NRC JPM RO/SRO COO2 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Determine Personnel Overtime Availability IAW GAP-FFD-02 Revision: NRC 2008 Task Number: N/A Approvals:

/ N/A - Exam Security /

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security /

Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time: 20/30 minutes Time Critical Task: No Alternate Path Task: No (RO/SRO)

Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC 2008 ADMIN JPM C002 October 2008

Recommended Start Location: Classroom Simulator Set-up: None Directions to the Instructor/Evaluator:

None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail.
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:
  • Self verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

1. GAP-FFD-02 Tools and Equipment:
1. Calculator NRC 2008 ADMIN JPM C002 October 2008

Task Standard: Determine Personnel Availability for Overtime IAW GAP-FFD-02.

Initial Conditions:

1. The plant is shutdown.
2. In order to support critical path work required for startup, personnel overtime will be required for the night shift on October 26 from 1830-0630.
3. All the overtime hours will be spent performing (ROs) or supervising (SROs) field activities.

Initiating Cues:

1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of overtime beginning at 1830 on October 26 without requiring an Overtime Deviation Request IAW GAP-FFD-02.
2. If an Overtime Deviation Request would be required for individual(s), state the work hour limit(s) which would be exceeded IAW GAP-FFD-02.
3. SROs ONLY - Complete Parts 1 and 2.A of an Overtime Deviation Request Form for all individuals who would need a deviation approved to cover the shift.

EXAMINER NOTE: FOR ROs - Provide Attachments A & C.

FOR SROs - Provide Attachments A, B & D, and Blank Overtime Deviation Request Form.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat Evaluator Acknowledge repeat back providing (GAP-OPS-O1/Operations Manual) correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure and GAP-FFD-02 obtained Sat/Unsat review/utilize the correct section of the procedure.

NRC 2008 ADMIN JPM C002 October 2008

3. FOR ROs - Reviews work hours for Reactor ROs - Determines the following: Pass/Fail Operators 1 thru 3 RO #1 - Eligible RO #2 - Not Eligible - would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 day period RO #3 - Not Eligible - would exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period FOR SROs - Reviews work hours for SROs - Determines the above limitations plus Reactor Operators 1 thru 3 and Senior Reactor the following:

Operators 1 and 2 SRO #1 - Eligible SRO #2 - Not Eligible - would exceed 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period

4. FOR SROs - Completes Overtime Deviation Completes Columns 1 and 2 of Part 1 of Pass/Fail Request Form GAP-FFD-02 Attachment 1, per attached key Completes Columns 3 and 4 of Part 1 of Sat/Unsat GAP-FFD-02 Attachment 1, per attached key Completes Part 2.A of GAP-FFD-02 Sat/Unsat Attachment 1, per attached key TERMINATING CUE: FOR ROs, JPM Attachment C completed. FOR SROs, JPM Attachment D and GAP-FFD-02 Attachment 1 completed RECORD STOP TIME NRC 2008 ADMIN JPM C002 October 2008

ATTACHMENT A - ROs RO #1 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 1830-0642 1830-0730 1830-0542 1830-0642 1830-0706 (includes 12 (includes 12 (includes 60 (includes 12 (includes 12 (includes 36 OFF OFF OFF minutes of minutes of minutes of minutes of minutes of minutes of turnover time) turnover time) turnover time) turnover time) turnover time) turnover time)

RO #2 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 1830-0630 1830-0642 1830-0654 1830-0642 1830-0642 (includes 12 (includes 0 (includes 12 (includes 24 (includes 12 (includes 12 OFF OFF OFF minutes of minutes of minutes of minutes of minutes of minutes of turnover time) turnover time) turnover time) turnover time) turnover time) turnover time)

RO #3 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 1830-0630 1830-0648 1830-0642 1830-0642 1830-0742 (includes 12 (includes 0 (includes 18 (includes 12 (includes 12 (includes 12 OFF OFF OFF minutes of minutes of minutes of minutes of minutes of minutes of turnover time) turnover time) turnover time) turnover time) turnover time) turnover time)

NRC 2008 ADMIN JPM C002 October 2008

ATTACHMENT B - SROs SRO #1 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 1830-0642 1830-0735 1830-0642 1830-0720 (includes (includes (includes (includes (includes 12 minutes 12 minutes OFF 65 minutes OFF 12 minutes 50 minutes OFF OFF of turnover of turnover of turnover of turnover of turnover time) time) time) time) time)

SRO #2 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 1830-0630 1830-0648 1830-0642 0630-1830 0500-1200 (includes (includes 0 (includes (includes (includes 0 (includes 0 12 minutes minutes of 18 minutes 12 minutes OFF minutes of OFF minutes of OFF of turnover turnover of turnover of turnover turnover turnover time) time) time) time) time) time)

NRC 2008 ADMIN JPM C002 October 2008

ATTACHMENT C - RO Answer Sheet Eligible to work without an If No, what work hour limit(s)

Overtime Deviation Request? would be exceeded IAW GAP-(Yes/No) FFD-02?

