Text

NRC 2008 ADMIN JPM C002 October 2008 NRC JPM RO/SRO COO2 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Determine Personnel Overtime Availability IAW GAP-FFD-02 Revision: NRC 2008 Task Number: N/A Approvals:

/

N/A - Exam Security

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security

/

Configuration Control Date Performer:

(RO/SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time:

20/30 minutes Time Critical Task:

No Alternate Path Task:

No (RO/SRO)

Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC 2008 ADMIN JPM C002 October 2008 Recommended Start Location: Classroom Simulator Set-up: None Directions to the Instructor/Evaluator:

None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail.
2. During Evaluated JPM:

Self verification shall be demonstrated.

3. During Training JPM:

Self verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. GAP-FFD-02 Tools and Equipment:
1. Calculator

NRC 2008 ADMIN JPM C002 October 2008 Task Standard:

Determine Personnel Availability for Overtime IAW GAP-FFD-02.

Initial Conditions:

1. The plant is shutdown.
2. In order to support critical path work required for startup, personnel overtime will be required for the night shift on October 26 from 1830-0630.
3. All the overtime hours will be spent performing (ROs) or supervising (SROs) field activities.

Initiating Cues:

1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of overtime beginning at 1830 on October 26 without requiring an Overtime Deviation Request IAW GAP-FFD-
02.
2. If an Overtime Deviation Request would be required for individual(s), state the work hour limit(s) which would be exceeded IAW GAP-FFD-02.
3. SROs ONLY - Complete Parts 1 and 2.A of an Overtime Deviation Request Form for all individuals who would need a deviation approved to cover the shift.

EXAMINER NOTE: FOR ROs - Provide Attachments A & C.

FOR SROs - Provide Attachments A, B & D, and Blank Overtime Deviation Request Form.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-O1/Operations Manual)

Sat/Unsat RECORD START TIME

2.

Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

GAP-FFD-02 obtained Sat/Unsat

NRC 2008 ADMIN JPM C002 October 2008

3.

FOR ROs - Reviews work hours for Reactor Operators 1 thru 3 FOR SROs - Reviews work hours for Reactor Operators 1 thru 3 and Senior Reactor Operators 1 and 2 ROs - Determines the following:

RO #1 - Eligible RO #2 - Not Eligible - would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 day period RO #3 - Not Eligible - would exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period SROs - Determines the above limitations plus the following:

SRO #1 - Eligible SRO #2 - Not Eligible - would exceed 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period Pass/Fail

4.

FOR SROs - Completes Overtime Deviation Request Form Completes Columns 1 and 2 of Part 1 of GAP-FFD-02 Attachment 1, per attached key Completes Columns 3 and 4 of Part 1 of GAP-FFD-02 Attachment 1, per attached key Completes Part 2.A of GAP-FFD-02, per attached key Pass/Fail Sat/Unsat Sat/Unsat TERMINATING CUE: FOR ROs, JPM Attachment C completed. FOR SROs, JPM Attachment D and GAP-FFD-02 Attachment 1 completed RECORD STOP TIME

NRC 2008 ADMIN JPM C002 October 2008 ATTACHMENT A - ROs RO #1 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 (includes 12 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time)

OFF 1830-0730 (includes 60 minutes of turnover time) 1830-0542 (includes 12 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time) 1830-0706 (includes 36 minutes of turnover time)

OFF OFF RO #2 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 OFF 1830-0642 (includes 12 minutes of turnover time) 1830-0630 (includes 0 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time) 1830-0654 (includes 24 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time)

OFF OFF RO #3 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 (includes 12 minutes of turnover time) 1830-0630 (includes 0 minutes of turnover time) 1830-0648 (includes 18 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time)

OFF 1830-0742 (includes 12 minutes of turnover time)

OFF OFF

NRC 2008 ADMIN JPM C002 October 2008 ATTACHMENT B - SROs SRO #1 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 (includes 12 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time)

OFF 1830-0735 (includes 65 minutes of turnover time)

OFF 1830-0642 (includes 12 minutes of turnover time) 1830-0720 (includes 50 minutes of turnover time)

OFF OFF SRO #2 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 1830-0642 (includes 12 minutes of turnover time) 1830-0630 (includes 0 minutes of turnover time) 1830-0648 (includes 18 minutes of turnover time) 1830-0642 (includes 12 minutes of turnover time)

OFF 0630-1830 (includes 0 minutes of turnover time)

OFF 0500-1200 (includes 0 minutes of turnover time)

OFF

NRC 2008 SRO ADMIN JPM C001 October 2008 ATTACHMENT C - RO Answer Sheet Eligible to work without an Overtime Deviation Request?

(Yes/No)

If No, what work hour limit(s) would be exceeded IAW GAP-FFD-02?

RO #1 RO #2 RO #3

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM C001 October 2008 ATTACHMENT D - SRO Answer Sheet Eligible to work without an Overtime Deviation Request?

