||
: 1. None Task Standard: | : 1. None Task Standard: | ||
Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003. | Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003. | ||
NMP2 2008 ML083230120.doc | NMP2 2008 ML083230120.doc 51 October 2008 | ||
NMP2 2008 ML083230120.doc | NMP2 2008 ML083230120.doc 52 October 2008 Initial Conditions: | ||
: 3. The plant experienced a Loss of Line 6. | |||
: 4. The plant was manually scrammed. | |||
: 5. Immediate and Subsequent Actions of N2-SOP-3 are complete. | |||
: 6. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete. | |||
: 7. Power has been restored to Line 6 and Power Control has verified its reliability. | |||
: 8. Ask the operator for any questions. | : 8. Ask the operator for any questions. | ||
Initiating cue: | Initiating cue: | ||
Performance Steps Standard Grade | (Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3. | ||
: 13. Obtain a copy of the reference procedure | Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3. | ||
Performance Steps Standard Grade | |||
Cue: If asked, inform the candidate that 86-SPRY01 is reset. | : 12. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | ||
: 5. At Panel 809 (CB 288'), verify reset 86-2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY). | : 13. Obtain a copy of the reference procedure N2-SOP-3 obtained. Precautions & Sat/Unsat and review/utilize the correct section. Limitations are reviewed and Attachment 1 Section 1.7 referenced. | ||
Cue: If asked, inform the candidate that 86-SPRZ08 is reset. | : 14. Review Attachment 1 Section 1.7 Power Per step 1.7.2, determines Sat/Unsat Restoration to determine applicable performance of Attachment 6 is Attachment to Energize Reserve required. | ||
: 6. Determine step 6.2 is N/A | Transformer 1B | ||
: 7. Determine section 6.3 is applicable | : 4. At Panel 808 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRY01 (RES STA SER XFMR 1B PRIM PROT LO RELAY). | ||
Cue: If asked, inform the candidate that 86-SPRY01 is reset. | |||
: 5. At Panel 809 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY). | |||
Cue: If asked, inform the candidate that 86-SPRZ08 is reset. | |||
: 6. Determine step 6.2 is N/A Marks N/A block for step 6.2 Sat/Unsat | |||
: 7. Determine section 6.3 is applicable Carries out the actions of section Sat/Unsat 6.3 NMP2 2008 ML083230120.doc 53 October 2008 | |||
Performance Steps Standard Grade | |||
: 8. Close MDS2 - (115 KV MOD SWITCH 63) Places MDS2 control switch to Pass/Fail LINE 6. CLOSE Observes MDS2 red light - ON Sat/Unsat Observes MDS2 green light - OFF Sat/Unsat | |||
: | : 9. Close MDS4 - (115 KV CIRCUIT Places MDS4 control switch from Pass/Fail SWITCHER CKT SWITCH 38). PULL-TO-LOCK to NORMAL-AFTER-OPEN Places MDS4 control switch to Pass/Fail CLOSE Observes MDS4 red light - ON Sat/Unsat Observes MDS4 green light - OFF Sat/Unsat The following annunciators clear with no required action: | ||
852421 MOT Operator CKT 2YUC-MDS4 852435 RES STA SER XFMER 1B Loss of Voltage | |||
: | : 10. IF required, place in Normal-After-Trip Places 3-1 control switch from Pass/Fail 2NPS-SWG003-1. PULL-TO-LOCK to NORMAL-AFTER-TRIP. | ||
: | Observes 3-1 green light - ON Sat/Unsat | ||
: 11. Return to Attachment 1 Section 1.7. Per step 1.7.8, determines Sat/Unsat performance of Attachment 7 is required. | |||
: 12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed | |||
: 12. Determines section 7.2 is applicable Carries out the actions of section Sat/Unsat 7.2 | |||
: 13. Place 3-14 in Pull-to-Lock. Places 3-14 control switch in PULL- Pass/Fail TO-LOCK Observes 3-14 green/red lights - Sat/Unsat OFF The following annunciator clears with no required action: | |||
852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC | |||
: 14. Place the SYNC switch to ON Rotates the SYNC switch to ON Pass/Fail (SYNCHRONIZE RES STA SVCE XFMR 1B). | |||
NMP2 2008 ML083230120.doc 54 October 2008 | |||
Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat | Performance Steps Standard Grade | ||
: 22. Close 15-3 | : 15. Close 3-1. Rotates 3-1 control switch to Pass/Fail CLOSE Observes 3-1 red light - ON Sat/Unsat Observes 3-1 green light - OFF Sat/Unsat Numerous annuciators clear. | ||
Numerous annunciators alarm. | |||
Numerous annunciators reflash. None of these requires action. | |||
: 16. Place the SYNC switch to OFF. Rotates the SYNC switch to OFF Pass/Fail | |||
: 17. Close 13-6. Rotates 13-6 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP. | |||
Observes 13-6 green light - ON Sat/Unsat Rotates 13-6 control switch to Pass/Fail CLOSE Observes 13-6 red light - ON Sat/Unsat Observes 13-6 green light - OFF Sat/Unsat The following annunciator clears with no required action: | |||
852527 4KV Bus NNS 013 Undervoltage | |||
: 18. Return to Attachment 1 Section 1.7. Per step 1.7.10, determines Sat/Unsat performance of Attachment 9 is required. | |||
: 19. Step 9.1 Prerequisites Cue: If asked, 9.1.4 lockout is verified reset. | |||
Step 9.1, Prerequisites, are completed | |||
: 20. Determines section 9.2 is applicable Carries out the actions of section Sat/Unsat 7.2 | |||
: 21. Verify closed 3-6. Rotates 3-6 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP. | |||
Observes 3-6 green light - ON Sat/Unsat Rotates 3-6 control switch to Pass/Fail CLOSE Observes 3-6 red light - ON Sat/Unsat Observes 3-6 green light - OFF Sat/Unsat | |||
: 22. Close 15-3 Rotates 15-3 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP. | |||
Observes 15-3 green light - ON Sat/Unsat Rotates 15-3 control switch to Pass/Fail CLOSE NMP2 2008 ML083230120.doc 55 October 2008 | |||
Performance Steps Standard Grade Observes 15-3 red light - ON Sat/Unsat Observes 15-3 green light - OFF Sat/Unsat | |||
: 23. Reports that Reserve Station Transformer 1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B Cue: Acknowledge report. | : 23. Reports that Reserve Station Transformer 1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B Cue: Acknowledge report. | ||
TERMINATING CUE: Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003. | TERMINATING CUE: Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003. | ||
RECORD STOP TIME | RECORD STOP TIME NMP2 2008 ML083230120.doc 56 October 2008 | ||
Initial Conditions: | |||
: 1. The plant experienced a Loss of Line 6. 2. The plant was manually scrammed. 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete. | : 1. The plant experienced a Loss of Line 6. | ||
: 5. Power has been restored to Line 6 and Power Control has verified its reliability. 6. Ask the operator for any questions. | : 2. The plant was manually scrammed. | ||
: 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. | |||
: 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete. | |||
: 5. Power has been restored to Line 6 and Power Control has verified its reliability. | |||
: 6. Ask the operator for any questions. | |||
Initiating cue: | Initiating cue: | ||
RO- | RO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.7 Power Restoration. | ||
NMP2 JPM #S-7 57 October 2008 | |||
Initial Conditions: | |||
: 1. The plant experienced a Loss of Line 6. 2. The plant was manually scrammed. 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete. | : 1. The plant experienced a Loss of Line 6. | ||
: 5. Power has been restored to Line 6 and Power Control has verified its reliability. 6. Ask the operator for any questions. | : 2. The plant was manually scrammed. | ||
Initiating cue: | : 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. | ||
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3. | : 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete. | ||
Candidate: Direct ALL communications and announcements | : 5. Power has been restored to Line 6 and Power Control has verified its reliability. | ||
: 6. Ask the operator for any questions. | |||
Initiating cue: | |||
(Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3. | |||
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3. | |||
Candidate: Direct ALL communications and announcements through the JPM Evaluator, first. | |||
NMP2 JPM #S-7 58 October 2008 | |||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate Suppression Chamber Cooling And Spray using RHS A Revision: NRC 2008 Task Number: N2-205000-01013 Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
Task Number: N2-205000-01013 Approvals: | NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | ||
Trainer/Evaluator: | |||
NA EXAMINATION SECURITY General Supervisor | Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: | ||
NO Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Comments: | |||
NMP2 JPM #S-7 59 October 2008 | |||
Evaluator Signature: Date: | |||
NMP2 JPM #S-7 60 October 2008 | |||
JPM | |||
Recommended Start Location: | |||
Simulator Simulator Set-up: | Simulator Simulator Set-up: | ||
: 8. Reset to IC 187 Directions to Operators: | : 8. Reset to IC 187 Directions to Operators: | ||
Line 758: | Line 776: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
* Self-verification shall be demonstrated. 3. During Training JPM: | : 2. During Evaluated JPM: | ||
* Self-verification shall be demonstrated. | |||
: 3. During Training JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | * No other verification shall be demonstrated. | ||
==References:== | ==References:== | ||
: 11. EOP-6 Attachment 22 12. NUREG K/A 226001 A4.01 Tools and Equipment: | : 11. EOP-6 Attachment 22 | ||
: 1. None | : 12. NUREG K/A 226001 A4.01 Tools and Equipment: | ||
: 1. None Task Standard: | |||
NMP2 JPM #S-7 61 October 2008 | |||
Suppression Pool Cooling & Spray initiated using RHS A NMP2 JPM #S-7 62 October 2008 | |||
Initiating cue: | Initial Conditions: | ||
: 15. A Small Break LOCA has occurred. | |||
: 16. Primary Containment Control EOP has been entered. | |||
Initiating cue: | |||
Performance Steps Standard Grade | (Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22. | ||
: 2. Obtain a copy of the reference procedure | Performance Steps Standard Grade | ||
: 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | |||
N/A, Suppression Chamber Spray is | : 2. Obtain a copy of the reference procedure EOP-6, Attachment 22 obtained. Step Sat/Unsat and review/utilize the correct section. 3.1 identified | ||
: 3. Start Suppression Chamber Spray: | |||
Suppression Chamber Spray using | N/A, Suppression Chamber Spray is Determines Suppression Chamber Sat/Unsat NOT required Spray is required IF Drywell Sprays are required concurrently with Suppression Chamber Sprays, perform Subsection 3.2 N/A, Drywell Spray is NOT required Determines step N/A Suppression Chamber Spray using Determines step to be used RHS A. (2CEC*PNL601) | ||
N/A, RHS A will NOT be used | N/A, RHS A will NOT be used | ||
: 4. IF a LOCA signal is present AND Determines bypass not required Sat/Unsat suppression chamber spray because DWP is >1.68 psig. | |||
operation is directed WITH drywell pressure less than 1.68 psig, perform the following to bypass the high drywell pressure interlock for 2RHS*MOV33A: | |||
NMP2 JPM #P-1 63 October 2008 | |||
: 4. IF a LOCA signal is present AND | |||
Remove relay E12A-K108A in | Performance Steps Standard Grade N/A, high drywell pressure interlock will NOT be bypassed NOTE: A L660 key may be needed to gain entry to 2CEC*PNL629. | ||
Install EOP Jumper #42 on terminal | Remove relay E12A-K108A in 2CEC*PNL629, Bay B (Figure 22-4) | ||
Install EOP Jumper #42 on terminal points BBB-49 AND AA-119 in 2CEC*PNL629, Bay B (Figure 22-4) | |||
Deliver relay E12A-K108A to SM | Deliver relay E12A-K108A to SM | ||
: 5. NOTE: Verifying SWP*MOV90A open may be delayed until after sprays are in service. This step is NOT sequence critical. | : 5. NOTE: Verifying SWP*MOV90A open may be delayed until after sprays are in service. This step is NOT sequence critical. | ||
