| number = ML11153A134
| number = ML11153A134
| issue date = 06/09/2011
| issue date = 06/09/2011
| title = North Anna Power Station, Unit No. 1 - Request for Additional Information Regarding Use of Weld Overlays as an Alternative Repair Technique for Steam Generator Hot Leg Nozzles (TAC ME5965)
| title = Request for Additional Information Regarding Use of Weld Overlays as an Alternative Repair Technique for Steam Generator Hot Leg Nozzles
| author name = Wiebe J S
| author name = Wiebe J
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000338
| docket = 05000338
| license number = NPF-004
| license number = NPF-004
| contact person = Wiebe J S, DORL/LPL2-1, 415-6606
| contact person = Wiebe J, DORL/LPL2-1, 415-6606
| case reference number = TAC ME5965
| case reference number = TAC ME5965
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
| page count = 4
| page count = 4
| project = TAC:ME5965
| stage = RAI
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center SOOO Dominion Boulevard Glen Allen, VA 23060-6711
==SUBJECT:==
NORTH ANNA POWER STATION, UNIT NO.1 - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING USE OF WELD OVERLAYS AS AN ALTERNATIVE REPAIR TECHNIQUE FOR STEAM GENERATOR HOT LEG NOZZLES (TAC NO. MES96S)
==Dear Mr. Heacock:==
By letter to the Nuclear Regulatory Commission (NRC) dated March 30, 2011, Virginia Electric and Power Company submitted a request for NRC approval of the use of a full structural weld overlay as an alternative repair technique for steam generator hot leg nozzles, for the North Anna Power Station, Unit No.1.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on June 1, 2011, it was agreed that you would provide a response by July 1, 2011.
The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 41S-6606.
Sincerely, ttJ~
oel S. Wiebe, Senior Project Manager lant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. SO-338
==Enclosure:==
RAI cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION NORTH ANNA POWER STATION, UNIT NO.1 DOCKET NO. 50-338 8y letter dated March 30, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110900566), Virginia Electric and Power Company, (the licensee),
submitted relief request (RR) N1-14-CMP-001 for the U.S. Nuclear Regulatory Commission's (NRC's) review and approval. The licensee proposed alternatives to the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code),
Section XI, requirements associated with dissimilar metal (OM) welds repairs.
RR N1-14-CMP-001 pertains to the use of full structural weld overlays (FSWOL) as an alternative repair technique for steam generator (SG) hot leg nozzle dissimilar metal (OM) welds at North Anna Power Station, Unit No.1 (North Anna, Unit 1).
RR N1-14-CMP-001 was submitted as a contingency in case unacceptable flaw indications are found during the examinations of North Anna, Unit 1, SG hot leg nozzle OM welds during the fourth 10-year inservice inspection (lSI) interval. The fourth 10-year lSI interval commenced on May 1, 2009, and will end on April 30, 2019.
The NRC staff has reviewed the information provided by the licensee in RR N1-14-CMP-001 and finds additional information is needed to complete its review.
: 1. On page 1 of Enclosure 1, Section 1 stated that the ASME Code components affected an Examination Category 8-F and Item No. 89.11. The NRC staff recognizes that the item no. should be 85.70. Please clarify and/or revise the examination category and/or item no.
: 2. On page 1 of Enclosure 1, Section 3 does not contain the ASME Code, Section XI, Appendix VIII, Supplements 2 and 10, as the applicable ASME Code requirement, even though on page 15 of Enclosure 1, Attachment 1, Section A 1.3(a)(3) specifies both supplements.
: a. Clarify why these supplements are not required and/or not included in the submittal as the applicable ASME Code requirement.
: b. Specify which edition and addenda of the ASME Code, Section XI, will be used for Appendix VIII, Supplements 2 and 10.
: 3. On page 2 of Enclosure 1, Section 3 does not contain the appropriate edition and addenda of the ASME Code, Section XI, for Appendix VIII, Supplement 11. Specify the appropriate edition and addenda of the ASME Code, Section XI, for Appendix VIII, Supplement 11.
Enclosure
                                                - 2
: 4. On page 9, Enclosure 1, Section 5, Subsection titled "Area Limitation," the licensee proposes to extend the temper bead surface area to up to greater than 700 in 2 but less than 1000 in 2 over the low alloy steel. The licensee stated that EPRI [Electric Power Research Institute] has issued Report 1021073 on June 21, 2010, entitled "Justification for Extension of the Temper Bead Limit to 1000 Square Inches for WOL [Weld Overlay]
of P1 and P3 Materials." The licensee stated that this report showed that the WOL area could be expanded to an area of 1000 square inches without creating deleterious residual stress levels and still maintain the structural integrity of the component. The staff previously approved up to 700 in 2 surface area over the low alloy steel only but not greater than 700 in2 (Le., safety evaluation letter dated January 21, 2010, "Davis Besse Nuclear Power Station, Unit 1, relief request RR A33 for the Application o'f Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping (TAC No.
ME0478)," ADAMS Accession No. ML100080573). Provide the results of the stress analysis performed on the FSWOL for surface area up to 1000 in2 over the low alloy steel at North Anna, Unit 1.
: 5. On page 14 of Enclosure 1, Attachment 1, Section A 1.2.2, Subsection (d)(3) specifies the delta ferrite content of 5 - 15 Ferrite Number (FN) for the stainless steel filler metal that will be used. ASME Code Case N-504-4, Section (e), states that, "The weld reinforcement shall consist of a minimum of two weld layers having as-deposited delta ferrite content of at least 7.5 FN. The first layer of weld metal with delta ferrite content of least 7.5 FN shall constitute the first layer of the weld reinforcement design thickness.
Alternatively, the first layers of at least 5 FN may be acceptable based on evaluation."
Discuss whether the requirements of ASME Code Case N-504-4, Section (e), will be satisfied.
: 6. On page 16 of Enclosure 1! Attachment 1! Section A 1.3, Subsection (b)( 1) specifies the axial length of the weld overlay to be 0.75 "Rt. Clarify if this distance is required to be applied to both sides of the weld overlay (Le., the nozzle side and the safe end side).
: 7. On page 18 of Enclosure 1, Attachment 1, Footnote 1 of Figure A1-1 states that "Dimension b is equivalent to the nominal thickness of the nozzle or pipe being overlaid, as appropriate." Dimension b is the UT distance away from the toe of the original weld.
The above requirement is inadequate and inconsistent with Footnote 2 of Figure A1-2 which requires that the examination extent shall be at least % inch beyond the as found flaw. The staff suggests the following wording:
iI ** .Dimension b is equivalent to the nominal thickness of the nozzle or pipe being overlaid, as appropriate; however it shall not be less than Y2 inch from the toe of the original weld ... "
Revise Footnote 1 of Figure A1-1 or justify why the proposed Footnote 1 of Figure A1-1 is adequate.
: 8. On Page 9 of Enclosure 1, "Analyses and Verifications," Item No.1 states that inside diameter (ID) weld repairs shall be assumed in the stress analyses to effectively bound any actual weld repairs that may have occurred in the nozzles. Discuss the repaired flaw size that was assumed in the stress analyses.
ML11153A134 OFFICE      DORULPL2-1/PM    DORULPL2-1/LA        DORULPL2-1/BC          DORULPL2-1/PM JWiebe            MO'Brien              GKulsea                JWiebe NAME w/minor changes      (PBoyle for) 06/07/11          06/06111              06/08/11              06/09/11 DTE}}