(Yes/No)

If No, what work hour limit(s) would be exceeded IAW GAP-FFD-02?

RO #1 RO #2 RO #3 SRO #1 SRO #2

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM C001 October 2008 Initial Conditions:

1. The plant is shutdown.
2. In order to support critical path work required for startup, personnel overtime will be required for the night shift on October 26 from 1830-0630.
3. All the overtime hours will be spent performing (ROs) or supervising (SROs) field activities.

Initiating Cues:

1. From the provided list of personnel working hours, determine who is eligible to work a complete 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of overtime beginning at 1830 on October 26 without requiring an Overtime Deviation Request IAW GAP-FFD-02.
2. If an Overtime Deviation Request would be required for individual(s), state the work hour limit(s) which would be exceeded IAW GAP-FFD-02.
3. SROs ONLY - Complete Parts 1 and 2.A of an Overtime Deviation Request Form for all individuals who would need a deviation approved to cover the shift.

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM C001 October 2008 NRC JPM SRO COO1 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Time to Boil Calculation for Reactor Coolant System Revision: NRC 2008 Task Number: N/A Approvals:

/

N/A - Exam Security

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security

/

Configuration Control Date Performer:

(SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time:

25 minutes Time Critical Task:

No Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC 2008 SRO ADMIN JPM C001 October 2008 Recommended Start Location: (Completion time based on the start location)

Classroom Simulator Set-up:

None Directions to the Instructor/Evaluator:

None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

4. Critical steps are identified in grading areas as Pass/Fail.
5. During Evaluated JPM:

Self verification shall be demonstrated.

6. During Training JPM:

Self verification shall be demonstrated.

No other verification shall be demonstrated.

References:

2. N1-ODP-OPS-0108 Tools and Equipment:
2. Calculator

Performance Steps Standard Grade NRC 2008 ADMIN SRO JPM EC October 2008 Task Standard:

Perform a Time to Boil calculation for the Reactor Coolant System in accordance with N1-ODP-OPS-0108.

Initial Conditions:

1. The plant has been shutdown for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. A loss of Shutdown Cooling has occurred.
3. Reactor Coolant Temperature = 150°F.
4. Reactor Water Level = 72 inches.
5. RBCLC Temperature on TI-70-23C = 80°F.
6. One (1) Spent Fuel Pool Cooling Loop is in Service.
7. Reactor Engineering reports the following information for burned bundles in the core:
  1. Bundles 1X = 160
  1. Bundles 2X = 164
  1. Bundles 3X = 148
  1. Bundles 4X = 60
8. Instructor to ask for any questions.

Initiating Cues:

(Operators name), perform a Time to Boil calculation for the Reactor Coolant System in accordance with N1-ODP-OPS-0108.

EXAMINER NOTE: Provide applicant a blank copy of N1-ODP-OPS-0108 Attachments 1 & 2 and Table 1.

EXAMINER NOTE: Refer to KEY for specifics of calculations.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-O1/Operations Manual)

Sat/Unsat RECORD START TIME

2.

Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

N1-ODP-OPS-0108 obtained.

Sat/Unsat

3.

Calculates DHPcore (Line 103 of Att. 2)

DHPcore = 38.1192 MBTU/HR Note: To account for differences in rounding, the acceptable range for this value is 38-38.2 MBTU/HR.

Note: This value can be obtained either by calculating heat production based on the number of fuel bundles, or directly from the Total column of Table 1.

Sat/Unsat

Performance Steps Standard Grade NRC 2008 ADMIN SRO JPM EC October 2008 Performance Steps Standard Grade

4.

Calculates DHP (Line 9 of Att.1)

DHP = 38.1192 MBTU/HR Note: To account for differences in rounding, the acceptable range for this value is 38-38.2 MBTU/HR.

Pass/Fail

5.

Calculates DHRsdc (Line 58 of Att.1)

DHR sdc = 0 MBTU/HR Sat/Unsat

6.

Calculates DHR (Line 64 of Att.1)

DHR = 0 MBTU/HR Pass/Fail

7.

Selects Thermal Capacity (K) for specific condition applicable (Line 74 of Att.1)

K = 0.557 MBTU/F Pass/Fail

8.

Calculates Time to Boil = [212°F -

SFP/Cavity Temp] / (DHP - DHR) / K (Line 82 of Att.1)

Time to Boil = (212 - 150)

(38.1192-0)/ 0.557

=0.906 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.44733e-4 months <br /> (or 54.36 minutes)

Note: To account for differences in rounding, the acceptable range for this value is 0.900-0.910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br /> (or 54.0-54.6 minutes)

Pass/Fail Terminating Cue:

Time to Boil Calculation is complete and results are reported.

