Line 3: Line 3:
| issue date = 10/28/2010
| issue date = 10/28/2010
| title = Notification of Conduct of a Triennial Fire Protection Baseline Inspection (IR 05000327-11-006 and 05000328-11-006)
| title = Notification of Conduct of a Triennial Fire Protection Baseline Inspection (IR 05000327-11-006 and 05000328-11-006)
| author name = Nease R L
| author name = Nease R
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Krich R M
| addressee name = Krich R
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328, 07200034
| docket = 05000327, 05000328, 07200034
Line 13: Line 13:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000327/2011006]]
See also: [[see also::IR 05000327/2011006]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                NUCLEAR REGULATORY COMMISSION
  October 28, 2010  
                                                REGION II
Mr. R. M. Krich  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Vice President, Nuclear Licensing  
                                      ATLANTA, GEORGIA 30303-1257
Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  
                                            October 28, 2010
SUBJECT: SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT NO. 05000327/2011006 AND 05000328/2011006)  
Mr. R. M. Krich
Dear Mr. Krich:  
Vice President, Nuclear Licensing
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a triennial fire protection baseline inspection at the Sequoyah Nuclear Plant in January and February 2011. The inspection team will be led by Mr. McKenzie  
Tennessee Valley Authority
Thomas, NRC Senior Reactor Inspector, of the Region II Office. The team will be composed of personnel from the NRC Region II Office. The inspection will be conducted in accordance with Inspection Procedure 71111.05T, the NRC's triennial fire protection inspection procedure, dated September 30, 2010. The inspection guidance will concentrate on the fire protection program infrastructure and the adequacy of compensatory measures implemented for identified  
3R Lookout Place
departures from code requirements. Inspection of circuit analysis is included in the inspection procedure.
1101 Market Street
On October 19, 2010, during a telephone conversation between Ms. Beth Wetzel (Sequoyah Licensing and Industry Affairs Manager) of your staff, and Mr. Thomas, our respective staffs confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:  
Chattanooga, TN 37402-2801
SUBJECT:       SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF CONDUCT OF A
                TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
                REPORT NO. 05000327/2011006 AND 05000328/2011006)
Dear Mr. Krich:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a triennial fire protection baseline inspection at the Sequoyah
Nuclear Plant in January and February 2011. The inspection team will be led by Mr. McKenzie
Thomas, NRC Senior Reactor Inspector, of the Region II Office. The team will be composed of
personnel from the NRC Region II Office. The inspection will be conducted in accordance with
Inspection Procedure 71111.05T, the NRCs triennial fire protection inspection procedure, dated
September 30, 2010. The inspection guidance will concentrate on the fire protection program
infrastructure and the adequacy of compensatory measures implemented for identified
departures from code requirements. Inspection of circuit analysis is included in the inspection
procedure.
On October 19, 2010, during a telephone conversation between Ms. Beth Wetzel (Sequoyah
Licensing and Industry Affairs Manager) of your staff, and Mr. Thomas, our respective staffs
confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite
inspection. The schedule for the inspection is as follows:
    *  Information gathering visit: January 4 - 6, 2011
    *  Week 1 of onsite inspection: January 24 - 28, 2011
    *  Week 2 of onsite inspection: February 7 - 11, 2011
The purposes of the information gathering visit are to obtain information and documentation
needed to support the inspection, to become familiar with the Sequoyah Nuclear Plant fire
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,
and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures
Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the
team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.
Please contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in
the Enclosures. The inspection team will try to minimize your administrative burden by
specifically identifying those documents required for inspection preparation.