RO #1 RO #2 RO #3 NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade ATTACHMENT D - SRO Answer Sheet Eligible to work without an If No, what work hour limit(s)

Overtime Deviation Request? would be exceeded IAW GAP-(Yes/No) FFD-02?

RO #1 RO #2 RO #3 SRO #1 SRO #2 NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade Initial Conditions:

1. The plant is shutdown.
2. In order to support critical path work required for startup, personnel overtime will be required for the night shift on October 26 from 1830-0630.
3. All the overtime hours will be spent performing (ROs) or supervising (SROs) field activities.

Initiating Cues:

1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of overtime beginning at 1830 on October 26 without requiring an Overtime Deviation Request IAW GAP-FFD-02.
2. If an Overtime Deviation Request would be required for individual(s), state the work hour limit(s) which would be exceeded IAW GAP-FFD-02.
3. SROs ONLY - Complete Parts 1 and 2.A of an Overtime Deviation Request Form for all individuals who would need a deviation approved to cover the shift.

NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade NRC JPM SRO COO1 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Time to Boil Calculation for Reactor Coolant System Revision: NRC 2008 Task Number: N/A Approvals:

/ N/A - Exam Security /

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security /

Configuration Control Date Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time: 25 minutes Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC 2008 SRO ADMIN JPM C001 October 2008

Recommended Start Location: (Completion time based on the start location)

Classroom Simulator Set-up:

None Directions to the Instructor/Evaluator:

None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

4. Critical steps are identified in grading areas as Pass/Fail.
5. During Evaluated JPM:
  • Self verification shall be demonstrated.
6. During Training JPM:
  • Self verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

2. N1-ODP-OPS-0108 Tools and Equipment:
2. Calculator NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade Task Standard: Perform a Time to Boil calculation for the Reactor Coolant System in accordance with N1-ODP-OPS-0108.

Initial Conditions:

1. The plant has been shutdown for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. A loss of Shutdown Cooling has occurred.
3. Reactor Coolant Temperature = 150°F.
4. Reactor Water Level = 72 inches.
5. RBCLC Temperature on TI-70-23C = 80°F.
6. One (1) Spent Fuel Pool Cooling Loop is in Service.
7. Reactor Engineering reports the following information for burned bundles in the core:
  1. Bundles 1X = 160
  1. Bundles 2X = 164
  1. Bundles 3X = 148
  1. Bundles 4X = 60
8. Instructor to ask for any questions.

Initiating Cues:

(Operators name), perform a Time to Boil calculation for the Reactor Coolant System in accordance with N1-ODP-OPS-0108.

EXAMINER NOTE: Provide applicant a blank copy of N1-ODP-OPS-0108 Attachments 1 & 2 and Table 1.

EXAMINER NOTE: Refer to KEY for specifics of calculations.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat Evaluator Acknowledge repeat back providing (GAP-OPS-O1/Operations Manual) correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure and N1-ODP-OPS-0108 obtained. Sat/Unsat review/utilize the correct section of the procedure.
3. Calculates DHPcore DHPcore = 38.1192 MBTU/HR Sat/Unsat (Line 103 of Att. 2) Note: To account for differences in rounding, the acceptable range for this value is 38-38.2 MBTU/HR.

Note: This value can be obtained either by calculating heat production based on the number of fuel bundles, or directly from the Total column of Table 1.

NRC 2008 ADMIN SRO JPM EC October 2008

Performance Steps Standard Grade Performance Steps Standard Grade

4. Calculates DHP DHP = 38.1192 MBTU/HR Pass/Fail (Line 9 of Att.1) Note: To account for differences in rounding, the acceptable range for this value is 38-38.2 MBTU/HR.
5. Calculates DHRsdc DHR sdc = 0 MBTU/HR Sat/Unsat (Line 58 of Att.1)
6. Calculates DHR DHR = 0 MBTU/HR Pass/Fail (Line 64 of Att.1)
7. Selects Thermal Capacity (K) for specific K = 0.557 MBTU/F Pass/Fail condition applicable (Line 74 of Att.1)
8. Calculates Time to Boil = [212°F - Time to Boil = (212 - 150) Pass/Fail SFP/Cavity Temp] / (DHP - DHR) / K (38.1192-0)/ 0.557 (Line 82 of Att.1) =0.906 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.44733e-4 months <br /> (or 54.36 minutes)

Note: To account for differences in rounding, the acceptable range for this value is 0.900-0.910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br /> (or 54.0-54.6 minutes)

Terminating Cue: Time to Boil Calculation is complete and results are reported.