RECORD STOP TIME

Performance Steps Standard Grade NRC 2008 ADMIN SRO JPM EC October 2008 Initial Conditions:

1. The plant has been shutdown for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. A loss of Shutdown Cooling has occurred.
3. Reactor Coolant Temperature = 150°F.
4. Reactor Water Level = 72 inches.
5. RBCLC Temperature on TI-70-23C = 80°F.
6. One (1) Spent Fuel Pool Cooling Loop is in Service.
7. Reactor Engineering reports the following information for burned bundles in the core:
  1. Bundles 1X = 160
  1. Bundles 2X = 164
  1. Bundles 3X = 148
  1. Bundles 4X = 60 Initiating Cues:

(Operators name), perform a Time to Boil calculation for the Reactor Coolant System in accordance with N1-ODP-OPS-0108.

Performance Steps Standard Grade NRC 2008 ADMIN SRO JPM EC October 2008 NRC JPM SRO EC Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Review of Surveillance Test (ST)

Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security Configuration Control Date Performer:

(SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time:

20 minutes Time Critical Task:

No Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature:

Date:

Performance Steps Standard Grade NRC 2008 ADMIN SRO JPM EC October 2008 Recommended Start Location: Classroom Simulator Set-up: None Directions to the Instructor/Evaluator:

For N1-ST-Q19, enter the surveillance data using an archived record from an actual performance of the surveillance. EXCEPTION: Step 8.1.12.b, enter the CW Circ Pump 11 d/p = 21.2, and Step 8.3.2, enter the 210.1-01 CLOSE TO OPEN time = 3.0 seconds.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1.

Critical steps are identified as Pass/Fail.

2.

During Evaluated JPM:

Self-verification shall be demonstrated.

3.

During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N1-ST-Q19; Section 10.0.
2. LER 2003-004.
3. K/A 2.2.12 (3.4).
4. K/A 2.2.24 (3.8).

Tools and Equipment:

1. None

Performance Steps Standard Grade NRC 2008 ADMIN SRO JPM EC October 2008 Task Standard:

Complete Section 10.1, Operations Review, and identify the unsatisfactory results for N1-ST-Q19. Determine the appropriate actions in response to the unsatisfactory conditions.

Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is at 100% power.
3. N1-ST-Q19 has just been completed up to the Operations Review.

Initiating cue:

(Operators name), using the completed surveillance provided, complete Section 10.1, Operations Review.

Record the results of your review and any required actions in the space below.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section.

Copy of completed surveillance will be provided to the performer.

Sat/Unsat

3. N1-ST-Q19:

Completes section 10.1, Operations Review, and references procedure sections as applicable to verify the required data. Evaluates the data.

Transcribes surveillance data to the appropriate table in section 10.1.

Determines acceptance criteria NOT in acceptable range for CW Circ Pump 11 d/p.

Value is in the REQUIRED ACTION range.

Declares CW Circ Pump inoperable.

Informs Condition Monitoring Group (CMG).

Determines 210.1-01 CLOSED TO OPEN stroke time is UNSAT. Value is above the IST limit, but within the Limiting Stroke Time.

Determines 210.1-01 may be stroked a second time.

Determines pump to be entered in ESL.

Determines TS 3.4.5 entry is required; restore CW pump to operable within 7 days.

Sat/Unsat Pass/Fail Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat Pass/Fail

Performance Steps Standard Grade NRC 2008 ADMIN SRO JPM EC October 2008 Performance Steps Standard Grade Determines entry into SM log required.

Determines yellow clearance tag required for CW pump.

Determines ACR and CR to be written.

Informs IST/CMG.

Informs Manager Operations.

Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat TERMINATING CUE:

Operations Review of N1-ST-Q19 is complete. Required actions and notifications are identified.

RECORD STOP TIME

NRC 2008 SRO ADMIN JPM C001 October 2008 Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is at 100% power.
3. N1-ST-Q19 has just been completed up to the Operations Review.

Initiating cue:

(Operators name), using the completed surveillance provided, complete Section 10.1, Operations Review. Record the results of your review and any required actions in the space below.

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM EP October 2008 NRC JPM SRO EP Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Emergency Event Classification, Notification and Reclassification Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security Configuration Control Date Performer:

(SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom/Simulator Expected Completion Time: 30 minutes Time Critical Task:

Yes Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature:

Date:

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM EP October 2008

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM EP October 2008 Recommended Start Location: Classroom/Simulator Simulator Set-up: None Directions to the Instructor/Evaluator: None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the Unit 2 SM, Security Supervisor, Communication Aid, and other personnel as necessary. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. EPIP-EPP-01, Classification Of Emergency Conditions at Unit 1
2. EPIP-EPP-18, Attachment 1 SM/ED Checklist
3. EPIP-EPP-20, Emergency Notifications
4. EPMP-EPP-0101
5. K/A 2.4.29(4.0), Knowledge of the Emergency Plan.