* Information gathering visit: January 4 - 6, 2011
TVA                                                2
* Week 1 of onsite inspection: January 24 - 28, 2011
During the information gathering visit, the team will also discuss the following inspection support
* Week 2 of onsite inspection: February 7 - 11, 2011
administrative details: office space; specific documents to be made available to the team in their
The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the Sequoyah Nuclear Plant fire protection program, fire protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2).  The types of documents the team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.
office space; arrangements for unescorted site access (including radiation protection training,
Please contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in the Enclosures. The inspection team will try to minimize your administrative burden by specifically identifying those documents required for inspection preparation.
security, safety and fitness for duty requirements); and the availability of knowledgeable plant
TVA 2    During the information gathering visit, the team will also discuss the following inspection support administrative details: office space; specific documents to be made available to the team in their office space; arrangements for unescorted site access (including radiation protection training, security, safety and fitness for duty requirements); and the availability of knowledgeable plant engineering and licensing organization personnel to serve as points of contact during the inspection.
engineering and licensing organization personnel to serve as points of contact during the
inspection.
We request that during the inspection weeks you ensure that copies of analyses, evaluations or
documentation regarding the implementation and maintenance of the Sequoyah Nuclear Plant
fire protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest for the fire protection portion of the inspection are
those documents which establish that your fire protection program satisfies NRC regulatory
requirements and conforms to applicable NRC and industry fire protection guidance. For the
B.5.b portion of the inspection, those documents implementing your mitigating strategies and
demonstrating the management of your commitments for the strategies are of specific interest.
Also, personnel should be available at the site during the inspection who are knowledgeable
regarding those plant systems required to achieve and maintain safe shutdown conditions from
inside and outside the control room (including the electrical aspects of the relevant post-fire safe
shutdown analyses), reactor plant fire protection systems and features, and the Sequoyah
Nuclear Plant fire protection program and its implementation.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Mr. Thomas at (404) 997-4673, or me at (404) 997-4530.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
                                              /RA/
                                              Rebecca L. Nease, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket Nos.: 50-327, 50-328, 72-034
License Nos.: DPR-77, DPR-79
Enclosures:    1. Triennial Fire Protection Inspection Support Documentation
                2. Mitigating Strategies Support Documentation
cc w/encls: (See page 3)


We request that during the inspection weeks you ensure that copies of analyses, evaluations or documentation regarding the implementation and maintenance of the Sequoyah Nuclear Plant  
TVA                                    3
fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest for the fire protection portion of the inspection are those documents which establish that your fire protection program satisfies NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance. For the B.5.b portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest. Also, personnel should be available at the site during the inspection who are knowledgeable
cc w/encls:
regarding those plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room (including the electrical aspects of the relevant post-fire safe shutdown analyses), reactor plant fire protection systems and features, and the Sequoyah Nuclear Plant fire protection program and its implementation. 
C.R. Church
Vice President
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150- 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document
Sequoyah Nuclear Plant
displays a currently valid Office of Management and Budget control number.
Tennessee Valley Authority
Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspection team's information or logistical needs, please contact Mr. Thomas at (404) 997-4673, or me at (404) 997-4530. 
P.O. Box 2000
Soddy-Daisy, TN 37384-2000
K. Langdon
Plant Manager
Sequoyah Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Soddy Daisy, TN 37384-2000
B. A. Wetzel
Manager
Licensing and Industry Affairs
Sequoyah Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Soddy Daisy, TN 37384-2000
E. J. Vigluicci
Assistant General Counsel
Tennessee Valley Authority
6A West Tower
400 West Summit Hill Drive
Knoxville, TN 37902
County Mayor
Hamilton County
Hamilton County Courthouse
Chattanooga, TN 37402-2801
Division of Radiological Health
TN Dept. of Environment & Conservation
401 Church Street
Nashville, TN 37243-1532
Senior Resident Inspector
U.S. Nuclear Regulatory Commission
Sequoyah Nuclear Plant
2600 Igou Ferry Road
Soddy Daisy, TN 37379-3624
Ann Harris
341 Swing Loop
Rockwood, TN 37854


