NRC 2008 JPM S-1 October 2008 NRC JPM S-1 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Initiate Liquid Poison Injection, RWCU Fails Revision: NRC 2008 To Isolate (Alternate Path)
Task Number: N1-211000-01006 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time: 15 minutes Time Critical Task:
No Alternate Path Task:
Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM S-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 1. Initialize Simulator to IC 181
- 2. Verify malfunctions RD33B and RD33D are inserted at position 36, and RP03 is inserted to establish failure to scram
- 3. Verify malfunctions CU12 and CU13 are inserted to establish RWCU isolation failure
- 4. Verify mode switch is in SHUTDOWN
- 5. Verify RRPs are tripped
- 4. Allow conditions to stabilize Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail.
- 2. During Evaluated JPM:
Self verification shall be demonstrated.
- 3. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. NUREG 1123, 211000, A1.08, RO 3.7, SRO 3.8
- 2. N1-EOP-HC, Attachment 9 Tools and Equipment:
None Task Standard: Liquid Poison pump 11 injecting into the Reactor Vessel and Reactor Water Cleanup isolated.
Initial Conditions:
- 1. The plant was operating at 100% power.
- 2. A failure to scram has occurred.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with N1-EOP-HC, Attachment 9.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue.
Evaluator acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-EOP-HC, Attachment 9 obtained Sat/Unsat
- 3.
Place Liquid Poison System keylock selector switch to SYS 11 Keylock selector switch is rotated CW to SYS 11 Pass/Fail
- 4.
Confirm:
Both explosive valves fire Squib valves 11 and 12 continuity lights verified extinguished Sat/Unsat Liquid Poison pump 11 Starts Liquid Poison pump 11 red light ON, green light OFF, amps and pressure rise Sat/Unsat RWCU System isolates Note: RWCU will fail to isolate Diagnoses failure of RWCU to isolate:
RWCU system isolation valves remain open with green lights OFF, red lights ON, RWCU pump in service Pass/Fail
NRC 2008 JPM S-1 October 2008 Performance Steps Standard Grade Proper communication used (GAP-OPS-01)
Sat/Unsat
- 5.
Notify CRS that the RWCU system failed to isolate Role Play: Acknowledge RWCU System failed to isolate
- 6.
IF RWCU does NOT automatically isolate THEN manually isolate the RWCU system IAW N1-OP-3 Note: Refers to N1-OP-3, Section H.11, Rapid System Isolation Refers to N1-OP-3, Section H.11 Sat/Unsat
- 7.
Provide close signal to both valves below at H panel Close 33-02R Close 33-04R Closes33-02R & 33-04R by rotating individual control switches CCW Pass/Fail
- 8.
Secure all operating cleanup pumps Secures RWCU pump 12 by rotating control switches CCW to STOP Sat/Unsat
- 9.
Open ONE of the following valves 33-10, Cleanup to Waste Disposal BV 33-11, Cleanup to condenser BV Opens ONE of the following valves using common control switch 33-10, Cleanup to Waste Disposal BV 33-11, Cleanup to condenser BV Sat/Unsat Role Play: When asked, state that Rapid Depressurization is NOT required and that RWCU system is to remain pressurized
- 10.
If high pressure system is to remain pressurized, THEN close 33-41, AO Blocking Valve.
Closes 33-41, AO Blocking Valve by rotating control switch CCW Sat/Unsat
- 11.
Provide close signal at H Panel to 33-01R, CU Return Isolation Valve 1 (inside)
Provides close signal at H Panel to 33-01R, CU Return Isolation Valve 1 (inside), by rotating control switch CCW Pass/Fail
- 12.
Adjust inservice PCV AND 33-165, Cleanup to Cond & Waste Flow, as required to maintain Cleanup system pressure less than 110 psig AND minimize reject flow Adjusts inservice PCV AND 33-165, Cleanup to Cond & Waste Flow, as required to maintain Cleanup system pressure less than 110 psig AND minimize reject flow Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 13.
Verify closed the following valves
- IV-33-02R
- IV-33-04R
- IV-33-01R Verifies closed the following valves (green light ON, red light OFF)
- IV-33-02R
- IV-33-04R IV-33-01R Sat/Unsat Note: Once this step is performed, the JPM is complete Terminating Cue: Liquid Poison pump 11 injecting into the Reactor Vessel and Reactor Water Cleanup isolated.
RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. The plant was operating at 100% power.
- 2. A failure to scram has occurred.
Initiating Cues:
(Operators name), inject Liquid Poison into the Reactor Vessel with Liquid Poison pump 11 in accordance with N1-EOP-HC, Attachment 9.
NRC 2008 JPM P-1 October 2008 NRC JPM S-2 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Transfer Torus Water to the Waste Collector Tank Using Revision: NRC 2008 Containment Spray Loop 111 Task Number: N1-226001-01015 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
15 Minutes Time Critical Task:
No Alternate Path Task:
No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 1. Initialize Simulator to IC 182
- 2. Verify torus water level raised to ~11.3 per N1-EOP-1 Attachment 18 Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 4. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 5. During Evaluated JPM:
Self verification shall be demonstrated.
- 6. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N1-EOP-1, Attachment 15
- 2. NUREG 1123 295029 EA 1.03 RO 2.9 SRO 3.0 Tools and Equipment:
None
NRC 2008 JPM P-1 October 2008 Task Standard:
Torus water level is being lowered via the Containment Spray System.
Initial Conditions:
- 1. Torus water level is 11.3 feet and rising slowly.
- 2. N1-EOP-4 has been entered.
- 3. Containment Spray pumps are in Pull to Lock.
Initiating Cues:
(Operators name), lower torus level to 11.0 feet by discharging water to the Waste Collector Tank using Containment Spray Loop 111 in accordance with N1-EOP-1, Attachment 15.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-EOP-1, Attachment 15 obtained Sat/Unsat
- 3.
Notify Radwaste of intent to pump down Torus to Waste Collector Tank Proper communications used (GAP-OPS-01)
Sat/Unsat Role Play: Acknowledge report
- 4.
Close valve 80-45, Cont Spray Bypass BV 122 Valve 80-45 is closed by turning control switch CCW and then observing green light on, red light off Pass/Fail
- 5.
Open valve 80-118, Cont Spray Test to Torus FCV Note: 80-118 is a throttlable valve, and must be held in the open position until fully open Valve 80-118 is opened by turning control switch CW to open and verifying green light off, red light on Pass/Fail
- 6.
Verify closed valve 80-16, Cont Spray Discharge IV 111 Valve 80-16, Cont Spray Discharge IV 111, is closed by turning control switch CCW and then observing green light on, red light off Pass/Fail
- 7.
Verify open 80-40, Cont Spray Bypass BV 111 Verifies valve 80-40 is open by observing red light on, green light off Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 8.
Start Containment Spray Raw Water Pump 111 Starts Containment Spray Raw Water Pump 111 by turning control switch CW to the start position and verifying one or more of the following:
Green light off, red light on Pump amps increase Flow increases Pass/Fail
- 9.
Start Containment Spray Pump 111 Starts Containment Spray Pump 111 by turning control switch CW to the start position and verifying one or more of the following:
Green light off, red light on Pump amps increase Flow increases System pressure rises Pass/Fail
- 10.
Open valve 80-115, Cont Spray to Radwaste IV 12 Valve 80-115 is opened by turning control switch CW and then observing green light off, red light on Pass/Fail
- 11.
Open valve 80-114, Cont Spray to Radwaste IV 11 Valve 80-114 is opened by turning control switch CW and then observing green light off, red light on Pass/Fail
- 12.
Throttle valve 80-118, Cont Spray Test to Torus FCV as required to control flow to Waste Collector Tank Valve 80-118 is throttled closed by turning control switch CCW and then verifying green light on Sat/Unsat Role Play: If requested, inform that Radwaste has indication of sufficient flow
- 13.
Monitor 58-05A and 58-06A TORUS H2O LEVEL indicators for level response TORUS H2O LEVEL indicators58-05A and 58-06A monitored for level response Sat/Unsat
- 14.
Inform CRS that flow to the Waste Collector Tank has been established using Containment Spray Loop 111 Proper communications used (GAP-OPS-01)
Sat/Unsat Role Play: Acknowledge report Terminating Cue: Torus water level is being lowered via Containment Spray Loop 111.
RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. Torus water level is 11.3 feet and rising slowly.
- 2. N1-EOP-4 has been entered.
- 3. Containment Spray pumps are in Pull to Lock.
Initiating Cues:
(Operators name), lower torus level to 11.0 feet by discharging water to the Waste Collector Tank using Containment Spray Loop 111 in accordance with N1-EOP-1, 5.