Tools and Equipment:

1.0 EPIP-EPP-01, ATTACHMENT 1, UNIT 1 EAL FLOWCHART 2.0 SM/ED Checklist Package

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM EP October 2008 Task Standard:

Classify and declare the emergency event within 15 minutes of the time that indications are available to the Candidate that an EAL has been exceeded. Make notifications to New York State and Oswego County within 15 minutes of the time the event is declared.

Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is operating at 100% power.
3. Unit 2 is operating at 100% power.
4. The following conditions exist:

An Earthquake has just hit the site Unit 2 reports seismic instrumentation reads 0.050g NAO reports structural steel has fallen and damaged Power Board 16B

5. Ask the operator for any questions.

Initiating Cue:

(Operators name), based on the above conditions, determine the event classification per EPIP-EPP-01 and complete steps 1 through 7.b of EPIP-EPP-18, Attachment 1, SM/ED Checklist. This is a time critical task.

Examiner Note: After this event is classified, declared and the notifications initiated, the plant conditions will change as stated below and a reclassification will be required.

Initial Conditions #2:

1. The reactor has been scrammed due to rising drywell pressure.
2. Drywell pressure is 4.0 psig and slowly rising.
3. A Loss of Offsite Power has occurred and both EDGs are supplying their emergency buses.
4. The Security Supervisor notified the Control Room that an individual has entered the Reactor Building with intent to commit sabotage.

Initiating Cue:

(Operators name), based upon the above changes in plant conditions, determine any change in the emergency declaration level. This is a time critical task.

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM EP October 2008 Performance Steps Standard Grade

1. Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

2. Obtain a copy of EPIP-EPP-01 attachment 1 and Shift Manager emergency paperwork and review/utilize the correct section.

EPIP-EPP-01 attachment 1 and Shift Manager emergency paperwork is obtained.

Sat/Unsat

3. Enters EPIP-EPP-18, Attachment 1, SM/ED Checklist and completes Steps 1 through 7.b.

Completes steps 1 thru 7b of EPIP-EPP-18, as described in subsequent JPM steps.

Sat/Unsat

4. Classifies and declares the emergency.

Declares an Alert within fifteen minutes of the JPM initial condition sheet being accepted in accordance with EAL 8.4.6.

EXAMINER NOTE: Time difference below must be 15 minutes or less:

JPM start time: ________

Time of Declaration: ____________

Pass/Fail

5. Completes EPIP-EPP-18 attachment 1, figure 1 flowchart to determine evacuation and accountability requirements.

Note: Evacuation determination is subjective and may or may not be performed. This will determine which path is taken on EPIP-EPP-18 Attachment 1 and which steps are completed on EPIP-EPP-18.

Completes Attachment as shown in KEY Sat/Unsat

6. Completes EPIP-EPP-18 attachment 2, Emergency Announcement.

Completes Attachment as shown in KEY Sat/Unsat

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM EP October 2008 Performance Steps Standard Grade

7. Completes EPIP-EPP-20 Part 1 Notification Fact Sheet.

Cue: If asked about the status of Unit 2, cue that Unit 2 is still operating at 100% power and meets EAL 8.4.1 (UE) due to the earthquake.

Completes Attachment as shown in KEY Part 1 Notification Fact Sheet Steps 3 thru 7 are Critical Steps EXAMINER NOTE: Time difference must be 15 minutes or less:

Time of Declaration (from JPM step 4):

Time EPIP-EPP-20 Part 1 Notification Fact Sheet is complete: _______

Pass/Fail

8. Completes EPIP-EPP-20 CAN Notification.

Completes Attachment as shown in KEY Sat/Unsat EXAMINER NOTE:

Once EPIP-EPP-20 CAN Notification Form is completed, provide the applicant with Initial Conditions and Initiating Cue #2.

Cue: If contacted as Security or state police for road access state that road access is normal.

Note: This is also Time Critical.

6. Reviews the given conditions and determines that an SAE declaration is required per EAL 8.1.7 Declares SAE within 15 minutes per EAL 8.1.7 EXAMINER NOTE: Time difference below must be 15 minutes or less:

Time 2nd set of conditions was received:

Time of Declaration: ____________

Pass/Fail TERMINATING CUE: The event has been classified and re-classified and all appropriate notifications initiated.

RECORD STOP TIME

NRC 2008 SRO ADMIN JPM C001 October 2008 Initial Conditions:

1. You are the Unit 1 Shift Manager.
2. Unit 1 is operating at 100% power.
3. Unit 2 is operating at 100% power.
4. The following conditions exist:
  • Unit 2 reports seismic instrumentation reads 0.050g
  • NAO reports structural steel has fallen and damaged Power Board 16B Initiating Cue:

(Operators name), based on the above conditions, determine the event classification per EPIP-EPP-01 and complete steps 1 through 7.b of EPIP-EPP-18,, SM/ED Checklist. This is a time critical task.