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
  (the Public Electronic Reading Room).
Sincerely,        /RA/ Rebecca L. Nease, Chief Engineering Branch 2
Division of Reactor Safety 
Docket Nos.: 50-327, 50-328, 72-034 License Nos.: DPR-77, DPR-79 
Enclosures: 1. Triennial Fire Protection Inspection Support Documentation    2. Mitigating Strategies Support Documentation 
cc w/encls:  (See page 3) 
TVA 3    cc w/encls: C.R. Church Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000
Soddy-Daisy, TN  37384-2000
K. Langdon Plant Manager Sequoyah Nuclear Plant
Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN  37384-2000
B. A. Wetzel Manager Licensing and Industry Affairs
Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN  37384-2000
E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive
Knoxville, TN  37902
County Mayor Hamilton County Hamilton County Courthouse
Chattanooga, TN  37402-2801
Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street
Nashville, TN  37243-1532
Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN  37379-3624


  Ann Harris 341 Swing Loop Rockwood, TN  37854
_________________________                      G SUNSI REVIEW COMPLETE
OFFICE            RII:DRS          RII:DRP              RII:DRS
SIGNATURE                  RA      RA                    RA
NAME              MThomas          EGuthrie              RNease
DATE                  10/28/2010        10/ 28 /2010      10/ 28 /2010 10/  /2010  10/  /2010  10/  /2010  10/
E-MAIL COPY?        YES        NO    YES          NO    YES        NO  YES      YES        NO YES      NO
       
                    Triennial Fire Protection Inspection Support Documentation
Note: This is a broad list of the documents the NRC inspection team may be interested in
reviewing, and possibly obtaining, during the information gathering site visit. The current
version of these documents is expected unless specified otherwise. Electronic media is
preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is .pdf).
The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease
of use. Please provide 5 copies of each CD/DVD-ROM submitted). Information in lists should
contain enough information to be easily understood by someone who has knowledge of the
technology. The lead inspector will discuss specific information needs with the licensee staff
and may request additional documents or electronic information.
    1. The current version of the Fire Protection Program and Fire Hazards Analysis.
    2. Corrective Action closeouts as part of operator manual actions corrective actions.
    3. List of identified fire-induced circuit failure configurations for select fire areas.
    4. Corrective actions for fire-induced circuit failures, both single and multiple spurious
        actuations for select fire areas.
    5. Cable routing for components and equipment credited for safe shutdown for select fire
        areas.
    6. List of protected safe shutdown train equipment for select fire areas.
    7. Current versions of the fire protection program implementing procedures (e.g.,
        administrative controls, surveillance testing, fire brigade).
    8.    Fire brigade training program and pre-fire plans.
    9.    Post-fire safe shutdown systems and separation analysis.
  10.    Post-fire alternative shutdown analysis.
  11.    Piping and instrumentation (flow) diagrams showing the components used to achieve
          and maintain hot standby and cold shutdown for fires outside the control room and
          those components used for those areas requiring alternative shutdown capability.
  12.    Plant layout and equipment drawings which identify the physical plant locations of hot
          standby and cold shutdown equipment.
  13.    Plant layout drawings which identify plant fire area delineation, areas protected by
          automatic fire suppression and detection, and the locations of fire protection equipment.
  14. Plant layout drawings which identify the general location of the post-fire emergency
        lighting.
                                                                                            Enclosure 1


_________________________  
                                                  2
G   SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRP RII:DRS    SIGNATURE                RA RA RA    NAME MThomas EGuthrie RNease    DATE 10/28/2010 10/ 28 /2010 10/ 28 /2010 10/      /201010/      /2010 10/      /2010 10/      E-MAIL COPY?    YES NO      YES NO    YES NO    YES YES NO  YES NO   
  15. Plant operating procedures which would be used and describe shutdown from inside
  Enclosure 1 Triennial Fire Protection Inspection Support Documentation
      the control room with a postulated fire occurring in any plant area outside the control
   Note: This is a broad list of the documents the NRC inspection team may be interested in reviewing, and possibly obtaining, during the information gathering site visitThe current version of these documents is expected unless specified otherwiseElectronic media is preferred, if readily available.  (The preferred file format on CD-ROM or DVDROM is ".pdf").   
      room, procedures which would be used to implement alternative shutdown capability in
The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease of usePlease provide 5 copies of each CD/DVD-ROM submitted)Information in "lists" should contain enough information to be easily understood by someone who has knowledge of the technologyThe lead inspector will discuss specific information needs with the licensee staff and may request additional documents or electronic information.
      the event of a fire in either the control or cable spreading room.
   16.  Maintenance and surveillance testing procedures for alternative shutdown capability
      and fire barriers, detectors, pumps and suppression systems.
  17. Maintenance procedures which routinely verify fuse breaker coordination in accordance
      with the post-fire safe shutdown coordination analysis.
  18. A list of significant fire protection and post-fire safe shutdown related design change
      packages and Generic Letter 86-10 evaluations.
   19.  The reactor plant's IPEEE, results of any post-IPEEE reviews, and listings of actions
      taken/plant modifications conducted in response to IPEEE information.
  21Organization charts of site personnel down to the level of fire protection staff personnel.
  22If applicable, layout/arrangement drawings of potential reactor coolant/recirculation
      pump lube oil system leakage points and associated lube oil collection systems.
  23Licensing basis documents for fire protection (safety evaluation reports, pertinent
      sections of the final safety analysis report, exemptions, deviations, letters to/from the
      NRC regarding fire protection/fire safe shutdown, etc.).
  24Procedures/instructions that control the configuration of the reactor plant's fire
      protection program, features, and post-fire safe shutdown methodology and system
      design.
  25.  A list of applicable codes and standards related to the design of plant fire protection
      features and evaluations of code deviations.
  26Procedures/instructions that govern the implementation of plant modifications,
      maintenance, and special operations, and their impact on fire protection.
  27Internal and external self-assessments, audits, peer-assessments or similar reviews
      related to post-fire safe shutdown capability or the fire protection program completed
      since the previous NRC fire protection triennial inspection.
  28. Recent QA surveillances of fire protection activities.
29.  A listing of open and closed fire protection problem identification and resolution reports
      (also known as condition reports/problem evaluation reports/NCRs) since the last
      triennial inspection.
                                                                                        Enclosure 1


1. The current version of the Fire Protection Program and Fire Hazards Analysis. 
                        Mitigating Strategies Support Documentation
2. Corrective Action closeouts as part of operator manual actions corrective actions. 
    Note: This is a broad list of the documents the NRC inspection team may be interested
3. List of identified fire-induced circuit failure configurations for select fire areas. 
    in reviewing, and possibly obtaining, during the information gathering visit. The current
4. Corrective actions for fire-induced circuit failures, both single and multiple spurious actuations for select fire areas. 
    version of these documents is expected unless specified otherwise. Electronic media is
5. Cable routing for components and equipment credited for safe shutdown for select fire areas. 
    preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is
6. List of protected safe shutdown train equipment for select fire areas. 
    .pdf). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to
  7. Current versions of the fire protection program implementing procedures (e.g., administrative controls, surveillance testing, fire brigade). 
    facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The
  8.  Fire brigade training program and pre-fire plans. 
    lead inspector will discuss specific information needs with the licensee staff and may
  9.  Post-fire safe shutdown systems and separation analysis. 
    request additional documents or electronic information.
1. A list of all modifications to regulatory commitments made to meet the requirements of
10.  Post-fire alternative shutdown analysis. 
    Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently
  11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room and those components used for those areas requiring alternative shutdown capability. 
    imposed license conditions, and 10 CFR 50.54(hh)(2).
  12. Plant layout and equipment drawings which identify the physical plant locations of hot standby and cold shutdown equipment. 
2. Copies of procedures/guidelines that were revised or generated to implement the
  13. Plant layout drawings which identify plant fire area delineation, areas protected by automatic fire suppression and detection, and the locations of fire protection equipment. 
    mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),
14. Plant layout drawings which identify the general location of the post-fire emergency lighting.
    severe accident management guidelines (SAMGs), emergency operating procedures
2  Enclosure 1  15. Plant operating procedures which would be used and describe shutdown from inside the control room with a postulated fire occurring in any plant area outside the control room, procedures which would be used to implement alternative shutdown capability in the event of a fire in either the control or cable spreading room. 
    (EOPs), abnormal operating procedures (AOPs), etc.
  16. Maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.
3. A matrix that shows the correlation between the mitigation strategies identified in
  17. Maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis. 
    Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are
    used to implement each strategy.
18. A list of significant fire protection and post-fire safe shutdown related design change packages and Generic Letter 86-10 evaluations.
4. Engineering evaluations/calculations that were used to verify engineering bases for the
  19. The reactor plant's IPEEE, results of any post-IPEEE reviews, and listings of actions taken/plant modifications conducted in response to IPEEE information.
    mitigation strategies.
  21.  Organization charts of site personnel down to the level of fire protection staff personnel.
5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied
 