NRC 2008 JPM P-1 October 2008 NRC JPM S-3 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Transfer Load from #11 and #12 Feedwater Pumps to #13 Revision: NRC 2008 Feedwater Pump, #13 Feedwater FCV fails closed (Alternate Path)
Task Number: N1-259001-01010 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
20 Minutes Time Critical Task:
No Alternate Path Task:
Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 1. Initialize Simulator to IC 182
- 2. Verify Feedwater flow is ~3.0x106 lbm/hr
- 6. Verify malfunction FW24 is on TRG1, initial severity = 65.5, final severity = 68, ramp time = 10 seconds
- 7. Verify TRG1 is set to actuate with the following event (13 FCV M/A station not in manual and FW Master controller in manual) zdfwmst4==1&&zdfwmacm!=1 Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 7. Critical steps are identified in grading areas Pass/Fail. During Evaluated JPM:
Self verification shall be demonstrated.
- 8. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 3. NUREG 1123, 259001, A2.07, RO 3.7, SRO 3.8
- 4. N1-OP-16 Tools and Equipment:
Initial Conditions:
- 4. Plant startup is in progress
- 5. Feedwater flow is 3.0x106 lbm/hr
- 8. #13 Feedwater pump has just been started
- 10. All recirc loops are operating
- 11. Instructor to ask operator for any questions Initiating Cues:
(Operators name), transfer Feedwater flow to #13 Feedwater pump and place #13 Feedwater FCV in automatic, then shutdown #11 and #12 Feedwater pumps, in accordance with N1-OP-16, section E.10.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-OP-16 obtained Precautions & limitations reviewed Section E.10 referenced Sat/Unsat
- 3.
Verify MCPR > minimum MCPR in the CRC book Note: Given in the initial conditions Verifies MCPR is SAT per initial conditions Sat/Unsat
- 4.
Transfer load from the Feedwater pump with its FCV in Manual (11 or 12) to the Shaft Pump by slowly opening 13 FCV AND slowly closing the FCV in Manual until the manual FWP FCV output is zero Rotate knob CW to increase flow on FWP 13 FCV and rotate knob CCW to lower flow on FWP 12 FCV, and then verify FWP 12 FCV output is zero by observing controller indication Pass/Fail
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 5.
Transfer load from the Feedwater pump with its FCV in AUTO (11 or 12) to the Shaft Pump by slowly opening 13 FCV until the AUTO Feedwater Pump FCV output is approximately zero Rotate knob CW to increase flow on FWP 13 FCV and then observe approximately zero flow on FWP 11 Pass/Fail
- 6.
Verify Manual output knob on M/A station of FCV in AUTO (11 or 12) fully counterclockwise Verifies Manual output knob on M/A station of FWP 11 FCV is rotated fully CCW Sat/Unsat
- 7.
Place VALVE CONTROL M/A station in AUTO (11 or 12) to MAN Places VALVE CONTROL M/A station in AUTO (11) to MAN by rotating mode switch CW Pass/Fail
- 8.
Control Vessel level using FWP 13 FCV in Manual Adjusts Manual output knob on M/A station of FWP 13 FCV as necessary to control Vessel level Sat/Unsat
- 9.
Place FWP 13 Valve Control M/A station in AUTO/BAL by performing the following:
Verify Feedwater Master Controller M/A station in Manual Mode switch on Feedwater Master Controller aligned to MANUAL Pass/Fail Null FWP 13 Valve Control by adjusting knob on Feedwater Master Controller until deviation meter reads 50% (red dot) on FWP 13 Valve Control GEMAC Rotates knob on Feedwater Master Controller CW or CCW and observes deviation meter on FWP 13 Valve Controller at 50% (red dot)
Sat/Unsat Place FWP 13 Valve Control mode switch to AUTO or BAL Note: Verify TRG1 goes active when the following two conditions are met:
13 FW FCV M/A station is NOT in manual FW Master controller is in manual TRG1 activates malfunction FW24, causing FWP 13 FCV to fail in the closed direction to 32% open over 10 seconds Note: The applicant should observe faulty response of FCV and must refer to N1-SOP-16.1, Feedwater System Failures, to control RPV level. JPM steps 10-12 will only be performed until the applicant recognizes the slow failure of 13 FW FCV.
Rotates mode switch on Feedwater Master Controller CCW to AUTO or BAL Pass/Fail
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 10.
Null setpoint error on Feedwater Master Controller by adjusting Thumbwheel/Setpoint tape to align Manual Setpoint (orange arrow) directly under Automatic Setpoint (green band)
Rotates thumbwheel on Feedwater Master Controller up or down and observes orange needle under green band on setpoint deviation meter Sat/Unsat/
NA
- 11.
Place Feedwater Master Controller M/A station in AUTO or BAL Rotates Feedwater Master Controller mode switch CCW to AUTO or BAL Sat/Unsat/
NA
- 12.
Confirm 13 FCV response to FW Master control adjustment by observing position indicator POI 29-134 Recognizes faulty response of 13 FCV Sat/Unsat/
NA
- 13.
Per N1-SOP-16.1, using available FCVs, take manual control of FWLC at M/A stations placing controllers in Manual, and attempt to control RPV level Injects to the RPV with 11 and/or 12 Feedpump by rotating respective M/A station knob CW, and observes RPV level response Pass/Fail
- 14.
Restore RPV level 65 - 83 Restores and maintains RPV level 65 - 83, preventing a reactor scram Pass/Fail
- 15.
Inform CRS that FWP 11 and/or 12 is in service in manual maintaining vessel level 65 to 83 Proper communications used Sat/Unsat Terminating Cue: #11 or #12 Feedwater pumps maintaining RPV water level in manual RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. Plant startup is in progress
- 2. Feedwater flow is ~3.0x106 lbm/hr
- 5. #13 Feedwater pump has just been started
- 7. All recirc loops are operating Initiating Cues:
(Operators name), transfer Feedwater flow to #13 Feedwater pump and place #13 Feedwater FCV in automatic, then shutdown #11 and #12 Feedwater pumps, in accordance with N1-OP-16, section E.10.
NRC 2008 JPM P-1 October 2008 NRC JPM S-4 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Startup Control Room Ventilation System Revision: NRC 2008 Task Number: N1-288003-01001 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
15 Minutes Time Critical Task:
No Alternate Path Task:
No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 8. Initialize Simulator to IC 184
- 9. Verify control room ventilation is secured in accordance with N1-OP-49, section G
- 10. Verify Cooling Coil Block Valve selected to 12
- 11. Verify EVS Fan 11 in AUTO Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 9. Critical steps are identified in grading areas Pass/Fail. During Evaluated JPM:
Self verification shall be demonstrated.
- 10. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 5. NUREG 1123, 290003, A4.01 (RO 3.2, SRO 3.2)
- 6. N1-OP-49
NRC 2008 JPM P-1 October 2008 Tools and Equipment:
- 2. None Task Standard: Startup the Control Room Ventilation System per N1-OP-49.
Initial Conditions:
- 12. The control room ventilation system is being restarted following maintenance
- 13. N1-OP-49, Attachment 1 valve lineup is complete
- 14. N1-OP-49, Attachment 2 electrical lineup is complete
- 15. Instructor to ask operator for any questions Initiating Cues:
(Operators name), startup the Control Room Ventilation System in accordance with N1-OP-49, with the following lineup:
Emergency Fan 12 in AUTO Cooling Coil 11 in service Chilled Water Circulating Pump 11 in service Control Room Circulating Fan 11 in service Performance Steps Standard Grade
- 3.
Provide repeat back of initiating cue Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 4.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-OP-49 obtained Precautions & limitations reviewed Section E referenced Sat/Unsat Note: Step E.1.0 is NOT required since the valve and electrical lineups are complete per the initial conditions
- 13.
Verify the following are open:
210-08, INLET BV 12 210-39, INLET BV 11 Observes 210-08 red light on, green light off Observes 210-39 red light on, green light off Sat/Unsat Sat/Unsat
- 14.
Verify the following are closed:
210-40, 11 CR Emergency Fan Inlet BV Observes 210-40 green light on, red light off Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade 210-41, 12 CR Emergency Fan Inlet BV Observes 210-41 green light on, red light off Sat/Unsat
- 15.
Place EMER FAN 12 control switch in AUTO Places Control Room Emergency Fan 12 control switch in AUTO Pass/Fail
- 16.
Place EMER FAN 11 control switch in OFF Places Control Room Emergency Fan 11 control switch in OFF Pass/Fail
- 17.
Place COOLING COIL 11 BLOCK VALVE selector switch in position 11 Places Cooling Coil 11 in service by rotating selector switch CCW Sat/Unsat
- 18.
Depress START pushbutton for CHILLED WATER CIRCULATING PUMP 11 and confirm red indicator light lit Depressed START pushbutton for Chilled Water Circulating Pump 11, and then observes red light lit Pass/Fail
- 19.
Start 111 CHILLER COMPRESSOR 112 or 121 CHILLER COMPRESSOR 122:
Place 111 CHILLER COMPRESSOR 112 control switch in RUN Place 121 CHILLER COMPRESSOR 122 control switch in RUN Depress CHILLER 11 START pushbutton Depress CHILLER 12 START pushbutton Confirm at least one lead chiller compressor red light lit.
Cue: Time compression is in effect, 111 and 121 Chiller Compressor red lights are lit Note: The red lights for the Chiller Compressors do not energize for approximately 2-3 minutes while the compressor timer cycles Rotates 111 CHILLER COMPRESSOR 112 control switch CW to RUN Rotates 121 CHILLER COMPRESSOR 122 control switch CW to RUN Depresses CHILLER 11 pushbutton, and then observes red light lit Depresses CHILLER 12 pushbutton, and then observes red light lit Observes red lights lit for 111 CHILLER COMPRESSOR 112 and 121 CHILLER COMPRESSOR 122 Pass/Fail Pass/Fail Pass/Fail Pass/Fail Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 20.
Start CR Circulating Fan by performing the following:
If Control Room Emergency Fan 12 was placed in AUTO, then place Circulating Fan 11 in RUN Circulating Fan 11 control switch rotated CW to RUN Pass/Fail
- 21.
Inform CRS that the Control Room Ventilation System is operating Role Play: Acknowledge report Proper communications used (GAP-OPS-01)
Sat/Unsat Terminating Cue: Control Room Ventilation system is operating with the following lineup:
Emergency Fan 12 in AUTO Cooling Coil 11 in service Chilled Water Circulating Pump 11 in service Control Room Circulating Fan 11 in service RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. The control room ventilation system is being restarted following maintenance
- 2. N1-OP-49, Attachment 1 valve lineup is complete
- 3. N1-OP-49, Attachment 2 electrical lineup is complete Initiating Cues:
(Operators name), startup the Control Room Ventilation System in accordance with N1-OP-49, with the following lineup:
- Emergency Fan 12 in AUTO
- Cooling Coil 11 in service
- Chilled Water Circulating Pump 11 in service
- Control Room Circulating Fan 11 in service
NRC 2008 JPM P-1 October 2008 NRC JPM S-5 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
EDG 103 S/D-PB 103 Return to Normal Power Revision: NRC 2008 (Alternate Path)
Task Number: N1-262001-01005 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
20 Minutes Time Critical Task:
No Alternate Path Task:
Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 12. Initialize Simulator to IC 185
- 13. Verify PB 103 is supplied by EDG 103 per N1-OP-45 section E.3
- 14. Verify CRD Pump 11 in service
- 15. Verify the Annunciator L1-4-5 is overridden to Fail Off, to simulate alternate SFP pump in service
- 16. Verify malfunction RD35B is inserted as TRUE, to simulate prevent start of 12 CRD pump
- 17. Verify override 5DS267LO2348 is inserted as OFF, to simulate prevent start of 12 CRD pump
- 18. Verify malfunction DG05B is inserted as TRUE for failure of EDG 103 to stop Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 11. Critical steps are identified in grading areas Pass/Fail. During Evaluated JPM:
Self verification shall be demonstrated.
- 12. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 7. NUREG 1123, 264000, A4.05, RO 3.6, SRO 3.7
- 8. N1-OP-45 Tools and Equipment:
- 3. None Task Standard: Shutdown EDG 103 and reenergize PB 103.
Initial Conditions:
- 16. EDG 103 is supplying PB 103 due to maintenance on breaker R1013
- 17. EDG 103 has been at minimum load for the past hour, and at 700 KW for the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- 18. 115 KV power is stable
- 19. N1-OP-45 section G.2 is complete through step 2.6
- 20. Instructor to ask operator for any questions Initiating Cues:
(Operators name), shutdown EDG 103 and return PB 103 to normal power in accordance with N1-OP-45, beginning at step G.2.7.
Performance Steps Standard Grade
- 5.
Provide repeat back of initiating cue Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 6.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-OP-45 obtained Precautions & limitations reviewed Section G.2 referenced Sat/Unsat
- 22.
Verify GREEN flagged R1013, PB 103 Normal Power Supply Breaker Rotates R1013 control switch CW from PTL to neutral Pass/Fail
- 23.
Place and HOLD in TRIP position R1032, Diesel Generator 103 Output Breaker Rotates R1032 control switch CCW and holds in trip position Pass/Fail
- 24.
When 3 to 5 seconds has elapsed, close R1013 Rotates R1013 control switch CW, observes red light on, green light off Pass/Fail
- 25.
Confirm normal voltage on PB 103 and PB 17B Observes ~4160 VAC on PB 103 voltmeter, and observes ~600 VAC on PB 17B voltmeter Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 26.
Return R1032 to Neutral Position Releases R1032 to the neutral position Pass/Fail
- 27.
Reset Lockout 86-17 device Note: Lockout device may not need to be reset if R1013 is closed closer to 3 seconds than 5 seconds (Step 5 above)
Rotates 86-17 control switch CW to reset position Pass/Fail/
NA
- 28.
Install Close fuse for CRD pump 12 Cue: Field operators will install fuse Note: Delete malfunction RD35B &
override 5DS267L02348, then report close fuse for CRD pump 12 has been installed and verified Proper communications used (GAP-OPS-01)
Sat/Unsat
- 29.
Verify Green light ON for CRD pump 12 Note: The green light will not be lit until the instructor note in step 9 above is completed Role Play: If informed to exit Technical Specification for CRD pump, acknowledge report Observes CRD pump 12 green light on Sat/Unsat
- 30.
Verify EDG Raw Water Cooling Pump started.
Cue: EDG 103 Raw Water Cooling Pump has started Proper communications used (GAP-OPS-01)
Sat/Unsat
- 31.
Restore normal loads on PB17B Cue: Another operator will restore PB17B loads Proper communications used (GAP-OPS-01)
Sat/Unsat
- 32.
IF EDG has run idle for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> OR operated less than 500 KW for 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, THEN shutdown EDG per Section G, Recovery after Light Load Operation Note: This step is N/A based on initial conditions Determines step is N/A based on initial conditions Sat/Unsat
- 33.
Verify Speed Droop set to zero Cue: EDG 103 Speed Droop set to zero Proper communications used (GAP-OPS-01)
Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 34.
Adjust Governor to achieve greater than or equal to 60.1 Hz synchronous speed AND the Governor high speed light lit as follows.
- a.
Adjust speed until governor yellow high speed light is lit
- b.
Adjust speed to achieve greater than or equal to 60.1 Hz with a maximum of 60.2 Hz.
Note: This step may be N/A based on EDG speed Raises EDG 103 speed as necessary by rotating governor control switch CCW, observes yellow high speed light lit Raises EDG 103 speed as necessary by rotating governor control switch CCW, and observes EDG 103 frequency of 60.1-60.2 Hz Sat/Unsat Sat/Unsat
- 35.
Independently verify speed greater than or equal to 60.1 HZ (max 60.2 Hz)
Cue: Speed is as you adjusted it.
Proper communications used (GAP-OPS-01)
Sat/Unsat
- 36.
Adjust voltage to 4200 V using VOLT ADJ RHEO GEN 103 Raises EDG 103 voltage as necessary by rotating voltage regulator control switch CCW, and observes voltage ~4200V Sat/Unsat
- 37.
Place DIESEL GEN 103 control switch in STOP Rotates EDG 103 control switch CCW to STOP position, observes EDG 103 output voltage lower Pass/Fail
- 38.
When approximately 3 minute cooldown has elapsed, verify EDG 103 stopped Cue: Time compression is in effect, 4 minutes have elapsed Note: The applicant should recognize that the EDG should have stopped Recognizes that EDG did not stop as it should have Sat/Unsat
- 39.
If the EDG did not shutdown, refer to Section G.7.0, Emergency Shutdown Refers to N1-OP-45 section G.7.0, Emergency Shutdown Sat/Unsat
- 40.
If offsite power is not available, THEN verify R1012 OR 1013 in Pull-To-Lock Note: This step is N/A, Offsite power is available per the initial conditions Determines offsite power is available per initial conditions Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 41.
If a loss of 125 VDC power is lost due to loss of battery board 11 or 12, then restore power per SOP-47.A1 Note: This step is N/A, 125 VDC is available Determines 125 VDC power is available based on various control room indications Sat/Unsat
- 42.