Verify open SWP*MOV90A, HEAT | Verify open SWP*MOV90A, HEAT Open SWP*MOV90A, HEAT Pass/Fail/ | ||
EXCHANGER 1A, SVCE WTR EXCHANGER 1A, SVCE WTR INLET NA INLET VLV VLV | |||
: 6. Verify closed AND IF possible Determines valve is closed by green Sat/Unsat overridden, RHS*MOV24A, LPCI A light ON and red light OFF indication. | |||
INJECTION VLV Failure to override injection valve Places control switch to CLOSE to Pass/Fail closed can result in pump runout, if obtain the amber override light lit. | |||
: 7. Verify running RHS*P1A, PMP 1A Determines pump is running by red light ON, green light OFF OR motor amps indication. | the valve auto opens with FV38A open during Suppression Pool Cooling operation. | ||
: 8. IF operation in Containment Spray | : 7. Verify running RHS*P1A, PMP 1A Determines pump is running by red Sat/Unsat light ON, green light OFF OR motor amps indication. | ||
: 8. IF operation in Containment Spray Determines step N/A Sat/Unsat mode AND a trip of 2RHS*P1A occurs, perform emergency refill per Section 3.3 | |||
: 9. Open RHS*MOV33A, OUTLET TO Open RHS*MOV33A, OUTLET TO Pass/Fail NMP2 JPM #P-1 64 October 2008 | |||
Verify open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR INLET VLV by red light ON and green light OFF indication. | Performance Steps Standard Grade SUPPR POOL SPRAY SUPPR POOL SPRAY | ||
: 10. Verify 450 gpm on SUPPR SPRAY Determines flow is acceptable Sat/Unsat HEADER FLOW. (2RHS*FI64A) | |||
: 11. IF Suppression Pool Cooling is directed, Throttle open RHS*FV38A, RETURN Pass/Fail throttle open RHS*FV38A, RETURN TO SUPPR POOL COOLING to attain TO SUPPR POOL COOLING to desired flow rate (7400 to 7500 gpm). | |||
establish a flow of approximately 7450 gpm (E12-R603A) | |||
N/A, Suppression Pool Cooling was NOT directed | |||
: 12. Verify RHS*MOV4A, PMP 1A MINIMUM Verifies RHS*MOV4A, PMP 1A Sat/Unsat FLOW VLV position as follows: MINIMUM FLOW VLV valve is closed by green light ON and red light OFF IF RHS A is in Suppression Pool indication. | |||
Cooling/Spray, verify closed 2RHS*MOV4A OR IF RHS A is in Suppression Chamber Spray ONLY, verify open RHS*MOV4A | |||
: 13. Verify open SWP*MOV90A, HEAT Verify open SWP*MOV90A, HEAT Pass/Fail/ | |||
EXCHANGER 1A, SVCE WTR EXCHANGER 1A, SVCE WTR INLET NA INLET VLV VLV by red light ON and green light OFF indication. | |||
If valve was previously opened, this is not a critical step. | If valve was previously opened, this is not a critical step. | ||
: 14. NOTE: Post LOCA, in order to supply greater than 2000 gpm SWP to RHR Heat Exchangers with less than 5 SWP pumps in service it may be necessary to isolate Turbine Bldg. loads IAW N2-OP-31 Section H.12.0. | |||
Throttle open SWP*MOV33A, HEAT | Throttle open SWP*MOV33A, HEAT Throttles open SWP*MOV33A, HEAT Pass/Fail EXCHANGER 1A SVCE WTR OUTLET EXCHANGER 1A SVCE WTR VLV to establish Service Water flow to OUTLET VLV and verifies flow remains RHR Heat Exchanger 1A NOT to less than 7400 GPM exceed 7400 gpm. (E12-R602A) | ||
NMP2 JPM #P-1 65 October 2008 | |||
Performance Steps Standard Grade | |||
: 15. NOTE: 2RHS*MOV8A is interlocked in the open position for 10 minutes following a Division I ECCS initiation. | |||
WHEN possible, close RHS*MOV8A, If possible, close RHS*MOV8A, HEAT Sat/Unsat/ | |||
HEAT EXCHANGER 1A INLET EXCHANGER 1A INLET BYPASS VLV NA BYPASS VLV OR determines step is N/A | |||
: 16. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Suppression Pool Cooling and Spray is in operation RECORD STOP TIME NMP2 JPM #P-1 66 October 2008 | |||
Initial Conditions: | |||
: 1. A Small Break LOCA has occurred. | |||
: 2. Primary Containment Control EOP has been entered. | |||
Initiating cue: | |||
(Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22. | |||
NMP2 JPM #P-1 67 October 2008 | |||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Align Service Water to SFC Heat Exchanger 1A Revision: NRC 2008 Task Number: | |||
Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | |||
Trainer/Evaluator: | |||
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: | |||
NO Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
NMP2 | Comments: | ||
NMP2 JPM #P-1 68 October 2008 | |||
Evaluator Signature: Date: | |||
NMP2 JPM #P-1 69 October 2008 | |||
Recommended Start Location: | |||
Plant Simulator Set-up: | |||
: 9. NA Directions to Operators: | |||
Plant | |||
: 9. NA | |||
Read Before Every JPM Performance: | Read Before Every JPM Performance: | ||
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | ||
Line 858: | Line 871: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
* Self-verification shall be demonstrated. 3. During Training JPM: | : 2. During Evaluated JPM: | ||
* Self-verification shall be demonstrated. | |||
: 3. During Training JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | * No other verification shall be demonstrated. | ||
==References:== | ==References:== | ||
: 13. N2-SOP-38, Rev 04 14. NUREG K/A 233000 K1.02 Tools and Equipment: | : 13. N2-SOP-38, Rev 04 | ||
: 1. None | : 14. NUREG K/A 233000 K1.02 Tools and Equipment: | ||
: 1. None Task Standard: | |||
NMP2 JPM #P-1 70 October 2008 | |||
Service Water is aligned to SFC 1A NMP2 JPM #P-1 71 October 2008 | |||
Initiating cue: | Initial Conditions: | ||
: 17. The Control Room has been evacuated | |||
: 18. A loss of Spent Fuel Pool Cooling has occurred Initiating cue: | |||
Performance Steps Standard Grade | (Operators name), Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5. | ||
: 2. Obtain a copy of the reference procedure | Performance Steps Standard Grade | ||
: 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | |||
UNLESS directed otherwise by the SM, | : 2. Obtain a copy of the reference procedure N2-SOP-38 obtained. Sat/Unsat and review/utilize the correct section. | ||
: 3. Obtain SM permission to supply Service Requests SM permission Sat/Unsat Water Cooling to SFC Heat Exchanger 1A UNLESS directed otherwise by the SM, verify Chemistry has sampled (C1) the CCP system AND sample results meet SPDES AND ODCM requirements for discharge N/A, the SM directs sampling to be performed later CUE: SM has granted permission and Chemistry sample is satisfactory | |||
N/A, the SM directs sampling to be | : 4. In the Division I Switchgear Room, place the following breakers in OFF: | ||
2EHS*MCC103-4A, CL LOOP CLG WTR TO SFP CLG HE A SPLY V | 2EHS*MCC103-4A, CL LOOP CLG Locates breaker and places in OFF Pass/Fail WTR TO SFP CLG HE A SPLY V 2CCP*MOV14A 2EHS*MCC103-4B, CL LOOP CLG Locates breaker and places in OFF Pass/Fail WTR FR SFP CLG HE A RTN V 2CCP*MOV18A NMP2 JPM #P-2 72 October 2008 | ||
Performance Steps Standard Grade | |||
: 5. In North Aux Bay Elev 240, place the following breakers in OFF: | |||
2EHS*MCC102-2A, SWP TO SPENT Locates breaker and places in OFF Pass/Fail FUEL POOL HE 2SWP*MOV17A 2EHS*MCC102-2B, SWP FROM Locates breaker and places in OFF Pass/Fail SPENT FUEL POOL HE 2SWP*MOV18A | |||
: 6. NOTE: 2CCP*MOV14A and MOV18A are located on RB Elev 215 outside the 2SFC*E1A Room. | |||
Manually close the following valves: | |||
2CCP*MOV14A, SFC HEAT Locates and closes valve Pass/Fail EXCHANGER RBCLC INLET 2CCP*MOV18A, SFC HEAT Locates and closes valve Pass/Fail EXCHANGER RBCLC OUTLET | |||
: 7. NOTE: 2SWP*MOV17A and MOV18A are located on RB Elev 196 by the North stairwell. | |||
Manually open the following valves: | Manually open the following valves: | ||
2SWP*MOV17A, SFC HEAT | 2SWP*MOV17A, SFC HEAT Locates and manually opens valve Pass/Fail EXCHANGER SERVICE WTR INLET 2SWP*MOV18A, SFC HEAT Locates and manually opens valve Pass/Fail EXCHANGER SERVICE WTR OUTLET | ||
: 8. Throttle 2CCP*V12, SFC HX 1A Throttles valve while monitoring Pass/Fail OUTLET ISOL, to maintain Spent Fuel temperatures until desired range is Pool temperature 80 - 100°oF reached until desired temperature is reached CUE/NOTE: The applicant should state that temperature can be monitored at_______. | |||
Provide feedback that the appropriate temperature has been reached once satisfied that the appropriate location to monitor NMP2 JPM #P-2 73 October 2008 | |||
Performance Steps Standard Grade temperature has been determined | |||
: 9. IF not previously done, contact Requests Chemistry provide sample Sat/Unsat Chemistry to sample the CCP System AND determine if sample meets requirements for discharge Examiner Note: JPM may be terminated at this point TERMINATING CUE: Service Water is providing cooling to SFC Heat Exchanger 1A RECORD STOP TIME NMP2 JPM #P-2 74 October 2008 | |||
Initial Conditions: | |||
: 1. The Control Room has been evacuated | |||
: 2. A loss of Spent Fuel Pool cooling has occurred Initiating cue: | |||
Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5 NMP2 JPM #P-2 75 October 2008 | |||
Pass | Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Isolating An HCU With Cooling Water Flow Revision: NRC 2008 Task Number: | ||
Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | |||
Trainer/Evaluator: | |||
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: | |||
NO Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Comments: | |||
NMP2 JPM #P-2 76 October 2008 | |||
Evaluator Signature: Date: | |||
NMP2 JPM #P-2 77 October 2008 | |||
Recommended Start Location: | |||
Plant Simulator Set-up: | |||
: 10. NA Directions to Operators: | |||
Plant | |||
: 10. NA | |||
Read Before Every JPM Performance: | Read Before Every JPM Performance: | ||
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | ||
Line 941: | Line 941: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
* Self-verification shall be demonstrated. 3. During Training JPM: | : 2. During Evaluated JPM: | ||
* Self-verification shall be demonstrated. | |||
: 3. During Training JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | * No other verification shall be demonstrated. | ||
==References:== | ==References:== | ||
: 15. N2-OP-30, Rev 14 16. NUREG K/A 201001 A1.06 Tools and Equipment: | : 15. N2-OP-30, Rev 14 | ||
: 1. None | : 16. NUREG K/A 201001 A1.06 Tools and Equipment: | ||
: 1. None Task Standard: | |||
NMP2 JPM #P-2 78 October 2008 | |||
HCU 34-23 is isolated with cooling water maintained. | |||
NMP2 JPM #P-2 79 October 2008 | |||
Initial Conditions: | |||
: 19. HCU 34-23 was declared inoperable and must be isolated for maintenance. | : 19. HCU 34-23 was declared inoperable and must be isolated for maintenance. | ||
Initiating cue: | Initiating cue: | ||
(Operators name), Isolate HCU 34-23 WITH cooling water per N2-OP-30. | |||
Performance Steps Standard Grade | Performance Steps Standard Grade | ||
: 2. Obtain a copy of the reference procedure | : 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | ||
CUE: | : 2. Obtain a copy of the reference procedure N2-OP-30 obtained. Section F.8.2 Sat/Unsat and review/utilize the correct section. identified for use | ||
: 4. Close 2RDS*V101, (34-23) Insert | : 3. IF an RDS Pump is in service, verify Determines criteria is met Sat/Unsat 79 HCUs are isolated. | ||
CUE: NO other HCUs are isolated | |||
Locates and closes valve Pass/Fail | : 4. Close 2RDS*V101, (34-23) Insert Locates and closes valve Pass/Fail Isolation. | ||
Locates and closes valve Pass/Fail | : 5. Close 2RDS*V102, (34-23) Withdraw Locates and closes valve Pass/Fail Isolation. | ||
Locates and closes valve Pass/Fail | : 6. Close 2RDS-V113, (34-23) Charging Locates and closes valve Pass/Fail Water Isolation. | ||
: 7. CAUTION Locates and attaches drain line Sat/Unsat Rx water will drain out of 2RDS*V107 if a Reactor Scram occurs. | |||
ATTACH drain line to HCU at | ATTACH drain line to HCU at 2RDS*V107, (34-23) Accumulator NMP2 JPM #P-3 80 October 2008 | ||
Locates and closes valve Pass/Fail | Performance Steps Standard Grade Drain AND route to floor/equipment drain. (Lubricant use N/A for Swagelok Fittings) | ||
: 13. Open 2RDS*V101, (34-23) Insert | : 8. Slowly open 2RDS*V107 (34-23) to Opens valve and observes Pass/Fail depressurize accumulator. accumulator pressure lowering | ||
: 9. Close 2RDS*V107 (34-23). Locates and closes valve Pass/Fail | |||
: 10. Open 2RDS*V107 (34-23) one turn. Locates and opens valve Pass/Fail | |||
: 11. Close 2RDS-V103, (34-23) Drive Locates and closes valve Pass/Fail Water Isolation. | |||
: 12. Close 2RDS-V105, (34-23) Exhaust Locates and closes valve Pass/Fail Water Isolation. | |||
: 13. Open 2RDS*V101, (34-23) Insert Locates and opens valve Pass/Fail Isolation. | |||
: 14. If the HCU is to have maintenance OR Locates and closes valve Pass/Fail is to be out of service for an extended period of time perform the following: | |||
Close 2RDS*V111, (34-23) Gas Accumulator Charging Valve. | |||
: 15. Using two wrenches, slowly loosen Loosens and removes cap from Sat/Unsat AND remove the cap from connector P6. connector | |||
: 16. Connect nitrogen charging rig. Connects rig Sat/Unsat NMP2 JPM #P-3 81 October 2008 | |||
Performance Steps Standard Grade | |||
: 17. Open 2RDS*V111, (34-23) AND, Locates and opens valve Pass/Fail utilizing the nitrogen charging rig vent valve, slowly bleed off nitrogen. | |||
: 18. Verify Nitrogen pressure on the Verifies pressure is 0 Sat/Unsat accumulator pressure gauge is at 0 psig. | |||
: 19. Disconnect charging rig. Disconnects rig Sat/Unsat | |||
: 20. NOTE: While torquing cap, use a Reinstalls Cap Sat/Unsat wrench on P6 connector to prevent connector movement at instrument block. | |||
Apply thin coat of Nickel NEVER SEEZ on P6 connector threads, THEN reinstall the cap AND torque the cap to 150-200 in-lbs. | |||
TERMINATING CUE: HCU 34-23 is isolated with cooling water maintained and charging rig has been disconnected. | |||
Disconnects rig Sat/Unsat | RECORD STOP TIME NMP2 JPM #P-3 82 October 2008 | ||
RECORD STOP TIME | |||
Initial Conditions: | |||
: 1. HCU 34-23 was declared inoperable and must be isolated for maintenance. | : 1. HCU 34-23 was declared inoperable and must be isolated for maintenance. | ||
Initiating cue: | Initiating cue: | ||
Isolate HCU 34-23 WITH cooling water per N2-OP-30 | Isolate HCU 34-23 WITH cooling water per N2-OP-30 NMP2 JPM #P-3 83 October 2008 | ||
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Off Gas Recovery After Automatic Shutdown Revision: NRC 2008 Task Number: | |||
Approvals: | |||
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) | |||
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) | |||
Trainer/Evaluator: | |||
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: | |||
NO Start Time: Stop Time: Completion Time: | |||
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment. | |||
Comments: | |||
NMP2 JPM #P-3 84 October 2008 | |||
Evaluator Signature: Date: | |||
NMP2 JPM #P-3 85 October 2008 | |||
Recommended Start Location: | |||
Plant Simulator Set-up: | |||
: 11. NA Directions to Operators: | |||
Plant | |||
: 11. NA | |||
Read Before Every JPM Performance: | Read Before Every JPM Performance: | ||
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary. | ||
Line 1,014: | Line 1,022: | ||
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier. | ||
Notes to Instructor / Evaluator: | Notes to Instructor / Evaluator: | ||
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted | : 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *. | ||
: 2. During Evaluated JPM: | |||
* Self-verification shall be demonstrated. | * Self-verification shall be demonstrated. | ||
* No other verification shall be demonstrated. | : 3. During Training JPM: | ||
* Self-verification shall be demonstrated. | |||
* No other verification shall be demonstrated. | |||
==References:== | ==References:== | ||
: 17. N2-OP-42, Rev 09 18. NUREG K/A 271000 A1.08 Tools and Equipment: | : 17. N2-OP-42, Rev 09 | ||
: 1. None | : 18. NUREG K/A 271000 A1.08 Tools and Equipment: | ||
: 1. None Task Standard: | |||
NMP2 JPM #P-3 86 October 2008 | |||
Off Gas system operating in a stable manner NMP2 JPM #P-3 87 October 2008 | |||
Initial Conditions: | |||
: 20. The plant is operating at 30% power. | |||
: 21. OffGas has automatically shut down | |||
: 22. Recombiner temperature is 390°F | |||
: 23. H2 concentration is 1% | |||
: 24. The Off Gas High Radiation trip has NOT occurred Initiating cue: | |||
(Operators name), Recover Off Gas after an automatic shutdown per N2-OP-42, Step H.1.5.4 Performance Steps Standard Grade | |||
: 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME | |||
: 2. Obtain a copy of the reference procedure N2-OP-42 obtained. Section 1.0 Sat/Unsat and review/utilize the correct section. identified for use Note: Action begins at procedure step 1.5.4 | |||
: 3. Reset the Offgas circuits by depressing Resets pushbuttons identified Pass/Fail AND releasing the following RESET pushbuttons: | |||
RESET RE13A&B red pushbutton RESET SYSTEM A black pushbutton RESET SYSTEM B black pushbutton RESET VAC PUMP VP-1A black pushbutton RESET VAC PUMP VP-1B black pushbutton | |||
: 4. Open 2OFG-LV20A(B), CONDENSER Opens level controller Pass/Fail 1A(B) LEVEL CONTROLLER, to allow process flow to recycle back to the Main Condenser. | |||
NMP2 JPM #P-3 88 October 2008 | |||
Performance Steps Standard Grade | |||
: 5. Open 2OFG-AOV1A(B), PREHTR Locates and opens valve Pass/Fail E1A(B) INLET ISOL, by placing the control switch to STARTUP. | |||
: 6. Verify open 2OFG-AOV103, OFFGAS Determines valve is open Sat/Unsat EXHAUST TO MAIN STACK. | |||
: 7. NOTE: When both 2OFG-AOV1A and Determines valve in proper position Sat/Unsat AOV1B are open, 2CCS-MOV45A and MOV45B will each automatically open to mid position. If only 2OFG-AOV1A(B) is open, the associated 2CCS-MOV45A(B) will automatically open fully. The valves are located in the OFG Bldg El 261' Hallway. | |||
Locally, verify 2CCS-MOV45A(B), | |||
OFFGAS CONDENSER 1A(B) | |||
OUTLET ISOLATION, is in the proper position. | |||
CUE: Isolation is in the proper position | |||
: 8. Verify one Dryer is in service with its Determines one dryer is in service and Sat/Unsat associated valve control switch in associated switch in OPEN OPEN (2OFG-AOV4A/5A, 4B/5B, 4C/5C). | |||
: 9. IF required, start 2OFG-P1A AND P1B, Locates and places control switch in Pass/Fail VACUUM PUMP VP-1A(B). START | |||
: 10. WHEN recombination is occurring, as Determines temperature rising. Places Pass/Fail indicated by OFG Recombiner control switch in AUTO temperature rising, place 2OFG-LV20A(B) control switch in AUTO. | |||
CUE: Temperature is slowly rising | |||
: 11. Open 2OFG-AOV11A(B), Places control switch to STARTUP and Pass/Fail NMP2 JPM #P-3 89 October 2008 | |||
Performance Steps Standard Grade CONDENSER 1A(B) OUTLET observes valve open ISOLATION, by placing the control switch to STARTUP. | |||
: 12. WHEN the OFG System stabilizes, Determines system stable. Locates Pass/Fail perform the following: and pushes SYSTEM RESET button and returns AOV control switches to Push the RESET SYSTEM A(B) AUTO pushbutton. | |||
Return the Recombiner Train Isolation AOV control switches to AUTO. | |||
CUE: System has stabilized TERMINATING CUE: When Off Gas system is operating and stable, this JPM is complete RECORD STOP TIME NMP2 JPM #P-3 90 October 2008 | |||
Initial Conditions: | |||
: 1. The plant is operating at 30% power. 2. OffGas has automatically shut down 3. Recombiner temperature is 390 | : 1. The plant is operating at 30% power. | ||
°F 4. H2 concentration is 1% | : 2. OffGas has automatically shut down | ||
: 5. The Off Gas High Radiation trip has NOT occurred Initiating cue: | : 3. Recombiner temperature is 390°F | ||
: 4. H2 concentration is 1% | |||
: 5. The Off Gas High Radiation trip has NOT occurred Initiating cue: | |||
(Operators name), Recover Off Gas after an automatic shutdown IAW N2-OP-42, Step 1.5.4 NMP2 JPM #P-3 91 October 2008}} |
Revision as of 12:06, 14 November 2019
ML083230120 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 10/31/2008 |
From: | Constellation Energy Group, Nine Mile Point |
To: | D'Antonio J Operations Branch I |
Hansell S | |
Shared Package | |
ML081060454 | List: |
References | |
TAC U01690 | |
Download: ML083230120 (91) | |
Text
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Place RCS HPU Subloop In Service And Reset FCV Lockout Revision: NRC 2008 Task Number: N2-202001-01001 N2-202001-01023 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task:
NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NMP2 JPM #S-1 1 October 2008
Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to IC 181 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. N2-OP-29, Rev 12, Sect. E.1.0
- 2. NUREG K/A 202002 A4.02 Tools and Equipment:
- 1. None Task Standard:
Hydraulic Power Unit A has been placed in service with Subloop 2 is in LEAD operation. FCV A motion inhibit is reset and all P602 annunciators associated with FCV A are clear.
NMP2 JPM #S-1 2 October 2008
Initial Conditions:
- 1. The plant is operating at rated power.
- 2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago.
- 3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service.
- 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
Initiating cue:
(Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0.
Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure N2-OP-29 obtained. Precautions & Sat/Unsat and review/utilize the correct section. limitations reviewed & section E.1.0 referenced.
- 3. NOTE: Reviews Note and Caution Sat/Unsat The LOOP A(B) HYDR FLUID OUTSIDE ISOL valves may be closed, to reduce flow control valve from drifting closed during an HPU/Control System failure. They can be left closed until after their HPU is restored to operation.
CAUTION:
IF a standby HPU Subloop remains pressurized (greater than 500 psig) when removed from service and is restarted without the other subloop in operation, this could cause RECIRC FCV motion. This should be avoided.
- 4. For the HPU being started, perform the Reviews Procedure Step Sat/Unsat following:
- IF any of the following conditions exist, isolate 2RCS*SOV65A(B),
NMP2 JPM #S-2 3 October 2008
Performance Steps Standard Grade 2RCS*SOV66A(B), 2RCS*SOV67A(B),
2RCS*SOV68A(B), for the affected HPU by taking the LOOP A(B) HYDR FLUID OUTSIDE ISOL switch to CLOSE:
o Unexpected pressure (greater than 400 psig) WHILE the subloop is in standby o Associated solenoid valve 2RCS-SOV106A(B) OR 2RCS-SOV107A(B) is known to be sticking partially open OR is NOT able to be over-ridden WHILE the solenoid coils are de-energized o It is known that EITHER OPERATE OR ISOLATE coil is burned out o FUSE BLOWN indicator is lit on the Modicon I/O module inside panel 2CEC-PNL634 at any of the following:
Subloop A1 - MTBA-2, west panel, left column, 2nd from top (total of 8)
Subloop A2 - MTBA-10, west panel, right column, 2nd from top (total of 8)
Subloop B1 - MTBB-2, east panel, left column, 2nd from top (total of 8)
Subloop B2 - MTBB-10, east panel, right column,2nd from top (total of 8)
Cue: Valves were previously closed. None of these conditions currently exist
- 5. IF the HPU has been idle for less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OR controls on the HPU have NOT been repositioned since the last shutdown, perform the following:
NMP2 JPM #S-2 4 October 2008
Performance Steps Standard Grade Cue/Note: Initial Conditions state that one hour has elapsed
- a. Verify open 2RCS-V2011A(B) AND Dispatches operator to verify local Sat/Unsat V2011C(D), Return Filter Isolation. valve positions.
Cue: 2RCS-V2011A and V2011C are open.
- b. Continue at Step E.1.14. Continues to step E.1.14 Sat/Unsat
- 6. At 2CEC-PNL634 (South), Rack 1 for Verifies red indicating lights are NOT lit Sat/Unsat HPU A AND Rack 2 for HPU B, NEST 5, CARD 1, (R/C/L, labeled B35-K686A(B)) verify the red indicating lights for Channel 1 and 2 are NOT lit.
IF lit depress the reset pushbuttons.
Cue: Red indicating lights for Channel 1 and 2 are extinguished.
- 7. Momentarily depress BOTH READY Depresses BOTH READY pushbuttons Pass/Fail pushbuttons Verify the following:
o READY light illuminates. Verifies lights and annunciator Sat/Unsat o MAINTENANCE light extinguishes.
o Annunciator 602103(104),
RECIRC FCV A(B) BACKUP HYDR INOPERABLE clears.
- 8. Unless isolated per Step E.1.1.1 verify At P602, opens valves using LOOP A Pass/Fail the following valves open: HYDR FLUID OUTSIDE ISOL switch.
Observes green closed lights o 2RCS*SOV65A(B) extinguish and the red open lights are o 2RCS*SOV66A(B) lit for the four outside isolation valves.
o 2RCS*SOV67A(B) o 2RCS*SOV68A(B)
Note: Not isolated per E1.1.1 NMP2 JPM #S-2 5 October 2008
Performance Steps Standard Grade
- 9. NOTE: Step 1.17 does not apply if I&C Reads Note Sat/Unsat is to use the Standby Unit (SBU) at 2CEC-PNL634 to reduce % SERVO ERROR to zero or have verified that the signal to the servo valve is approximately zero.
Cue: If asked, I&C will NOT be using SBU to reduce % SERVO ERROR.
Using 2RCS-HC1603A(B), RECIRC At P602, Reduces % SERVO ERROR Pass/Fail LOOP A(B) FLOW CONTROL at to ZERO using Loop A controller 2CEC*PNL602, reduce % SERVO ERROR to zero.
NOTE: Failure to zero the % SERVO ERROR will result in an unplanned reactivity transient, as the FCV opens.
- 10. Decide which subloop is to control the Depresses PUMP/FAN MTR RUN Pass/Fail actuator AND depress its PUMP/FAN pushbutton for HPU A, Subloop 2 MTR RUN pushbutton.
Verify the following: Verifies indications Sat/Unsat
- PUMP/FAN MTR STOP light extinguishes.
- PUMP/FAN MTR RUN light illuminates.
- PRESSURIZED light illuminates OR 2RCS-PI1001A(B)-1(2) locally indicates 1850-1950 psi.
- Annunciator 602101(102), RECIRC FCV A(B) HYDRAULICS INOPERABLE clears.
- 11. At 2CEC*PNL602, verify:
NMP2 JPM #S-2 6 October 2008
Performance Steps Standard Grade
- Annunciator 602111(112), RECIRC Verifies annunciators clear, with the Sat/Unsat FCV A(B) HYDRAULICS MAINT exception of 602105 REQD cleared.
- Annunciator 602103(104), RECIRC FCV A(B) BACK UP HYDR INOPERABLE cleared.
- Annunciator 602127(128),
DRYWELL HIGH PRESSURE SWITCH A(B) TEST POSITION cleared.
- Annunciator 602133(134),
DRYWELL HIGH PRESSURE SYSTEM A(B) INTERLOCK cleared.
- Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT, in alarm condition.
- 12. Depress the applicable FCV MOTION Depresses FCV MOTION INHIBIT Pass/Fail INHIBIT RESET pushbutton at RESET pushbutton 2CEC*PNL602:
Verify the following: Verifies light illuminated and Sat/Unsat annunciator clear
- LEAD subloop OPERATIONAL light illuminated
- Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT extinguishes.
- 13. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Hydraulic Power Unit A Subloop 2 is in operation and FCV A motion inhibit is reset with all annunciators associated with FCV A cleared.
RECORD STOP TIME NMP2 JPM #S-2 7 October 2008
Initial Conditions:
- 1. The plant is operating at rated power.
- 2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago.
- 3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service.
- 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
Initiating cue:
(Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0.
NMP2 JPM #S-2 8 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shifting Feedwater Pumps at Power65% power when 2 pumps are in service Revision:
NRC 2008 Task Number: N2-259001-01004 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
YES Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-2 9 October 2008
Evaluator Signature: Date:
NMP2 JPM #S-2 10 October 2008
Recommended Start Location:
Simulator Simulator Set-up:
- 2. Reset to IC ????-182
- 3. 65% Power with malfunction FW10C preset.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 3. N2-OP-3, Rev 21, Sect. F.13.0
- 4. NUREG K/A 259001 A4.02 3.7 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #S-2 11 October 2008
C Feedwater Pump is in service and level is under control in the normal band via MANUAL controller operation. A Feedwater Pump is secured with LV10A in manual and closed.
NMP2 JPM #S-2 12 October 2008
Initial Conditions:
- 5. The plant is operating at 65% power.
- 6. C Feedwater Pump C is ready to be placed in service.
- 7. Pre-start checks are complete.
Initiating cue:
(Operators name), Place C Feedwater Pump in service, and rRemove A Feedwater Pump A from service and place Feedwater Pump C in service, IAW N, per N2-OP-3, Section F.13.0.
Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure N2-OP-3 obtained. Precautions & Sat/Unsat and review/utilize the correct section. limitations reviewed & section F.13.0 referenced.
- 3. NOTES: Reads notes. Obtains Key 18 Sat/Unsat
- 1. All actions in this Subsection are performed at 2CEC*PNL851 and PNL603 unless otherwise noted.
- 2. Shifting Feedwater Pumps will be performed at approximately 65% power by securing one pump and starting the standby.
- 3. IF re-starting 2FWS-P1A (B,C) from operating temperatures (D.4.0), Electrical Maintenance should perform an inspection of windings at first opportunity.
- 4. Feedwater minimum flow setpoint will be lowered to 4 Kgpm for all three Feedwater Pumps and then restored to 8 Kgpm after pump swap(s) are complete.
- 5. Fourth Point Heater Drain Pumps may remain pumping forward during this evolution if NMP2 2008 JPM #S-3 13 October 2008
Performance Steps Standard Grade feedwater heater level controllers are stable at 65%
power, with the permission of the Shift Manager.
- 6. Steps 13.1 AND 13.2 may be performed simultaneously.
- 7. The following step requires key
- 18 from the SM key locker.
CAUTION Throughout this section if a plant casualty occurs such that Feedwater Pumps will remain on minimum flow for greater than 15 minutes, Reactor Power should be immediately reduced below 55% AND Feedwater Pump minimum flow should be returned to 8 Kgpm on all three Feedwater Pumps.
- 4. Adjust ALL three Feedwater Pump Dispatches operator to Aadjust s Pass/Fail minimum flow valve setpoints as setpoints of all 3 minimum flow valves. Sat/Unsat follows:
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68A, RX FD WTR P1A RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68B, RX FD WTR P1B RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68C, RX FD WTR P1C RECIRC controller, to 4 Kgpm.
CUE: Min flow valve setpoints for all three feedwater pumps are set at 4 Kgpm.
- 5. Perform pre-start checks locally for the Reviews step Sat/Unsat associated Feedwater pump to be started ONLY per step F.13.2.1 through F.13.2.7.
NOTE: Pre-Start checks are complete NMP2 2008 JPM #S-3 14 October 2008
Performance Steps Standard Grade
- 6. Using N2-OP-101D, verify Reactor Reviews step and determines power is Sat/Unsat power has been reduced 65%. at 65%
NOTE: Power is at 65%. Rated MWth is 3467 and 65% power is 2253 MWth.
Depress Manual (M) pushbutton on Depresses M pushbutton on 2FWS- Pass/Fail 2FWS-LV10A (B,C) controller. LV10A controller 2FWS-HIC1010A and yellow M light is lit.
DURING this evolution, verify that the Verifies remaining LCV maintains level Sat/Unsat remaining level control valve 2FWS- on an on-going basis during evolution.
LV10B (C,A) maintains desired water level.
- 8. Slowly close 2FWS-LV10A (B,C) to the Locates Using 2FWS-HIC1010A slow Pass/Fail 2 to 4% valve position by using the slow detent close PBpushbutton and ,
CLOSE detent pushbutton on 2FWS- depresses until about 2-4% shown.
LV10A (B,C) controller.
- 9. Close 2FWS-LV10A (B,C) to the 0% Using 2FWS-HIC1010A fast detent Pass/Fail valve position by depressing the fast close pushbutton, Locates fast close CLOSE detent pushbutton on 2FWS- PB and depresses until 0% shown.
LV10A (B,C) controller.
- 10. Secure 2FWS-P1A (B,C), REACTOR Places FW Pump A in green flagged Pass/Fail FW PMP 1A (B,C), by placing its control position switch to Normal-After-STOP (Green flagged).
- 11. Verify 2FWL-P2A (B,C), AUX LUBE Determines Aux Lube Oil Pump starts Sat/Unsat OIL PMP 2A (B,C), auto starts. by observing AUX LUBE OIL PMP 2A red light ON.
- 12. Confirm 2FWR-FV2A (B,C), REACTOR Determines valve closes by observing Sat/Unsat FD P1A (B,C) RECIRC VLV, closes REACTOR FD P1A RECIRC VLV immediately. POSN meter indication goes to 0%
VALVE POSITION.
NMP2 2008 JPM #S-3 15 October 2008
Performance Steps Standard Grade
- 13. At 2FWS-P1A (B,C), place the Auxiliary Dispatches operator to Pplaces Aux Pass/Fail Lube Oil Pump control switch 2FWL- Lube Oil Pump control switch to Sat/Unsat LCS752 (753, 754) to START AND START, determines pump remains verify 2FWL-P2A (B,C) remains running running.
BOOTH OPERATOR: Activate remote to start aux oil pump.
- 14. IF 2FWS-P1A (B,C) is being placed in Dispatches operator to Oopen s Pass/Fail standby, open 2FWS-V25A (B,C) FD warmup line isolation. Sat/Unsat WTR PUMP 1A (B,C) WRMUP LN ISOLATION.
CUE: If directed, report 2FWS-V25A is open.
- 15. NOTE: The following step requires key Determines step is N/A
- 18 from the SM key locker.
IF the plant will remain at 65 % power for more than a shift, adjust ALL Feedwater Pump minimum flow valve setpoints as follows:
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 8 k gpm.
CUE: The Unit plant will remain at 65%
power for LESS than a shift.
- 16. NOTE: The following step will be Determines Step is N/A performed prior to starting the standby feed pump.
NMP2 2008 JPM #S-3 16 October 2008
Performance Steps Standard Grade Perform Feedwater Pump Warmup for the pump being started per subsection F.14.0.
CUE: Another Operator has performed the warmup NOTE: Min flow valve setpoints are at 4 Kgpm from previous steps.
- 17. Adjust ALL three Feedwater Pump Adjusts all 3 controllers Pass/Fail minimum flow valve setpoints as Sat/Unsat follows:
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 4 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 4 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 4 k gpm.
Verify open 2FWS-MOV47A (B,C), Verifies Discharge Block Valve is open Sat/Unsat REACTOR FW PMP 1A (B,C) DISCH by observing REACTOR FW PMP 1C BLOCK VLV. DISCH BLOCK VLV FWS-MOV47C red light is ON and green light is OFF.
- 19. IF applicable, verify open 2FWS-V103A Determines valve is openstep is NA, Sat/Unsat (B), FEEDWATER PUMP 1A (B) LOW since Feedwater Pump C is being FLOW LINE ISOL. started.
NMP2 2008 JPM #S-3 17 October 2008
Performance Steps Standard Grade
- 20. IF required, start the standby Determines three Condensate Pumps Sat/Unsat Condensate pump by placing 2CNM- running.
P1A (B,C) control switch in Normal-After-START (Red-flagged).
Note: NOT required, since all Condensate Pumps are running.
- 21. Verify sufficient Condensate Iron Determines sufficient Condensate Iron Sat/Unsat Prefilters are in service to support the Prefilters are in service maximum expected Condensate System flow rate. Refer to N2-OP-5A, Attachment 1.
CUE: If asked, Ssufficient Iron Prefilters are in service
- 22. NOTE: Nine Condensate Dispatches operator to determine at Sat/Unsat Demineralizers in service is the least eight demineralizers are in preferred lineup in the next step. service.
Verify at least eight Condensate Demineralizers are in service in accordance with N2-OP-5.
CUE: 8Nine demineralizers are in service
- 23. IF all three Heater Drain pumps are Determines step is N/A because heater Sat/Unsat NOT pumping forward, start the drain pumps are pumping forward.
standby Condensate Booster pump as follows:
Using 2CNM-PI39A (B,C), locally confirm condensate booster pump suction pressure is > 150 psig.