RECORD STOP TIME NRC 2008 ADMIN SRO JPM EC October 2008

Performance Steps Standard Grade Initial Conditions:

1. The plant has been shutdown for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. A loss of Shutdown Cooling has occurred.
3. Reactor Coolant Temperature = 150°F.
4. Reactor Water Level = 72 inches.
5. RBCLC Temperature on TI-70-23C = 80°F.
6. One (1) Spent Fuel Pool Cooling Loop is in Service.
7. Reactor Engineering reports the following information for burned bundles in the core:
  1. Bundles 1X = 160
  1. Bundles 2X = 164
  1. Bundles 3X = 148
  1. Bundles 4X = 60 Initiating Cues:

(Operators name), perform a Time to Boil calculation for the Reactor Coolant System in accordance with N1-ODP-OPS-0108.

NRC 2008 ADMIN SRO JPM EC October 2008

Performance Steps Standard Grade NRC JPM SRO EC Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Review of Surveillance Test (ST) Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security Configuration Control Date Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time: 20 minutes Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC 2008 ADMIN SRO JPM EC October 2008

Performance Steps Standard Grade Recommended Start Location: Classroom Simulator Set-up: None Directions to the Instructor/Evaluator:

For N1-ST-Q19, enter the surveillance data using an archived record from an actual performance of the surveillance. EXCEPTION: Step 8.1.12.b, enter the CW Circ Pump 11 d/p = 21.2, and Step 8.3.2, enter the 210.1-01 CLOSE TO OPEN time = 3.0 seconds.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

1. N1-ST-Q19; Section 10.0.
2. LER 2003-004.
3. K/A 2.2.12 (3.4).
4. K/A 2.2.24 (3.8).

Tools and Equipment:

1. None NRC 2008 ADMIN SRO JPM EC October 2008

Performance Steps Standard Grade Task Standard:

Complete Section 10.1, Operations Review, and identify the unsatisfactory results for N1-ST-Q19. Determine the appropriate actions in response to the unsatisfactory conditions.

Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is at 100% power.
3. N1-ST-Q19 has just been completed up to the Operations Review.

Initiating cue:

(Operators name), using the completed surveillance provided, complete Section 10.1, Operations Review.

Record the results of your review and any required actions in the space below.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat Evaluator Acknowledge repeat back providing (GAP-OPS-O1) correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure and Copy of completed surveillance will be Sat/Unsat review/utilize the correct section. provided to the performer.
3. N1-ST-Q19: Transcribes surveillance data to the Sat/Unsat Completes section 10.1, Operations Review, and appropriate table in section 10.1.

references procedure sections as applicable to verify the required data. Evaluates the data. Determines acceptance criteria NOT in Pass/Fail acceptable range for CW Circ Pump 11 d/p.

Value is in the REQUIRED ACTION range.

Declares CW Circ Pump inoperable. Pass/Fail Informs Condition Monitoring Group Sat/Unsat (CMG).

Determines 210.1-01 CLOSED TO OPEN Pass/Fail stroke time is UNSAT. Value is above the IST limit, but within the Limiting Stroke Time.

Determines 210.1-01 may be stroked a Sat/Unsat second time.

Determines pump to be entered in ESL. Sat/Unsat Determines TS 3.4.5 entry is required; restore CW pump to operable within 7 days. Pass/Fail NRC 2008 ADMIN SRO JPM EC October 2008

Performance Steps Standard Grade Performance Steps Standard Grade Sat/Unsat Determines entry into SM log required.

Sat/Unsat Determines yellow clearance tag required for CW pump.

Sat/Unsat Determines ACR and CR to be written.

Sat/Unsat Informs IST/CMG.

Sat/Unsat Informs Manager Operations.

TERMINATING CUE:

Operations Review of N1-ST-Q19 is complete. Required actions and notifications are identified.

RECORD STOP TIME NRC 2008 ADMIN SRO JPM EC October 2008

Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is at 100% power.
3. N1-ST-Q19 has just been completed up to the Operations Review.

Initiating cue:

(Operators name), using the completed surveillance provided, complete Section 10.1, Operations Review. Record the results of your review and any required actions in the space below.

NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade NRC JPM SRO EP Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Emergency Event Classification, Notification and Reclassification Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security Configuration Control Date Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom/Simulator Expected Completion Time: 30 minutes Time Critical Task: Yes Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC 2008 SRO ADMIN JPM EP October 2008

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM EP October 2008

Performance Steps Standard Grade Recommended Start Location: Classroom/Simulator Simulator Set-up: None Directions to the Instructor/Evaluator: None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the Unit 2 SM, Security Supervisor, Communication Aid, and other personnel as necessary. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

1. EPIP-EPP-01, Classification Of Emergency Conditions at Unit 1
2. EPIP-EPP-18, Attachment 1 SM/ED Checklist
3. EPIP-EPP-20, Emergency Notifications
4. EPMP-EPP-0101
5. K/A 2.4.29(4.0), Knowledge of the Emergency Plan.

Tools and Equipment:

1.0 EPIP-EPP-01, ATTACHMENT 1, UNIT 1 EAL FLOWCHART 2.0 SM/ED Checklist Package NRC 2008 SRO ADMIN JPM EP October 2008

Performance Steps Standard Grade Task Standard:

Classify and declare the emergency event within 15 minutes of the time that indications are available to the Candidate that an EAL has been exceeded. Make notifications to New York State and Oswego County within 15 minutes of the time the event is declared.

Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is operating at 100% power.
3. Unit 2 is operating at 100% power.
4. The following conditions exist:

An Earthquake has just hit the site Unit 2 reports seismic instrumentation reads 0.050g NAO reports structural steel has fallen and damaged Power Board 16B

5. Ask the operator for any questions.

Initiating Cue:

(Operators name), based on the above conditions, determine the event classification per EPIP-EPP-01 and complete steps 1 through 7.b of EPIP-EPP-18, Attachment 1, SM/ED Checklist. This is a time critical task.

Examiner Note: After this event is classified, declared and the notifications initiated, the plant conditions will change as stated below and a reclassification will be required.

Initial Conditions #2:

1. The reactor has been scrammed due to rising drywell pressure.
2. Drywell pressure is 4.0 psig and slowly rising.
3. A Loss of Offsite Power has occurred and both EDGs are supplying their emergency buses.
4. The Security Supervisor notified the Control Room that an individual has entered the Reactor Building with intent to commit sabotage.

Initiating Cue:

(Operators name), based upon the above changes in plant conditions, determine any change in the emergency declaration level. This is a time critical task.

NRC 2008 SRO ADMIN JPM EP October 2008

Performance Steps Standard Grade Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat Evaluator Acknowledge repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of EPIP-EPP-01 attachment 1 EPIP-EPP-01 attachment 1 and Shift Manager Sat/Unsat and Shift Manager emergency paperwork emergency paperwork is obtained.

and review/utilize the correct section.

3. Enters EPIP-EPP-18, Attachment 1, SM/ED Completes steps 1 thru 7b of EPIP-EPP-18, as Sat/Unsat Checklist and completes Steps 1 through 7.b. described in subsequent JPM steps.
4. Classifies and declares the emergency. Declares an Alert within fifteen minutes of the Pass/Fail JPM initial condition sheet being accepted in accordance with EAL 8.4.6.

EXAMINER NOTE: Time difference below must be 15 minutes or less:

JPM start time: ________

Time of Declaration: ____________

5. Completes EPIP-EPP-18 attachment 1, Completes Attachment as shown in KEY Sat/Unsat figure 1 flowchart to determine evacuation and accountability requirements.

Note: Evacuation determination is subjective and may or may not be performed. This will determine which path is taken on EPIP-EPP-18 Attachment 1 and which steps are completed on EPIP-EPP-18 Attachment 2.

6. Completes EPIP-EPP-18 attachment 2, Completes Attachment as shown in KEY Sat/Unsat Emergency Announcement.

NRC 2008 SRO ADMIN JPM EP October 2008

Performance Steps Standard Grade Performance Steps Standard Grade

7. Completes EPIP-EPP-20 Part 1 Notification Completes Attachment as shown in KEY Pass/Fail Fact Sheet.

Part 1 Notification Fact Sheet Steps 3 thru 7 Cue: If asked about the status of Unit 2, cue that are Critical Steps Unit 2 is still operating at 100% power and meets EAL 8.4.1 (UE) due to the EXAMINER NOTE: Time difference must earthquake. be 15 minutes or less:

Time of Declaration (from JPM step 4):

Time EPIP-EPP-20 Part 1 Notification Fact Sheet is complete: _______

8. Completes EPIP-EPP-20 CAN Notification. Completes Attachment as shown in KEY Sat/Unsat EXAMINER NOTE:

Once EPIP-EPP-20 CAN Notification Form is completed, provide the applicant with Initial Conditions and Initiating Cue #2.

Cue: If contacted as Security or state police for road access state that road access is normal.

Note: This is also Time Critical.

6. Reviews the given conditions and determines Declares SAE within 15 minutes per Pass/Fail that an SAE declaration is required per EAL EAL 8.1.7 8.1.7 EXAMINER NOTE: Time difference below must be 15 minutes or less:

Time 2nd set of conditions was received:

Time of Declaration: ____________

TERMINATING CUE: The event has been classified and re-classified and all appropriate notifications initiated.

RECORD STOP TIME NRC 2008 SRO ADMIN JPM EP October 2008

Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is operating at 100% power.
3. Unit 2 is operating at 100% power.
4. The following conditions exist:
  • Unit 2 reports seismic instrumentation reads 0.050g
  • NAO reports structural steel has fallen and damaged Power Board 16B Initiating Cue:

(Operators name), based on the above conditions, determine the event classification per EPIP-EPP-01 and complete steps 1 through 7.b of EPIP-EPP-18, Attachment 1, SM/ED Checklist. This is a time critical task.

Attachment 1: Meteorological Data Wind Speed (30 ft) 5 mph Wind Speed (200 ft) 10 mph Wind Direction (30 ft) 60o Wind Direction (200 ft) 60o Stability Class D NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade Initial Conditions #2:

1. The reactor has been scrammed due to rising drywell pressure.
2. Drywell Pressure is 4.0 psig and slowly rising.
3. A Loss of Offsite Power has occurred and both EDGs are supplying their emergency buses.
4. The Security Supervisor notified the Control Room that an individual has entered the Reactor Building with intent to commit sabotage.