Meteorological Data Wind Speed (30 ft) 5 mph Wind Speed (200 ft) 10 mph Wind Direction (30 ft) 60o Wind Direction (200 ft) 60o Stability Class D

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM RC October 2008 Initial Conditions #2:

1. The reactor has been scrammed due to rising drywell pressure.
2. Drywell Pressure is 4.0 psig and slowly rising.
3. A Loss of Offsite Power has occurred and both EDGs are supplying their emergency buses.
4. The Security Supervisor notified the Control Room that an individual has entered the Reactor Building with intent to commit sabotage.

Initiating Cue:

(Operators name), based upon the above changes in plant conditions, determine any change in the emergency declaration level. This is a time critical task.

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM RC October 2008 NRC JPM SRO RC Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Determine Actions for Inoperable Service Water Radiation Monitor Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security Configuration Control Date Performer:

(SRO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time:

25 minutes Time Critical Task:

No Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature:

Date:

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM RC October 2008

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM RC October 2008 Recommended Start Location: Classroom Simulator Set-up: None Directions to the Instructor/Evaluator: None Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected. Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

7. Critical steps are identified in grading areas Pass/Fail.
8. During Evaluated JPM:

Self checking shall be demonstrated.

9. During Training JPM:

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

5. ARP H1; H1-4-5.
6. ODCM 3.6.14.a and TBL 3.6.14-1 Inst. 1B.
7. DER NM-2003-5168, ODCM Entry Due to SW RM Low Flow.
8. DER NM-2004-976, Unplanned LCO - SW RM Low Flow.
9. K/A 2.3.11 (3.2) Ability to control radiation releases.

Tools and Equipment:

1. None Task Standard: Determine actions per ARP H1-4-5 and ODCM in response to service water radiation monitor low flow condition.

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM RC October 2008 Initial Conditions:

1. The plant is operating at 100% power.
2. High wind conditions (20-25 mph with higher gusts) are present and are expected to continue for the next twelve (12) hours.
3. H1-4-5, LQ PROCESS RAD MON, has alarmed.
4. Computer Point F172, SERVICE WATER SKID FAILURE, is in alarm.
5. Operator reports an EQUIP FAIL Light is shown for the Service Water Discharge Monitor at the J Panel.
6. Chemistry reports alarm is caused by low sample flow. Flows are reading 0.98 gpm on the east side (TB) and 0.99 gpm on the west side (RB).
7. Sample flow cannot be adjusted.
8. Ask the operator for any questions.

Initiating cue:

(Operators name), determine the appropriate actions and compensatory measures in response to ARP H1-4-5.

Record your findings on the provided attachment.

ER NOTE: Provide Attachment 2.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

1. Obtain a copy of the reference procedure and review/utilize the correct section.

ARP H1-4-5 obtained.

Operator Actions referenced.

ODCM obtained.

DLCO 3.6.14 referenced.

Table D 3.6.14-1 referenced.

Sat/Unsat

2. Per ARP H1-4-5, if service water monitor alarm, and monitor EQUIP FAIL light is lit, then:
a. Notify Radiation Protection Instrument Support for repair.

Notifies Radiation Protection Instrument Support to initiate repairs.

Sat/Unsat

b. Initiate LCO sampling (Chemistry).

Directs Chemistry to perform DLCO sampling per Table D 3.6.14-1 Instrument 1B action (d); twelve (12) hour grab samples to be collected/analyzed for SW effluent.

Pass/Fail

3. Reference ODCM and takes appropriate actions.

Determines SW Radiation Monitor is inoperable.

Sat/Unsat

Performance Steps Standard Grade NRC 2008 SRO ADMIN JPM RC October 2008 Performance Steps Standard Grade References ODCM DLCO 3.6.14.a and Table D 3.6.14-1 Instrument 1B and note (d) applies.

Determines less than the minimum number of radioactive liquid effluent monitoring channels for service water effluent and takes action shown in Table D 3.6.14-1.

Determines action (d) applies.

Effluent releases via this pathway can continue provided that at least once per twelve (12) hours grab samples are collected and analyzed SW effluent.

Sat/Unsat Pass/Fail Pass/Fail TERMINATING CUE: Applicable actions per ARP H1-4-5 and ODCM in response to service water radiation monitor low flow condition have been identified and recorded.

RECORD STOP TIME

NRC 2008 SRO ADMIN JPM C001 October 2008 Initial Conditions:

1. The plant is operating at 100% power.
2. High wind conditions (20-25 mph with higher gusts) are present and are expected to continue for the next twelve (12) hours.
3. H1-4-5, LQ PROCESS RAD MON, has alarmed.
4. Computer Point F172, SERVICE WATER SKID FAILURE, is in alarm.
5. Operator reports an EQUIP FAIL Light is shown for the Service Water Discharge Monitor at the J Panel.
6. Chemistry reports alarm is caused by low sample flow. Flows are reading 0.98 gpm on the east side (TB) and 0.99 gpm on the west side (RB).
7. Sample flow cannot be adjusted.

Initiating cue:

(Operators name), determine the appropriate actions and compensatory measures in response to ARP H1-4-5. Record your findings on the provided attachment.

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM COO1 October 2008 ANSWER KEY ropriate actions in response to these conditions.

ument) rotection Instrument Support for repair.

o initiate required LCO sampling adiation Monitor is inoperable.

an the minimum number of radioactive liquid effluent monitoring channels for service water effluent and takes action shown in Table D 3.6.14-1.

identified in note (d) applies. Effluent releases via this pathway can continue provided that at least once per twelve (12) hours grab samples are collected and analyzed.

14 TABLE D 3.6.14-1.

14 TABLE NOTE (d)

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM COO1 October 2008 JPM Scorecard For Applicant Use ropriate actions in response to these conditions.

ument)

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM COO1 October 2008 NRC JPM RO COO1 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Control Room System Lineup Verification Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security Configuration Control Date Performer:

(RO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Simulator Expected Completion Time:

15 minutes Time Critical Task:

No Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature:

Date:

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM COO1 October 2008 Recommended Start Location: Simulator Simulator Set-up: IC-187 (100% power IC with the following overrides)

Place 60-18B EC Makeup LCV 12 in MAN Verify open Containment Spray Suction Valve 122. Hang red clearance on switch indicating that the valve should be closed.

Place Containment Spray Pump 122 control switch in PTL with a red clearance tag applied.

  • Activate remote CS06 for Core Spray 40-31 BRK STATUS RACK IN (K Panel green light is ON)

Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

10. Critical steps are identified in grading areas Pass/Fail.
11. During Evaluated JPM:

Self checking shall be demonstrated.

12. During Training JPM:

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

10. N1-PM-D002 Attachment 1
11. K/A 2.1.31 (4.2) Ability to locate control room switches/controls and indications and to determine that they are correctly reflecting the desired plant lineup.

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM COO1 October 2008 Tools and Equipment:

1. None.

Task Standard: Perform the panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1, and identify incorrect lineups.

Initial Conditions:

1. The plant is operating at 100% power.
2. You are the oncoming day shift RO.
3. N1-PM-D002, Control Switch Lineup Verification, attachment 1 is in progress.
4. Ask the operator for any questions.

Initiating cue:

(Operators name), complete the panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section.

N1-PM-D002 obtained and Attachment 1 reviewed Sat/Unsat

3. Proceed to K Panel to continue lineup.

Proceeds to K Panel to perform panel lineup checks Sat/Unsat

4. Record Attachment 1 lineup verifications, starting with section 1.2 and evaluates plant status.
  • Performs checks for Liquid Poison system
  • Performs checks for Emergency Cooling system Identifies LC-60-18B EM CONDSR MAKEUP LCV 12 in manual Sat/Unsat Sat/ Unsat Pass/Fail

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM COO1 October 2008 Performance Steps Standard Grade

  • Identifies CONT SPRAY SUCTION ISOLATION VALVE 122 is open with a red clearance tag applied requiring the valve to be closed Sat/Unsat Pass/Fail
  • Performs checks for Core Spray system Identifies 40-31 CORE SPRAY VENT ISOLATION VALVE 121 position lights are ON, indicating its circuit breaker is in the wrong position.

Sat/Unsat Pass/Fail

5. For abnormal switch and/or indications detected which are not expected, the Control Room Supervisor shall be immediately informed. No attempt shall be made to correct the condition prior to obtaining permission from the Control Room Supervisor, and the expected response of such actions is completely understood.

Immediately reports out of position switches and components to CRS.

Does not attempt to correct these conditions prior to obtaining permission from the CRS.

Sat/Unsat Pass/Fail

6. Reports completion of section 1.2 to SRO.

Reports completion of section 2.2 Sat/Unsat Terminating Cue: The panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1, are complete and all discrepancies have been reported to CRS.

RECORD STOP TIME:

NRC 2008 SRO ADMIN JPM C001 October 2008 Initial Conditions:

1. The plant is operating at 100% power.
2. You are the oncoming day shift RO.
3. N1-PM-D002, Control Switch Lineup Verification, attachment 1 is in progress.

Initiating cue:

(Operators name), complete the panel K checks of N1-PM-D002, Control Switch Lineup Verification, attachment 1.

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EC October 2008 NRC JPM RO EC Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Daily Thermal Limit Surveillance Revision: NRC 2008 Task Number: N/A Approvals:

N/A - Exam Security General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security Configuration Control Date Performer:

(RO)

Trainer/Evaluator:

Evaluation Method: Perform Evaluation Location: Classroom Expected Completion Time:

20 minutes Time Critical Task:

No Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature:

Date:

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EC October 2008

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EC October 2008 Recommended Start Location: Classroom Simulator Set-up: N/A Directions to the Instructor/Evaluator:

1. Must have 3D Monicore cases from two consecutive days. The cases must be for four loop operation, with the MAPRAT correction factor incorrectly set to 1.000.
2. Must have N1-RESP-1 completed up to section 9.2.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected. Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

13. Critical steps are identified in grading areas Pass/Fail.
14. During Evaluated JPM:

Self checking shall be demonstrated.