Latest revision as of 20:00, 12 November 2019

Request for Additional Information Regarding Use of Weld Overlays as an Alternative Repair Technique for Steam Generator Hot Leg Nozzles
ML11153A134
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/09/2011
From: Joel Wiebe
Plant Licensing Branch II
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Wiebe J, DORL/LPL2-1, 415-6606
References
TAC ME5965
Download: ML11153A134 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 9, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center SOOO Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

NORTH ANNA POWER STATION, UNIT NO.1 - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING USE OF WELD OVERLAYS AS AN ALTERNATIVE REPAIR TECHNIQUE FOR STEAM GENERATOR HOT LEG NOZZLES (TAC NO. MES96S)

Dear Mr. Heacock:

By letter to the Nuclear Regulatory Commission (NRC) dated March 30, 2011, Virginia Electric and Power Company submitted a request for NRC approval of the use of a full structural weld overlay as an alternative repair technique for steam generator hot leg nozzles, for the North Anna Power Station, Unit No.1.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on June 1, 2011, it was agreed that you would provide a response by July 1, 2011.

The NRC staff considers that timely responses to RAls help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 41S-6606.

Sincerely, ttJ~

oel S. Wiebe, Senior Project Manager lant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. SO-338

Enclosure:

RAI cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION NORTH ANNA POWER STATION, UNIT NO.1 DOCKET NO. 50-338 8y letter dated March 30, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110900566), Virginia Electric and Power Company, (the licensee),

submitted relief request (RR) N1-14-CMP-001 for the U.S. Nuclear Regulatory Commission's (NRC's) review and approval. The licensee proposed alternatives to the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code),

Section XI, requirements associated with dissimilar metal (OM) welds repairs.

RR N1-14-CMP-001 pertains to the use of full structural weld overlays (FSWOL) as an alternative repair technique for steam generator (SG) hot leg nozzle dissimilar metal (OM) welds at North Anna Power Station, Unit No.1 (North Anna, Unit 1).