Start 2CNM-P2A (B,C), CONDENSATE BOOSTER PMP 2A (B,C), by placing the control switch to Normal-After-START (Red-flagged).
At 2CNM-P2A (B,C), place the Auxiliary Lube Oil Pump control switch 2CNO-LCS706 (707, 708) to AUTO AND verify 2CNO-P2A (B,C) stops.
NMP2 2008 JPM #S-3 18 October 2008
Performance Steps Standard Grade CUE: Heater Drain Pumps are pumping forward
- 24. For the Feedwater pump to be started, Determines that controller 2FWS-HIC- Pass/Fail verify the level controllers are in Manual 1010C is in manual by observing Sat/Unsat (M) AND valve positions are at 0% yellow M light is lit and % VALVE open. POSITION metervalve position i indicates 0.
- 25. CAUTION Reviews Caution Sat/Unsat The next two steps shall be performed concurrently.
IF feedwater pump suction pressure drops to 220 psig, start the third Condensate Booster pump if NOT already operating.
- 26. NOTE: IF 2FWS-P1C is selected to NOTE: Since 2FWS-P1B is to be left start, the preferable power supply is running, the preferable power supply from 2NPS-SWG003 if 2FWS-P1A will for 2FWS-P1C is 2NPS-SWG001.
be left running, or 2NPS-SWG001 if 2FWS-P1B is to be left running.
Start 2FWS-P1A (B,C) REACTOR FD Rotates control switch REACTOR FW Pass/Fail P1A (B,C), by placing the control switch PMP 1C FROM BUS 001 FWS-P1C to to Normal-After-Start (red flagged). red flagged position.
- 27. Confirm 2FWR-FV2A (B,C), REACTOR Determines valve starts to Sat/Unsat FD P1A (B,C) RECIRC VLV, starts to openDetermines valve starts to open open. by observing REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION.
- 28. WHEN 2FWR-FV2A (B,C) is 15% When REACTOR FD P1C RECIRC Sat/Unsat open, confirm 2FWS-P1A (B,C) starts. VLV POSN meter indication goes past 15% VALVE POSITION, observe pump start by observing red light and ammeter FWS-P1C BUS 001 CURRENT indication.Verifies valve position and pump start NMP2 2008 JPM #S-3 19 October 2008
Performance Steps Standard Grade
- 29. Using 2CNM-FI68A (B,C), RX FD WTR Determines flow on 2CNM-FI68C, RX Sat/Unsat P1A (B,C) FLOW meter, confirm FD WTR P1C FLOW meter is about 2FWS-P1A (B,C) flow is approximately 4000 gpm 4000 gpm.
- 30. NOTES: Reviews notes
- 1. The following two steps are performed locally at the associated Feedwater pump just started.
Place the Auxiliary Lube Oil Pump Places Aux Lube Oil Pump Control Pass/Fail control switch 2FWL-LCS752 (753, Switch in AUTO and verifies pump Sat/Unsat 754) to AUTO AND verify 2FWL-P2A stops (B,C) stops.
- 31. Close 2FWS-V25A (B,C), FD WTR Dispatches operator to Ccloses Pass/Fail PUMP 1A (B,C) WRMUP LN warmup line isolation. Sat/Unsat ISOLATION.
CUE: If asked, report 2FWS-V25C is closed.
NOTES: Reviews Notes and Caution Sat/Unsat
- 1. When opening 2FWS-LV10A (B,C) from a fully shut position, the initial 2 seconds of valve open signal serve only to wake up the control circuit computer with no additional action.
Pressing the valve open push button for an additional 10 seconds in manual slow detent (2% position per second) serves to take the control circuit from the minus (-) 20% position to the 0% position PRIOR to any actual valve position indicator movement taking place.
- 2. Once the LV10 valve circuitry reaches the 0% position, the first 1.5% to 2% of the valve stroke, as indicated by the position indicator, is used to release the seating force held NMP2 2008 JPM #S-3 20 October 2008
Performance Steps Standard Grade by the compression of the SB spring.
Therefore, the valve stem will not be lifted to establish flow until approximately 2% valve indication is reached. Reactor water level should be closely monitored during this evolution.
CAUTION The fast detent position (20% position per second) should NOT be used to take the control circuit from the minus (-
-) 20% to 0% position as the LV10 will likely open beyond the desired position as the valve can only physically open at 6% per second, and will continue to open once the operator releases the open pushbutton if the demand signal is beyond the 0% position until valve position catches up to the circuit controller demand.
- 32. Throttle open 2FWS-LV10A (B,C), Throttles LCV by depressing the OPEN Pass/Fail Feedwater Pump 1A (B,C) Level pushbuttonOPEN detent pushbutton Control Valve, by using the OPEN for controller 2FWS-HIC-1010C and detent pushbutton on 2FWS-LV10A observes % VALVE POSITION meter.
(B,C) controller.
- 33. Verify 2FWS-LV10B (C,A) closes Determines valve is closing by Sat/Unsat gradually as 2FWS-LV10A (B,C) observing % VALVE POSITION meter slowly opens. for 2FWS-LV10B.
- 34. Continue to slowly open 2FWS-LV10A Adjusts position using 2FWS-HIC- Pass/Fail (B,C) UNTIL the input signal (vertical) 1010C until vertical and horizontal AND output signal (horizontal) read the signals are equal.
same on 2FWS-LV10A (B,C) controller.
- 35. Place 2FWS-LV10A (B,C) in Auto by Depresses 2FWS-HIC-1010C AUTO Pass/Fail momentarily depressing the pushbutton and observe green AUTO Auto (A) pushbutton on 2FWS-LV10A light is lit.
(B,C) controller.
Booth Operator: Insert MMalfunction (or preset) FW10C is preset and when AUTO NMP2 2008 JPM #S-3 21 October 2008
Performance Steps Standard Grade pushbutton is depressed, the malfunction becomes effective causing LV10C to go full open.
As FWS-LV10C opens due to failure, FW flow Observe and report 2FWS-LV10C is Sat/Unsat and RPV water level will rise. Annunciator opening unexpectedly.
603139 REACTOR WATER LEVEL HIGH/LOW alarms.
- 36. Auto controller fails requiring manual Recognizes controller failure and takes Pass/Fail control returns 2FWS-HIC-1010C to manual control using controller pushbutton IAW per N2-SOP-6 and stabilize RPV level to avoid Level 3 and Level 8 protective functions.
- 37. Report status to CRS Status reported Sat/Unsat TERMINATING CUE: JPM is complete when level is being controlled manually in the normal band (between the low and high water level alarm setpoints).
RECORD STOP TIME NMP2 2008 JPM #S-3 22 October 2008
Initial Conditions:
- 1. The plant is operating at 65% power.
- 2. C Feedwater Pump is ready to be placed in service.
- 3. Pre-start checks are complete.
Initiating cue:
(Operators name), Remove Feedwater Pump A from service and place Feedwater Pump C in service, per N2-OP-3, Section F.13.0Place C Feedwater Pump in service, and remove A Feedwater Pump from service, IAW N2-OP-3, Section 13.0 NMP2 2008 JPM #S-3 23 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate RCIC and Respond To Overspeed Trip (Alternate) Revision: NRC 2008 Task Number: N2-217000-01048 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: YES Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NMP2 2008 JPM #S-3 24 October 2008
Recommended Start Location:
Simulator Simulator Set-up:
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. N2-OP-35
- 2. N2-ARP-01 601305
- 3. NUREG K/A 217000 A4.02 Tools and Equipment:
- 1. None Task Standard:
RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
NMP2 2008 JPM #S-3 25 October 2008
Initial Conditions:
- 2. N2-EOP-RPV is being implemented.
Initiating cue:
(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches.
Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference N2-EOP-HC-2 Attachment 5, Sat/Unsat procedure and review/utilize the correct Automatic RCIC Injection is section. obtained/referenced.
- 3. ARM and DEPRESS RCIC MANUAL ARM and DEPRESS RCIC Pass/Fail INITIATION pushbutton. MANUAL INITIATION pushbutton.
- 4. Verify system startup GLAND SEAL SYSTEM AIR Sat/Unsat COMPRESSOR starts. Red light ON. Green light OFF.
ICS*MOV116 Cooling Water MOV Sat/Unsat opens. Red light ON. Green light OFF.
When 2ICS*MOV120 Steam Admission Valve opens, turbine speed and pump discharge ICS*MOV120 Steam opens. Red Sat/Unsat pressure rise. light ON. Green light OFF.
When turbine speed exceeds 3000 RPM, ICS*MOV126 opens. Red light ON. Sat/Unsat 2ICS*MOV150 Trip Throttle Valve closes due Green light OFF.
to unexpected overspeed trip.
- 5. Observes RCIC Turbine trip Observes Annunciators 601305 lit. Sat/Unsat Observes TURBINE TRIPPED Sat/Unsat Cue: When informed of RCIC Turbine amber postage stamp lit.
trip, instruct candidate to Reset the RCIC Turbine from P601 and reestablish Recognizes RCIC Turbine tripped Sat/Unsat injection to the RPV Reports RCIC Turbine Tripped to Sat/Unsat SM NMP2 2008 JPM #S-3 26 October 2008
Performance Steps Standard Grade Cue: If directed to investigate, report Dispatches operator to RCIC Room Sat/Unsat overspeed trip mechanism is tripped. to investigate.
- 6. Reset ICS*MOV150 at P601 per N2-OP-35 H.1.0, RCIC Turbine Reset.
- 7. Verify cause is understood and Verify cause is understood and Sat/Unsat corrected. corrected.
- 8. Places ICS*MOV150 switch to CLOSED Places ICS*MOV150 switch to Pass/Fail until BOTH valve positions indicate CLOSED until BOTH valve valve is closed positions indicate valve is closed.(P601)
Observes ICS*MOV150 Green Sat/Unsat light ON (P601 Apron)
Observes ICS*MOV150 Red Sat/Unsat light OFF (P601 Apron)
Observes Trip/Throttle valve Sat/Unsat Green light ON (P601 verical)
Observes Trip/Throttle valve Sat/Unsat Red light OFF (P601 vertical)
- 9. Verify turbine speed is less than 3500 Verify turbine speed is less than Sat/Unsat RPM. 3500 RPM.
- 10. IF RCIC turbine tripped on overspeed Directs operator to locally reset the Sat/Unsat OR was locally tripped. Locally reset trip overspeed trip mechanism.
mechanism.
BOOTH OPERATOR: REMOTE RC01 to RESET.
CUE: Report trip mechanism is reset.
- 11. IF an initiation signal is sealed in, perform the following:
- a. Throttle open ICS*MOV150 Places ICS*MOV150 switch to Pass/Fail OPEN (P601)
NMP2 2008 JPM #S-3 27 October 2008
Performance Steps Standard Grade Observes ICS*MOV150 Green Sat/Unsat light OFF (P601 Apron)
Observes ICS*MOV150 Red Sat/Unsat light ON (P601 Apron)
Observes Trip/Throttle valve Sat/Unsat Green light OFF (P601 verical)
Observes Trip/Throttle valve Sat/Unsat Red light ON (P601 vertical)
- b. At 2ICS*MOV150, verify proper Directs operator to verify proper Sat/Unsat latching of the latch lever and trip latching.
hook.
CUE: Report trip mechanism is properly latched.
- c. Verify RCIC restarts Observe turbine speed and pump Sat/Unsat discharge pressure are rising.
- 12. Establish RPV Injection Places ICS*MOV126 switch to Pass/Fail OPEN (P601)
When RCIC flow is > 220 gpm, Sat/Unsat observe ICS*MOV143 Min Flow closes.
When RCIC discharge pressure > Sat/Unsat reactor pressure, ICS*MOV156 and 157 Injection Check Valves open.
RCIC Injection controlled at 600 gpm. Sat/Unsat
- 13. Report completion. Report RCIC injecting. Sat/Unsat TERMINATING CUE: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
RECORD STOP TIME NMP2 2008 JPM #S-3 28 October 2008
Initial Conditions:
- 2. N2-EOP-RPV is being implemented.
Initiating cue:
(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches.
NMP2 JPM #S-4 29 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shift RBCLCW and TBCLCW Pumps Revision: NRC 2008 Task Number: N2-SOP-14-01001 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
YES Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-4 30 October 2008
Evaluator Signature: Date:
NMP2 JPM #S-4 31 October 2008
Recommended Start Location:
Simulator Simulator Set-up:
- 4. Reset to IC 184
- 5. Remote CW-27 103.9oF, triggered from stopping CCS-P1A Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 5. N2-OP-13, Rev 07
- 6. N2-OP-14, Rev 05
- 7. ARP 601244
- 8. NUREG K/A 400000 A4.01 Tools and Equipment:
- 1. None NMP2 JPM #S-4 32 October 2008
Task Standard:
RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
NMP2 JPM #S-4 33 October 2008
Initial Conditions:
- 8. The plant is operating at full power.
