Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this August 19, 2010 Mr. Ross Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) NRC SECURITY INSPECTION REPORT 05000361/2010402; 05000362/2010402 | | {{#Wiki_filter:UNIT ED STATES NU C LE AR RE G UL AT O RY C O M M I S S I O N ust 19, 2010 |
| | |
| | ==SUBJECT:== |
| | SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) - NRC SECURITY INSPECTION REPORT 05000361/2010402; 05000362/2010402 |
|
| |
|
| ==Dear Mr. Ridenoure:== | | ==Dear Mr. Ridenoure:== |
| On July 22, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your San Onofre Nuclear Generating Station. The inspection covered one or more of the key attributes of the Security CProcess. The enclosed inspection report documents the inspection results, which were discussed on July 22, 2010, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to security and The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified. available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Southern California Edison Company - 2 Public Electronic Reading Room). However, because of the security-related concerns enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 -Related Information-10 CFR 2.390(b)(1). | | On July 22, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your San Onofre Nuclear Generating Station. The inspection covered one or more of the key attributes of the Security Cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 22, 2010, with you and other members of your staff. |
| | |
| | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. |
| | |
| | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. |
| | |
| | No findings were identified. |
| | |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS. |
| | |
| | ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Southern California Edison Company -2-Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), |
| | the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1). |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-361, 50-362 License No.: NPF-10, NPF-15 Nonpublic Enclosure: NRC Inspection Report 05000361/2010402; 05000362/2010402 w/Attachment: Supplemental Information cc w/enclosure: Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Doug Bouder Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Southern California Edison Company - 3 R. St. Onge Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Southern California Edison Company - 4 Distribution w/enclosure: Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov) Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov) Branch Chief, RIII DRS/PSB (Eric.Duncan@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Electronic distribution by RIV w/o enclosure: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Acting Director (Tony.Vegel@nrc.gov) DRP Acting Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Acting Deputy Director (Jeff.Clark@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Project Engineer, DRP/D (Peter.Jayroe@nrc.gov) Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Randy.Hall@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource Inspection Reports/MidCycle and EOC Letters to the following: ROPreports Only inspection reports to the following: OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov) Executive Technical Assistant (John.Giessner@nrc.gov) Security Related Complete Report - OUO: SUNSI Review Completed: PRF ADAMS: Yes Initials: PRF Non-Publicly Available Sensitive-Security- Related-Periodic Review Required Southern California Edison Company - 5 Letter Only: SUNSI Review Completed: PRF ADAMS: Yes Initials: PRF Publicly Available Non-Sensitive PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBD C:PSB1 PFrechette JRollins JBuchanan MShannon RLantz MShannon /RA/ /RA/ /RA/MS for /RA/ /RA/ /RA/ 8/12/10 8/19/10 8/13/10 8/19/10 8/19/10 8/19/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | | /RA/ |
| | Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-361, 50-362 License No.: NPF-10, NPF-15 Nonpublic Enclosure: |
| | NRC Inspection Report 05000361/2010402; 05000362/2010402 w/Attachment: Supplemental Information cc w/enclosure: |
| | Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Doug Bouder Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Southern California Edison Company -3-R. St. Onge Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Southern California Edison Company -4-Distribution w/enclosure: |
| | Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov) |
| | Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov) |
| | Branch Chief, RIII DRS/PSB (Eric.Duncan@nrc.gov) |
