ML092370646: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML092370646
| number = ML092370646
| issue date = 08/24/2009
| issue date = 08/24/2009
| title = North Anna Power Station, Units 1 & 2 - Response to Request for Additional Information Reactor Coolant Pressure Boundary Visual Inspections Proposed Alternative - N1-I3-nde-024 and N2-I3-NDE-025
| title = Response to Request for Additional Information Reactor Coolant Pressure Boundary Visual Inspections Proposed Alternative - N1-I3-nde-024 and N2-I3-NDE-025
| author name = Hartz L N
| author name = Hartz L
| author affiliation = Virginia Electric & Power Co (VEPCO)
| author affiliation = Virginia Electric & Power Co (VEPCO)
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
| page count = 5
| page count = 5
| project =
| stage = Response to RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:10CFR50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261August24,2009U.S.NuclearRegulatoryCommissionAttention:DocumentControlDeskWashington,D.C.20555SerialNo.NL&OS/ETSDocketNos.LicenseNos.
{{#Wiki_filter:10 CFR 50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 24, 2009 U.S. Nuclear Regulatory Commission                                Serial No. 09-253A Attention: Document Control Desk                                  NL&OS/ETS RO Washington, D.C. 20555                                            Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
09-253A RO 50-338 50-339 NPF-4 NPF-7 VIRGINIA ELECTRICANDPOWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REACTOR COOLANT PRESSURE BOUNDARY VISUAL INSPECTIONS PROPOSED ALTERNATIVE - N1-13-NDE-024 AND N2-13-NDE-025 In a letter dated May 12, 2009 (Serial No. 09-253), Dominion requested approval of an alternative to the inspection requirements of footnote                  1 included    in 10 CFR50.55a(g)(6)(ii)(E), Reactor Coolant Pressure Boundary Visual Inspections, for North Anna Units 1 and 2. The requested alternative will permit the inspections performed during the Unit 1 fall 2007 and Unit 2 fall 2008 refueling outages on the bottom mounted instrument tubes (8MI) to be used as the initial reactor coolant pressure boundary visual inspection in place of the footnote requirement for the initial inspection to be performed at the next refueling outage after January 1, 2009. The NRC requested additional information in an August 3, 2009 e-mail. The response to the requested information is included in the attachment to this letter.
NORTH ANNA POWER STATIONUNITS1AND2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REACTOR COOLANT PRESSURE BOUNDARY VISUAL INSPECTIONS PROPOSED ALTERNATIVE-N1-13-NDE-024ANDN2-13-NDE-025InaletterdatedMay12,2009(SerialNo.09-253),Dominionrequestedapprovalofanalternativetotheinspectionrequirementsoffootnote1includedin 10 CFR50.55a(g)(6)(ii)(E),ReactorCoolantPressure BoundaryVisualInspections, forNorthAnnaUnits1and2.Therequestedalternativewillpermitthe inspectionsperformedduringtheUnit1fall2007andUnit2fall2008refuelingoutagesonthebottommountedinstrumenttubes(8MI)tobeusedastheinitialreactorcoolantpressureboundaryvisualinspectioninplaceofthefootnoterequirementfortheinitialinspectiontobeperformedatthenextrefuelingoutageafterJanuary1,2009.TheNRCrequestedadditionalinformationinanAugust3,2009e-mail.Theresponsetotherequestedinformationisincludedintheattachmenttothisletter.Ifyoushouldhaveanyquestionsregardingthissubmittal,pleasecontactMr.ThomasShaubat(804)273-2763.
If you should have any questions            regarding this    submittal, please  contact Mr. Thomas Shaub at (804) 273-2763.
Sincerely, c.'>:;r-:LeslieN.HartzVicePresident-NuclearSupportServices
Sincerely,
: c. '>:;     r-:
Leslie N. Hartz Vice President - Nuclear Support Services


==Attachment:==
==Attachment:==
ResponsetoRequestforAdditionalInformationCommitments.madeinthisletter:None cc:U.S.NuclearRegulatoryCommissionRegionIISamNunn AtlantaFederalCenter 61ForsythStreet,SWSuite23T85 Atlanta, Georgia 30303Mr.J.E.Reasor,Jr.OldDominionElectricCooperative InnsbrookCorporateCenter4201DominionBlvd.Suite300GlenAllen,Virginia23060 NRC SeniorResidentInspectorNorthAnnaPowerStationDr.V.SreenivasNRCProject ManagerU.S.NuclearRegulatoryCommissionOneWhiteFlintNorthMaiIStop 8G9A 11555RockvillePikeRockville,Maryland20852Ms.K.R.CottonNRCProject ManagerU.S.NuclearRegulatoryCommissionOneWhiteFlintNorthMailStop16E1511555RockvillePikeRockville,Maryland20852SerialNo.09-253A Docket Nos.50-338/339 AlternativeforBMI Baseline InspectionsPage2of2 Serial No.09-253ADocketNos.
Response to Request for Additional Information Commitments.made in this letter: None
50-338/339 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REACTOR COOLANT PRESSURE BOUNDARY VISUAL INSPECTIONS PROPOSED ALTERNATIVEN1-13-NDE-024andN2-13-NDE-025 VIRGINIA ELECTRICANDPOWER COMPANY (DOMINION)
 