RR N1-14-CMP-001 was submitted as a contingency in case unacceptable flaw indications are found during the examinations of North Anna, Unit 1, SG hot leg nozzle OM welds during the fourth 10-year inservice inspection (lSI) interval. The fourth 10-year lSI interval commenced on May 1, 2009, and will end on April 30, 2019.

The NRC staff has reviewed the information provided by the licensee in RR N1-14-CMP-001 and finds additional information is needed to complete its review.

1. On page 1 of Enclosure 1, Section 1 stated that the ASME Code components affected an Examination Category 8-F and Item No. 89.11. The NRC staff recognizes that the item no. should be 85.70. Please clarify and/or revise the examination category and/or item no.
2. On page 1 of Enclosure 1, Section 3 does not contain the ASME Code,Section XI, Appendix VIII, Supplements 2 and 10, as the applicable ASME Code requirement, even though on page 15 of Enclosure 1, Attachment 1, Section A 1.3(a)(3) specifies both supplements.
a. Clarify why these supplements are not required and/or not included in the submittal as the applicable ASME Code requirement.
b. Specify which edition and addenda of the ASME Code,Section XI, will be used for Appendix VIII, Supplements 2 and 10.
3. On page 2 of Enclosure 1, Section 3 does not contain the appropriate edition and addenda of the ASME Code,Section XI, for Appendix VIII, Supplement 11. Specify the appropriate edition and addenda of the ASME Code,Section XI, for Appendix VIII, Supplement 11.

Enclosure

- 2

4. On page 9, Enclosure 1, Section 5, Subsection titled "Area Limitation," the licensee proposes to extend the temper bead surface area to up to greater than 700 in 2 but less than 1000 in 2 over the low alloy steel. The licensee stated that EPRI [Electric Power Research Institute] has issued Report 1021073 on June 21, 2010, entitled "Justification for Extension of the Temper Bead Limit to 1000 Square Inches for WOL [Weld Overlay]

of P1 and P3 Materials." The licensee stated that this report showed that the WOL area could be expanded to an area of 1000 square inches without creating deleterious residual stress levels and still maintain the structural integrity of the component. The staff previously approved up to 700 in 2 surface area over the low alloy steel only but not greater than 700 in2 (Le., safety evaluation letter dated January 21, 2010, "Davis Besse Nuclear Power Station, Unit 1, relief request RR A33 for the Application o'f Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping (TAC No.

ME0478)," ADAMS Accession No. ML100080573). Provide the results of the stress analysis performed on the FSWOL for surface area up to 1000 in2 over the low alloy steel at North Anna, Unit 1.

5. On page 14 of Enclosure 1, Attachment 1, Section A 1.2.2, Subsection (d)(3) specifies the delta ferrite content of 5 - 15 Ferrite Number (FN) for the stainless steel filler metal that will be used. ASME Code Case N-504-4, Section (e), states that, "The weld reinforcement shall consist of a minimum of two weld layers having as-deposited delta ferrite content of at least 7.5 FN. The first layer of weld metal with delta ferrite content of least 7.5 FN shall constitute the first layer of the weld reinforcement design thickness.

Alternatively, the first layers of at least 5 FN may be acceptable based on evaluation."

Discuss whether the requirements of ASME Code Case N-504-4, Section (e), will be satisfied.

6. On page 16 of Enclosure 1! Attachment 1! Section A 1.3, Subsection (b)( 1) specifies the axial length of the weld overlay to be 0.75 "Rt. Clarify if this distance is required to be applied to both sides of the weld overlay (Le., the nozzle side and the safe end side).
7. On page 18 of Enclosure 1, Attachment 1, Footnote 1 of Figure A1-1 states that "Dimension b is equivalent to the nominal thickness of the nozzle or pipe being overlaid, as appropriate." Dimension b is the UT distance away from the toe of the original weld.

The above requirement is inadequate and inconsistent with Footnote 2 of Figure A1-2 which requires that the examination extent shall be at least % inch beyond the as found flaw. The staff suggests the following wording:

iI ** .Dimension b is equivalent to the nominal thickness of the nozzle or pipe being overlaid, as appropriate; however it shall not be less than Y2 inch from the toe of the original weld ... "

Revise Footnote 1 of Figure A1-1 or justify why the proposed Footnote 1 of Figure A1-1 is adequate.

8. On Page 9 of Enclosure 1, "Analyses and Verifications," Item No.1 states that inside diameter (ID) weld repairs shall be assumed in the stress analyses to effectively bound any actual weld repairs that may have occurred in the nozzles. Discuss the repaired flaw size that was assumed in the stress analyses.