Place DIESEL GEN control switch to EM STOP Role Play: If contacted to shutdown EDG locally, report that communications have failed and no one can be dispatched to shutdown the EDG locally Rotates EDG 103 control switch CCW to EM STOP position, observes EDG 103 frequency lower Pass/Fail Terminating Cue: EDG 103 stopped and PB 103 energized RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. EDG 103 is supplying PB 103 due to maintenance on breaker R1013
- 2. EDG 103 has been at minimum load for the past hour, and at 700 KW for the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- 3. 115 KV power is stable
- 4. N1-OP-45 section G.2 is complete through step 2.6 Initiating Cues:
(Operators name), shutdown EDG 103 and return PB 103 to normal power in accordance with N1-OP-45, beginning at step G.2.7.
NRC 2008 JPM P-1 October 2008 NRC JPM S-6 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Perform RWM Diagnostic & Rod Block Tests Revision: NRC 2008 Task Number: N1-201003-01001 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
20 minutes Time Critical Task:
No Alternate Path Task:
No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 1. Initialize simulator to IC 183
- 2. Verify RWM Bypass Switch in OFF Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, the use of applicable methods of verification and checking are expected.
Therefore, either another individual or I will act as the independent verifier or peer checker.
Notes to Instructor / Evaluator:
- 13. Critical steps are identified in grading areas Pass/Fail.
- 14. During Evaluated JPM:
Self checking shall be demonstrated.
- 15. During Training JPM:
Self checking shall be demonstrated.
Peer checking shall be demonstrated.
References:
- 9. N1-ST-V3
- 10. K/A 201006 A4.01 thru A4.06 2.9/2.9 to 3.3/3.4 Tools and Equipment:
- 1. None
NRC 2008 JPM P-1 October 2008 Task Standard: RWM system diagnostic test and rod block test complete Initial Conditions:
- 21. The plant is shutdown
- 22. The Rod Worth Minimizer must be retested following corrective maintenance
- 23. An approved work order requires completion of steps in N1-ST-V3 for the Post Maintenance Testing
- 24. Instructor to ask for any questions Initiating Cues:
(Operators name), perform the following sections/steps of N1-ST-V3 for Post Maintenance Testing of the Rod Worth Minimizer:
- 1. Section 8.2 RWM Diagnostic Test - Complete ALL steps
- 2. Section 8.3 RWM Select Error test - Step 8.3.1 through Step 8.3.5 ONLY
- 3. Section 8.4 RWM Rod Block Test - Complete ALL steps Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator acknowledge repeat back providing correction if necessary Proper communications used (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure Note : The following Steps are for Section 8.2 N1-ST-V3 is obtained Precautions & Limitations reviewed Sections 8.2, 8.3 and 8.4 referenced Sat/Unsat
- 3.
Place RWM BYPASS Switch in "ON" position Rotates RWM BYPASS Switch CW to "ON" position Pass/Fail
- 4.
Place RWM BYPASS Switch in "OFF" position Rotates RWM BYPASS Switch CCW to "OFF" position Pass/Fail
- 5.
Press CLEAR BYPASS Depresses CLEAR BYPASS pushbutton Pass/Fail
- 6.
Press ERROR CLEAR Depresses ERROR CLEAR pushbutton Pass/Fail
- 7.
Press RESET Depresses RESET pushbutton Pass/Fail
- 8.
Press SYSTEM START Depresses SYSTEM START pushbutton Pass/Fail
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 9.
Momentarily depress SYSTEM DIAGNOSTIC Button AND confirm the following lights cycle ON/OFF:
- a. INSERT BLOCK light at Rod Worth Minimizer Display Panel [INSERT BLOCK light ON then OFF]
- b. WITHDRAW BLOCK light at Rod Worth Minimizer Display Panel
[WITHDRAW BLOCK light ON then OFF]
- c. Annunciator F3-4-4, ROD BLOCK
[F3-4-4 ON then OFF]
Momentarily depresses SYSTEM DIAGNOSTIC Button AND confirms the following lights cycle ON/OFF:
- a. INSERT BLOCK light at Rod Worth Minimizer Display Panel [INSERT BLOCK light ON then OFF]
- b. WITHDRAW BLOCK light at Rod Worth Minimizer Display Panel
[WITHDRAW BLOCK light ON then OFF]
- c. Annunciator F3-4-4, ROD BLOCK
[F3-4-4 ON then OFF]
Pass/Fail
- 10.
Place RWM BYPASS Switch in ON position Rotates RWM BYPASS Switch CW to ON position Pass/Fail
- 11.
WHEN RWM has sequenced, THEN confirm following lights remain OFF:
- a. INSERT BLOCK light [INSERT BLOCK light OFF]
- b. WITHDRAW BLOCK light
[WITHDRAW BLOCK light OFF]
- c. Annunciator F3-4-4, ROD BLOCK
[F3-4-4 OFF]
WHEN RWM has sequenced, THEN confirms following lights remain OFF:
- a. INSERT BLOCK light [INSERT BLOCK light OFF]
- b. WITHDRAW BLOCK light
[WITHDRAW BLOCK light OFF]
- c. Annunciator F3-4-4, ROD BLOCK
[F3-4-4 OFF]
Sat/Unsat
- 12.
Complete Section 10.1.2, Acceptance Criteria, for System Diagnostic Testing Cue: Another operator has completed Section 10.1.2 Proper communications used (GAP-OPS-01)
Sat/Unsat Note: The applicant should now proceed to Section 8.3 and perform steps 8.3.1 thru 8.3.5 ONLY
- 13.
Place RWM BYPASS Switch in OFF position Rotates RWM BYPASS Switch CCW to OFF position Pass/Fail
- 14.
Press CLEAR BYPASS Depresses CLEAR BYPASS pushbutton Pass/Fail
- 15.
Press ERROR CLEAR Depresses ERROR CLEAR pushbutton Pass/Fail
- 16.
Press RESET Depresses RESET pushbutton Pass/Fail
- 17.
Press SYSTEM START Depresses SYSTEM START pushbutton Pass/Fail
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade Note: The applicant should now proceed to Section 8.4 for the Rod Block Test
- 18.
Select an "out of sequence" Rod at position 00 as designated by Reactor Engineering AND record Rod Selected Cue: Select Rod 22-51 Selects an "out of sequence" Rod at position 00 as designated by Reactor Engineering AND records Rod Selected Pass/Fail
- 19.
Confirm SELECT ERROR light ON at Rod Worth Minimizer Display Panel Confirms SELECT ERROR light ON at Rod Worth Minimizer Display Panel Sat/Unsat
- 20.
Using CONTROL ROD MOVEMENT Switch in ROD OUT NOTCH mode, withdraw designate Control Rod to "04" position Cue: Inform Candidate that you are performing the role of both the reactivity SRO and the peer checker. Agree with Candidates actions as necessary.
Using CONTROL ROD MOVEMENT Switch in ROD OUT NOTCH mode, withdraws designate Control Rod to "04" position Pass/Fail
- 21.
Verify Rod motion to position 04 Verifies Rod motion to position 04 Sat/Unsat
- 22.
Using CONTROL ROD MOVEMENT Switch in ROD OUT NOTCH mode, attempt to withdraw designated Control Rod to"06" position AND confirm Rod motion is blocked beyond position "04" Using CONTROL ROD MOVEMENT Switch in ROD OUT NOTCH mode, attempts to withdraw designated Control Rod to "06" position AND confirms Rod motion is blocked beyond position "04" Pass/Fail
- 23.
Confirm the following indications ON:
- a. WITHDRAW BLOCK light ON at RWM Display Panel [WITHDRAW BLOCK light ON]
- b. ROD WORTH MINIMIZER light ON at Rod Block Monitor Display Panel [ROD WORTH MINIMIZER light ON]
- c. Annunciator F3-4-4, ROD BLOCK -
ON [F3-4-4 ON]
Confirms the following indications ON:
- a. WITHDRAW BLOCK light ON at RWM Display Panel [WITHDRAW BLOCK light ON]
- b. ROD WORTH MINIMIZER light ON at Rod Block Monitor Display Panel [ROD WORTH MINIMIZER light ON]
- c. Annunciator F3-4-4, ROD BLOCK
- ON [F3-4-4 ON]
Sat/Unsat
- 24.
Re-select designated rod if deselected Note: Step is N/A Determines rod has NOT deselected Sat/Unsat
- 25.
Attempt to withdraw designated rod to position 06 Attempts to withdraw designated rod to position 06 Pass/Fail
- 26.
Confirm no rod movement Confirms no rod movement Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 27.
Re-select designated rod if deselected Note: Step is N/A Determines rod has NOT deselected Sat/Unsat
- 28.
Insert Control Rod to position 00 by placing CONTROL ROD MOVEMENT Switch to ROD IN Inserts Control Rod to position 00 by placing CONTROL ROD MOVEMENT Switch to ROD IN Pass/Fail
- 29.
Confirm following lights OFF:
- a. WITHDRAW BLOCK light OFF at Rod Worth Minimizer Display Panel
- b. ROD WORTH MINIMIZER light OFF at Rod block Monitor Display Panel
- c. Annunciator F3-4-4, ROD BLOCK -
OFF Confirms following lights OFF:
- a. WITHDRAW BLOCK light OFF at Rod Worth Minimizer Display Panel
- b. ROD WORTH MINIMIZER light OFF at Rod block Monitor Display Panel
- c. Annunciator F3-4-4, ROD BLOCK
- OFF Sat/Unsat
- 30.
Select a Rod which is In Sequence with prescribed Rod Withdrawal Sequence AND confirm SELECT ERROR light OFF Cue: Select rod 06-27 Selects Rod 06-27 AND confirms SELECT ERROR light OFF Pass/Fail
- 31.
Complete Section 10.1.4, Acceptance Criteria, for RWM Rod Block Testing Cue: Another operator will complete section 10.1.4 Proper communications used (GAP-OPS-01)
Sat/Unsat Terminating Cue:
RWM Diagnostic and Rod Block Tests complete RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. The plant is shutdown
- 2. The Rod Worth Minimizer must be retested following corrective maintenance
- 3. An approved work order requires completion of steps in N1-ST-V3 for the Post Maintenance Testing Initiating Cues:
(Operators name), perform the following sections/steps of N1-ST-V3 for Post Maintenance Testing of the Rod Worth Minimizer:
- 1. Section 8.2 RWM Diagnostic Test - Complete ALL steps
- 2. Section 8.3 RWM Select Error test - Step 8.3.1 through Step 8.3.5 ONLY
- 3. Section 8.4 RWM Rod Block Test - Complete ALL steps
NRC 2008 JPM P-1 October 2008 NRC JPM S-7 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Remove the Generator from the Grid and Perform Revision: NRC 2008 Emergency Governor Trip Test Task Number: N1-245000-01041 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
20 Minutes Time Critical Task:
No Alternate Path Task:
No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 1. Initialize simulator to IC 186
- 2. Verify main generator output 90-120 MWe and 50-100 MVARs to the bus
- 3. Verify turbine ready to be removed from the grid Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 16. Critical steps are identified in grading areas Pass/Fail. During Evaluated JPM:
Self verification shall be demonstrated.
- 17. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 11. NUREG 1123, K/A 245000, A4.02 (RO 3.1, SRO 2.9), A4.06 (RO 2.7, SRO 2.6)
- 12. N1-OP-31
- 13. N1-PM-V7
NRC 2008 JPM P-1 October 2008 Tools and Equipment:
- 4. None Task Standard: Generator removed from the grid and Emergency Governor Trip Test complete Initial Conditions:
- 25. Plant shutdown is in progress
- 26. The Main Generator is at 90 MWE and ready to be removed from the grid
- 27. Instructor to ask operator for any questions Initiating Cues:
(Operators name), remove the Generator from the grid in accordance with N1-OP-31, Section G.2.0 and perform the Emergency Governor Trip with Lockout Test in accordance with N1-PM-V7, Section 8.1.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-OP-31 obtained Precautions & limitations reviewed Section G.2.0 referenced Sat/Unsat
- 3.
Turn off Auto Reclosure for R925 and R915:
- R925 AUTO RECLOSURE off
- R915 AUTO RECLOSURE off Rotates control switch CCW to OFF for:
- R925 AUTO RECLOSURE
- R915 AUTO RECLOSURE Pass/Fail
- 4.
Bring Governor (speed/load changer) in control AND continue to lower generator load to 40-50 MWe Note: Expected that annunciators A1-4-6
& F1-4-8 will alarm Note: The controls on E-console are normally used for this step. The A-panel controls will not function unless the synchroscope switch is turned on.
Rotates Governor control switch CW to LOWER, observes lowering Governor setpoint indication, observes lowering MWe, releases Governor control switch to obtain 40-50 MWe Pass/Fail
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 5.
Lower Megavars to zero Rotates Voltage Regulator Adjustment control switch CW to LOWER, observes lowering MVAR, releases switch to obtain zero MVAR Pass/Fail
- 6.
Open R925 and R915 Opens R925 and R915 by placing associated control switches to TRIP, observes green lights on, red lights off Pass/Fail
- 7.
Open SW 18 Opens SW 18 by rotating control switch CCW to TRIP, observes green light on, red light on Sat/Unsat
- 8.
Place the control switch for SW 18 in Pull-to-Lock Rotates control switch CCW and pulls to retain in Pull-to-Lock, observes green light off Sat/Unsat
- 9.
Place VOLTAGE REG TRANSFER switch to OFF Rotates VOLTAGE REG TRANSFER switch CCW to OFF, observes green light on, red light off Sat/Unsat
- 10.
Place EXCITER switch to TRIP Rotates EXCITER switch CCW to TRIP, observes green light on, red light off Sat/Unsat
- 11.
Perform Turbine Overspeed testing per N1-PM-V7 Cue: N1-PM-V7 Section 8.1 is required Refers to N1-PM-V7, Section 8.1 Sat/Unsat
- 12.
Verify NORMAL (green) light on, above Turbine speed indicator (Panel 1B)
Observes NORMAL (green) light on, above Turbine speed indicator (Panel 1B)
Sat/Unsat
- 13.
Turn EMERG GOV OIL TRIP LOCKOUT switch to LOCKOUT Rotates EMERG GOV OIL TRIP LOCKOUT switch CW to LOCKOUT Pass/Fail
- 14.
Confirm LOCKOUT (yellow) light ON Observes LOCKOUT (yellow) light ON Sat/Unsat
- 15.
Turn EMERG GOV OIL TRIP TEST switch to TRIP position, AND verify the following:
( ) NORMAL (green) light off
( ) TRIP (red) light on (Emergency Governor tripped)
( ) Annunciator A1-3-7, TURBINE EMERGENCY GOVERNOR TRIP, ON Cue: Annunciator A1-3-7 is ON.
Rotates EMERG GOV OIL TRIP TEST switch CCW to TRIP position, AND observes the following:
( ) NORMAL (green) light off
( ) TRIP (red) light on (Emergency Governor tripped)
( ) Annunciator A1-3-7, TURBINE EMERGENCY GOVERNOR TRIP, ON Pass/Fail
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 16.
Turn EMERG GOV OIL TRIP TEST switch to RESET position, AND verify the following:
( ) NORMAL (green) light on
( ) TRIP (red) light off
( ) Annunciator A1-3-7, TURBINE EMERGENCY GOVERNOR TRIP, OFF Cue: Annunciator A1-3-7 is OFF.
Rotates EMERG GOV OIL TRIP TEST switch CW to RESET position, AND observes the following:
( ) NORMAL (green) light on
( ) TRIP (red) light off
( ) Annunciator A1-3-7, TURBINE EMERGENCY GOVERNOR TRIP, OFF Pass/Fail
- 17.
Release EMERG GOV OIL TRIP TEST, switch spring return to neutral Note: This is a spring return switch which will return to neutral when step 16 above is performed Ensures EMERG GOV OIL TRIP TEST switch has returned to neutral Sat/Unsat
- 18.
Turn EMERG OIL TRIP LOCKOUT switch to OFF Rotates EMERG OIL TRIP LOCKOUT switch CCW to OFF Pass/Fail
- 19.
Verify LOCKOUT (yellow) light off (Emergency Governor Trip function back in service)
Observes LOCKOUT (yellow) light off Sat/Unsat Terminating Cue: Generator removed from the Grid and Emergency Governor Trip Lockout Test complete RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. A shutdown is in progress
- 2. The Main Generator is at 90 MWE and ready to be removed from the grid Initiating Cues:
(Operators name), remove the Generator from the grid in accordance with N1-OP-31, Section G.2.0 and perform the Emergency Governor Trip with Lockout Test in accordance with N1-PM-V7, Section 8.1.