| | Senior Resident Inspector (Greg.Warnick@nrc.gov) |
| | Electronic distribution by RIV w/o enclosure: |
| | Regional Administrator (Elmo.Collins@nrc.gov) |
| | Deputy Regional Administrator (Chuck.Casto@nrc.gov) |
| | DRP Acting Director (Tony.Vegel@nrc.gov) |
| | DRP Acting Deputy Director (Troy.Pruett@nrc.gov) |
| | DRS Director (Roy.Caniano@nrc.gov) |
| | DRS Acting Deputy Director (Jeff.Clark@nrc.gov) |
| | Resident Inspector (John.Reynoso@nrc.gov) |
| | Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) |
| | Senior Project Engineer, DRP/D (Don.Allen@nrc.gov) |
| | SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) |
| | Project Engineer, DRP/D (Peter.Jayroe@nrc.gov) |
| | Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | Project Manager (Randy.Hall@nrc.gov) |
| | Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | Regional Counsel (Karla.Fuller@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | OEMail Resource Inspection Reports/MidCycle and EOC Letters to the following: |
| | ROPreports Only inspection reports to the following: |
| | OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov) |
| | Executive Technical Assistant (John.Giessner@nrc.gov) |
| | Security Related Complete Report - OUO: |
| | SUNSI Review Completed: PRF ADAMS: YesInitials: PRF Non-Publicly Available Sensitive-Security- Related-Periodic Review Required Southern California Edison Company -5-Letter Only: |
| | SUNSI Review Completed: PRF ADAMS: Yes Initials: PRF Publicly Available Non-Sensitive PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBD C:PSB1 PFrechette JRollins JBuchanan MShannon RLantz MShannon |
| | /RA/ /RA/ /RA/MS for /RA/ /RA/ /RA/ |
| | 8/12/10 8/19/10 8/13/10 8/19/10 8/19/10 8/19/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000361/20230012023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commissions Analysis of Southern California Edisons Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) ML22136A0842022-05-12012 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] Category:Inspection Report
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 IR 05000361/20240032024-05-20020 May 2024 – NRC Inspection Report 050-00361/2024-003 and 050-00362/2024-003 IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 IR 05000361/20230012023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 IR 05000361/20220012022-03-14014 March 2022 NRC Inspection Report 05000361/2022-001; 05000362/2022-001 IR 05000361/20210042021-12-0303 December 2021 NRC Inspection Report 05000361/2021-004 and 05000362/2021-004 IR 05000361/20210032021-09-22022 September 2021 NRC Inspection Report 05000361/2021-003 and 05000362/2021-003 IR 05000206/20214022021-07-20020 July 2021 Security Baseline Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021402 IR 05000361/20210022021-07-0606 July 2021 NRC Inspection Report 05000361/2021002 and 05000362/2021002 IR 05000361/20210012021-03-0303 March 2021 NRC Inspection Report 05000361/2021001 and 05000362/2021001 IR 05000361/20200042020-12-18018 December 2020 NRC Inspection Report 05000361/2020-004 and 05000362/2020-004 IR 05000361/20200032020-10-22022 October 2020 NRC Inspection Report 05000361/2020003 and 05000362/2020003 IR 05000206/20200072020-09-14014 September 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020007; 05000361/2020007; 05000362/2020007; and 07200041/2020003 IR 05000361/20204012020-08-0505 August 2020 Security Baseline Inspection Report 05000361/2020401 and 05000362/2020401 IR 05000206/20200062020-08-0404 August 2020 Southern California Edison Company, San Onofre Nuclear Generating Station Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020006; 05000361/2020006; 05000362/2020006; and 07200041/2020002 IR 05000206/20200022020-07-20020 July 2020 NRC Inspection Report 05000206/2020-002, 05000361/2020-002, and 05000362/2020-002 IR 05000206/20200052020-04-28028 April 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020005; 05000361/2020005; 05000362/2020005; and 07200041/2020001 IR 05000361/20200012020-02-25025 February 2020 NRC Inspection Report 05000361/2020-001 and 05000362/2020-001 IR 05000206/20190042020-02-20020 February 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2019 004; 05000361/2019 007; 05000362/2019 007; and 07200054/2019-002 IR 05000361/20190062019-12-0909 December 2019 NRC Inspection Report 05000361/2019006 and 05000362/2019006 IR 05000206/20190032019-11-22022 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Inspection Report 050-00206/2019-003, 050 00361/2019-005, 050-00362/2019-005, 072 00041/2019-001 IR 05000361/20190042019-09-25025 