Initiating Cue:

(Operators name), based upon the above changes in plant conditions, determine any change in the emergency declaration level. This is a time critical task.

NRC 2008 SRO ADMIN JPM RC October 2008

Performance Steps Standard Grade NRC JPM SRO RC Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Determine Actions for Inoperable Service Water Radiation Monitor Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security Configuration Control Date Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time: 25 minutes Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC 2008 SRO ADMIN JPM RC October 2008

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM RC October 2008

Performance Steps Standard Grade Recommended Start Location: Classroom Simulator Set-up: None Directions to the Instructor/Evaluator: None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected. Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

7. Critical steps are identified in grading areas Pass/Fail.
8. During Evaluated JPM:
  • Self checking shall be demonstrated.
9. During Training JPM:
  • Self checking shall be demonstrated.
  • Peer checking shall be demonstrated.

References:

5. ARP H1; H1-4-5.
6. ODCM 3.6.14.a and TBL 3.6.14-1 Inst. 1B.
7. DER NM-2003-5168, ODCM Entry Due to SW RM Low Flow.
8. DER NM-2004-976, Unplanned LCO - SW RM Low Flow.
9. K/A 2.3.11 (3.2) Ability to control radiation releases.

Tools and Equipment:

1. None Task Standard: Determine actions per ARP H1-4-5 and ODCM in response to service water radiation monitor low flow condition.

NRC 2008 SRO ADMIN JPM RC October 2008

Performance Steps Standard Grade Initial Conditions:

1. The plant is operating at 100% power.
2. High wind conditions (20-25 mph with higher gusts) are present and are expected to continue for the next twelve (12) hours.
3. H1-4-5, LQ PROCESS RAD MON, has alarmed.
4. Computer Point F172, SERVICE WATER SKID FAILURE, is in alarm.
5. Operator reports an EQUIP FAIL Light is shown for the Service Water Discharge Monitor at the J Panel.
6. Chemistry reports alarm is caused by low sample flow. Flows are reading 0.98 gpm on the east side (TB) and 0.99 gpm on the west side (RB).
7. Sample flow cannot be adjusted.
8. Ask the operator for any questions.

Initiating cue:

(Operators name), determine the appropriate actions and compensatory measures in response to ARP H1-4-5.

Record your findings on the provided attachment.

ER NOTE: Provide Attachment 2.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
1. Obtain a copy of the reference ARP H1-4-5 obtained. Sat/Unsat procedure and review/utilize the Operator Actions referenced.

correct section.

ODCM obtained.

DLCO 3.6.14 referenced.

Table D 3.6.14-1 referenced.

2. Per ARP H1-4-5, if service water monitor alarm, and monitor EQUIP FAIL light is lit, then:
a. Notify Radiation Protection Notifies Radiation Protection Sat/Unsat Instrument Support for repair. Instrument Support to initiate repairs.
b. Initiate LCO sampling Directs Chemistry to perform DLCO Pass/Fail (Chemistry). sampling per Table D 3.6.14-1 Instrument 1B action (d); twelve (12) hour grab samples to be collected/analyzed for SW effluent.
3. Reference ODCM and takes Determines SW Radiation Monitor is Sat/Unsat appropriate actions. inoperable.

NRC 2008 SRO ADMIN JPM RC October 2008

Performance Steps Standard Grade Performance Steps Standard Grade References ODCM DLCO 3.6.14.a Sat/Unsat and Table D 3.6.14-1 Instrument 1B and note (d) applies.

Determines less than the minimum Pass/Fail number of radioactive liquid effluent monitoring channels for service water effluent and takes action shown in Table D 3.6.14-1.

Determines action (d) applies. Pass/Fail Effluent releases via this pathway can continue provided that at least once per twelve (12) hours grab samples are collected and analyzed SW effluent.

TERMINATING CUE: Applicable actions per ARP H1-4-5 and ODCM in response to service water radiation monitor low flow condition have been identified and recorded.

RECORD STOP TIME NRC 2008 SRO ADMIN JPM RC October 2008

Initial Conditions:

1. The plant is operating at 100% power.
2. High wind conditions (20-25 mph with higher gusts) are present and are expected to continue for the next twelve (12) hours.
3. H1-4-5, LQ PROCESS RAD MON, has alarmed.
4. Computer Point F172, SERVICE WATER SKID FAILURE, is in alarm.
5. Operator reports an EQUIP FAIL Light is shown for the Service Water Discharge Monitor at the J Panel.
6. Chemistry reports alarm is caused by low sample flow. Flows are reading 0.98 gpm on the east side (TB) and 0.99 gpm on the west side (RB).
7. Sample flow cannot be adjusted.

Initiating cue:

(Operators name), determine the appropriate actions and compensatory measures in response to ARP H1-4-5. Record your findings on the provided attachment.

NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade Attachment 1 ANSWER KEY ropriate actions in response to these conditions.

ument) rotection Instrument Support for repair.

o initiate required LCO sampling adiation Monitor is inoperable. 14 TABLE D 3.6.14-1.

an the minimum number of radioactive liquid effluent monitoring channels for service water effluent and takes action shown in Table D 3.6.14-1.

14 TABLE NOTE (d) identified in note (d) applies. Effluent releases via this pathway can continue provided that at least once per twelve (12) hours grab samples are collected and analyzed.

NRC 2008 RO ADMIN JPM COO1 October 2008

Performance Steps Standard Grade Attachment 2 JPM Scorecard For Applicant Use ropriate actions in response to these conditions.

ument)

NRC 2008 RO ADMIN JPM COO1 October 2008

Performance Steps Standard Grade NRC JPM RO COO1 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Control Room System Lineup Verification Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security Configuration Control Date Performer: (RO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Simulator Expected Completion Time: 15 minutes Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC 2008 RO ADMIN JPM COO1 October 2008

Performance Steps Standard Grade Recommended Start Location: Simulator Simulator Set-up: IC-187 (100% power IC with the following overrides)

  • Place 60-18B EC Makeup LCV 12 in MAN
  • Verify open Containment Spray Suction Valve 122. Hang red clearance on switch indicating that the valve should be closed.
  • Activate remote CS06 for Core Spray 40-31 BRK STATUS RACK IN (K Panel green light is ON)

Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

10. Critical steps are identified in grading areas Pass/Fail.
11. During Evaluated JPM:
  • Self checking shall be demonstrated.
12. During Training JPM:
  • Self checking shall be demonstrated.
  • Peer checking shall be demonstrated.

References:

10. N1-PM-D002 Attachment 1
11. K/A 2.1.31 (4.2) Ability to locate control room switches/controls and indications and to determine that they are correctly reflecting the desired plant lineup.

NRC 2008 RO ADMIN JPM COO1 October 2008

Performance Steps Standard Grade Tools and Equipment:

1. None.

Task Standard: Perform the panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1, and identify incorrect lineups.

Initial Conditions:

1. The plant is operating at 100% power.
2. You are the oncoming day shift RO.
3. N1-PM-D002, Control Switch Lineup Verification, attachment 1 is in progress.
4. Ask the operator for any questions.

Initiating cue:

(Operators name), complete the panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat Evaluator Acknowledge repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure and N1-PM-D002 obtained and Attachment 1 Sat/Unsat review/utilize the correct section. reviewed
3. Proceed to K Panel to continue lineup. Proceeds to K Panel to perform panel lineup Sat/Unsat checks
4. Record Attachment 1 lineup verifications,
  • Performs checks for Liquid Poison system Sat/Unsat starting with section 1.2 and evaluates plant status.
  • Performs checks for Emergency Cooling Sat/ Unsat system
  • Identifies LC-60-18B EM CONDSR Pass/Fail MAKEUP LCV 12 in manual NRC 2008 RO ADMIN JPM COO1 October 2008

Performance Steps Standard Grade Performance Steps Standard Grade

  • Identifies CONT SPRAY SUCTION Pass/Fail ISOLATION VALVE 122 is open with a red clearance tag applied requiring the valve to be closed
  • Identifies 40-31 CORE SPRAY Pass/Fail VENT ISOLATION VALVE 121 position lights are ON, indicating its circuit breaker is in the wrong position.
5. For abnormal switch and/or indications
  • Immediately reports out of position Sat/Unsat detected which are not expected, the Control switches and components to CRS.

Room Supervisor shall be immediately informed. No attempt shall be made to

  • Does not attempt to correct these Pass/Fail correct the condition prior to obtaining conditions prior to obtaining permission permission from the Control Room from the CRS.

Supervisor, and the expected response of such actions is completely understood.

6. Reports completion of section 1.2 to SRO.
  • Reports completion of section 2.2 Sat/Unsat Terminating Cue: The panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1, are complete and all discrepancies have been reported to CRS.

RECORD STOP TIME:

NRC 2008 RO ADMIN JPM COO1 October 2008

Initial Conditions:

1. The plant is operating at 100% power.
2. You are the oncoming day shift RO.
3. N1-PM-D002, Control Switch Lineup Verification, attachment 1 is in progress.

Initiating cue:

(Operators name), complete the panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1.

NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade NRC JPM RO EC Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Daily Thermal Limit Surveillance Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security Configuration Control Date Performer: (RO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time: 20 minutes Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC 2008 RO ADMIN JPM EC October 2008

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EC October 2008

Performance Steps Standard Grade Recommended Start Location: Classroom Simulator Set-up: N/A Directions to the Instructor/Evaluator:

1. Must have 3D Monicore cases from two consecutive days. The cases must be for four loop operation, with the MAPRAT correction factor incorrectly set to 1.000.
2. Must have N1-RESP-1 completed up to section 9.2.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected. Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

13. Critical steps are identified in grading areas Pass/Fail.
14. During Evaluated JPM:
  • Self checking shall be demonstrated.
15. During Training JPM:
  • Self checking shall be demonstrated.
  • Peer checking shall be demonstrated.