    upon in the mitigation strategies. These could be the type used for training.
  22. If applicable, layout/arrangement drawings of potential reactor coolant/recirculation pump lube oil system leakage points and associated lube oil collection systems.
6. A modification package or simplified drawings/descriptions of modifications that were
  23. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).
    made to plant systems to implement the mitigation strategies.
  24. Procedures/instructions that control the configuration of the reactor plant's fire protection program, features, and post-fire safe shutdown methodology and system
7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required
design.  25. A list of applicable codes and standards related to the design of plant fire protection features and evaluations of code deviations.
    to be used to implement the mitigation strategies.
8. A list of B.5.b strategies, if any, which have implementing details that differ from that
26. Procedures/instructions that govern the implementation of plant modifications, maintenance, and special operations, and their impact on fire protection.
    documented in the submittals and the safety evaluation report.
  27. Internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program completed
9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas
since the previous NRC fire protection triennial inspection.
    referenced in B.5.b documents.
  28. Recent QA surveillances of fire protection activities. 
10. Training records/training matrix/lesson plans related to B.5.b.
29. A listing of open and closed fire protection problem identification and resolution reports (also known as condition reports/problem evaluation reports/NCRs) since the last triennial inspection. 
11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)
  Enclosure 2 Mitigating Strategies Support Documentation
    required to implement any mitigating strategies.
  Note: This is a broad list of the documents the NRC inspection team may be interested in reviewing, and possibly obtaining, during the information gathering visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is  
                                                                                    Enclosure 2
".pdf"). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The lead inspector will discuss specific information needs with the licensee staff and may request additional documents or electronic information.  
1. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2).  
  2. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures  
(EOPs), abnormal operating procedures (AOPs), etc.
  3. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy.  
  4. Engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.
  5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied upon in the mitigation strategies. These could be the type used for training.
  6. A modification package or simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.
7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies.  
  8. A list of B.5.b strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report.
  9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas referenced in B.5.b documents.  
  10. Training records/training matrix/lesson plans related to B.5.b.  
    11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies.
}}
}}

Latest revision as of 08:02, 13 November 2019

Notification of Conduct of a Triennial Fire Protection Baseline Inspection (IR 05000327-11-006 and 05000328-11-006)
ML103010271
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/28/2010
From: Nease R
NRC/RGN-II/DRS/EB2
To: Krich R
Tennessee Valley Authority
References
Download: ML103010271 (7)


See also: IR 05000327/2011006

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

October 28, 2010

Mr. R. M. Krich

Vice President, Nuclear Licensing

Tennessee Valley Authority

3R Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

SUBJECT: SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF CONDUCT OF A

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT NO. 05000327/2011006 AND 05000328/2011006)

Dear Mr. Krich:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a triennial fire protection baseline inspection at the Sequoyah

Nuclear Plant in January and February 2011. The inspection team will be led by Mr. McKenzie

Thomas, NRC Senior Reactor Inspector, of the Region II Office. The team will be composed of

personnel from the NRC Region II Office. The inspection will be conducted in accordance with

Inspection Procedure 71111.05T, the NRCs triennial fire protection inspection procedure, dated

September 30, 2010. The inspection guidance will concentrate on the fire protection program

infrastructure and the adequacy of compensatory measures implemented for identified

departures from code requirements. Inspection of circuit analysis is included in the inspection

procedure.

On October 19, 2010, during a telephone conversation between Ms. Beth Wetzel (Sequoyah

Licensing and Industry Affairs Manager) of your staff, and Mr. Thomas, our respective staffs

confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite

inspection. The schedule for the inspection is as follows:

  • Information gathering visit: January 4 - 6, 2011
  • Week 1 of onsite inspection: January 24 - 28, 2011
  • Week 2 of onsite inspection: February 7 - 11, 2011

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Sequoyah Nuclear Plant fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures

Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the

team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.

Please contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in

the Enclosures. The inspection team will try to minimize your administrative burden by

specifically identifying those documents required for inspection preparation.

TVA 2

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in their

office space; arrangements for unescorted site access (including radiation protection training,

security, safety and fitness for duty requirements); and the availability of knowledgeable plant

engineering and licensing organization personnel to serve as points of contact during the

inspection.

We request that during the inspection weeks you ensure that copies of analyses, evaluations or

documentation regarding the implementation and maintenance of the Sequoyah Nuclear Plant

fire protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For the

B.5.b portion of the inspection, those documents implementing your mitigating strategies and

demonstrating the management of your commitments for the strategies are of specific interest.

Also, personnel should be available at the site during the inspection who are knowledgeable

regarding those plant systems required to achieve and maintain safe shutdown conditions from

inside and outside the control room (including the electrical aspects of the relevant post-fire safe

shutdown analyses), reactor plant fire protection systems and features, and the Sequoyah

Nuclear Plant fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Thomas at (404) 997-4673, or me at (404) 997-4530.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Rebecca L. Nease, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-327, 50-328,72-034

License Nos.: DPR-77, DPR-79

Enclosures: 1. Triennial Fire Protection Inspection Support Documentation

2. Mitigating Strategies Support Documentation

cc w/encls: (See page 3)

TVA 3

cc w/encls:

C.R. Church

Vice President

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000

Soddy-Daisy, TN 37384-2000

K. Langdon

Plant Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000

Soddy Daisy, TN 37384-2000

B. A. Wetzel

Manager

Licensing and Industry Affairs

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000

Soddy Daisy, TN 37384-2000

E. J. Vigluicci

Assistant General Counsel

Tennessee Valley Authority

6A West Tower

400 West Summit Hill Drive

Knoxville, TN 37902

County Mayor

Hamilton County

Hamilton County Courthouse

Chattanooga, TN 37402-2801

Division of Radiological Health

TN Dept. of Environment & Conservation

401 Church Street

Nashville, TN 37243-1532

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Sequoyah Nuclear Plant

2600 Igou Ferry Road

Soddy Daisy, TN 37379-3624

Ann Harris

341 Swing Loop

Rockwood, TN 37854

_________________________ G SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE RA RA RA

NAME MThomas EGuthrie RNease

DATE 10/28/2010 10/ 28 /2010 10/ 28 /2010 10/ /2010 10/ /2010 10/ /2010 10/

E-MAIL COPY? YES NO YES NO YES NO YES YES NO YES NO

Triennial Fire Protection Inspection Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested in

reviewing, and possibly obtaining, during the information gathering site visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is .pdf).

The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease

of use. Please provide 5 copies of each CD/DVD-ROM submitted). Information in lists should

contain enough information to be easily understood by someone who has knowledge of the

technology. The lead inspector will discuss specific information needs with the licensee staff

and may request additional documents or electronic information.