Initiating cue:
(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation.
Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure N2-OP-13 & N2-OP-14 obtained. Sat/Unsat and review/utilize the correct section. Precautions & limitations reviewed
- 3. For the Main CCP pump to be started, Ensures checked by local operator Sat/Unsat verify the pump casing is free of air as follows:
Uncap AND throttle open 2CCP-V195 (V196, V197), P1A (B,C) VENT. WHEN a steady stream of water is observed, close AND recap 2CCP-V195 (V196, V197).
CUE: Checked by local operator
- 4. For the Main CCP pump to be started, Places control switch in red flagged Pass/Fail at panel 2CEC*P601, start 2CCP-P1A position (B,C), PMP 1A (B,C), by placing control switch in Normal-After-START (red flagged).
Note: The applicant will check board indications for amps and discharge pressure
- 5. Confirm normal operating indications in Ensures checked by local operator Sat/Unsat accordance with Subsection F.1.0.
NMP2 JPM #S-5 34 October 2008
Performance Steps Standard Grade CUE: Local indications are normal
- 6. At 2CEC*PNL601, secure 2CCP-P1A Places control switch in green flagged Pass/Fail (B,C), PMP 1A (B,C), by placing control position switch in Normal-After-STOP. (Green flagged)
- 7. IF required, place 2CCP-P1A (B,C) May request required status Sat/Unsat control switch in PULL TO LOCK.
- 8. Confirm normal operating indications in Ensures local checks are made Sat/Unsat accordance with Subsection F.1.0.
CUE: Another operator will check local indications Examiner Note: The applicant will now refer to N2-OP-14 for TBCLCW operations NOTES:
- 1. CCS system flow of greater than 8000 gpm requires more than one heat exchanger in service.
- 2. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
- 9. IF time permits, perform the following: Dispatched operator or determines Sat/Unsat task has been performed Dispatch an Operator to the pump to perform prestart inspection AND observe pump during start.
For the pump to be started, close 2CCS-V303A(B,C), TBCLC PUMP 1A(B,C) STOP CHECK.
CUE: Pre-start checks complete; the stop-check valve is CLOSED NMP2 JPM #S-5 35 October 2008
Performance Steps Standard Grade
- 10. Start 2CCS-P1A(B,C), PMP 1A(B,C), by Places control switch in red flagged Pass/Fail placing the control switch to Normal- position After-START (red flagged).
- 11. Slowly open 2CCS-V303A(B,C). Directs local operator to open valve Sat/Unsat CUE: Valve has been opened
- 12. Confirm normal operating indications in Ensures checked by local operator Sat/Unsat accordance with Subsection F.1.0.
CUE: Local indications are normal
- 13. NOTES: Checks indications Sat/Unsat
- 1. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
- 2. CCS Pump runout is 8,500 gpm. If system flow is greater than 8,000 gpm for one pump operations or 16,000 gpm for two pump operations, then starting an additional pump increases the probability of damaging tube vibrations in the CCS heat exchangers.
Three CCS pump operation shall be avoided unless shifting of pumps is required.
Confirm the CCS pump is NOT required for CCS System flow as follows:
Computer Point CCSFA01 Number of Running Pumps 1,000 - 8,200 GPM 1 8,200 - 16,400 GPM 2
- 14. NOTE: 2CCS-V303A (B,C) is located at Directs a local operator to close valve Sat/Unsat 2CCS-P1A (B,C) on TB Elev 250 Southwest.
Close 2CCS-V303A (B,C), TBCLC PUMP 1A (B,C) STOP CHECK.
Cue: Valve is closed NMP2 JPM #S-5 36 October 2008
Performance Steps Standard Grade
- 15. Secure 2CCS-P1A (B,C), PMP 1A Places control switch in green flagged Pass/Fail (B,C), by placing the control switch in position Normal-After-STOP. (Green flagged)
Booth Operator: Malfunction to fail temperature controller REMOTE CW-27 103.9oF when CCS-P1A is stopped.
- 16. IF required, place 2CCS-P1A (B,C) May request required status of control Sat/Unsat control switch in PULL TO LOCK. switch
- 17. Confirm normal operating indications for Ensures checked by local operator Sat/Unsat the running CCS Pump(s) in accordance with Subsection F.1.0.
Examiner Note: Applicant will respond to annunciator 601244 and Computer Point CCSTC04 for TBCLCW HX DISCH TEMP
- 18. Determines temp controller is failed and Determines ARP 601244 actions apply Sat/Unsat refers to ARP 601244
- 19. Places 2CCS-TIK104 in M Manual Places controller TBCLC HEAT Pass/Fail EXCHANGER TEMP CONTROLLER 2CCS-TIK104 in M Manual by depressing M button.
- 20. Manually controls temperature Adjusts temperature downward to Pass/Fail approximately 85°F (80 to 95),
indicated on TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104
- 21. Report status to CRS Report status. Sat/Unsat TERMINATING CUE: RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
RECORD STOP TIME NMP2 JPM #S-5 37 October 2008
Initial Conditions:
- 1. The plant is operating at full power.
Initiating cue:
(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation.
NMP2 JPM #S-5 38 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Depressurize the RPV to the Main Condenser Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
YES Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-5 39 October 2008
Evaluator Signature: Date:
NMP2 JPM #S-5 40 October 2008
Recommended Start Location:
Simulator Simulator Set-up:
- 6. Reset to IC 185
- 7. Malfunction MS-13 MSIV Isolation Failure Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 9. EOP-6 Attachment 18
- 10. NUREG K/A 239001 A4.09 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #S-5 41 October 2008
RPV is depressurizing to Main Condenser using Bypass Valves or Drain valves NMP2 JPM #S-5 42 October 2008
Initial Conditions:
- 10. Only 5 SRVs could be opened
- 11. EOP-6, Attachment 18 is in progress.
Initiating cue:
(Operators name), Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure EOP-6, Attachment 18 obtained. Sat/Unsat and review/utilize the correct section.
- 3. IF a LOCA signal is present OR Determines LOCA is present. Sat/Unsat expected, using PA235 key, place the following LOCA override switches to OVERRIDE: (2CEC*PNL851)
LOCA OVERRIDE VLV IAS*SOV166 Using key, places switch in Sat/Unsat OVERRIDE LOCA OVERRIDE VLV IAS*SOV184 Using key, places switch in Sat/Unsat OVERRIDE Annunciators 601517 and 601519 alarms when switches are placed in OVERRIDE.
- 4. Verify open the following valves (2CEC*PNL851)
IAS*SOV166, PRIMARY CNTMT Open IAS*SON166 and observe red Sat/Unsat OUTBD ISOL VLV TO SRV light ON and green light OFF.
IAS*SOV184, PRIMARY CNTMT INBD Open IAS*SON184 and observe red Sat/Unsat ISOL VLV TO SRV light ON and green light OFF.
NMP2 2008 ML083230120.doc 43 October 2008
Performance Steps Standard Grade
- 5. Record differential pressure across the Determines differential pressure is Sat/Unsat MSIVs using C33-R605 on within 150 psid.
2CEC*PNL603 AND one or more of the following Trip Units:
B22-N676A, STM LINE PRESS LO (2CEC*PNL609)
B22-N676C, STM LINE PRESS LO (2CEC*PNL609)
B22-N676B, STM LINE PRESS LO (2CEC*PNL611)
B22-N676D, STM LINE PRESS LO (2CEC*PNL611)
Note: PNL609 trip units are not within the scope of simulation.
CUE: Differential Pressure is <150 psid
- 6. IF differential pressure across the Determines step is N/A, based on Sat/Unsat MSIVs is > 150 psid, open at least one differential pressure.
pair of MSIVs by performing N2-OP-1, Section H.4.0 AND THEN continue at Step 3.1.7 N/A, differential pressure across the MSIVs is < 150 psid
- 7. IF differential pressure across the MSIVs is < 150 psid, open at least one pair of MSIVs as follows:
N/A, a pair of MSIVs will be opened per N2-OP-1, Section H.4.0 Verify MSIV isolation signals reset by performing the following:
(2CEC*PNL602)
Place control switches for the following Places all eight MSIV control switches Sat\Unsat to CLOSE: in CLOSE
- MSS*AOV6A, MSIV
- MSS*AOV6B, MSIV NMP2 2008 ML083230120.doc 44 October 2008
Performance Steps Standard Grade
- MSS*AOV6C, MSIV
- MSS*AOV6D, MSIV
- MSS*AOV7A, MSIV
- MSS*AOV7B, MSIV
- MSS*AOV7C, MSIV
- 10. Open one pair of MSIVs as follows: Places control switches for one pair of Sat/Unsat (2CEC*PNL602) MSIVs to AUTO. MSIVs will not open Place the control switch for ANY outboard MSIV to AUTO Place the control switch for the corresponding inboard MSIV to AUTO.
Examiner Note: Applicant must continue in procedure because MSIVs will not open
- 11. IF a pair of MSIVs can NOT be opened, align steam line drains to depressurize the RPV as follows:
N/A, a pair of MSIVs are open Verify open MSS*MOV207, INSIDE Opens MSS*MOV207 and observe red Pass/Fail MSIVS UPSTREAM DRAIN VLV. light ON and green light OFF.
Verify open MSS*MOV111, MAIN STM LINE DRAIN ISOL VLV. Opens MSS*MOV111 and observe red Pass/Fail (2CEC*PNL602) light ON and green light OFF.
NMP2 2008 ML083230120.doc 45 October 2008
Performance Steps Standard Grade
- 12. NOTE: A CAT 60 key may be required for entry to 2EHS*MCC102.
Place 2EHS*MCC102-7A, Directs operator to locally close Sat/Unsat 2MSS*MOV112 MAIN STEAM LINE 2EHS*MCC102-7A AND place alarm DRAIN OUTBD to ON (Aux Bay-North circuit to enable.
El 240)
BOOTH OPERATOR: Enter Remote MS05B, 2MSS*MOV112 APP R CKT BKR, CLOSE CUE: Report the breaker is closed and alarm circuit is enabled.
Place 2EHS*MCC102-7A, ALARM CIRCUIT control switch to ENABLE Verify open 2MSS*MOV112 Open 2MSS*MOV112 and observe red Pass/Fail (2CEC*PNL602) light ON and green light OFF.
Verify open MSS-MOV187, MAIN STM Pass/Fail LINE PRESS EQL/WARMING Open 2MSS-MOV187 and observe red (2CEC*PNL602) light ON and green light OFF.
- 13. Using BYPASS VALVE OPENING Depresses and holds to attempt to Pass/Fail/
JACK SELECTOR, depress AND hold open bypasses NA the INCREASE pushbutton UNTIL bypass valves are full open (2CEC*PNL851)
N/A, Turbine Bypass Valves will NOT open
- 14. IF Bypass Valves are unavailable, verify Performs if bypass valves would not Pass/Fail/
open as many of the following open NA steam line drains as possible to depressurize the RPV to the condenser:
N/A, Turbine Bypass Valves are available Open Turbine Stop Valve Drains (2CEC-PNL824):
MSS-MOV21A, TURBINE STOP VLV MSV3 DRAIN VLV NMP2 2008 ML083230120.doc 46 October 2008
Performance Steps Standard Grade MSS-MOV21B, TURBINE STOP VLV MSV4 DRAIN VLV MSS-MOV21C, TURBINE STOP VLV MSV1 DRAIN VLV MSS-MOV21D, TURBINE STOP VLV MSV2 DRAIN VLV Examiner Note: Step only performed if bypass valves could not be opened.