NORTHANNAPOWER STATIONUNITS1AND2 SerialNo.09-253ADocketNos.
Serial No. 09-253A Docket Nos. 50-338/339 Alternative for BMI Baseline Inspections Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.
50-338/339 Page1of2REQUESTFOR ADDITIONAL INFORMATIONTHIRD10-YEARINSERVICE INSPECTION INTERVAL REQUESTSFORRELIEFNOS.N1-13-NDE-024AND N2-13-NDE-025 VIRGINIAELECTRICANDPOWER COMPANY NORTH ANNA POWER STATION.UNITS1AND2DOCKETNUMBERS 50-338 AND 50-339 BackgroundTheAmericanSocietyofMechanicalEngineers(ASME)CodeofrecordfortheNorthAnnaPowerStation(NAPS),Unit1third10-yearintervalinserviceinspectionprogramisthe1989EditionnoAddendaofAmericanSocietyofMechanicalEngineers(ASME)Code,SectionXIandforNAPS,Unit2itisthe1995EditionoftheASMECode,SectionXIthroughthe1996Addenda.ByletterdatedMay12,2009,VirginiaElectricandPowerCompany(Dominion)submitteditsthird10-yearintervalinserviceinspection(lSI)programplanRequestsforReliefNos.N1-13-NDE-024and N2-13-NDE-025forNAPS,Units1and2,respectively.Dominion'ssubmittalproposedtouseinspectionsthatwereperformedonthereactorbottom-mountedinstrument(BMI)penetrationsduringthefallof2007andfall2008forNAPS,Units1and2,respectively,inplaceoftheinitialinspectionsrequiredbyTitle10oftheCodeofFederalRegulations(10CFR)50.55a(g)(6)(ii)(E).10CFR50.55a(g)(6)(ii)(E)requireslicensees,toimplementASMECodecaseN-722"Additional Examinations for PWRPressureRetainingWeldsinClass 1 Components Fabricated with Alloy 600/82/182 Material."ThestaffreviewedtheinformationDominionprovidedthatsupportstheproposedReliefRequestNos.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
N1-13-NDE-024 and N2-13-NDE-025andrequiredaresponseregardingthefollowingissues:
Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 8G9A 11555 Rockville Pike Rockville, Maryland 20852 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 16E15 11555 Rockville Pike Rockville, Maryland 20852
NRC Question 1Whatweretheresultsofthelicensee'sinspectionsthatwereperformedonthereactorbottom-mountedinstrumentnozzlepenetrationsduringthefallof2007andfallof2008forNAPS,Units1and2,respectively?Werethereanyindicationsofleakagefound,e.g.,signsofcorrosion,boricacidresidue?
 
Dominion ResponseTheBMIpenetrationshavebeeninspectedtwiceoneachunit,mostrecentlyduringthefallof2007andfallof2008forNorthAnnaUnits1and2,respectively.Therehavebeennoindicationsofleakage,nosignsofcorrosionandnoboricacidresiduefoundoneitherunit.
Serial No. 09-253A Docket Nos. 50-338/339 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REACTOR COOLANT PRESSURE BOUNDARY VISUAL INSPECTIONS PROPOSED ALTERNATIVE N1-13-NDE-024 and N2-13-NDE-025 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SerialNo.09-253ADocketNos.
NORTH ANNA POWER STATION UNITS 1 AND 2
50-338/339Page2of2 NRC Question 2Onpage3of4inthefirstparagraphofthelicensee'ssubmittaldatedMay12,2009,itwasnotedthatEnclosure1wasthe"ExaminerQualificationandResolutionsRequirements".ItappearstothestaffthatEnclosure1wasasummaryofthe"ExaminerQualificationandResolutionsRequirements"nottheactualdocument.Provideaclarificationortheactualdocument.
 