1. The current version of the Fire Protection Program and Fire Hazards Analysis.

2. Corrective Action closeouts as part of operator manual actions corrective actions.

3. List of identified fire-induced circuit failure configurations for select fire areas.

4. Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for select fire areas.

5. Cable routing for components and equipment credited for safe shutdown for select fire

areas.

6. List of protected safe shutdown train equipment for select fire areas.

7. Current versions of the fire protection program implementing procedures (e.g.,

administrative controls, surveillance testing, fire brigade).

8. Fire brigade training program and pre-fire plans.

9. Post-fire safe shutdown systems and separation analysis.

10. Post-fire alternative shutdown analysis.

11. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room and

those components used for those areas requiring alternative shutdown capability.

12. Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment.

13. Plant layout drawings which identify plant fire area delineation, areas protected by

automatic fire suppression and detection, and the locations of fire protection equipment.

14. Plant layout drawings which identify the general location of the post-fire emergency

lighting.

Enclosure 1

2

15. Plant operating procedures which would be used and describe shutdown from inside

the control room with a postulated fire occurring in any plant area outside the control

room, procedures which would be used to implement alternative shutdown capability in

the event of a fire in either the control or cable spreading room.

16. Maintenance and surveillance testing procedures for alternative shutdown capability

and fire barriers, detectors, pumps and suppression systems.

17. Maintenance procedures which routinely verify fuse breaker coordination in accordance

with the post-fire safe shutdown coordination analysis.

18. A list of significant fire protection and post-fire safe shutdown related design change

packages and Generic Letter 86-10 evaluations.

19. The reactor plant's IPEEE, results of any post-IPEEE reviews, and listings of actions

taken/plant modifications conducted in response to IPEEE information.

21. Organization charts of site personnel down to the level of fire protection staff personnel.

22. If applicable, layout/arrangement drawings of potential reactor coolant/recirculation

pump lube oil system leakage points and associated lube oil collection systems.

23. Licensing basis documents for fire protection (safety evaluation reports, pertinent

sections of the final safety analysis report, exemptions, deviations, letters to/from the

NRC regarding fire protection/fire safe shutdown, etc.).

24. Procedures/instructions that control the configuration of the reactor plant's fire

protection program, features, and post-fire safe shutdown methodology and system

design.

25. A list of applicable codes and standards related to the design of plant fire protection

features and evaluations of code deviations.

26. Procedures/instructions that govern the implementation of plant modifications,

maintenance, and special operations, and their impact on fire protection.

27. Internal and external self-assessments, audits, peer-assessments or similar reviews

related to post-fire safe shutdown capability or the fire protection program completed

since the previous NRC fire protection triennial inspection.

28. Recent QA surveillances of fire protection activities.

29. A listing of open and closed fire protection problem identification and resolution reports

(also known as condition reports/problem evaluation reports/NCRs) since the last

triennial inspection.

Enclosure 1

Mitigating Strategies Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested

in reviewing, and possibly obtaining, during the information gathering visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is

.pdf). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to

facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The

lead inspector will discuss specific information needs with the licensee staff and may

request additional documents or electronic information.

1. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently

imposed license conditions, and 10 CFR 50.54(hh)(2).

2. Copies of procedures/guidelines that were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),

severe accident management guidelines (SAMGs), emergency operating procedures

(EOPs), abnormal operating procedures (AOPs), etc.

3. A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are

used to implement each strategy.

4. Engineering evaluations/calculations that were used to verify engineering bases for the

mitigation strategies.

5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied

upon in the mitigation strategies. These could be the type used for training.

6. A modification package or simplified drawings/descriptions of modifications that were

made to plant systems to implement the mitigation strategies.

7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required

to be used to implement the mitigation strategies.

8. A list of B.5.b strategies, if any, which have implementing details that differ from that

documented in the submittals and the safety evaluation report.

9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas

referenced in B.5.b documents.

10. Training records/training matrix/lesson plans related to B.5.b.

11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)

required to implement any mitigating strategies.

Enclosure 2