References:

12. N1-RESP-1
13. N1-OP-16, Att.4
14. 3D Monicore Cases Tools and Equipment:
1. None NRC 2008 RO ADMIN JPM EC October 2008

Performance Steps Standard Grade Task Standard: Daily thermal limit surveillance completed in accordance with N1-RESP-1, section 9.2, with all discrepancies identified.

Initial Conditions:

9. The plant is operating at approximately 100% power.
10. No change in power or control rod movement has occurred since the current 3D Monicore case was generated.
11. Recirc Pump 14 is secured and isolated for maintenance on the MG set.
12. The following data is provided:

Computer Point A-390 reads 349 degrees F Computer Point A-392 reads 352 degrees F LEFM Flow correction factor process computer point J385 reads 0.99900 LEFM Flow correction factor process computer point J386 reads 0.99070 LEFM Flow correction factor from CRC Book - West = 0.99900 LEFM Flow correction factor from CRC Book - East = 0.99070

13. Ask the Candidate if they have any questions.

Initiating cue:

(Operators name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1, section 9.2.

ER NOTE: Provide copies of N1-RESP-1 and 3D monicore case edits (current and previous day). DO NOT provide N1-OP-16, Att.4 unless the procedure is requested Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat Evaluator Acknowledge repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure and N1-RESP-1 and 3D Monicore casess Sat/Unsat review/utilize the correct section. obtained
3. Complete N1-RESP-1, section 9.2. N1-RESP-1 completed per the key Sat/Unsat Note: Refer to KEY for completed surveillance. The following discrepancies are identified:

Step 9.2.4 - MAPRAT CORRECTION Pass/Fail Cue: If asked how to proceed at step 9.2.5 with FACTOR = 1.00 on the 3D monicore the incorrect MAPRAT correction factor, state case, it should = 0.98 with 4 loop that Reactor Engineering has corrected the operation.

MAPRAT correction factor to 0.98 and all other numbers on the 3D Monicore case have been Step 9.2.15 - West Feedwater temperature Pass/Fail verified correct. Direct the candidate to continue (Pt A-390) is < 351 degrees F. Per N1-at step 9.2.5 with the values listed on the 3D OP-16, Att.4, the minimum required Monicore case. temperature is 349.9 degrees F.

Step 9.2.16 - Notifies Operations to Pass/Fail restore feedwater temperature to within specification and inform Reactor NRC 2008 RO ADMIN JPM EC October 2008

Performance Steps Standard Grade Performance Steps Standard Grade Engineering supervision.

TERMINATING CUE: Daily thermal limit surveillance completed in accordance with N1-RESP-1, section 9.2, with all discrepancies identified.

RECORD STOP TIME NRC 2008 RO ADMIN JPM EC October 2008

Initial Conditions:

1. The plant is operating at approximately 100% power.
2. No change in power or control rod movement has occurred since the current 3D Monicore case was generated.
3. Recirc Pump 14 is secured and isolated for maintenance on the MG set.
4. The following data is provided:

Computer Point A-390 reads 349 degrees F Computer Point A-392 reads 352 degrees F LEFM Flow correction factor process computer point J385 reads 0.99900 LEFM Flow correction factor process computer point J386 reads 0.99070 LEFM Flow correction factor from CRC Book - West = 0.99900 LEFM Flow correction factor from CRC Book - East = 0.99070 Initiating cue:

(Operators name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1, section 9.2.

NRC 2008 SRO ADMIN JPM C001 October 2008

Performance Steps Standard Grade NRC JPM RO EP Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Actions for a Medical Emergency with Revision: NRC 2008 an Injured, Contaminated Person Task Number: N/A Approvals:

/ N/A - Exam Security /

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

N/A - Exam Security /

Configuration Control Date Performer: (RO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC 2008 RO ADMIN JPM EP October 2008

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EP October 2008

Performance Steps Standard Grade Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required): N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:
  • Self verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

1. EPIP-EPP-04 and Attachment 1
2. NUREG 1123, 2.4.39 (3.9)

Tools and Equipment:

1. None NRC 2008 RO ADMIN JPM EP October 2008

Performance Steps Standard Grade Task Standard: Complete the CSO actions for a medical emergency with an injured, contaminated person in the plant in accordance with EPIP-EPP-04.

Initial Conditions:

1. The Plant is operating at 100%.
2. You are the CSO.
3. You have just received a report that a Mechanic has passed out on Reactor Building elevation 261, near the RWCU pumps.
4. The Mechanic is bleeding from the left arm and respiration is shallow.
5. Ask the Operator for any questions.

Initiating Cues:

(Operators name), perform the required actions for the medical emergency as the CSO.