Degrading vacuum may have caused closure
- 15. Open MSS-MOV147, TURBINE Performs if bypass valves did not open Pass/Fail/
CONTROL VLVS DRAIN VLV NA (2CEC-PNL824)
- 16. Open Main Steam Line Drains (2CEC- Performs if bypass valves did not open Pass/Fail/
PNL824): NA MSS-AOV191, MAIN STM LINE HEADER DRAIN VLV MSS-AOV194, MAIN STM LINE HEADER DRAIN VLV MSS-AOV203, MAIN STM LINE HEADER DRAIN VLV MSS-AOV205, MAIN STM LINE HEADER DRAIN VLV MSS-AOV209, MAIN STM LINE HEADER DRAIN VLV MSS-AOV87A MSL A LOW POINT DRAIN VALVE MSS-AOV87B MSL B LOW POINT DRAIN VALVE MSS-AOV87C MSL C LOW POINT DRAIN VALVE MSS-AOV87D MSL D LOW POINT DRAIN VALVE NMP2 2008 ML083230120.doc 47 October 2008
Performance Steps Standard Grade MSS-AOV88A MSL DRAIN HEADER ISOL VALVE MSS-A0V88B MSL DRAIN HEADER ISOL VALVE
- 17. Open MSL Drain Orifice Bypass (2CEC- Performs if bypass valves did not open Pass/Fail/
PNL824): NA MSS-AOV85A, MAIN STM LINE DRAIN VLV MSS-AOV85B, MAIN STM LINE DRAIN VLV MSS-AOV85C, MAIN STM LINE DRAIN VLV MSS-AOV85D, MAIN STM LINE DRAIN VLV TERMINATING CUE: RPV is depressurizing to Main Condenser via Bypass valves or Drain valves RECORD STOP TIME NMP2 2008 ML083230120.doc 48 October 2008
Initial Conditions:
- 13. Only 5 SRVs could be opened
- 14. N2-EOP-6, Attachment 18 is in progress.
Initiating cue:
Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser NMP2 2008 ML083230120.doc 49 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Energize Reserve Station Transformer 1B and NPS-SWG003. Revision: NRC 2008 Task Number: N2-262000-01002, N2-SOP-03-01001 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NMP2 2008 ML083230120.doc 50 October 2008
Recommended Start Location:
Simulator Simulator Set-up:
Reset to IC 186 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 4. N2-SOP-03 Tools and Equipment:
- 1. None Task Standard:
Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
NMP2 2008 ML083230120.doc 51 October 2008
NMP2 2008 ML083230120.doc 52 October 2008 Initial Conditions:
- 3. The plant experienced a Loss of Line 6.
- 4. The plant was manually scrammed.
- 5. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 6. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
- 7. Power has been restored to Line 6 and Power Control has verified its reliability.
- 8. Ask the operator for any questions.
Initiating cue:
(Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3.
Performance Steps Standard Grade
- 12. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 13. Obtain a copy of the reference procedure N2-SOP-3 obtained. Precautions & Sat/Unsat and review/utilize the correct section. Limitations are reviewed and Attachment 1 Section 1.7 referenced.
- 14. Review Attachment 1 Section 1.7 Power Per step 1.7.2, determines Sat/Unsat Restoration to determine applicable performance of Attachment 6 is Attachment to Energize Reserve required.
Transformer 1B
- 4. At Panel 808 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRY01 (RES STA SER XFMR 1B PRIM PROT LO RELAY).
Cue: If asked, inform the candidate that 86-SPRY01 is reset.
- 5. At Panel 809 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY).
Cue: If asked, inform the candidate that 86-SPRZ08 is reset.
- 6. Determine step 6.2 is N/A Marks N/A block for step 6.2 Sat/Unsat
- 7. Determine section 6.3 is applicable Carries out the actions of section Sat/Unsat 6.3 NMP2 2008 ML083230120.doc 53 October 2008
Performance Steps Standard Grade
- 8. Close MDS2 - (115 KV MOD SWITCH 63) Places MDS2 control switch to Pass/Fail LINE 6. CLOSE Observes MDS2 red light - ON Sat/Unsat Observes MDS2 green light - OFF Sat/Unsat
- 9. Close MDS4 - (115 KV CIRCUIT Places MDS4 control switch from Pass/Fail SWITCHER CKT SWITCH 38). PULL-TO-LOCK to NORMAL-AFTER-OPEN Places MDS4 control switch to Pass/Fail CLOSE Observes MDS4 red light - ON Sat/Unsat Observes MDS4 green light - OFF Sat/Unsat The following annunciators clear with no required action:
852421 MOT Operator CKT 2YUC-MDS4 852435 RES STA SER XFMER 1B Loss of Voltage
- 10. IF required, place in Normal-After-Trip Places 3-1 control switch from Pass/Fail 2NPS-SWG003-1. PULL-TO-LOCK to NORMAL-AFTER-TRIP.
Observes 3-1 green light - ON Sat/Unsat
- 11. Return to Attachment 1 Section 1.7. Per step 1.7.8, determines Sat/Unsat performance of Attachment 7 is required.
- 12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed
- 12. Determines section 7.2 is applicable Carries out the actions of section Sat/Unsat 7.2
- 13. Place 3-14 in Pull-to-Lock. Places 3-14 control switch in PULL- Pass/Fail TO-LOCK Observes 3-14 green/red lights - Sat/Unsat OFF The following annunciator clears with no required action:
852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC
- 14. Place the SYNC switch to ON Rotates the SYNC switch to ON Pass/Fail (SYNCHRONIZE RES STA SVCE XFMR 1B).
NMP2 2008 ML083230120.doc 54 October 2008
Performance Steps Standard Grade
- 15. Close 3-1. Rotates 3-1 control switch to Pass/Fail CLOSE Observes 3-1 red light - ON Sat/Unsat Observes 3-1 green light - OFF Sat/Unsat Numerous annuciators clear.
Numerous annunciators alarm.
Numerous annunciators reflash. None of these requires action.
- 16. Place the SYNC switch to OFF. Rotates the SYNC switch to OFF Pass/Fail
- 17. Close 13-6. Rotates 13-6 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.
Observes 13-6 green light - ON Sat/Unsat Rotates 13-6 control switch to Pass/Fail CLOSE Observes 13-6 red light - ON Sat/Unsat Observes 13-6 green light - OFF Sat/Unsat The following annunciator clears with no required action:
852527 4KV Bus NNS 013 Undervoltage
- 18. Return to Attachment 1 Section 1.7. Per step 1.7.10, determines Sat/Unsat performance of Attachment 9 is required.
- 19. Step 9.1 Prerequisites Cue: If asked, 9.1.4 lockout is verified reset.
Step 9.1, Prerequisites, are completed
- 20. Determines section 9.2 is applicable Carries out the actions of section Sat/Unsat 7.2
- 21. Verify closed 3-6. Rotates 3-6 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.
Observes 3-6 green light - ON Sat/Unsat Rotates 3-6 control switch to Pass/Fail CLOSE Observes 3-6 red light - ON Sat/Unsat Observes 3-6 green light - OFF Sat/Unsat
- 22. Close 15-3 Rotates 15-3 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.
Observes 15-3 green light - ON Sat/Unsat Rotates 15-3 control switch to Pass/Fail CLOSE NMP2 2008 ML083230120.doc 55 October 2008
Performance Steps Standard Grade Observes 15-3 red light - ON Sat/Unsat Observes 15-3 green light - OFF Sat/Unsat
- 23. Reports that Reserve Station Transformer 1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B Cue: Acknowledge report.
TERMINATING CUE: Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
RECORD STOP TIME NMP2 2008 ML083230120.doc 56 October 2008
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Initiating cue:
RO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.7 Power Restoration.
NMP2 JPM #S-7 57 October 2008
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Initiating cue:
(Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3.
Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.
NMP2 JPM #S-7 58 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate Suppression Chamber Cooling And Spray using RHS A Revision: NRC 2008 Task Number: N2-205000-01013 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-7 59 October 2008
Evaluator Signature: Date:
NMP2 JPM #S-7 60 October 2008
Recommended Start Location:
Simulator Simulator Set-up:
- 8. Reset to IC 187 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 11. EOP-6 Attachment 22
- 12. NUREG K/A 226001 A4.01 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #S-7 61 October 2008
Suppression Pool Cooling & Spray initiated using RHS A NMP2 JPM #S-7 62 October 2008
Initial Conditions:
- 15. A Small Break LOCA has occurred.
- 16. Primary Containment Control EOP has been entered.
Initiating cue:
(Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22.
Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure EOP-6, Attachment 22 obtained. Step Sat/Unsat and review/utilize the correct section. 3.1 identified
- 3. Start Suppression Chamber Spray:
N/A, Suppression Chamber Spray is Determines Suppression Chamber Sat/Unsat NOT required Spray is required IF Drywell Sprays are required concurrently with Suppression Chamber Sprays, perform Subsection 3.2 N/A, Drywell Spray is NOT required Determines step N/A Suppression Chamber Spray using Determines step to be used RHS A. (2CEC*PNL601)
N/A, RHS A will NOT be used
- 4. IF a LOCA signal is present AND Determines bypass not required Sat/Unsat suppression chamber spray because DWP is >1.68 psig.
operation is directed WITH drywell pressure less than 1.68 psig, perform the following to bypass the high drywell pressure interlock for 2RHS*MOV33A:
NMP2 JPM #P-1 63 October 2008
Performance Steps Standard Grade N/A, high drywell pressure interlock will NOT be bypassed NOTE: A L660 key may be needed to gain entry to 2CEC*PNL629.
Remove relay E12A-K108A in 2CEC*PNL629, Bay B (Figure 22-4)
Install EOP Jumper #42 on terminal points BBB-49 AND AA-119 in 2CEC*PNL629, Bay B (Figure 22-4)
Deliver relay E12A-K108A to SM
- 5. NOTE: Verifying SWP*MOV90A open may be delayed until after sprays are in service. This step is NOT sequence critical.
Verify open SWP*MOV90A, HEAT Open SWP*MOV90A, HEAT Pass/Fail/
EXCHANGER 1A, SVCE WTR EXCHANGER 1A, SVCE WTR INLET NA INLET VLV VLV
- 6. Verify closed AND IF possible Determines valve is closed by green Sat/Unsat overridden, RHS*MOV24A, LPCI A light ON and red light OFF indication.
INJECTION VLV Failure to override injection valve Places control switch to CLOSE to Pass/Fail closed can result in pump runout, if obtain the amber override light lit.
the valve auto opens with FV38A open during Suppression Pool Cooling operation.
- 7. Verify running RHS*P1A, PMP 1A Determines pump is running by red Sat/Unsat light ON, green light OFF OR motor amps indication.
- 8. IF operation in Containment Spray Determines step N/A Sat/Unsat mode AND a trip of 2RHS*P1A occurs, perform emergency refill per Section 3.3
- 9. Open RHS*MOV33A, OUTLET TO Open RHS*MOV33A, OUTLET TO Pass/Fail NMP2 JPM #P-1 64 October 2008
Performance Steps Standard Grade SUPPR POOL SPRAY SUPPR POOL SPRAY
- 10. Verify 450 gpm on SUPPR SPRAY Determines flow is acceptable Sat/Unsat HEADER FLOW. (2RHS*FI64A)
- 11. IF Suppression Pool Cooling is directed, Throttle open RHS*FV38A, RETURN Pass/Fail throttle open RHS*FV38A, RETURN TO SUPPR POOL COOLING to attain TO SUPPR POOL COOLING to desired flow rate (7400 to 7500 gpm).
establish a flow of approximately 7450 gpm (E12-R603A)
N/A, Suppression Pool Cooling was NOT directed
- 12. Verify RHS*MOV4A, PMP 1A MINIMUM Verifies RHS*MOV4A, PMP 1A Sat/Unsat FLOW VLV position as follows: MINIMUM FLOW VLV valve is closed by green light ON and red light OFF IF RHS A is in Suppression Pool indication.
Cooling/Spray, verify closed 2RHS*MOV4A OR IF RHS A is in Suppression Chamber Spray ONLY, verify open RHS*MOV4A
- 13. Verify open SWP*MOV90A, HEAT Verify open SWP*MOV90A, HEAT Pass/Fail/
EXCHANGER 1A, SVCE WTR EXCHANGER 1A, SVCE WTR INLET NA INLET VLV VLV by red light ON and green light OFF indication.
If valve was previously opened, this is not a critical step.
- 14. NOTE: Post LOCA, in order to supply greater than 2000 gpm SWP to RHR Heat Exchangers with less than 5 SWP pumps in service it may be necessary to isolate Turbine Bldg. loads IAW N2-OP-31 Section H.12.0.
Throttle open SWP*MOV33A, HEAT Throttles open SWP*MOV33A, HEAT Pass/Fail EXCHANGER 1A SVCE WTR OUTLET EXCHANGER 1A SVCE WTR VLV to establish Service Water flow to OUTLET VLV and verifies flow remains RHR Heat Exchanger 1A NOT to less than 7400 GPM exceed 7400 gpm. (E12-R602A)
NMP2 JPM #P-1 65 October 2008
Performance Steps Standard Grade
- 15. NOTE: 2RHS*MOV8A is interlocked in the open position for 10 minutes following a Division I ECCS initiation.