Dominion ResponseAtthetimetheexaminationswereperformed,CodeCaseN-722hadnotbeenissued.ASMECodeCaseN-722includesspecificrequirementsforthevisualexamination(VE)andthequalificationofpersonnelperformingtheVEsofthe 8Mls.Enclosure1tothe Relief RequestwasintendedtobeasummaryofhowDominionmettheserequirementsforthevisualexaminationofthe 8Mls.NRC Question 3Isthesamplesizeandselectionofcomponentsfortheinspectionsperformedinthefallof2007and2008forNAPS,Units1and2,respectively, equivalenttoTable1ofASMECodeCaseN-722?
Serial No. 09-253A Docket Nos. 50-338/339 Page 1 of 2 REQUEST FOR ADDITIONAL INFORMATION THIRD 10-YEAR INSERVICE INSPECTION INTERVAL REQUESTS FOR RELIEF NOS. N1-13-NDE-024 AND N2-13-NDE-025 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION. UNITS 1 AND 2 DOCKET NUMBERS 50-338 AND 50-339
Dominion ResponseYes,all8MIpenetrationswereinspectedduringthefall2007andfall2008refuelingoutagesforNorthAnnaUnits1and2,respectively.ThisapproachisconsistentwiththerequirementsofCodeCaseN-722,whichrequiresallpenetrationsbeexamined.}}
 
===Background===
The American Society of Mechanical Engineers (ASME) Code of record for the North Anna Power Station (NAPS), Unit 1 third 10-year interval inservice inspection program is the 1989 Edition no Addenda of American Society of Mechanical Engineers (ASME)
Code, Section XI and for NAPS, Unit 2 it is the 1995 Edition of the ASME Code, Section XI through the 1996 Addenda.
By letter dated May 12, 2009, Virginia Electric and Power Company (Dominion) submitted its third 10-year interval inservice inspection (lSI) program plan Requests for Relief Nos. N1-13-NDE-024 and N2-13-NDE-025 for NAPS, Units 1 and 2, respectively.
Dominion's submittal proposed to use inspections that were performed on the reactor bottom-mounted instrument (BMI) penetrations during the fall of 2007 and fall 2008 for NAPS, Units 1 and 2, respectively, in place of the initial inspections required by Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(6)(ii)(E). 10 CFR 50.55a(g)(6)(ii)(E) requires licensees, to implement ASME Code case N-722 "Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Material."
The staff reviewed the information Dominion provided that supports the proposed Relief Request Nos. N1-13-NDE-024 and N2-13-NDE-025 and required a response regarding the following issues:
NRC Question 1 What were the results of the licensee's inspections that were performed on the reactor bottom-mounted instrument nozzle penetrations during the fall of 2007 and fall of 2008 for NAPS, Units 1 and 2, respectively? Were there any indications of leakage found, e.g., signs of corrosion, boric acid residue?
Dominion Response The BMI penetrations have been inspected twice on each unit, most recently during the fall of 2007 and fall of 2008 for North Anna Units 1 and 2, respectively. There have been no indications of leakage, no signs of corrosion and no boric acid residue found on either unit.
 
Serial No. 09-253A Docket Nos. 50-338/339 Page 2 of 2 NRC Question 2 On page 3 of 4 in the first paragraph of the licensee's submittal dated May 12, 2009, it was noted that Enclosure 1 was the "Examiner Qualification and Resolutions Requirements". It appears to the staff that Enclosure 1 was a summary of the "Examiner Qualification and Resolutions Requirements" not the actual document.
Provide a clarification or the actual document.
Dominion Response At the time the examinations were performed, Code Case N-722 had not been issued.
ASME Code Case N-722 includes specific requirements for the visual examination (VE) and the qualification of personnel performing the VEs of the 8Mls. Enclosure 1 to the Relief Request was intended to be a summary of how Dominion met these requirements for the visual examination of the 8Mls.
NRC Question 3 Is the sample size and selection of components for the inspections performed in the fall of 2007 and 2008 for NAPS, Units 1 and 2, respectively, equivalent to Table 1 of ASME Code Case N-722?
Dominion Response Yes, all 8MI penetrations were inspected during the fall 2007 and fall 2008 refueling outages for North Anna Units 1 and 2, respectively. This approach is consistent with the requirements of Code Case N-722, which requires all penetrations be examined.}}

Latest revision as of 03:56, 14 November 2019

Response to Request for Additional Information Reactor Coolant Pressure Boundary Visual Inspections Proposed Alternative - N1-I3-nde-024 and N2-I3-NDE-025
ML092370646
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/24/2009
From: Hartz L
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-253A
Download: ML092370646 (5)


Text

10 CFR 50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 24, 2009 U.S. Nuclear Regulatory Commission Serial No. 09-253A Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REACTOR COOLANT PRESSURE BOUNDARY VISUAL INSPECTIONS PROPOSED ALTERNATIVE - N1-13-NDE-024 AND N2-13-NDE-025 In a letter dated May 12, 2009 (Serial No.09-253), Dominion requested approval of an alternative to the inspection requirements of footnote 1 included in 10 CFR50.55a(g)(6)(ii)(E), Reactor Coolant Pressure Boundary Visual Inspections, for North Anna Units 1 and 2. The requested alternative will permit the inspections performed during the Unit 1 fall 2007 and Unit 2 fall 2008 refueling outages on the bottom mounted instrument tubes (8MI) to be used as the initial reactor coolant pressure boundary visual inspection in place of the footnote requirement for the initial inspection to be performed at the next refueling outage after January 1, 2009. The NRC requested additional information in an August 3, 2009 e-mail. The response to the requested information is included in the attachment to this letter.