NRC 2008 JPM P-1 October 2008 Oswego08 NRC JPM S-8 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Alternate RPV Blowdown Through the Emergency Revision: NRC 2008 Condenser Vents to Torus Task Number: N1-EOP-8-01001 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
15 minutes Time Critical Task:
No Alternate Path Task:
No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Simulator Simulator Set-up (if required):
- 1. Initialize simulator to IC 184
- 2. Verify the following malfunctions are inserted:
AD07B, ERV112 FAILS SHUT AD07C, ERV113 FAILS SHUT AD07D, ERV121 FAILS SHUT AD07E, ERV122 FAILS SHUT AD07F, ERV123 FAILS SHUT MS03A, ONE MSIV FAILS CLOSED (VALVE 122)
MS03B, ONE MSIV FAILS CLOSED (VALVE 112)
- 3. Verify RPV pressure is at least 72 psi above torus pressure
- 4. Verify torus water level is above 8.5 feet Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 18. Critical steps are identified in grading areas Pass/Fail. During Evaluated JPM:
Self verification shall be demonstrated.
- 19. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N1-EOP-8
- 2. N1-EOP-1, Attachment 14
Tools and Equipment:
- 5. MSIV EOP Jumpers Task Standard: Emergency Depressurize the RPV through the Emergency Condenser Vents to the Torus Initial Conditions:
- 1. The reactor has scrammed
- 2. MSIVs are closed
- 3. RPV blowdown is required per Emergency Operating Procedures
- 4. Instructor to ask operator for any questions Initiating cue:
(Operators name), commencing an RPV Blowdown. Initiate Emergency Condensers and open 3 ERVs.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator acknowledge repeat back providing correction if necessary Proper communications used (GAP-OPS-O1)
Sat/Unsat RECORD START TIME Note: It is not necessary to reference N1-EOP-8 since this action is normally directed by the CRS
- 2.
Initiate Emergency Condensers as follows:
- a.
Place 39-05, EMERG CNDSR RET ISOLATION VALVE 11 control switch to OPEN Rotates 39-05, EMERG CNDSR RET ISOLATION VALVE 11 control switch CW to OPEN Pass/Fail
- b.
Place 39-06, EMERG CNDSR RET ISOLATION VALVE 12 control switch to OPEN Rotates 39-06, EMERG CNDSR RET ISOLATION VALVE 12 control switch CW to OPEN Pass/Fail
- 3.
Opens ERV 111 Note: All other ERVs will fail to open when attempted Rotates ERV 111 control switch CW to OPEN observes green and blue lights off, both red lights on Pass/Fail
- 4.
Attempts to open ERVs 112, 113, 121, 122, and 123 Rotates control switches for ERVs 112, 113, 121, 122, and 123 CW to OPEN, observes green and blue lights off, both red lights off Sat/Unsat
NRC 2008 JPM P-1 October 2008 Performance Steps Standard Grade
- 5.
Reports only ERV 111 is open Role Play: Acknowledge report and then direct the candidate to depressurize the RPV using the Emergency Condenser vents to the torus per N1-EOP-1, 4 Proper communications used (GAP-OPS-O1)
Sat/Unsat
- 6.
Obtain a copy of the reference procedure and review/utilize the correct section N1-EOP-1 obtained 4 referenced Sat/Unsat
- 7.
Verify the Bypass MSIV Isolation jumpers at EOP ISOLATION BYPASS JUMPER SUBPANEL installed Inserts EOP jumpers 15, 16, 22, 23 Pass/Fail
- 8.
Depressurize the RPV using EC Vents to Torus Proceeds to Step 2.4, EC Vents to Torus Sat/Unsat
- 9.
Confirm Torus level is above 8.5 feet Observes torus level indicator is >8.5 feet Sat/Unsat
- 10.
Verify open the following Emergency Condenser Vents to Torus at Panel K:
- a.
05-05, EC VENT TO TORUS BV 11 Rotates 05-05 control switch CW to OPEN, observes red light on, green light off Pass/Fail
- b.
05-07, EC VENT TO TORUS BV 12 Rotates 05-07 control switch CW to OPEN, observes red light on, green light off Pass/Fail
- c.
05-11, EMERG COND VENT ISOLATION VALVE 112 Observes 05-11 red light on and green light off Sat/Unsat
- d.05-01R, EMERG COND VENT ISOLATION VALVE 111 Observes05-01R red light on and green light off Sat/Unsat
- e.05-04R, EMERG COND VENT ISOLATION VALVE 121 Observes05-04R red light on and green light off Sat/Unsat
- f.
05-12, EMERG COND VENT ISOLATION VALVE 122 Observes 05-12 red light on and green light off Sat/Unsat
- 11.
Reports that the reactor is being depressurized using the Emergency Condenser vents to the torus Role Play: Acknowledge report Proper communications used (GAP-OPS-O1)
Sat/Unsat Terminating Cue:
The RPV is depressurized using the Emergency Condenser Vents to the Torus.
RECORD STOP TIME
NRC 2008 JPM P-1 October 2008 Initial Conditions:
- 1. The reactor has scrammed
- 2. MSIVs are closed
- 3. RPV blowdown is required per Emergency Operating Procedures Initiating cue:
(Operators name), commencing an RPV Blowdown. Initiate Emergency Condensers and open 3 ERVs.
NRC 2008 JPM P-1 October 2008 NRC JPM P-1 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Air Start the Diesel Fire Pump Revision: NRC 2008 Task Number: N1-286000-04039 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time:
15 minutes Time Critical Task:
No Alternate Path Task:
No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-1 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Screen House Simulator Set-up (if required):
None Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 20. Critical steps are identified in grading areas as Pass/Fail. During Evaluated JPM:
Self verification shall be demonstrated.
- 21. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 14. NUREG 1123, 286000, A3.01 (RO 3.4, SRO 3.4)
- 15. N1-OP-21A Tools and Equipment:
None
NRC 2008 JPM P-1 October 2008 Task Standard: The Diesel Fire Pump is running Initial Conditions:
- 28. The plant is shutdown
- 29. A total loss of DC power has occurred
- 30. Instructor to ask operator for any questions Initiating Cues:
(Operators name), start the Diesel Fire Pump per N1-OP-21A, Section H.6.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator acknowledge repeat back providing correction if necessary Proper communications used (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure Cue: Step 6.1 is complete N1-OP-21A obtained Precautions & limitations reviewed Section H.6 referenced Sat/Unsat
- 3.
Place Diesel Fire Pump Control Switch to OFF Local Control Switch rotated CW to OFF in Diesel Fire Pump Room Sat/Unsat
- 4.
Manually open 100-1211, Solenoid Operated Inlet Valve, to the Woodward Governor Manually opens 100-1211 by rotating override lever CW Pass/Fail
- 5.
Manually close 100-1212, Outlet Blocking Valve, from the Woodward Governor Manually closes 100-1212 by rotating handwheel CW Pass/Fail
- 6.
Manually open 100-1213, Pump Lubrication Solenoid Valve Manually opens 100-1213 by rotating override lever CW Pass/Fail
- 7.
Open 100.4-04 (IA-222) OR 100.4-03 (IA-223), Starting Air Bypass valves to provide starting air supply Cue: Engine started and is running IA-222 or IA-223 opened by turning lever on valve such that the operating lever is in-line with the piping Pass/Fail
Performance Steps Standard Grade NRC 2008 JPM P-1 October 2008
- 8.
Upon successful Diesel Fire Pump engine start, close 100.4-04 (IA-222) OR 100.4-03 (IA-223)
IA-222 or IA-223 (whichever one was opened in step 7 above) is closed by turning lever on valve until the operating lever is perpendicular to the piping Sat/Unsat
- 9.
Notifies Control Room that the Diesel Fire Pump is running Role Play: Acknowledge report Proper communications used (GAP-OPS-01)
Sat/Unsat Terminating Cue:
Diesel Fire Pump is running RECORD STOP TIME
Performance Steps Standard Grade NRC 2008 JPM P-2 October 2008 Initial Conditions:
- 1. The plant is shutdown
- 2. A total loss of DC power has occurred Initiating Cues:
(Operators name), start the Diesel Fire Pump per N1-OP-21A, Section H.6.
NRC 2008 JPM P-2 October 2008 NRC JPM P-2 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Perform Initiation of ECs from Remote Shutdown Revision: NRC 2008 Panel 12 (Alternate Path)
Task Number: N1-296000-01009 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time:
15 minutes Time Critical Task:
No Alternate Path Task:
Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-2 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Turbine Building Elevation 261 Simulator Set-up (if required):
None Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 22. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 23. During Evaluated JPM:
Self verification shall be demonstrated.
- 24. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. NUREG 1123 KA 295016, AA1.09, RO 4.0, SRO 4.0
- 2. N1-SOP-21.2 Tools and Equipment:
- 6. VA-1 Key
NRC 2008 JPM P-2 October 2008 Task Standard: Emergency Cooling Loop 11 placed in service from Remote Shutdown Panel 11 and shell side water level controlled in manual.
