ML18088A726

From kanterella
Jump to navigation Jump to search

NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)
ML18088A726
Person / Time
Site: Nine Mile Point 
Issue date: 05/21/2018
From: Brian Fuller
Operations Branch I
To:
Exelon Generation Co
Shared Package
ML16210A438 List:
References
CAC U01941
Download: ML18088A726 (1)


Text

The following revisions have been made to the Nine Mile Point Unit 1 February 2017 operating exam based on submittal comments and NRC prep week:

Scenario 1 Removed credit for SRO Technical Specification evaluation on ES-Dl.

Scenario 2 Added an additional role play.

Scenario 3 Added an additional role play.

Scenario 4 Update ES-Dl to give credit for additional post-EOP entry malfunction.

Simulator JPM 1 Added an additional evaluator cue.

Simulator JPM 2 Added an additional evaluator cue.

Added evaluator note for expected conditions.

Simulator JPM 3 Added evaluator note for expected conditions.

Simulator JPM 4 Minor enhancement to applicant cue sheet.

Simulator JPM 6 Made an additional step critical.

Admin JPM RO/SRO COO 1 Made editorial changes Admin JPM RO RC Made editorial changes Admin JPM SRO EP Enhanced standard description to annotate which form the evaluated information in located on.

Admin JPM SRO RC Added an additional role play.