If you should have any questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.

Sincerely,

c. '>:; r-:

Leslie N. Hartz Vice President - Nuclear Support Services

Attachment:

Response to Request for Additional Information Commitments.made in this letter: None

Serial No. 09-253A Docket Nos. 50-338/339 Alternative for BMI Baseline Inspections Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 8G9A 11555 Rockville Pike Rockville, Maryland 20852 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 16E15 11555 Rockville Pike Rockville, Maryland 20852

Serial No. 09-253A Docket Nos. 50-338/339 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REACTOR COOLANT PRESSURE BOUNDARY VISUAL INSPECTIONS PROPOSED ALTERNATIVE N1-13-NDE-024 and N2-13-NDE-025 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2

Serial No. 09-253A Docket Nos. 50-338/339 Page 1 of 2 REQUEST FOR ADDITIONAL INFORMATION THIRD 10-YEAR INSERVICE INSPECTION INTERVAL REQUESTS FOR RELIEF NOS. N1-13-NDE-024 AND N2-13-NDE-025 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION. UNITS 1 AND 2 DOCKET NUMBERS 50-338 AND 50-339

Background

The American Society of Mechanical Engineers (ASME) Code of record for the North Anna Power Station (NAPS), Unit 1 third 10-year interval inservice inspection program is the 1989 Edition no Addenda of American Society of Mechanical Engineers (ASME)

Code,Section XI and for NAPS, Unit 2 it is the 1995 Edition of the ASME Code,Section XI through the 1996 Addenda.

By letter dated May 12, 2009, Virginia Electric and Power Company (Dominion) submitted its third 10-year interval inservice inspection (lSI) program plan Requests for Relief Nos. N1-13-NDE-024 and N2-13-NDE-025 for NAPS, Units 1 and 2, respectively.

Dominion's submittal proposed to use inspections that were performed on the reactor bottom-mounted instrument (BMI) penetrations during the fall of 2007 and fall 2008 for NAPS, Units 1 and 2, respectively, in place of the initial inspections required by Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(6)(ii)(E). 10 CFR 50.55a(g)(6)(ii)(E) requires licensees, to implement ASME Code case N-722 "Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Material."

The staff reviewed the information Dominion provided that supports the proposed Relief Request Nos. N1-13-NDE-024 and N2-13-NDE-025 and required a response regarding the following issues:

NRC Question 1 What were the results of the licensee's inspections that were performed on the reactor bottom-mounted instrument nozzle penetrations during the fall of 2007 and fall of 2008 for NAPS, Units 1 and 2, respectively? Were there any indications of leakage found, e.g., signs of corrosion, boric acid residue?

Dominion Response The BMI penetrations have been inspected twice on each unit, most recently during the fall of 2007 and fall of 2008 for North Anna Units 1 and 2, respectively. There have been no indications of leakage, no signs of corrosion and no boric acid residue found on either unit.

Serial No. 09-253A Docket Nos. 50-338/339 Page 2 of 2 NRC Question 2 On page 3 of 4 in the first paragraph of the licensee's submittal dated May 12, 2009, it was noted that Enclosure 1 was the "Examiner Qualification and Resolutions Requirements". It appears to the staff that Enclosure 1 was a summary of the "Examiner Qualification and Resolutions Requirements" not the actual document.

Provide a clarification or the actual document.

Dominion Response At the time the examinations were performed, Code Case N-722 had not been issued.

ASME Code Case N-722 includes specific requirements for the visual examination (VE) and the qualification of personnel performing the VEs of the 8Mls. Enclosure 1 to the Relief Request was intended to be a summary of how Dominion met these requirements for the visual examination of the 8Mls.

NRC Question 3 Is the sample size and selection of components for the inspections performed in the fall of 2007 and 2008 for NAPS, Units 1 and 2, respectively, equivalent to Table 1 of ASME Code Case N-722?

Dominion Response Yes, all 8MI penetrations were inspected during the fall 2007 and fall 2008 refueling outages for North Anna Units 1 and 2, respectively. This approach is consistent with the requirements of Code Case N-722, which requires all penetrations be examined.