Initial Conditions:
- 31. Control Room evacuation has occurred
- 32. All control room actions were completed
- 33. All control rods are in
- 34. RPV pressure is 900 psig and slowly rising
- 35. RPV level is 72 and stable
- 36. The Remote Shutdown Keys have been obtained
- 37. You are the Chief Shift Operator
- 38. Offsite power is available
- 40. Other operators are performing the manual vessel isolation and removing ERV fuses
- 41. Instructor to ask operator for any questions Initiating Cues:
(Operators name), place Emergency Cooling Loop 11 in service in accordance with N1-SOP-21.2.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator acknowledge repeat back providing correction if necessary Proper communications used (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-SOP-21.2 obtained Section B is reviewed Sat/Unsat
- 3.
Go to Remote Shutdown Panel #11 Cue: EC System has NOT isolated Proceed to RSP 11, TB 250 South Sat/Unsat
- 4.
Place the Channel 11 CONTROL TRANSFER keylock switch in EMERG position to transfer control to RSP Rotate control switch CW to the emergency position Pass/Fail
- 5.
Verify open 39-07 and 39-09 Cue: 39-07 and 39-09 are open Observe red lights on, green lights off Sat/Unsat
- 6.
Control RPV cooldown by cycling open and closed 39-05, EMERGENCY CONDENSER COND RTN IV 11 Cue: 39-05 is open, Reactor pressure is 900 psig and slowly lowering, RPV level is 72 inches and stable Rotate control switch for valve 39-05 CW to the open position, observe red light energized, green light extinguished Pass/Fail
NRC 2008 JPM P-2 October 2008 Performance Steps Standard Grade Note: The following cue indicates that AUTO shell level control has failed Cue: If the Candidate references EC shell water level indicator, inform them that EC shell water level is 5.5 and slowly lowering
- 7.
Place EC 111/112 Level Control Transfer Switch to Local Rotate control switch CW to the Local position Pass/Fail
- 8.
Verify AUTO control by observing A on status panel Cue: EC shell water level is 5.0 and slowly lowering Observe A illuminated on status panel Sat/Unsat
- 9.
Depress A/M key pad Manual mode selected by depressing the A/M key pad Pass/Fail
- 10.
Verify M is displayed Cue: M is illuminated Observe M is illuminated on status panel Sat/Unsat
- 11.
Control level by depressing arrows on key pad Cue: EC Condenser Shell is 6.4 and stable, Reactor pressure is 850 psig and slowly lowering Level is raised in the EC Condenser Shell by depressing the key pad arrows Pass/Fail
- 12.
Report that #11 EC Condenser in service, EC shell level control is in Manual Proper communications used (GAP-OPS-01)
Sat/Unsat Terminating Cue:
Emergency Cooling Loop 11 placed in service in accordance with N1-SOP-21.2, and EC Shell Level controlled Manual RECORD STOP TIME
Performance Steps Standard Grade NRC 2008 JPM P-3 October 2008 Initial Conditions:
- 1. Control Room evacuation has occurred
- 2. All control room actions were completed
- 3. All control rods are in
- 4. RPV pressure is 900 psig and slowly rising
- 5. RPV level is 72 and stable
- 6. The Remote Shutdown Keys have been obtained
- 7. You are the Chief Shift Operator
- 8. Offsite power is available
- 10. Other operators are performing the manual vessel isolation and removing ERV fuses Initiating Cues:
(Operators name), place Emergency Cooling Loop 11 in service in accordance with N1-SOP-21.2.
NRC 2008 JPM P-3 October 2008 NRC JPM P-3 Constellation Energy Group NINE MILE POINT UNIT 1 OPERATOR JOB PERFORMANCE MEASURE
Title:
Place UPS 162A in Standby from Shutdown Condition, Revision: NRC 2008 Transfer to Supply RPS 11 Task Number: N1-212000-04001, N1-212000-04002 Approvals:
/
N/A - Exam Security
/
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
N/A - Exam Security
/
Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time:
30 Minutes Time Critical Task:
No Alternate Path Task:
No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC 2008 JPM P-3 October 2008 Recommended Start Location: (Completion time based on the start location)
NMP Unit 1 Turbine Building Elevation 261 Simulator Set-up (if required):
None Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 25. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a
- 26. During Evaluated JPM:
Self verification shall be demonstrated.
- 27. During Training JPM:
Self verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 16. N1-OP-40
- 17. NUREG 1123 K/A 212000 A1.04 (RO 2.8, SRO 3.0), A1.05 (RO 2.6, SRO 2.7)
Tools and Equipment:
None
NRC 2008 JPM P-3 October 2008 Task Standard:
RPS Bus 11 is supplied from UPS 162A.
Initial Conditions:
- 2.
Control Switch and Electrical Lineups are complete per N1-OP-40 Attachments 1 and 2
- 3.
The Electrical Safety requirements for the upcoming job have been determined to be as follows:
Leather gloves Safety glasses or goggles 100% cotton long sleeve shirt and pants, OR 100% cotton short sleeve shirt and pants under flame-resistant lab coat
- 4.
Instructor to ask for any questions Initiating Cues:
(Operators name), place UPS 162A in standby in accordance with N1-OP-40, section E.1, and then transfer RPS Bus 11 supply from UPS 162B to UPS 162A in accordance with N1-OP-40, section F.2.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue Evaluator Acknowledge repeat back providing correction if necessary Proper communications used (GAP-OPS-01)
Sat/Unsat RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure N1-OP-40 obtained Precautions & limitations reviewed Section E.1 and F.2 referenced Sat/Unsat
- 3.
Verify Control Switch Lineup performed per Attachment 1 and Electrical Lineup performed per Attachment 2 Determines Lineups complete per initial conditions Sat/Unsat
- 4.
Verify open the following breakers, at UPS to be started:
B401, RECTIFIER INPUT BKR B402, RECTIFIER OUTPUT BKR B1, INVERTER INPUT BKR B2, INVERTER OUTPUT BKR B201, STATIC SW INPUT BKR Verifies open the following breakers at UPS 162A:
B401, RECTIFIER INPUT BKR B402, RECTIFIER OUTPUT BKR B1, INVERTER INPUT BKR B2, INVERTER OUTPUT BKR B201, STATIC SW INPUT BKR Sat/Unsat
- 5.
Perform the following at UPS control cabinets:
- b. Close BPSW, BYPASS DISC SW
- b. Close BPSW, BYPASS DISC SW
NRC 2008 JPM P-3 October 2008 Performance Steps Standard Grade
- 6.
Confirm Bypass Transformer PRIMARY VOLTAGE V801 indicates approximately 600 VAC Cue: Voltage indicates 600 VAC Observes Bypass Transformer PRIMARY VOLTAGE V801 indicates approximately 600 VAC Sat/Unsat
- 7.
Confirm BYPASS AC INPUT V201 indicates 118-126 VAC Cue: AC Input indicates 121 VAC Observes BYPASS AC INPUT V201 indicates 118-126 VAC Sat/Unsat
- 8.
Close B1, INVERTER INPUT BKR as follows:
- a. Depress PRE-CHARGE PUSHBUTTON, UNTIL PRECHARGE light (P7) becomes energized Cue: P7 light is energized Depresses PRE-CHARGE PUSHBUTTON, UNTIL PRECHARGE light (P7) becomes energized Pass/Fail
- b. WHEN PRE-CHARGE light is energized, close B1 AND confirm the following:
BATTERY DC INPUT V1 133-135 VDC INVERTER OUTPUT V2 118-126 VAC INVERTER FREQUENCY E1 59.5-60.5 Hz Cue: Battery DC Input V1 is 134 VDC Inverter Output V2 is 120 VAC Inverter Frequency E1 is 60 Hz Closes B1 AND observes the following:
BATTERY DC INPUT V1 133-135 VDC INVERTER OUTPUT V2 118-126 VAC INVERTER FREQUENCY E1 59.5-60.5 Hz Pass/Fail Sat/Unsat Sat/Unsat Sat/Unsat
- 9.
Close B401, RECTIFIER INPUT BKR and confirm the following:
RECTIFIER INPUT V401, V402, V403 approximately 600 VAC RECTIFIER OUTPUT V404 137-145 VDC Cue: Rectifier Input V401,V402, V403 indicate 600 VAC Rectifier Output V404 is 140 VDC Closes B401, RECTIFIER INPUT BKR and confirms the following:
RECTIFIER INPUT V401, V402, V403 approximately 600 VAC RECTIFIER OUTPUT V404 137-145 VDC Pass/Fail Sat/Unsat Sat/Unsat
NRC 2008 JPM P-3 October 2008 Performance Steps Standard Grade
- 10.
Close B402, RECTIFIER OUTPUT BKR Closes B402, RECTIFIER OUTPUT BKR Pass/Fail
- 11.