Note: Candidate should be direct all communications to the examiner, rather than make actual GAItronics announcements.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat Evaluator Acknowledge repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure and Obtains a copy of EPIP-EPP-04. Sat/Unsat review/utilize the correct section of the References Section 3.1 and Attachment 1.

procedure.

3. Place the GAItronics in the Merge Mode. Places the GAItronics in the MERGE mode Sat/Unsat by placing the switch on the Communications Console in the Control Room to the MERGE position.
4. Notify the Fire Brigade. Sounds the Station Alarm and directs the Pass/Fail FIRE BRIGADE to report to Reactor Building Cue: As the Fire Brigade Leader reply elevation 261 to evaluate the situation.

that, The Fire Brigade is on the way to Reactor Building 261 and I will report on the situation as soon as I arrive on the scene.

5. Notify the SM. Notifies the SM of the reported situation. Pass/Fail Cue: As the SM, acknowledge the Candidates report.

Cue: As the Fire Brigade Leader, report, NRC 2008 RO ADMIN JPM EP October 2008

Performance Steps Standard Grade Performance Steps Standard Grade The Mechanic is still unconscious and is potentially contaminated.

Request Radiation Protection assistance. Also request an ambulance for transport to Oswego Hospital.

6. Contact Radiation Protection. Contacts Radiation Protection AND requests Pass/Fail that they report to the scene of the medical Cue: As the RP Tech, acknowledge the emergency.

request and state that an RP Tech is on the way.

7. Contact Oswego County 911 Center. Contacts OSWEGO COUNTY 911 CENTER Pass/Fail and requests an ambulance be sent to the Cue: As the 911 Center Operator, NINE MILE POINT CONSTELLATION acknowledge the request and that the ENERGY SECURITY CHECKPOINT, 350 person for transport is contaminated. LAKE ROAD.

State that an ambulance will be on the

  • Via land telephone line at 343-1313.

way shortly.

  • Informs the 911 Center that the person for transport is potentially contaminated.
8. Contact Security Shift Supervisor. Contacts the SECURITY SHIFT Pass/Fail SUPERVISOR and requests a security force Cue: As the Security Shift Supervisor, member be sent to the scene of the medical acknowledge the request. emergency AND informs them of the impending ambulance arrival.
9. Contact the Oswego Hospital. Contacts the OSWEGO HOSPITAL. Pass/Fail
  • Via land telephone line at 349-5522.

Cue: As the Oswego Hospital

  • Informs them that ONE contaminated Representative, acknowledge the injured person will be transported to them.

report of the situation and state that

  • Requests that setup the RADIATION the REA will be setup. EMERGENCY AREA (REA).

Cue: As the Fire Brigade Leader, report that the RP Tech will need to accompany the ambulance to the hospital.

10. Arrange for the RP Tech to accompany the Requests permission from the SM for the RP Sat/Unsat ambulance. Tech to accompany the ambulance.

Cue: As the SM, give permission for the RP Informs RP Tech at the scene that they have Sat/Unsat Tech to accompany the ambulance. SM permission to accompany the ambulance.

Cue: As the RP Tech, acknowledge Informs the RP Supervisor of the incident and Sat/Unsat permission to accompany the directs them to the hospital ambulance.

NRC 2008 RO ADMIN JPM EP October 2008

Performance Steps Standard Grade Performance Steps Standard Grade Informs the SM that an evaluation of required Sat/Unsat Cue: As the RP Supervisor, acknowledge staffing should be performed report and state that you will meet the ambulance at the hospital.

Cue: As the SM, state that you will evaluate staffing levels.

11. Request SM contact Plant General Manager. Requests SM contact Plant General Manager Sat/Unsat and provide details within one hour of Cue: As the SM, acknowledge the request. incident.
12. Request Security Shift Supervisor to contact Requests Security Shift Supervisor to contact Sat/Unsat Supervisor, Communications Supervisor, Communications and provide details of the incident Cue: As the Security Shift Supervisor acknowledge the request.

Cue: As the Fire Brigade Leader, inform the Candidate that the contaminated injured person has left the site and is proceeding to Oswego Hospital in the ambulance.

13. Inform the SM of the termination of the Informs the SM that the emergency is Sat/Unsat emergency. terminated.

Cue: As the SM, acknowledge the Candidates report.

14. Announce termination of medical Sounds the Station Alarm and announces that Sat/Unsat emergency. the medical emergency has been terminated.

Terminating Cue: The medical emergency has been terminated.

RECORD STOP TIME NRC 2008 RO ADMIN JPM EP October 2008

Initial Conditions:

1. The Plant is operating at 100%.
2. You are the CSO.
3. You have just received a report that a Mechanic has passed out on Reactor Building elevation 261, near the RWCU pumps.
4. The Mechanic is bleeding from the left arm and respiration is shallow.

Initiating Cues:

(Operators name), perform the required actions for the medical emergency as the CSO.

Note: Candidate should be direct all communications to the examiner, rather than make actual GAItronics announcements.

NRC 2008 SRO ADMIN JPM C001 October 2008