15. During Training JPM:

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

12. N1-RESP-1
13. N1-OP-16, Att.4
14. 3D Monicore Cases Tools and Equipment:
1. None

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EC October 2008 Task Standard: Daily thermal limit surveillance completed in accordance with N1-RESP-1, section 9.2, with all discrepancies identified.

Initial Conditions:

9. The plant is operating at approximately 100% power.
10. No change in power or control rod movement has occurred since the current 3D Monicore case was generated.
11. Recirc Pump 14 is secured and isolated for maintenance on the MG set.
12. The following data is provided:

Computer Point A-390 reads 349 degrees F Computer Point A-392 reads 352 degrees F LEFM Flow correction factor process computer point J385 reads 0.99900 LEFM Flow correction factor process computer point J386 reads 0.99070 LEFM Flow correction factor from CRC Book - West = 0.99900 LEFM Flow correction factor from CRC Book - East = 0.99070

13. Ask the Candidate if they have any questions.

Initiating cue:

(Operators name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1, section 9.2.

ER NOTE: Provide copies of N1-RESP-1 and 3D monicore case edits (current and previous day). DO NOT provide N1-OP-16, Att.4 unless the procedure is requested Performance Steps Standard Grade

1. Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section.

N1-RESP-1 and 3D Monicore casess obtained Sat/Unsat

3. Complete N1-RESP-1, section 9.2.

Note: Refer to KEY for completed surveillance.

Cue: If asked how to proceed at step 9.2.5 with the incorrect MAPRAT correction factor, state that Reactor Engineering has corrected the MAPRAT correction factor to 0.98 and all other numbers on the 3D Monicore case have been verified correct. Direct the candidate to continue at step 9.2.5 with the values listed on the 3D Monicore case.

N1-RESP-1 completed per the key The following discrepancies are identified:

Step 9.2.4 - MAPRAT CORRECTION FACTOR = 1.00 on the 3D monicore case, it should = 0.98 with 4 loop operation.

Step 9.2.15 - West Feedwater temperature (Pt A-390) is < 351 degrees F. Per N1-OP-16, Att.4, the minimum required temperature is 349.9 degrees F.

Step 9.2.16 - Notifies Operations to restore feedwater temperature to within specification and inform Reactor Sat/Unsat Pass/Fail Pass/Fail Pass/Fail

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EC October 2008 Performance Steps Standard Grade Engineering supervision.

TERMINATING CUE: Daily thermal limit surveillance completed in accordance with N1-RESP-1, section 9.2, with all discrepancies identified.

RECORD STOP TIME

NRC 2008 SRO ADMIN JPM C001 October 2008 Initial Conditions:

1. The plant is operating at approximately 100% power.
2. No change in power or control rod movement has occurred since the current 3D Monicore case was generated.
3. Recirc Pump 14 is secured and isolated for maintenance on the MG set.
4. The following data is provided:

Computer Point A-390 reads 349 degrees F Computer Point A-392 reads 352 degrees F LEFM Flow correction factor process computer point J385 reads 0.99900 LEFM Flow correction factor process computer point J386 reads 0.99070 LEFM Flow correction factor from CRC Book - West = 0.99900 LEFM Flow correction factor from CRC Book - East = 0.99070 Initiating cue:

(Operators name), perform the Daily Thermal Limit Surveillance in accordance with N1-RESP-1, section 9.2.

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EP October 2008 NRC JPM RO EP Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE

Title:

Perform Actions for a Medical Emergency with Revision: NRC 2008 an Injured, Contaminated Person Task Number: N/A Approvals:

/

N/A - Exam Security

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

N/A - Exam Security

/

Configuration Control Date Performer:

(RO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time:

15 minutes Time Critical Task:

No Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EP October 2008

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EP October 2008 Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required): N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:

Self verification shall be demonstrated.

3. During Training JPM:

Self verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. EPIP-EPP-04 and Attachment 1
2. NUREG 1123, 2.4.39 (3.9)

Tools and Equipment:

1. None

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EP October 2008 Task Standard: Complete the CSO actions for a medical emergency with an injured, contaminated person in the plant in accordance with EPIP-EPP-04.

Initial Conditions:

1. The Plant is operating at 100%.
2. You are the CSO.
3. You have just received a report that a Mechanic has passed out on Reactor Building elevation 261, near the RWCU pumps.
4. The Mechanic is bleeding from the left arm and respiration is shallow.
5. Ask the Operator for any questions.

Initiating Cues:

(Operators name), perform the required actions for the medical emergency as the CSO.