WHEN possible, close RHS*MOV8A, If possible, close RHS*MOV8A, HEAT Sat/Unsat/
HEAT EXCHANGER 1A INLET EXCHANGER 1A INLET BYPASS VLV NA BYPASS VLV OR determines step is N/A
- 16. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Suppression Pool Cooling and Spray is in operation RECORD STOP TIME NMP2 JPM #P-1 66 October 2008
Initial Conditions:
- 1. A Small Break LOCA has occurred.
- 2. Primary Containment Control EOP has been entered.
Initiating cue:
(Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22.
NMP2 JPM #P-1 67 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Align Service Water to SFC Heat Exchanger 1A Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-1 68 October 2008
Evaluator Signature: Date:
NMP2 JPM #P-1 69 October 2008
Recommended Start Location:
Plant Simulator Set-up:
- 9. NA Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 13. N2-SOP-38, Rev 04
- 14. NUREG K/A 233000 K1.02 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #P-1 70 October 2008
Service Water is aligned to SFC 1A NMP2 JPM #P-1 71 October 2008
Initial Conditions:
- 17. The Control Room has been evacuated
- 18. A loss of Spent Fuel Pool Cooling has occurred Initiating cue:
(Operators name), Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5.
Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure N2-SOP-38 obtained. Sat/Unsat and review/utilize the correct section.
- 3. Obtain SM permission to supply Service Requests SM permission Sat/Unsat Water Cooling to SFC Heat Exchanger 1A UNLESS directed otherwise by the SM, verify Chemistry has sampled (C1) the CCP system AND sample results meet SPDES AND ODCM requirements for discharge N/A, the SM directs sampling to be performed later CUE: SM has granted permission and Chemistry sample is satisfactory
- 4. In the Division I Switchgear Room, place the following breakers in OFF:
2EHS*MCC103-4A, CL LOOP CLG Locates breaker and places in OFF Pass/Fail WTR TO SFP CLG HE A SPLY V 2CCP*MOV14A 2EHS*MCC103-4B, CL LOOP CLG Locates breaker and places in OFF Pass/Fail WTR FR SFP CLG HE A RTN V 2CCP*MOV18A NMP2 JPM #P-2 72 October 2008
Performance Steps Standard Grade
- 5. In North Aux Bay Elev 240, place the following breakers in OFF:
2EHS*MCC102-2A, SWP TO SPENT Locates breaker and places in OFF Pass/Fail FUEL POOL HE 2SWP*MOV17A 2EHS*MCC102-2B, SWP FROM Locates breaker and places in OFF Pass/Fail SPENT FUEL POOL HE 2SWP*MOV18A
- 6. NOTE: 2CCP*MOV14A and MOV18A are located on RB Elev 215 outside the 2SFC*E1A Room.
Manually close the following valves:
2CCP*MOV14A, SFC HEAT Locates and closes valve Pass/Fail EXCHANGER RBCLC INLET 2CCP*MOV18A, SFC HEAT Locates and closes valve Pass/Fail EXCHANGER RBCLC OUTLET
- 7. NOTE: 2SWP*MOV17A and MOV18A are located on RB Elev 196 by the North stairwell.
Manually open the following valves:
2SWP*MOV17A, SFC HEAT Locates and manually opens valve Pass/Fail EXCHANGER SERVICE WTR INLET 2SWP*MOV18A, SFC HEAT Locates and manually opens valve Pass/Fail EXCHANGER SERVICE WTR OUTLET
- 8. Throttle 2CCP*V12, SFC HX 1A Throttles valve while monitoring Pass/Fail OUTLET ISOL, to maintain Spent Fuel temperatures until desired range is Pool temperature 80 - 100°oF reached until desired temperature is reached CUE/NOTE: The applicant should state that temperature can be monitored at_______.
Provide feedback that the appropriate temperature has been reached once satisfied that the appropriate location to monitor NMP2 JPM #P-2 73 October 2008
Performance Steps Standard Grade temperature has been determined
- 9. IF not previously done, contact Requests Chemistry provide sample Sat/Unsat Chemistry to sample the CCP System AND determine if sample meets requirements for discharge Examiner Note: JPM may be terminated at this point TERMINATING CUE: Service Water is providing cooling to SFC Heat Exchanger 1A RECORD STOP TIME NMP2 JPM #P-2 74 October 2008
Initial Conditions:
- 1. The Control Room has been evacuated
- 2. A loss of Spent Fuel Pool cooling has occurred Initiating cue:
Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5 NMP2 JPM #P-2 75 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Isolating An HCU With Cooling Water Flow Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-2 76 October 2008
Evaluator Signature: Date:
NMP2 JPM #P-2 77 October 2008
Recommended Start Location:
Plant Simulator Set-up:
- 10. NA Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 15. N2-OP-30, Rev 14
- 16. NUREG K/A 201001 A1.06 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #P-2 78 October 2008
HCU 34-23 is isolated with cooling water maintained.
NMP2 JPM #P-2 79 October 2008
Initial Conditions:
- 19. HCU 34-23 was declared inoperable and must be isolated for maintenance.
Initiating cue:
(Operators name), Isolate HCU 34-23 WITH cooling water per N2-OP-30.
Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure N2-OP-30 obtained. Section F.8.2 Sat/Unsat and review/utilize the correct section. identified for use
- 3. IF an RDS Pump is in service, verify Determines criteria is met Sat/Unsat 79 HCUs are isolated.
CUE: NO other HCUs are isolated
- 4. Close 2RDS*V101, (34-23) Insert Locates and closes valve Pass/Fail Isolation.
- 5. Close 2RDS*V102, (34-23) Withdraw Locates and closes valve Pass/Fail Isolation.
- 6. Close 2RDS-V113, (34-23) Charging Locates and closes valve Pass/Fail Water Isolation.
- 7. CAUTION Locates and attaches drain line Sat/Unsat Rx water will drain out of 2RDS*V107 if a Reactor Scram occurs.
ATTACH drain line to HCU at 2RDS*V107, (34-23) Accumulator NMP2 JPM #P-3 80 October 2008
Performance Steps Standard Grade Drain AND route to floor/equipment drain. (Lubricant use N/A for Swagelok Fittings)
- 8. Slowly open 2RDS*V107 (34-23) to Opens valve and observes Pass/Fail depressurize accumulator. accumulator pressure lowering
- 9. Close 2RDS*V107 (34-23). Locates and closes valve Pass/Fail
- 10. Open 2RDS*V107 (34-23) one turn. Locates and opens valve Pass/Fail
- 11. Close 2RDS-V103, (34-23) Drive Locates and closes valve Pass/Fail Water Isolation.
- 12. Close 2RDS-V105, (34-23) Exhaust Locates and closes valve Pass/Fail Water Isolation.
- 13. Open 2RDS*V101, (34-23) Insert Locates and opens valve Pass/Fail Isolation.
- 14. If the HCU is to have maintenance OR Locates and closes valve Pass/Fail is to be out of service for an extended period of time perform the following:
Close 2RDS*V111, (34-23) Gas Accumulator Charging Valve.
- 15. Using two wrenches, slowly loosen Loosens and removes cap from Sat/Unsat AND remove the cap from connector P6. connector
Performance Steps Standard Grade
- 17. Open 2RDS*V111, (34-23) AND, Locates and opens valve Pass/Fail utilizing the nitrogen charging rig vent valve, slowly bleed off nitrogen.
- 18. Verify Nitrogen pressure on the Verifies pressure is 0 Sat/Unsat accumulator pressure gauge is at 0 psig.
- 19. Disconnect charging rig. Disconnects rig Sat/Unsat
- 20. NOTE: While torquing cap, use a Reinstalls Cap Sat/Unsat wrench on P6 connector to prevent connector movement at instrument block.
Apply thin coat of Nickel NEVER SEEZ on P6 connector threads, THEN reinstall the cap AND torque the cap to 150-200 in-lbs.
TERMINATING CUE: HCU 34-23 is isolated with cooling water maintained and charging rig has been disconnected.
RECORD STOP TIME NMP2 JPM #P-3 82 October 2008
Initial Conditions:
- 1. HCU 34-23 was declared inoperable and must be isolated for maintenance.
Initiating cue:
Isolate HCU 34-23 WITH cooling water per N2-OP-30 NMP2 JPM #P-3 83 October 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Off Gas Recovery After Automatic Shutdown Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-3 84 October 2008
Evaluator Signature: Date:
NMP2 JPM #P-3 85 October 2008
Recommended Start Location:
Plant Simulator Set-up:
- 11. NA Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 17. N2-OP-42, Rev 09
- 18. NUREG K/A 271000 A1.08 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #P-3 86 October 2008
Off Gas system operating in a stable manner NMP2 JPM #P-3 87 October 2008
Initial Conditions:
- 20. The plant is operating at 30% power.
- 21. OffGas has automatically shut down
- 22. Recombiner temperature is 390°F
- 23. H2 concentration is 1%
- 24. The Off Gas High Radiation trip has NOT occurred Initiating cue:
(Operators name), Recover Off Gas after an automatic shutdown per N2-OP-42, Step H.1.5.4 Performance Steps Standard Grade
- 1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure N2-OP-42 obtained. Section 1.0 Sat/Unsat and review/utilize the correct section. identified for use Note: Action begins at procedure step 1.5.4
- 3. Reset the Offgas circuits by depressing Resets pushbuttons identified Pass/Fail AND releasing the following RESET pushbuttons:
RESET RE13A&B red pushbutton RESET SYSTEM A black pushbutton RESET SYSTEM B black pushbutton RESET VAC PUMP VP-1A black pushbutton RESET VAC PUMP VP-1B black pushbutton
- 4. Open 2OFG-LV20A(B), CONDENSER Opens level controller Pass/Fail 1A(B) LEVEL CONTROLLER, to allow process flow to recycle back to the Main Condenser.
NMP2 JPM #P-3 88 October 2008
Performance Steps Standard Grade
- 5. Open 2OFG-AOV1A(B), PREHTR Locates and opens valve Pass/Fail E1A(B) INLET ISOL, by placing the control switch to STARTUP.
- 6. Verify open 2OFG-AOV103, OFFGAS Determines valve is open Sat/Unsat EXHAUST TO MAIN STACK.
- 7. NOTE: When both 2OFG-AOV1A and Determines valve in proper position Sat/Unsat AOV1B are open, 2CCS-MOV45A and MOV45B will each automatically open to mid position. If only 2OFG-AOV1A(B) is open, the associated 2CCS-MOV45A(B) will automatically open fully. The valves are located in the OFG Bldg El 261' Hallway.
Locally, verify 2CCS-MOV45A(B),
OFFGAS CONDENSER 1A(B)
OUTLET ISOLATION, is in the proper position.
CUE: Isolation is in the proper position
- 8. Verify one Dryer is in service with its Determines one dryer is in service and Sat/Unsat associated valve control switch in associated switch in OPEN OPEN (2OFG-AOV4A/5A, 4B/5B, 4C/5C).
- 9. IF required, start 2OFG-P1A AND P1B, Locates and places control switch in Pass/Fail VACUUM PUMP VP-1A(B). START
- 10. WHEN recombination is occurring, as Determines temperature rising. Places Pass/Fail indicated by OFG Recombiner control switch in AUTO temperature rising, place 2OFG-LV20A(B) control switch in AUTO.
CUE: Temperature is slowly rising
- 11. Open 2OFG-AOV11A(B), Places control switch to STARTUP and Pass/Fail NMP2 JPM #P-3 89 October 2008
Performance Steps Standard Grade CONDENSER 1A(B) OUTLET observes valve open ISOLATION, by placing the control switch to STARTUP.
- 12. WHEN the OFG System stabilizes, Determines system stable. Locates Pass/Fail perform the following: and pushes SYSTEM RESET button and returns AOV control switches to Push the RESET SYSTEM A(B) AUTO pushbutton.
Return the Recombiner Train Isolation AOV control switches to AUTO.
CUE: System has stabilized TERMINATING CUE: When Off Gas system is operating and stable, this JPM is complete RECORD STOP TIME NMP2 JPM #P-3 90 October 2008
Initial Conditions:
- 1. The plant is operating at 30% power.
- 2. OffGas has automatically shut down
- 3. Recombiner temperature is 390°F
- 4. H2 concentration is 1%
- 5. The Off Gas High Radiation trip has NOT occurred Initiating cue:
(Operators name), Recover Off Gas after an automatic shutdown IAW N2-OP-42, Step 1.5.4 NMP2 JPM #P-3 91 October 2008