MONTHYEARML24150A3362024-05-29029 May 2024 Request for Confirmation of Information Relief Request 1RR06 (Proposed Alternative) Susquehanna Nuclear, LLC Susquehanna Steam Electric Station (Susquehanna), Unit 1 Docket No. 50-387 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 ML24102A1252024-04-10010 April 2024 Request for Additional Information for Susquehanna, Unit 1 Alternative Request 4RR-11 ML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information ML23013A2082023-01-13013 January 2023 Request for Additional Information IR 05000387/20224042022-05-26026 May 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000387/2022404 and 05000388/2022404 ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request IR 05000387/20220132022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 ML21316A1242021-11-18018 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Emergency Core Cooling Technical Specifications ML20056E4392020-02-21021 February 2020 Ti 2515/194 Inspection Documentation Request ML20010D2012020-01-0909 January 2020 Request for Additional Information Related to Request to Allow Application of Framatome Analysis Methodologies Necessary to Support a Planned Transition to Atrium 11 Fuel Under Maximum ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19128A0232019-05-0707 May 2019 Request for Additional Information: Susquehanna Steam Electric Station, Units 1 and 2 License Amendment Request for ESW Piping Replacement ML18352B1832018-12-13013 December 2018 Enclosurequest for Additional Information (Letter to K. Cimorelli Request for Additional Information Regarding Susquehanna Nuclear, Llc'S Decommissioning Funding Plan Update for Susquehanna Steam Electric Station Independent Spent Fuel Stor ML17180A2002017-07-0707 July 2017 Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits ML17059D2142017-03-0606 March 2017 Susquehanna Steam Electric Station - Supplemental Information Needed for Acceptance of Requested Licensing Action Re: License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage Frequency Limits ML16251A0652016-09-0909 September 2016 Susquehanna Steam Electric Station, Unit 2 - RAI Regarding Temporary Change of Unit 2, Technical Specifications 3.7.1 & 3.8.7 to Allow Replacement of Unit 1, 480 Volt Engineered Safeguard System Load Center Transformers(CAC No. MF7298) ML16245A2052016-09-0101 September 2016 Draft Request for Additional Information Replacement of Load Center Transformers ML16243A0952016-08-30030 August 2016 Draft Request for Additional Information Application for Approval of Indirect Transfer of Control of Licenses ML16060A2302016-03-24024 March 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.71 and 3.87 to Allow Replacement of Unit 1 480V Ess Load Center Transformers ML15316A5632015-11-13013 November 2015 Request for Additional Information Regarding Proposed Relief Requests for the Third 10-Year Inservice Inspection Interval(Cac Nos. MF6302 Through MF6307) ML15292A1782015-10-15015 October 2015 TSTF-425 LAR Draft 3rd RAIs ML15230A0802015-08-26026 August 2015 Request for Additional Information Regarding License Amendment Request to Adopt NEI 99-01, Revision 6, EAL Scheme Change ML15209A9742015-08-24024 August 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 ML15230A0462015-08-17017 August 2015 Draft RAIs SSES EAL Scheme Change LAR in Accordance with NEI 99-01 Rev 6 ML15229A2092015-08-17017 August 2015 SSES Draft Request for Additional Information Licensee Request to Adopt TSTF-425 ML15229A2002015-08-17017 August 2015 E-mail from J. Whited to J. Jennings SSES Draft TSTF-425 RAIs ML15183A3502015-07-0202 July 2015 SSES Relief Requests 3RR-19, 3RR-20, and 3RR-21 Draft Identified Information Insufficiencies (TAC Nos. MF6302 Through MF6307) ML15103A3962015-05-22022 May 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 (TAC Nos. MF5151 and MF5152) ML15128A5092015-05-0808 May 2015 E-mail from J. Whited to D. Filchner SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15128A5162015-05-0808 May 2015 SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15008A4702015-01-30030 January 2015 Request for Additional Information Request to Revise Technical Specification 3.4.10, RCS Pressure and Temperature (P/T) Limits. ML15016A2742015-01-16016 January 2015 Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML15016A2722015-01-16016 January 2015 E-mail from J. Whited to D. Filchner Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML14343A9842015-01-0808 January 2015 Request for Additional Information Relief Request 4RR-01 ML14345A2412014-12-16016 December 2014 Request for Additional Information Request for Order Approving Indirect Transfer of Control and Conforming License Amendments ML14346A4022014-12-12012 December 2014 Draft RAIs Relief Request 4RR-01 ML14346A4012014-12-12012 December 2014 E-mail from J. Whited to D. Filchner Susquehanna Steam Electric Station Draft RAIs Relief Request 4RR-01 ML14346A1022014-12-12012 December 2014 Draft License Transfer Revised 2nd RAIs ML14346A1002014-12-12012 December 2014 E-mail from J. Whited to R. Sgarro Susquehanna Steam Electric Station Draft License Transfer Revised 2nd RAIs ML14342A8132014-12-0808 December 2014 SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14342A8082014-12-0808 December 2014 E-mail from J. Whited to R. Sgarro (PPL) SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14233A2772014-08-27027 August 2014 Request for Additional Information License Amendment Request to Change the Low Pressure Safety Limit ML14233A3392014-08-21021 August 2014 Draft RAIs for Susquehanna Steam Electric Station Units 1 and 2 License Amendment Request for Changes to the Low Pressure Safety Limits ML13298A7582014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage (TAC ME9607 and ME960) ML13298A7812014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator Minimum Steady State Frequency (TACs ME9609. ML14013A1502014-01-31031 January 2014 Request for Additional Information Regarding Relief Requests for the Fourth 10-Year Inservice Testing Interval 2024-05-07
[Table view] |
Text
REQUEST FOR CONFIRMATION OF INFORMATION (RCI)
RELIEF REQUEST 1RR06 (PROPOSED ALTERNATIVE)
SUSQUEHANNA NUCLEAR, LLC SUSQUEHANNA STEAM ELECTRIC STATION (SUSQUEHANNA), UNIT 1 DOCKET NO. 50-387 EPID L-2024-LLR-0033
By application dated May 23, 2024 (Agencywide Documents Access and Management System Accession No. ML24144A273), Susquehanna Nuclear, LLC (the licensee) submitted Relief Request 1RR06 in accordance with Paragraph 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR) for a proposed alternative to certain requirements of the American Society of Mechanical Engineers (ASME) Code incorporated by reference in 10 CFR 50.55a Codes and Standards, for Susquehanna Steam Electric Station (Susquehanna), Unit 1. The proposed alternative would allow the licensee to extend the Unit 1 fourth 10-year Inservice Testing (IST) Program interval by 12 months.
The U.S Nuclear Regulatory Commission (NRC) staff has reviewed the application and determined that confirmation of the information below is needed to complete its review. The NRC is requesting a response to this request on or by May 29, 2024.
RCI-01
The last paragraph of section5, Proposed Alternative and Basis for Use, of Relief Request1RR06 (Agencywide Documents Access and Management System Accession No.ML24144A273) states:
The ASME OM Code [American Society of Mechanical Engineers Codefor Operation and Maintenance of Nuclear Power Plants], Subsection ISTD, is applicable to the Susquehanna Snubber Program. However, the Susquehanna Snubber Program is maintained as an independent program and interval, and therefore, is not impacted by the requested one-year extension to the end of the fourth 10-year interval of the IST [inservice testing] Program.
Susquehanna Nuclear, LLC (the licensee) previously submitted a request 5RR-02 related to snubber attachments dated June 1, 2023 (ML23152A244), which states:
The Fifth 10- Year ISI [inservice inspection] Interval and Fifth 10- Year Snubber Program Interval at SSES [Susquehanna Steam Electric Station] will begin on June 1, 2024, and are currently scheduled to end May 31, 2034. Accordingly, Susquehanna [the licensee] requests authorization of this request by March 31, 2024, to support the Fifth 10- Year ISI Interval. The Fifth 10- Year ISI Interval of the ISI Program at SSES will comply with the 2019 Edition of the ASME BPV Code. The relief request is for relief of the ISI requirements of 2019 Edition of ASME Section XI on examination boundaries and sample size of snubbers.
NUREG-1482, Revision 3, Guidelines for Inservice Testing at Nuclear Power Plants (ML20202A473), Appendix A, Guidelines for Inservice Examination and Testing Program for 2
Dynamic Restraints (Snubbers) at Nuclear Power Plants, sectionA.2.6, Snubber Program Plan and its Update Documents, states:
As required by 10 CFR 50.55a(g), the Snubber Program Plan and its update should be developed and aligned with the plants 10- year ISI program interval.
Currently, the industry is transitioning and updating their snubber programs from the ASME BPV Code,Section XI, to the OM Code. Therefore, the Snubber Program Plan may be aligned with 10-year IST program interval. Licensees should provide details about this in the snubber program and the applicable plants 10- year IST program interval or 10-year ISI program interval document with the start and end dates.
The NRC staff requests the licensee to confirm the following:
- a. The Susquehanna, Units 1 and 2 Fifth 10-Year Snubber Program is aligned with the Susquehanna, Unit 1 and 2 Fifth 10-Year ISI interval and, therefore, the Snubber Program woul d not be affected by authorizing the alternative in Relief Request 1RR06.
- b. The Susquehanna, Units 1 and 2 Fifth 10-Year Snubber Program is based on ASME OM Code, Edition 2020.
RCI-02
Relief Request 1RR06, Table 3-Additional Fourth 10- year IST Program Interval Relief Requests only lists the Susquehanna, Unit 2 Request RR02; however, the Unit 2 Fourth 10- Year Interval IST Program submitted on October 7, 2014 (ML14294A624, Enclosure 2, Attachment E), lists requests 2RR01, 2RR02, 2RR03, and 2RR04.
The NRC staff requests the licensee to confirm whether it considered the impacts of extending the Unit 2 Fourth 10- Year IST Program interval on requests 2RR01, 2RR02, 2RR03, and 2RR04.