Note: Candidate should be direct all communications to the examiner, rather than make actual GAItronics announcements.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

Obtains a copy of EPIP-EPP-04.

References Section 3.1 and Attachment 1.

Sat/Unsat

3. Place the GAItronics in the Merge Mode.

Places the GAItronics in the MERGE mode by placing the switch on the Communications Console in the Control Room to the MERGE position.

Sat/Unsat

4. Notify the Fire Brigade.

Cue:

As the Fire Brigade Leader reply that, The Fire Brigade is on the way to Reactor Building 261 and I will report on the situation as soon as I arrive on the scene.

Sounds the Station Alarm and directs the FIRE BRIGADE to report to Reactor Building elevation 261 to evaluate the situation.

Pass/Fail

5. Notify the SM.

Cue:

As the SM, acknowledge the Candidates report.

Notifies the SM of the reported situation.

Pass/Fail Cue:

As the Fire Brigade Leader, report,

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EP October 2008 Performance Steps Standard Grade The Mechanic is still unconscious and is potentially contaminated.

Request Radiation Protection assistance. Also request an ambulance for transport to Oswego Hospital.

6. Contact Radiation Protection.

Cue:

As the RP Tech, acknowledge the request and state that an RP Tech is on the way.

Contacts Radiation Protection AND requests that they report to the scene of the medical emergency.

Pass/Fail

7. Contact Oswego County 911 Center.

Cue:

As the 911 Center Operator, acknowledge the request and that the person for transport is contaminated.

State that an ambulance will be on the way shortly.

Contacts OSWEGO COUNTY 911 CENTER and requests an ambulance be sent to the NINE MILE POINT CONSTELLATION ENERGY SECURITY CHECKPOINT, 350 LAKE ROAD.

Via land telephone line at 343-1313.

Informs the 911 Center that the person for transport is potentially contaminated.

Pass/Fail

8. Contact Security Shift Supervisor.

Cue:

As the Security Shift Supervisor, acknowledge the request.

Contacts the SECURITY SHIFT SUPERVISOR and requests a security force member be sent to the scene of the medical emergency AND informs them of the impending ambulance arrival.

Pass/Fail

9. Contact the Oswego Hospital.

Cue:

As the Oswego Hospital Representative, acknowledge the report of the situation and state that the REA will be setup.

Cue:

As the Fire Brigade Leader, report that the RP Tech will need to accompany the ambulance to the hospital.

Contacts the OSWEGO HOSPITAL.

Via land telephone line at 349-5522.

Informs them that ONE contaminated injured person will be transported to them.

Requests that setup the RADIATION EMERGENCY AREA (REA).

Pass/Fail

10. Arrange for the RP Tech to accompany the ambulance.

Cue:

As the SM, give permission for the RP Tech to accompany the ambulance.

Cue:

As the RP Tech, acknowledge permission to accompany the ambulance.

Requests permission from the SM for the RP Tech to accompany the ambulance.

Informs RP Tech at the scene that they have SM permission to accompany the ambulance.

Informs the RP Supervisor of the incident and directs them to the hospital Sat/Unsat Sat/Unsat Sat/Unsat

Performance Steps Standard Grade NRC 2008 RO ADMIN JPM EP October 2008 Performance Steps Standard Grade Cue:

As the RP Supervisor, acknowledge report and state that you will meet the ambulance at the hospital.

Cue:

As the SM, state that you will evaluate staffing levels.

Informs the SM that an evaluation of required staffing should be performed Sat/Unsat

11. Request SM contact Plant General Manager.

Cue:

As the SM, acknowledge the request.

Requests SM contact Plant General Manager and provide details within one hour of incident.

Sat/Unsat

12. Request Security Shift Supervisor to contact Supervisor, Communications Cue:

As the Security Shift Supervisor acknowledge the request.

Cue:

As the Fire Brigade Leader, inform the Candidate that the contaminated injured person has left the site and is proceeding to Oswego Hospital in the ambulance.

Requests Security Shift Supervisor to contact Supervisor, Communications and provide details of the incident Sat/Unsat

13. Inform the SM of the termination of the emergency.

Cue:

As the SM, acknowledge the Candidates report.

Informs the SM that the emergency is terminated.

Sat/Unsat

14. Announce termination of medical emergency.

Sounds the Station Alarm and announces that the medical emergency has been terminated.

Sat/Unsat Terminating Cue:

The medical emergency has been terminated.

RECORD STOP TIME

NRC 2008 SRO ADMIN JPM C001 October 2008 Initial Conditions:

1. The Plant is operating at 100%.
2. You are the CSO.
3. You have just received a report that a Mechanic has passed out on Reactor Building elevation 261, near the RWCU pumps.
4. The Mechanic is bleeding from the left arm and respiration is shallow.

Initiating Cues:

(Operators name), perform the required actions for the medical emergency as the CSO.

Note: Candidate should be direct all communications to the examiner, rather than make actual GAItronics announcements.