September 2019 NRC Inspection Report 05000361/2019-004 and 05000362/2019-004 IR 05000361/20194012019-08-0505 August 2019 Physical Security Inspection Report 05000361/2019401 and 05000362/2019401 IR 05000361/20190032019-07-15015 July 2019 Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Inspection Report 05000361/2019-003 and 05000362/2019-003 IR 05000206/20180062019-07-0909 July 2019 EA-18-155; Southern California Edison Company; San Onofre Nuclear Generating Station; NRC Supplemental Inspection Report 050-00206/2018-006, 050-00361/2018-006, 050-00362/2018-006, 072-00041/2018-002 IR 05000206/20190022019-05-30030 May 2019 NRC Inspection Report 05000206/2019002, 05000361/2019002, and 05000362/2019002 IR 05000361/20180052019-03-25025 March 2019 Notice of Violation and Proposed Imposition of Civil Penalty and NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001 IR 05000206/20190012019-03-18018 March 2019 NRC Inspection Report 05000206/2019001, 05000361/2019001, and 05000362/2019001 IR 05000206/20180042019-02-21021 February 2019 NRC Inspection Report 05000206/2018-004, 05000361/2018-004, and 05000362/2018-004 ML18341A1722018-12-19019 December 2018 Errata for San Onofre Nuclear Generating Station - NRC Special Inspection Report 05000206-2018-005, 05000361-2018-005, 05000362-2018-005, 07200041-2018-001 and Notice of Violation ML18332A3572018-11-28028 November 2018 EA-18-155, Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001 and Notice of Violation IR 05000361/20180032018-11-19019 November 2018 Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Inspection Report 05000361/2018-003 and 05000362/2018-003 IR 05000206/20170032018-08-24024 August 2018 NRC Inspection Report 05000206/2017-003, 05000361/2017-003, 05000362/2017-003, and 07200041/2017-001 IR 05000361/20180022018-08-10010 August 2018 NRC Inspection Report 05000361/2018002 and 05000362/2018002 IR 05000361/20184122018-07-16016 July 2018 Security Inspection Report 05000361/2018412 and 05000362/2018412 IR 05000361/20184112018-05-0808 May 2018 Physical Security Inspection Report 05000361/2018411 and 05000362/2018411 IR 05000361/20184102018-04-0202 April 2018 Physical Security Inspection Report 05000361/2018410; 05000362/2018410 2024-08-09
[Table view] |
Text
UNIT ED STATES NU C LE AR RE G UL AT O RY C O M M I S S I O N ust 19, 2010
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) - NRC SECURITY INSPECTION REPORT 05000361/2010402; 05000362/2010402
Dear Mr. Ridenoure:
On July 22, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your San Onofre Nuclear Generating Station. The inspection covered one or more of the key attributes of the Security Cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 22, 2010, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Southern California Edison Company -2-Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii),
the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-361, 50-362 License No.: NPF-10, NPF-15 Nonpublic Enclosure:
NRC Inspection Report 05000361/2010402; 05000362/2010402 w/Attachment: Supplemental Information cc w/enclosure:
Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Doug Bouder Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Southern California Edison Company -3-R. St. Onge Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Southern California Edison Company -4-Distribution w/enclosure:
Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)
Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)
Branch Chief, RIII DRS/PSB (Eric.Duncan@nrc.gov)
Senior Resident Inspector (Greg.Warnick@nrc.gov)
Electronic distribution by RIV w/o enclosure:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Acting Director (Tony.Vegel@nrc.gov)
DRP Acting Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Acting Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)
Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports Only inspection reports to the following:
OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov)
Executive Technical Assistant (John.Giessner@nrc.gov)
Security Related Complete Report - OUO:
SUNSI Review Completed: PRF ADAMS: YesInitials: PRF Non-Publicly Available Sensitive-Security- Related-Periodic Review Required Southern California Edison Company -5-Letter Only:
SUNSI Review Completed: PRF ADAMS: Yes Initials: PRF Publicly Available Non-Sensitive PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBD C:PSB1 PFrechette JRollins JBuchanan MShannon RLantz MShannon
/RA/ /RA/ /RA/MS for /RA/ /RA/ /RA/
8/12/10 8/19/10 8/13/10 8/19/10 8/19/10 8/19/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax