ML11138A036: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 24, 2011 Mr. Kenneth W. Kammeier Allegheny Electric Cooperative, Inc. 212 Locust Sf. P. O. Box 1266 Harrisburg, PA 17108-1266 SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RE: 2011 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. ME5542 AND ME5543) | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 24, 2011 Mr. Kenneth W. Kammeier Allegheny Electric Cooperative, Inc. | ||
212 Locust Sf. | |||
P. O. Box 1266 Harrisburg, PA 17108-1266 | |||
==SUBJECT:== | |||
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: 2011 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. ME5542 AND ME5543) | |||
==Dear Mr. Kammeier:== | ==Dear Mr. Kammeier:== | ||
By letter dated April 11, 2011, Allegheny Electric Cooperative, Inc. (AEC) submitted "NRC Decommissioning Funding Status Report, December 31, 2010, for the Susquehanna Steam Electric Station, Units 1 and 2. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. | By letter dated April 11, 2011, Allegheny Electric Cooperative, Inc. (AEC) submitted "NRC Decommissioning Funding Status Report, December 31, 2010, for the Susquehanna Steam Electric Station, Units 1 and 2. | ||
AEC should provide a response within 30 days from the date of this letter. Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 | The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. AEC should provide a response within 30 days from the date of this letter. | ||
Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/encl: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION NRC DECOMMISSIONING FUNDING STATUS DECEMBER ALLEGHENY ELECTRIC COOPERATIVE SUSQUEHANNA STEAM ELECTRIC STATION. UNITS 1 AND DOCKET NOS. 50-387 AND This RAI is in response to the Allegheny Electric Cooperative's (AEC) 2011 Decommissioning Funding Status (DFS) Report. By letter dated April 11 ,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11109A046), PPL submitted to the Nuclear Regulatory Commission (NRC) the 2011 DFS Report for Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2), as required under Title 10 of the Code of Federal Regulations (10 CFR) 50.75(f)(1). | As stated cc w/encl: Distribution via Listserv | ||
AEC should provide a response within 30 days from the date of this letter. RAI#1: Minimum DFA calculation: | |||
Provide the minimum decommissioning funding assurance calculation by using current escalation factors for labor and energy from the U.S. Department of Labor, Bureau of Labor Statistics and, if necessary, a corrected submittal for that part of the DFS Report. On March 29, 2011, AEC reported an amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c) less than the amount calculated by the NRC staff. Also, AEC used the factors for labor and energy taken from NUREG-1307, Rev. 14, "Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities." According to 10 CFR 50.75(f)(1), the amount provided in the DFS report should be "the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c)." As stated under 10 CFR 50.75(c)(2): | REQUEST FOR ADDITIONAL INFORMATION (RAI) | ||
[e]scalation factors for labor and energy [ ...J are to be taken from regional data of U.S. Department of Labor Bureau of Labor Statistics | REGARDING NRC DECOMMISSIONING FUNDING STATUS REPORT DECEMBER 31.2011 ALLEGHENY ELECTRIC COOPERATIVE FOR SUSQUEHANNA STEAM ELECTRIC STATION. UNITS 1 AND 2 DOCKET NOS. 50-387 AND 388 This RAI is in response to the Allegheny Electric Cooperative's (AEC) 2011 Decommissioning Funding Status (DFS) Report. By letter dated April 11 ,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11109A046), PPL submitted to the Nuclear Regulatory Commission (NRC) the 2011 DFS Report for Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2), as required under Title 10 of the Code of Federal Regulations (10 CFR) 50.75(f)(1). AEC should provide a response within 30 days from the date of this letter. | ||
... RAI#2: Citation for real rate of returns: Provide the citation (e.g., an Order by the rate-regulatory authority) by the regulatory entity that allows for the assumptions used regarding rates of escalation in decommissioning costs, rate of earnings on decommissioning funds and rates of other factors assumed within the DFS Report. Enclosure | RAI#1: Minimum DFA calculation: | ||
-2 In the submission on March 29, 2011, AEC reported the following: | Provide the minimum decommissioning funding assurance calculation by using current escalation factors for labor and energy from the U.S. Department of Labor, Bureau of Labor Statistics and, if necessary, a corrected submittal for that part of the DFS Report. | ||
5 percent rate of escalation in decommissioning costs, 6.5 percent rates of earnings on decommissioning funds As stated in 10 CFR 50.75(f)(1), ... The information in [the DFS] report must include [ ...] the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections | On March 29, 2011, AEC reported an amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c) less than the amount calculated by the NRC staff. Also, AEC used the factors for labor and energy taken from NUREG-1307, Rev. 14, "Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities." | ||
... RAI#3: After-tax decommissioning funds as of December 31, 2010: Indicate if the amount of decommissioning funds identified within the DFS Report for SSES 1 and 2 are the after-tax amounts of decommissioning funds accumulated through December 31, 2010. If not, provide the after-tax amounts of decommissioning funds accumulated through December 31,2010. In the submission on March 29, 2011, AEC reported the amounts of decommissioning funds accumulated as of December 31, 2010, for SSES 1 and 2, but did not indicate if the amounts stated were the before or after-tax balances. | According to 10 CFR 50.75(f)(1), the amount provided in the DFS report should be "the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c)." | ||
As stated under 10 CFR 50.75(c)(2): | |||
[e]scalation factors for labor and energy [... J are to be taken from regional data of U.S. Department of Labor Bureau of Labor Statistics ... | |||
RAI#2: Citation for real rate of returns: | |||
Provide the citation (e.g., an Order by the rate-regulatory authority) by the regulatory entity that allows for the assumptions used regarding rates of escalation in decommissioning costs, rate of earnings on decommissioning funds and rates of other factors assumed within the DFS Report. | |||
Enclosure | |||
-2 In the submission on March 29, 2011, AEC reported the following: | |||
5 percent rate of escalation in decommissioning costs, 6.5 percent rates of earnings on decommissioning funds As stated in 10 CFR 50.75(f)(1), | |||
... The information in [the DFS] report must include [...] the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections ... | |||
RAI#3: After-tax decommissioning funds as of December 31, 2010: | |||
Indicate if the amount of decommissioning funds identified within the DFS Report for SSES 1 and 2 are the after-tax amounts of decommissioning funds accumulated through December 31, 2010. If not, provide the after-tax amounts of decommissioning funds accumulated through December 31,2010. | |||
In the submission on March 29, 2011, AEC reported the amounts of decommissioning funds accumulated as of December 31, 2010, for SSES 1 and 2, but did not indicate if the amounts stated were the before or after-tax balances. | |||
The provisions of 10 CFR 50.75(f)(1) and (2) require the licensee to report the amount of funds accumulated to the end of the calendar year preceding the report. | The provisions of 10 CFR 50.75(f)(1) and (2) require the licensee to report the amount of funds accumulated to the end of the calendar year preceding the report. | ||
May 24,2011 Mr. Kenneth W. Kammeier Allegheny Electric Cooperative, Inc. 212 Locust St. P. O. Box 1266 Harrisburg, PA 17108-1266 SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RE: 2011 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. ME5542 AND ME5543) | |||
May 24,2011 Mr. Kenneth W. Kammeier Allegheny Electric Cooperative, Inc. | |||
212 Locust St. | |||
P. O. Box 1266 Harrisburg, PA 17108-1266 | |||
==SUBJECT:== | |||
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: 2011 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. ME5542 AND ME5543) | |||
==Dear Mr. Kammeier:== | ==Dear Mr. Kammeier:== | ||
By letter dated April 11, 2011, Allegheny Electric Cooperative, Inc. (AEC) submitted "NRC Decommissioning Funding Status Report, December 31,2010, for the Susquehanna Steam Electric Station, Units 1 and 2. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. | By letter dated April 11, 2011, Allegheny Electric Cooperative, Inc. (AEC) submitted "NRC Decommissioning Funding Status Report, December 31,2010, for the Susquehanna Steam Electric Station, Units 1 and 2. | ||
AEC should provide a response within 30 days from the date of this letter. Sincerely, Ira! Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 | The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. AEC should provide a response within 30 days from the date of this letter. | ||
Sincerely, Ira! | |||
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/encl: Distribution via Listserv DISTRIBUTION: | As stated cc w/encl: Distribution via Listserv DISTRIBUTION: | ||
PUBLIC | PUBLIC LPL1-1 RlF RidsNRRDorILPI1-1 RidsNRRPMSusquehanna RidsNrrLASLittie (hard copy) RidsOGCRp RidsNrrDprPfib RidsNrrDorl Dpr RidsNrrDirsltsb RidsAcrsAcnw&mMailCenter RidsRg1MailCenter M. Purdie, NRRlPFIB J. Simpson, NRRlPFIB ADAMS Accession No.: ML11138A036 (*) No substantial change in the RAI Memo | ||
(*) No substantial change in the RAI Memo ** via e-mail dated 05/23/2011 OFFICE LPL 1-1/PM LPL 1-1/LA(**) | ** via e-mail dated 05/23/2011 OFFICE LPL 1-1/PM LPL 1-1/LA(**) NRR/PFIB/BC(*) 1/BC LPL 1-1/PM NAME BVaidya SLittle CRegan BVaidya DATE 05/23/11 05/23/11 05/11/11 05/24/11 OFFICIAL RECORD COpy}} | ||
NRR/PFIB/BC(*) | |||
NAME BVaidya SLittle CRegan DATE 05/23/11 05/23/11 05/11/11 |
Latest revision as of 19:23, 12 November 2019
ML11138A036 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 05/24/2011 |
From: | Bhalchandra Vaidya Plant Licensing Branch 1 |
To: | Kammeier K Allegheny Electric Cooperative |
Vaidya B, NRR/DORL/LPL1-1, 415-3308 | |
References | |
TAC ME5542, TAC ME5543 | |
Download: ML11138A036 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 24, 2011 Mr. Kenneth W. Kammeier Allegheny Electric Cooperative, Inc.
212 Locust Sf.
P. O. Box 1266 Harrisburg, PA 17108-1266
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: 2011 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. ME5542 AND ME5543)
Dear Mr. Kammeier:
By letter dated April 11, 2011, Allegheny Electric Cooperative, Inc. (AEC) submitted "NRC Decommissioning Funding Status Report, December 31, 2010, for the Susquehanna Steam Electric Station, Units 1 and 2.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. AEC should provide a response within 30 days from the date of this letter.
Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION (RAI)
REGARDING NRC DECOMMISSIONING FUNDING STATUS REPORT DECEMBER 31.2011 ALLEGHENY ELECTRIC COOPERATIVE FOR SUSQUEHANNA STEAM ELECTRIC STATION. UNITS 1 AND 2 DOCKET NOS. 50-387 AND 388 This RAI is in response to the Allegheny Electric Cooperative's (AEC) 2011 Decommissioning Funding Status (DFS) Report. By letter dated April 11 ,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11109A046), PPL submitted to the Nuclear Regulatory Commission (NRC) the 2011 DFS Report for Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2), as required under Title 10 of the Code of Federal Regulations (10 CFR) 50.75(f)(1). AEC should provide a response within 30 days from the date of this letter.
RAI#1: Minimum DFA calculation:
Provide the minimum decommissioning funding assurance calculation by using current escalation factors for labor and energy from the U.S. Department of Labor, Bureau of Labor Statistics and, if necessary, a corrected submittal for that part of the DFS Report.
On March 29, 2011, AEC reported an amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c) less than the amount calculated by the NRC staff. Also, AEC used the factors for labor and energy taken from NUREG-1307, Rev. 14, "Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities."
According to 10 CFR 50.75(f)(1), the amount provided in the DFS report should be "the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c)."
As stated under 10 CFR 50.75(c)(2):
[e]scalation factors for labor and energy [... J are to be taken from regional data of U.S. Department of Labor Bureau of Labor Statistics ...
RAI#2: Citation for real rate of returns:
Provide the citation (e.g., an Order by the rate-regulatory authority) by the regulatory entity that allows for the assumptions used regarding rates of escalation in decommissioning costs, rate of earnings on decommissioning funds and rates of other factors assumed within the DFS Report.
Enclosure
-2 In the submission on March 29, 2011, AEC reported the following:
5 percent rate of escalation in decommissioning costs, 6.5 percent rates of earnings on decommissioning funds As stated in 10 CFR 50.75(f)(1),
... The information in [the DFS] report must include [...] the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections ...
RAI#3: After-tax decommissioning funds as of December 31, 2010:
Indicate if the amount of decommissioning funds identified within the DFS Report for SSES 1 and 2 are the after-tax amounts of decommissioning funds accumulated through December 31, 2010. If not, provide the after-tax amounts of decommissioning funds accumulated through December 31,2010.
In the submission on March 29, 2011, AEC reported the amounts of decommissioning funds accumulated as of December 31, 2010, for SSES 1 and 2, but did not indicate if the amounts stated were the before or after-tax balances.
The provisions of 10 CFR 50.75(f)(1) and (2) require the licensee to report the amount of funds accumulated to the end of the calendar year preceding the report.
May 24,2011 Mr. Kenneth W. Kammeier Allegheny Electric Cooperative, Inc.
212 Locust St.
P. O. Box 1266 Harrisburg, PA 17108-1266
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: 2011 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. ME5542 AND ME5543)
Dear Mr. Kammeier:
By letter dated April 11, 2011, Allegheny Electric Cooperative, Inc. (AEC) submitted "NRC Decommissioning Funding Status Report, December 31,2010, for the Susquehanna Steam Electric Station, Units 1 and 2.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. AEC should provide a response within 30 days from the date of this letter.
Sincerely, Ira!
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL1-1 RlF RidsNRRDorILPI1-1 RidsNRRPMSusquehanna RidsNrrLASLittie (hard copy) RidsOGCRp RidsNrrDprPfib RidsNrrDorl Dpr RidsNrrDirsltsb RidsAcrsAcnw&mMailCenter RidsRg1MailCenter M. Purdie, NRRlPFIB J. Simpson, NRRlPFIB ADAMS Accession No.: ML11138A036 (*) No substantial change in the RAI Memo
- via e-mail dated 05/23/2011 OFFICE LPL 1-1/PM LPL 1-1/LA(**) NRR/PFIB/BC(*) 1/BC LPL 1-1/PM NAME BVaidya SLittle CRegan BVaidya DATE 05/23/11 05/23/11 05/11/11 05/24/11 OFFICIAL RECORD COpy