| title = Project, Units 1 and 2 - Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.8.3.1, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section Xi
| title = Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.8.3.1, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section XI
| author name = Thadani M C
| author name = Thadani M
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Harrison A
| addressee name = Harrison A
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Thadani, Mohan Sent: Monday, June 21, 2010 3:31 PM To: Harrison, Albon Cc: Lingam, Siva; Lent, Susan; Burkhardt, Janet; Khanna, Meena  
{{#Wiki_filter:From:                       Thadani, Mohan Sent:                       Monday, June 21, 2010 3:31 PM To:                         Harrison, Albon Cc:                         Lingam, Siva; Lent, Susan; Burkhardt, Janet; Khanna, Meena


==Subject:==
==Subject:==
ACCEPTANCE REVIEW FOR AMENDMENT TO TS 6.8.3.1. "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM."
ACCEPTANCE REVIEW FOR AMENDMENT TO TS 6.8.3.1. "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM."
Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P. O. Box 289 Wadsworth, TX 77483  
Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P. O. Box 289 Wadsworth, TX 77483


==SUBJECT:==
==SUBJECT:==
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - RE: AMENDMENT TO TECHNICAL SPECIFICATION 6.8.3.1 "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM." (TAC NOS. ME3969 AND E3970)  
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - RE: AMENDMENT TO TECHNICAL SPECIFICATION 6.8.3.1 "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM. (TAC NOS. ME3969 AND E3970)


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==


By letter dated May 18, 2010, (ADAMS Accession No. ML101450414), STP Nuclear Operating Company (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to Technical Specification 6.8.3.1, "Containment Post-Tensioning System Surveillance Program," for South Texas Project, Units 1 and 2.
By letter dated May 18, 2010, (ADAMS Accession No. ML101450414), STP Nuclear Operating Company (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to Technical Specification 6.8.3.1, Containment Post-Tensioning System Surveillance Program, for South Texas Project, Units 1 and 2.
 
The purpose of this letter is to provide the results of the NRC staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this letter is to provide the results of the NRC staff
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
If you have any questions, please contact me at (301) 415-1476.
 
Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov}}
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.  
 
If you have any questions, please contact me at (301) 415-1476.  
 
Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476     Mohan.Thadani@nrc.gov}}

Latest revision as of 16:52, 13 November 2019

Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.8.3.1, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code,Section XI
ML101720607
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/21/2010
From: Thadani M
Plant Licensing Branch IV
To: Harrison A
South Texas
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC ME3969, TAC ME3970
Download: ML101720607 (2)


Text

From: Thadani, Mohan Sent: Monday, June 21, 2010 3:31 PM To: Harrison, Albon Cc: Lingam, Siva; Lent, Susan; Burkhardt, Janet; Khanna, Meena

Subject:

ACCEPTANCE REVIEW FOR AMENDMENT TO TS 6.8.3.1. "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM."

Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P. O. Box 289 Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - RE: AMENDMENT TO TECHNICAL SPECIFICATION 6.8.3.1 "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM. (TAC NOS. ME3969 AND E3970)

Dear Mr. Halpin:

By letter dated May 18, 2010, (ADAMS Accession No. ML101450414), STP Nuclear Operating Company (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to Technical Specification 6.8.3.1, Containment Post-Tensioning System Surveillance Program, for South Texas Project, Units 1 and 2.

The purpose of this letter is to provide the results of the NRC staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1476.

Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov