ML111040113: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML111040113
| number = ML111040113
| issue date = 04/27/2011
| issue date = 04/27/2011
| title = Grand Gulf Nuclear Station, Unit 1 - Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00011 (TAC No. ME4679)
| title = Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00011
| author name = Wang A B
| author name = Wang A
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 3
| page count = 3
| project = TAC:ME4679
| project = TAC:ME4679
| stage = Other
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 27, 2011 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
 
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME4679)
 
==Dear Sir or Madam:==
 
By letter dated February 23, 2011 (GNRO-2011/00011) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110540545), you submitted an affidavit dated February 20, 2011, executed by Edward D. Schrull, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Attachment 1, GNRO-2011/00011, "Grand Gulf Nuclear Station Extended Power Uprate, Response to Request for Additional Information, Mechanical and Civil Engineering Branch (Proprietary)," dated February 23, 2011, A publicly available version of Attachment 1, designated as Attachment 2 to GNRO-2011/0011, is in ADAMS Accession No. ML110540545. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
: a.      Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies.
: b.      Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
 
                                                - 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at 301-415-1445 or via e-mail at alan. wang@nrc.gov.
Sincerely, AI~,~~r Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc:    Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.
Wilmington, NC 28401 Additional Distribution via Listserv
 
ML111040113 OFFICE    NRR/LPL4/PM        NRR/LPL4/LA        NRR/DE/EMCB/BC    NRR/LPL4/BC        NRR/LPL4/PM MMarkley (BSingal I NAME      AWang              JBurkhardt        MKhanna          for)                AWang DATE      4/18/11            4/15/11            4/19/11          4/26/11            4/27/11}}

Latest revision as of 01:58, 13 November 2019

Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00011
ML111040113
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/27/2011
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME4679
Download: ML111040113 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 27, 2011 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME4679)

Dear Sir or Madam:

By letter dated February 23, 2011 (GNRO-2011/00011) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110540545), you submitted an affidavit dated February 20, 2011, executed by Edward D. Schrull, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

Attachment 1, GNRO-2011/00011, "Grand Gulf Nuclear Station Extended Power Uprate, Response to Request for Additional Information, Mechanical and Civil Engineering Branch (Proprietary)," dated February 23, 2011, A publicly available version of Attachment 1, designated as Attachment 2 to GNRO-2011/0011, is in ADAMS Accession No. ML110540545. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies.
b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions, please contact me at 301-415-1445 or via e-mail at alan. wang@nrc.gov.

Sincerely, AI~,~~r Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.

Wilmington, NC 28401 Additional Distribution via Listserv

ML111040113 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EMCB/BC NRR/LPL4/BC NRR/LPL4/PM MMarkley (BSingal I NAME AWang JBurkhardt MKhanna for) AWang DATE 4/18/11 4/15/11 4/19/11 4/26/11 4/27/11