Confirm BATTERY DC INPUT A1 indicates 0 amps Cue: Battery DC Input A1 indicates 0 amps Observes BATTERY DC INPUT A1 indicates 0 amps Sat/Unsat
- 12.
Close B2, INVERTER OUTPUT BKR Closes B2, INVERTER OUTPUT BKR Pass/Fail
- 13.
Close B201, STATIC SW INPUT BKR and confirm the following:
STATIC SWITCH OUTPUT V202 indicates 118-126 VAC IN SYNC light (P3) energized Cue: Static Switch Output V202 indicates 122 VAC In Sync light is energized Closes B201, STATIC SW INPUT BKR and observes the following:
STATIC SWITCH OUTPUT V202 indicates 118-126 VAC IN SYNC light (P3) energized Pass/Fail Sat/Unsat Sat/Unsat
- 14.
IF the IN SYNC light (P3) is not energized, THEN contact Electrical Maintenance to adjust R5 on oscillator board X2 as needed to energize the IN SYNC light (P3)
Determines step is N/A Sat/Unsat
- 15.
Once the IN SYNC light is energized, confirm the following occurs within approximately 30 seconds:
INVERTER TO LOAD light (P201) energized BYPASS AC TO LOAD light (P202) extinguished Cue: INVERTER TO LOAD light is on BYPASS AC TO LOAD light is off Once the IN SYNC light is energized, observes the following occurs within approximately 30 seconds:
INVERTER TO LOAD light (P201) energized BYPASS AC TO LOAD light (P202) extinguished Sat/Unsat
- 16.
Depress ALARM RESET (S2) to clear all alarm lights on UPS Cue: All alarms are clear Depress ALARM RESET (S2) to clear all alarm lights on UPS Sat/Unsat
NRC 2008 JPM P-3 October 2008 Performance Steps Standard Grade
- 17.
Close ACOSW, AC OUTPUT DISC SW and confirm UPS output voltage by:
Place the SYNCHROSCOPE CONTROL switch (S701) in the ON position Confirm 118-126 VAC on UPS A VOLTS TO SYNCHROSCOPE V701 or UPS B VOLTS TO SYNCHROSCOPE V702, as appropriate Cue: Volts indicate 120 VAC Place SYNCHROSCOPE CONTROL switch (S701) in OFF Closes ACOSW, AC OUTPUT DISC SW and observes UPS output voltage by:
Places the SYNCHROSCOPE CONTROL switch (S701) in the ON position Observes 118-126 VAC on UPS A VOLTS TO SYNCHROSCOPE V701 or UPS B VOLTS TO SYNCHROSCOPE V702, as appropriate Places SYNCHROSCOPE CONTROL switch (S701) in OFF Pass/Fail Sat/Unsat Sat/Unsat Sat/Unsat
- 18.
Eight hour warm up time is utilized when energizing shutdown UPS after N1-EPM-UPS-003 Cue: 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is complete Notes 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> warmup time Sat/Unsat
- 19.
Re-confirms UPS output 117-125 VAC by the following steps:
Place the SYNCHROSCOPE CONTROL switch (S701) in the ON position Confirm 118-126 VAC on UPS A VOLTS TO SYNCHROSCOPE V701 or UPS B VOLTS TO SYNCHROSCOPE V702, as appropriate Cue: Volts indicate 120 VAC Place SYNCHROSCOPE CONTROL switch (S701) in OFF Places the SYNCHROSCOPE CONTROL switch (S701) in the ON position Observes 118-126 VAC on UPS A VOLTS TO SYNCHROSCOPE V701 or UPS B VOLTS TO SYNCHROSCOPE V702, as appropriate Places SYNCHROSCOPE CONTROL switch (S701) in OFF Sat/Unsat Sat/Unsat Sat/Unsat
NRC 2008 JPM P-3 October 2008 Performance Steps Standard Grade Note: Continues at procedure step F.2
- 20.
Notify Control Room that RPS Bus 11 will be transferred from UPS 162B to UPS 162A Role Play: Acknowledge report Proper communications used (GAP-OPS-01)
Sat/Unsat
- 21.
Confirm UPS 162A in Standby by observing the following:
RECTIFIER OUTPUT A404 approximately 40 amps BATTERY DC INPUT A1 0 amps INVERTER OUTPUT V2 greater than OR equal to 120 VAC STATIC SWITCH OUTPUT V202 greater than OR equal to 120 VAC Cue: RECTIFIER OUTPUT A404 is 40 amps BATTERY DC INPUT A1 is 0 amps INVERTER OUTPUT V2 is 120 VAC STATIC SWITCH OUTPUT V202 is 120 VAC Confirms UPS 162A in Standby by observing the following:
RECTIFIER OUTPUT A404 approximately 40 amps BATTERY DC INPUT A1 0 amps INVERTER OUTPUT V2 greater than OR equal to 120 VAC STATIC SWITCH OUTPUT V202 greater than OR equal to 120 VAC Sat/Unsat
- 22.
Place SYNCHROSCOPE CONTROL (S701) in ON position AND confirm the following:
UPS A VOLTS TO SYNCHROSCOPE V701 approximately 120 VAC UPS B VOLTS TO SYNCHROSCOPE V702 approximately 120 VAC Cue: UPS A VOLTS TO SYNCHROSCOPE V701 is 120 VAC UPS B VOLTS TO SYNCHROSCOPE V702 is 120 VAC Places SYNCHROSCOPE CONTROL (S701) in ON position AND observes the following:
UPS A VOLTS TO SYNCHROSCOPE V701 approximately 120 VAC UPS B VOLTS TO SYNCHROSCOPE V702 approximately 120 VAC Sat/Unsat
- 23.
IF synchroscope is NOT within 10 degrees of the 12 o'clock position, THEN contact Electrical Maintenance to perform adjustment Cue: Synchroscope is at 12 oclock Checks synchroscope position, determines step N/A Sat/Unsat
NRC 2008 JPM P-3 October 2008 Performance Steps Standard Grade
- 24.
WHEN needle of synchroscope is within 10 degrees of 12 o'clock position, place MANUAL TRANSFER SWITCH (S702) to the UPS A SUPPLYING LOAD position WHEN needle of synchroscope is within 10 degrees of 12 o'clock position, places MANUAL TRANSFER SWITCH (S702) to the UPS A SUPPLYING LOAD position Pass/Fail
- 25.
Confirm load transfer by observing the following:
UPS B SUPPLYING LOAD light OFF and/or UPS 162B STATIC SWITCH OUTPUT A202 0 amps UPS A SUPPLYING LOAD light ON and/or UPS 162A STATIC SWITCH OUTPUT A202 approximately 80-90 amps Cue: UPS B Supplying load light is OFF Switch Output is 0 amps UPS A Supplying Load light is ON Switch Output is 85 amps Confirms load transfer by observing the following:
UPS B SUPPLYING LOAD light OFF and/or UPS 162B STATIC SWITCH OUTPUT A202 0 amps UPS A SUPPLYING LOAD light ON and/or UPS 162A STATIC SWITCH OUTPUT A202 approximately 80-90 amps Sat/Unsat
- 26.
Verify NO unanticipated annunciators OR computer points present due to UPS 162A supply power Cue: No unanticipated annunciators or computer points are present Verifies NO unanticipated annunciators OR computer points present due to UPS 162A supply power Sat/Unsat
- 27.
Place SYNCHROSCOPE CONTROL (S701) in OFF position Places SYNCHROSCOPE CONTROL (S701) in OFF position Sat/Unsat
- 28.
Place "STANDBY UPS" sign on 162B Power Supply Places "STANDBY UPS" sign on 162B Power Supply Sat/Unsat
- 29.
Notify Control Room transfer complete Role Play: Acknowledge report Proper communications used (GAP-OPS-01)
Sat/Unsat Terminating Cue: UPS 162A is powering RPS 11 RECORD STOP TIME
Performance Steps Standard Grade NRC 2008 JPM P-3 October 2008 Initial Conditions:
- 1.
UPS 162B is supplying RPS Bus 11
- 2.
Control Switch and Electrical Lineups are complete per N1-OP-40 Attachments 1 and 2
- 3.
The Electrical Safety requirements for the upcoming job have been determined to be as follows:
Leather gloves Safety glasses or goggles 100% cotton long sleeve shirt and pants, OR 100% cotton short sleeve shirt and pants under flame-resistant lab coat Initiating Cues:
(Operators name), place UPS 162A in standby in accordance with N1-OP-40, section E.1, and then transfer RPS Bus 11 supply from UPS 162B to UPS 162A in accordance with N1-OP-40, section F.2.